09.11.2012 Views

OFFERING MEMORANDUM Global Offering of up to ... - Nordex

OFFERING MEMORANDUM Global Offering of up to ... - Nordex

OFFERING MEMORANDUM Global Offering of up to ... - Nordex

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

not authorized <strong>to</strong> construct other buildings not serving this purpose. To secure development and<br />

ensure utilization <strong>of</strong> the property in line with the agreement, the city <strong>of</strong> Ros<strong>to</strong>ck has reserved the right<br />

<strong>to</strong> repurchase the property. In the event that <strong>Nordex</strong> Ro<strong>to</strong>r GmbH sells the property within five years<br />

after its acquisition, <strong>Nordex</strong> Ro<strong>to</strong>r GmbH must pay over any pr<strong>of</strong>it made on the sale <strong>to</strong> the city <strong>of</strong><br />

Ros<strong>to</strong>ck.<br />

On September 27, 1999, <strong>Nordex</strong> Energy GmbH made a notarized <strong>of</strong>fer valid from August 31, 2004, <strong>to</strong><br />

Oc<strong>to</strong>ber 31, 2004, <strong>to</strong> purchase 32,395m 2 <strong>of</strong> land on Erich-Schlesinger-Straße, Ros<strong>to</strong>ck, which it has<br />

been renting since September 1, 1999. Rental payments made <strong>up</strong> <strong>to</strong> the date <strong>of</strong> purchase will be<br />

deducted from the purchase price. Therefore the parties understand that the entire purchase price will<br />

have been paid by the time the <strong>of</strong>fer can be accepted. A notice <strong>of</strong> exemption pursuant <strong>to</strong> Article 1,<br />

Section 4, Paragraph 3 <strong>of</strong> the Umweltrahmengesetz (Environmental Framework Act) <strong>of</strong> June 29, 1999,<br />

in the form laid down by Article 12 <strong>of</strong> the Gesetz zur Beseitigung von Hemmnissen bei der<br />

Privatisierung von Unternehmen und zur Förderung von Investitionen (Act for the Removal <strong>of</strong> Barriers<br />

<strong>to</strong> the Privatisation <strong>of</strong> Companies and the Promotion <strong>of</strong> Investment) <strong>of</strong> March 22, 1999, was issued <strong>to</strong><br />

the former owner <strong>of</strong> the aforementioned site. This notice exempts 90% <strong>of</strong> the overall costs <strong>of</strong> measures<br />

necessary for averting risks caused by residual waste. The exemption is expected <strong>to</strong> be transferred <strong>to</strong><br />

Landesgesellschaft Mecklenburg-Vorpommern and thereafter <strong>to</strong> <strong>Nordex</strong> Energy GmbH. If this occurs,<br />

<strong>Nordex</strong> Energy GmbH will be required <strong>to</strong> bear 10% <strong>of</strong> the costs for measures <strong>to</strong> avert the risk caused by<br />

residual waste. For measures <strong>to</strong> avert the risk caused by residual waste, which arose after July 1, 1990<br />

and prior <strong>to</strong> September 1, 1999, <strong>Nordex</strong> Energy GmbH will assume the first DM 500,000 <strong>of</strong> the costs for<br />

such measures. Landesgesellschaft Mecklenburg-Vorpommern will assume any costs between<br />

DM 500,001 and DM 1 million. Costs exceeding DM 1 million will be borne by <strong>Nordex</strong> Energy GmbH.<br />

Litigation<br />

Except for the matters detailed below, neither the Company nor its subsidiaries have been involved in<br />

any legal or arbitration proceedings that have had or could have a material influence on the economic<br />

position <strong>of</strong> the Company or on its subsidiaries in the past two fiscal years or since their formation. With<br />

the exception <strong>of</strong> the matters detailed below, <strong>to</strong> the best <strong>of</strong> the Company’s knowledge and that <strong>of</strong> its<br />

subsidiaries, no such proceedings are currently threatened.<br />

In an agreement dated November 22, 2000, Borsig Energy GmbH under<strong>to</strong>ok <strong>to</strong> release the Company<br />

from obligations resulting from litigation with Aerpac Aerodynamic Products and Consultancy B.V.<br />

(including the costs required for the retr<strong>of</strong>it program agreed for this purpose – <strong>up</strong> <strong>to</strong> an agreed<br />

maximum amount), from the claims made by the Danish purchaser <strong>of</strong> Ekter Aioliki S.A. due <strong>to</strong> this<br />

company’s litigation with ITA S.A., and from claims arising out <strong>of</strong> disputes with Wehrle Werk AG,<br />

Energiekon<strong>to</strong>r Windkraft GmbH, BOREAS Energie GmbH and Atlas Energieanlagen GmbH & Co. KG<br />

Windpark Neur<strong>up</strong>pin. These disputes and litigation are described below. With the exception <strong>of</strong> the costs<br />

for the retr<strong>of</strong>it program, this liability release undertaking applies <strong>up</strong> <strong>to</strong> a maximum <strong>to</strong>tal amount <strong>of</strong> DM<br />

20 million. In the light <strong>of</strong> the current status <strong>of</strong> the disputes and litigation, including a settlement<br />

agreed with ITA S.A., the Company believes that this amount is sufficient.<br />

Litigation with Aerpac Aerodynamic Products and Consultancy B.V.<br />

Aerpac Aerodynamic Products and Consultancy B.V. (‘‘Aerpac’’) is one <strong>of</strong> <strong>Nordex</strong> Energy GmbH’s longstanding<br />

s<strong>up</strong>pliers for ro<strong>to</strong>r blades. <strong>Nordex</strong> Energy GmbH concluded a master s<strong>up</strong>ply agreement for the<br />

s<strong>up</strong>ply <strong>of</strong> ro<strong>to</strong>r blades with this company in early 1999. In this contract, <strong>Nordex</strong> Energy GmbH<br />

under<strong>to</strong>ok <strong>to</strong> purchase at least one set <strong>of</strong> blades per week. The contract was <strong>to</strong> run until December 31,<br />

2003.<br />

Having ascertained material technical defects, <strong>Nordex</strong> Energy GmbH, having given notice and<br />

threatened <strong>to</strong> reject future shipments, terminated the agreement for good cause on Oc<strong>to</strong>ber 25, 2000.<br />

<strong>Nordex</strong> Energy GmbH cancelled the orders it had already given under the contract.<br />

Aerpac asserts that the termination <strong>of</strong> the agreement was not based on good cause and that the<br />

defects were not development or manufacturing defects, but rather damage resulting from blade<br />

vibration due <strong>to</strong> the ro<strong>to</strong>r being overburdened. Aerpac therefore demands that <strong>Nordex</strong> Energy GmbH<br />

60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!