Air Traffic Management Concept Baseline Definition - The Boeing ...
Air Traffic Management Concept Baseline Definition - The Boeing ...
Air Traffic Management Concept Baseline Definition - The Boeing ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Figure 6.4 shows a template for illustrating phased improvements in the NAS driven by<br />
the top-level stakeholder goals. <strong>The</strong> upper right corner identifies the Regional Plan<br />
represented. Separate transition logic diagrams are created for capacity and efficiency,<br />
and for each operational phase of the constraints analysis. A benefit mechanism is<br />
identified for each diagram, with incremental phasing of operational enhancements.<br />
Approach Configuration<br />
- Approach Path Length<br />
-<br />
Other Runway Dependencies<br />
- Runway Occupancy Factors<br />
<strong>Air</strong>plane Performance<br />
- Approach Speed<br />
- Weight Class<br />
- Braking Performance<br />
- Gate Assignment<br />
CONDITION:<br />
LOCATION:<br />
Wake Vortex<br />
- Visibility<br />
Final<br />
Approach<br />
Nav/Guidance Performance<br />
- Accuracy<br />
- Availability<br />
- Integrity<br />
- Gross Navig. Error Rate<br />
Control Performance<br />
- Finall Approach<br />
Sequence<br />
- Spacing Precision<br />
- Go-around decision<br />
- Blunder Detection &<br />
Alarm<br />
Monitoring Performance<br />
- Availability<br />
- Integrity<br />
- Accuracy; Latency<br />
Comm Performance<br />
- Availability/Coverage<br />
- Integrity<br />
- Message Delivery<br />
Performance<br />
Figure 6.3 Final Approach Throughput Performance Factors<br />
CNS/ATM Transition Logic Diagram<br />
REGIONAL PLAN<br />
Operational Phase Benefit Mechanism Capacity (Efficiency)<br />
Regional Initiative<br />
ENABLER<br />
Operational<br />
Enhancement<br />
Phase 1<br />
ENABLER<br />
Regional Initiative<br />
Regional Initiative<br />
ENABLER<br />
Operational<br />
Enhancement<br />
Phase 2<br />
ENABLER<br />
Initiative (Not in Regional Plan)<br />
Regional Initiative<br />
ENABLER<br />
Operational<br />
Enhancement<br />
Phase 3<br />
ENABLER<br />
Initiative (Not in Regional Plan)<br />
Figure 6.4 CNS/ATM Transition Logic Diagram Template<br />
105