Hangers - USP Connectors
Hangers - USP Connectors Hangers - USP Connectors
Rod Chairs – RCD & RCT Rod chairs hold reinforcing bars for proper placement during the pouring or application of concrete. Materials: Welded Wire Finish: None RCD Typical RCD installation Concrete & Masonry USP Stock No. Ref. No. Description Dimensions (in) RCD -- -- Double Rod Chair 4 x 5 x 8-1/4 RCT -- -- Triple Rod Chair 3-1/2 x 4 x 12 Safety Caps – SCV & SCH series Bright orange safety caps protect against injuries from vertical rebar. RCT Typical RCT installation © Copyright 2013 USP Structural Connectors ® Materials: Composite Plastic Finish: None SCV Typical SCV installation USP Stock No. Ref. No. Description Dimensions (in) SCH -- -- Horizontal Safety Cap 2-3/8 x 2-1/2 x 2-1/2 SCV -- -- Vertical Safety Cap 3-1/4 x 3-3/4 x 3-3/4 Anchor Bolt Stabber (Bolt Rite) – ABS12 SCH Typical SCH installation For accurate placement of 1/2˝ (12.7 mm) anchor bolts in wet concrete. The outstanding legs are different lengths, with the shorter leg centering the anchor bolt in a 2 x 4 sill plate and the longer leg centering the anchor bolt in a 2 x 6 sill plate. Materials: Composite Plastic Finish: See chart Patents: Pending Installation: • Slide ABS over anchor bolt and screw on cap. • Place bolt in wet concrete using guides for proper edge distance. USP Bolt Dia. Stock No. 1 Ref. No. (in) Color ABS12 -- -- 1/2 orange 1) Anchor bolt caps are included with product. ABS12 Typical ABS12 installation 28 1-800-328-5934 • www.USPconnectors.com
Threaded Rods – THR series USP has added longer length THR’s to support the new deck oriented code requirements for mechanically reinforced railing post and deck to house ledger board attachments. Materials: ASTM A 36 Steel, also conforms to ASTM F 1554 Grade 36 Finish: Hot-dip galvanized L © Copyright 2013 USP Structural Connectors ® Installation: • Install into wet concrete or drill minimum 1 ⁄16" oversized hole and secure with anchor epoxy. • Nuts and washers are included. USP Stock No. Ref. No. Bolt Dia. (in) L (in) THR125-HDG RFB#4X5HDG 1/2 5 THR126-HDG RFB#4X6HDG 1/2 6 THR128-HDG RFB#4X8HDG 1/2 8 THR1218-HDG -- -- 1/2 18 THR1224-HDG -- -- 1/2 24 THR1236-HDG -- -- 1/2 36 THR585-HDG RFB#5X5HDG 5/8 5 THR588-HDG RFB#5X8HDG 5/8 8 THR5812-HDG RFB#5X12HDG 5/8 12 THR5816-HDG RFB#5X16HDG 5/8 16 New products or updated product information are designated in red font. NEW SIZES Epoxy Coated Rebar – CRE24 THR ½" THR Threaded Rod Typical THR installation DTB-TZ Page 195 Typical THR Deck to ledger installation Concrete & Masonry Two-foot epoxy coated rebar provides maximum protection against corrosion. Materials: A615 Steel Finish: Epoxy Dipped USP Dimensions Stock No. Ref. No. Dia L CRE24 -- -- 10 mm 24" Round Nail Stake – NSR Nail stakes are used to secure form boards to prevent movement and bowing. Materials: Steel Finish: Black Primer Installation: • Fastener holes will accommodate up to a 16d duplex nail. USP Dimensions (in) Stock No. Ref. No. Dia L NSR -- -- 3/4 18 Retro Plate – RP6 Uses heavy gauge HRPO steel and a large surface area to distribute seismic forces on masonry exteriors. L CRE24 NSR Typical CRE24 installation Typical NSR installation Materials: 3/8˝ plate Finish: USP primer Options: RP6 is available in Hot-dip galvanized. To order add HDG to stock number, as in RP6-HDG. 6˝ 3˝ 3/4˝ dia. threaded rod Installation: • Install with a 3/4˝ diameter steel threaded rod. USP Stock No. Ref. No. RP6 RP6 3˝ 6˝ RP6 Typical RP6 installation 1-800-328-5934 • www.USPconnectors.com 29 USP2240-131
- Page 1 and 2: Product Catalog 57 th Edition
- Page 3 and 4: The Original Connector Company! HA
- Page 5 and 6: USP Index © Copyright 2013 USP Str
- Page 7 and 8: Corrosion Information © Copyright
- Page 9 and 10: Product Information U.S. Standard S
- Page 11 and 12: Design Notes © Copyright 2013 USP
- Page 13 and 14: Fasteners © Copyright 2013 USP Str
- Page 15 and 16: Nails - N & NA series continued NA1
- Page 17 and 18: Wood Screw Applications - WS series
- Page 19 and 20: Wood Screw Applications - WS series
- Page 21 and 22: Concrete & Masonry © Copyright 201
- Page 23 and 24: ADHESIVE ANCHORING SYSTEMS CIA-GEL
- Page 25 and 26: Undercut Anchoring Systems - DUC Du
- Page 27: Steel Angle Lintels - SAL series St
- Page 31 and 32: Anchor Bolts - STB & STBL series Em
- Page 33 and 34: Anchor Bolts - AB & ABP series Anch
- Page 35 and 36: Foundation Anchors - ST series ST1-
- Page 37 and 38: Adjustable Support Posts - JP serie
- Page 39 and 40: Type 2 Top Plates - T2TP Series ©
- Page 41 and 42: Predeflected Holdowns - PHD & PHDA
- Page 43 and 44: Holdowns - TD & TDX series continue
- Page 45 and 46: Tension Ties - HTT, LTS series & LT
- Page 47 and 48: Foundation Straps - LSTAD & STAD Se
- Page 49 and 50: Foundation Straps - HPAHD & PAHD42
- Page 51 and 52: Caps & Bases Post Anchors . . . . .
