01.01.2015 Views

ARTICLE 1: - emits - ESA

ARTICLE 1: - emits - ESA

ARTICLE 1: - emits - ESA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>ESA</strong>/REG/001, rev. 2<br />

Annex III,rev.1<br />

Page 43<br />

Chapter 7: TEB responsibilities subsequent to the receipt of tenders<br />

The TEB, with the assistance of tender evaluation panels where appointed, shall assess<br />

tenders, mark them, apply weighting factors when applicable, prepare a final report on<br />

the results and make a recommendation as to any contract action to be taken as a<br />

outcome of the evaluation, in accordance with the following procedures.<br />

7.1 Preliminary assessment<br />

7.1.1 Prior to a qualitative assessment of the tenders admitted for evaluation by the<br />

TOB, the TEB shall undertake a second verification that each tender contains:<br />

i. a technical and managerial proposal;<br />

ii.<br />

iii.<br />

iv.<br />

a financial proposal including a binding price and price type;<br />

a statement of contractual compliance;<br />

a list of deliverables and associated delivery date(s);<br />

v. a confirmation of compliance with Article 18.1 and 18.5 of the Procurement<br />

Regulations; and,<br />

vi.<br />

a signature validating the tender.<br />

7.1.2 If any of the above elements, or if any other element specifically required in the<br />

conditions of tender (including key acceptance factors established in the ITT ) is<br />

missing and that omission is such as to render the tender substantively incomplete, then<br />

the TEB shall eliminate such tender from further evaluation.<br />

7.2 Evaluation<br />

7.2.1 The TEB shall evaluate against the set of criteria defined in the ITT:<br />

i. the completeness and the quality of the tender against the requirements of the<br />

ITT .<br />

ii.<br />

whether the ITT requirements (including work statement and management<br />

requirements) are complied with.<br />

7.2.2 The TEB shall identify the strengths and weaknesses of each tender in respect to<br />

the criteria 20 .<br />

7.2.3 If a statement contained in a tender needs clarification, the procedure to be<br />

followed in such a case is the one described in Chapter 8 below.<br />

20 This shall be done by comparing the tender with the ITT requirements, and not by comparing tenders<br />

among themselves.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!