GEOTOUR & IRSE 2012.pdf - Fakulta BERG - TUKE
GEOTOUR & IRSE 2012.pdf - Fakulta BERG - TUKE
GEOTOUR & IRSE 2012.pdf - Fakulta BERG - TUKE
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>GEOTOUR</strong> & <strong>IRSE</strong> 2012<br />
Fig. 3 The gate and the building of the Educational Centre<br />
THE BASIS OF THE PARK: THE EDUCATIONAL CENTRE<br />
The municipality of Telkibánya provided a building attached to its youth hostel for Educational<br />
Centre (Figs. 3. and 4), in which teaching rooms were furnished and equipments are stored. A<br />
collection of rocks and minerals of the Tokaj Mts. was established, partly in showcases for<br />
demonstration, partly in drawers as hand specimens for practicing rock description. The cores of 2<br />
exploration drillholes from the last prospecting project were also donated to the educational park.<br />
There are tools for geological observations (hammers, GPS receivers etc.) and equipment for<br />
underground work (lamps, helmets, protective clothing, boots).<br />
Educational programs and materials were worked out in English language, summarized in the form<br />
of booklets. These programs are offered not only the university students but also people at different<br />
levels from secondary school to specialized postgraduate studies; demo courses were organized for<br />
each level (Fig. 5). Since then, courses are organized by the Institute of Mineralogy and Geology of<br />
the University of Miskolc for our own students as well as for any partner institutes or societies<br />
claiming it. These partners can use the facilities also for their own courses. Beyond this,<br />
conferences, professional and society meetings take place here.<br />
THE UNDERGROUND DEMONSTRATION SITE: THE MÁRIA ADIT<br />
The Mária Adit (Fig. 6) is one of the best remained and relatively safe tunnels of the area. Its<br />
ventilation is secured through the Jupiter Ventilation Shaft. It transects hard rock in its whole<br />
length, therefore (except the entrance in the loose near-surface zone) there was no need of support.<br />
Although the original low profile can be seen in some drift branches, the main tunnel was enlarged<br />
for wagon transport in the modern times, so it is viable easily. Considering all these properties, this<br />
adit was chosen and built as the underground demonstration site of the Educational Park. It can be<br />
9