ESA/REG/001, rev.2 Page 74 ARTICLE 56 - INTERIM MEASURES 1. The timely submission of a claim under Article 51 of these Regulations may result in the suspension of the procurement process by the Director General as foreseen under Article 31 of these Regulations, provided that the claim is not frivolous and contains a declaration the contents of which, if proven, demonstrate that the claimant will suffer irreparable injury in the absence of a suspension, it is probable that the complaint will succeed and the granting of the suspension would not cause disproportionate harm to the Agency. 2. Interim measures may be proposed to the Director General by the Head of the Procurement Department, the Agency’s Industrial Ombudsman or the Agency’s Procurement Review Board.
ESA/REG/001, rev.2 Page 75 ARTICLE 57 - COMPENSATION Where as a result of the review procedure foreseen under Part VI of these Regulations a final and binding decision grants compensation to a claimant for the loss or injury suffered due to a procedural breach of these Regulations by the Agency, such compensation shall in all cases be limited to the cost for tender preparation and the costs incurred for protest within the limit of 100 000 Euro. In no event shall the Agency be held liable for payments in excess of 100 000 Euro for compensation granted under these Regulations.
- Page 23 and 24: ESA/REG/001, rev.2 Page 23 ARTICLE
- Page 25 and 26: ESA/REG/001, rev.2 Page 25 PART II:
- Page 27 and 28: ESA/REG/001, rev.2 Page 27 ARTICLE
- Page 29 and 30: ESA/REG/001, rev.2 Page 29 If provi
- Page 31 and 32: ESA/REG/001, rev.2 Page 31 PART III
- Page 33 and 34: ESA/REG/001, rev.2 Page 33 ARTICLE
- Page 35 and 36: ESA/REG/001, rev.2 Page 35 ARTICLE
- Page 37 and 38: ESA/REG/001, rev.2 Page 37 ARTICLE
- Page 39 and 40: ESA/REG/001, rev.2 Page 39 PART IV
- Page 41 and 42: ESA/REG/001, rev.2 Page 41 ARTICLE
- Page 43 and 44: ESA/REG/001, rev.2 Page 43 2. For r
- Page 45 and 46: ESA/REG/001, rev.2 Page 45 ARTICLE
- Page 47 and 48: ESA/REG/001, rev.2 Page 47 ARTICLE
- Page 49 and 50: ESA/REG/001, rev.2 Page 49 ARTICLE
- Page 51 and 52: ESA/REG/001, rev.2 Page 51 10. When
- Page 53 and 54: ESA/REG/001, rev.2 Page 53 ARTICLE
- Page 55 and 56: ESA/REG/001, rev.2 Page 55 ARTICLE
- Page 57 and 58: ESA/REG/001, rev.2 Page 57 ARTICLE
- Page 59 and 60: ESA/REG/001, rev.2 Page 59 ARTICLE
- Page 61 and 62: ESA/REG/001, rev.2 Page 61 b) where
- Page 63 and 64: ESA/REG/001, rev.2 Page 63 ARTICLE
- Page 65 and 66: ESA/REG/001, rev.2 Page 65 PART VI:
- Page 67 and 68: ESA/REG/001, rev.2 Page 67 ARTICLE
- Page 69 and 70: ESA/REG/001, rev.2 Page 69 ARTICLE
- Page 71 and 72: ESA/REG/001, rev.2 Page 71 ARTICLE
- Page 73: ESA/REG/001, rev.2 Page 73 ARTICLE
- Page 77 and 78: ESA/REG/001, rev.2 Page 77 PART VII
- Page 79 and 80: ESA/REG/001, rev.2 ANNEXES ANNEXES
- Page 81 and 82: ESA/REG/001, rev.2 Annex I,rev.1 AN
- Page 83 and 84: ESA/REG/001, rev.2 Annex I,rev.1 Pa
- Page 85 and 86: ESA/REG/001, rev.2 Annex I,rev.1 Pa
- Page 87 and 88: ESA/REG/001, rev.2 Annex I,rev.1 Pa
- Page 89 and 90: ESA/REG/001, rev.2 Annex I,rev.1 Pa
- Page 91 and 92: ESA/REG/001, rev.2 Annex I,rev.1 Pa
- Page 93 and 94: ESA/REG/001, rev.2 Annex II, rev.1
- Page 95 and 96: ESA/REG/001, rev.2 Annex II,rev.1 P
- Page 97 and 98: ESA/REG/001, rev.2 Annex II,rev.1 P
- Page 99 and 100: ESA/REG/001, rev.2 Annex II,rev.1 P
- Page 101 and 102: ESA/REG/001, rev.2 Annex II,rev.1 P
- Page 103 and 104: ESA/REG/001, rev.2 Annex III, rev.1
- Page 105 and 106: ESA/REG/001, rev. 2 Annex III,rev.1
- Page 107 and 108: ESA/REG/001, rev. 2 Annex III,rev.1
- Page 109 and 110: ESA/REG/001, rev. 2 Annex III,rev.1
- Page 111 and 112: ESA/REG/001, rev. 2 Annex III,rev.1
- Page 113 and 114: ESA/REG/001, rev. 2 Annex III,rev.1
- Page 115 and 116: ESA/REG/001, rev. 2 Annex III,rev.1
- Page 117 and 118: ESA/REG/001, rev. 2 Annex III,rev.1
- Page 119 and 120: ESA/REG/001, rev. 2 Annex III,rev.1
- Page 121 and 122: ESA/REG/001, rev. 2 Annex III,rev.1
- Page 123 and 124: ESA/REG/001, rev. 2 Annex III,rev.1
<strong>ESA</strong>/REG/001, rev.2<br />
Page 74<br />
<strong>ARTICLE</strong> 56 -<br />
INTERIM MEASURES<br />
1. The timely submission of a claim under Article 51 of these Regulations may result in<br />
the suspension of the procurement process by the Director General as foreseen under<br />
Article 31 of these Regulations, provided that the claim is not frivolous and contains a<br />
declaration the contents of which, if proven, demonstrate that the claimant will suffer<br />
irreparable injury in the absence of a suspension, it is probable that the complaint will<br />
succeed and the granting of the suspension would not cause disproportionate harm to<br />
the Agency.<br />
2. Interim measures may be proposed to the Director General by the Head of the<br />
Procurement Department, the Agency’s Industrial Ombudsman or the Agency’s<br />
Procurement Review Board.