02.01.2015 Views

Air Traffic Management Concept Baseline Definition - The Boeing ...

Air Traffic Management Concept Baseline Definition - The Boeing ...

Air Traffic Management Concept Baseline Definition - The Boeing ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 6.4 shows a template for illustrating phased improvements in the NAS driven by<br />

the top-level stakeholder goals. <strong>The</strong> upper right corner identifies the Regional Plan<br />

represented. Separate transition logic diagrams are created for capacity and efficiency,<br />

and for each operational phase of the constraints analysis. A benefit mechanism is<br />

identified for each diagram, with incremental phasing of operational enhancements.<br />

Approach Configuration<br />

- Approach Path Length<br />

-<br />

Other Runway Dependencies<br />

- Runway Occupancy Factors<br />

<strong>Air</strong>plane Performance<br />

- Approach Speed<br />

- Weight Class<br />

- Braking Performance<br />

- Gate Assignment<br />

CONDITION:<br />

LOCATION:<br />

Wake Vortex<br />

- Visibility<br />

Final<br />

Approach<br />

Nav/Guidance Performance<br />

- Accuracy<br />

- Availability<br />

- Integrity<br />

- Gross Navig. Error Rate<br />

Control Performance<br />

- Finall Approach<br />

Sequence<br />

- Spacing Precision<br />

- Go-around decision<br />

- Blunder Detection &<br />

Alarm<br />

Monitoring Performance<br />

- Availability<br />

- Integrity<br />

- Accuracy; Latency<br />

Comm Performance<br />

- Availability/Coverage<br />

- Integrity<br />

- Message Delivery<br />

Performance<br />

Figure 6.3 Final Approach Throughput Performance Factors<br />

CNS/ATM Transition Logic Diagram<br />

REGIONAL PLAN<br />

Operational Phase Benefit Mechanism Capacity (Efficiency)<br />

Regional Initiative<br />

ENABLER<br />

Operational<br />

Enhancement<br />

Phase 1<br />

ENABLER<br />

Regional Initiative<br />

Regional Initiative<br />

ENABLER<br />

Operational<br />

Enhancement<br />

Phase 2<br />

ENABLER<br />

Initiative (Not in Regional Plan)<br />

Regional Initiative<br />

ENABLER<br />

Operational<br />

Enhancement<br />

Phase 3<br />

ENABLER<br />

Initiative (Not in Regional Plan)<br />

Figure 6.4 CNS/ATM Transition Logic Diagram Template<br />

105

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!