- Page 53 and 54: Wet Post Anchors - WAS & WE series
- Page 55 and 56: © Copyright 2013 USP Structural Co
- Page 57 and 58: Post Caps - EPCM & PCM series © Co
- Page 59 and 60: Post Beam Corner - PBC series The P
- Page 61 and 62: Column Caps - KCCQ & KECCQ series c
- Page 63 and 64: Column Caps - KCCQ & KECCQ series c
- Page 65 and 66: Angles & Straps Coiled Strapping .
- Page 67 and 68: Multi-Purpose Framing Angles - MP34
- Page 69 and 70: Framing Angles - A3, AC, JA, & MP s
- Page 71 and 72: Stud Plate Ties - RSPT, SPT, & SPTH
- Page 73 and 74: Corner Reinforcements - B & BL seri
- Page 75 and 76: Framing Clips - SFC6 Framing clips
- Page 77 and 78: Strap Ties - HRS, HTP, KST, KSTI, L
Rod Chairs – RCD & RCT<br />
Rod chairs hold reinforcing bars for proper placement<br />
during the pouring or application of concrete.<br />
Materials: Welded Wire<br />
Finish: None<br />
RCD<br />
Typical RCD<br />
installation<br />
Concrete & Masonry<br />
<strong>USP</strong><br />
Stock No.<br />
Ref. No.<br />
Description<br />
Dimensions<br />
(in)<br />
RCD -- -- Double Rod Chair 4 x 5 x 8-1/4<br />
RCT -- -- Triple Rod Chair 3-1/2 x 4 x 12<br />
Safety Caps – SCV & SCH series<br />
Bright orange safety caps protect against injuries from vertical rebar.<br />
RCT<br />
Typical RCT<br />
installation<br />
© Copyright 2013 <strong>USP</strong> Structural <strong>Connectors</strong> ®<br />
Materials: Composite Plastic<br />
Finish: None<br />
SCV<br />
Typical SCV<br />
installation<br />
<strong>USP</strong><br />
Stock No. Ref. No. Description Dimensions (in)<br />
SCH -- -- Horizontal Safety Cap 2-3/8 x 2-1/2 x 2-1/2<br />
SCV -- -- Vertical Safety Cap 3-1/4 x 3-3/4 x 3-3/4<br />
Anchor Bolt Stabber (Bolt Rite) – ABS12<br />
SCH<br />
Typical SCH<br />
installation<br />
For accurate placement of 1/2˝ (12.7 mm) anchor bolts in wet concrete. The<br />
outstanding legs are different lengths, with the shorter leg centering the anchor<br />
bolt in a 2 x 4 sill plate and the longer leg centering the anchor bolt in a 2 x 6<br />
sill plate.<br />
Materials: Composite Plastic<br />
Finish: See chart<br />
Patents: Pending<br />
Installation:<br />
• Slide ABS over anchor bolt and screw on cap.<br />
• Place bolt in wet concrete using guides for proper edge distance.<br />
<strong>USP</strong><br />
Bolt Dia.<br />
Stock No. 1<br />
Ref. No. (in) Color<br />
ABS12 -- -- 1/2 orange<br />
1) Anchor bolt caps are included with product.<br />
ABS12<br />
Typical ABS12<br />
installation<br />
28<br />
1-800-328-5934 • www.<strong>USP</strong>connectors.com