Research and development<br />
Certification <strong>of</strong> the N50/800kW turbines has substantially been completed, series production started in<br />
early 2000. In order <strong>to</strong> tap the market for variable-speed, adjustable-pitch wind turbines, work on an<br />
N50p (variable-speed/pitch) turbine began on the basis <strong>of</strong> the N50/stall and a pro<strong>to</strong>type installed mid-<br />
August. Pro<strong>to</strong>type testing will start in the high-wind seasons <strong>of</strong> fall and winter, and first results should<br />
be available in the spring <strong>of</strong> 2001.<br />
The N43 turbine can presently be regarded as the most sturdy and flexible NORDEX product; even at<br />
locations <strong>of</strong> extreme climatic conditions with temperatures varying between +40ºC and -30ºC such as<br />
the Egyptian Desert or Inner Mongolia, the N43 presents good <strong>up</strong>times and satisfies the warranty<br />
requirements <strong>of</strong> the international market (<strong>up</strong>time and characteristic performance curve).<br />
In January 2000, the N80/2500kW pro<strong>to</strong>type was installed as scheduled. Extensive trials and tests have<br />
since been conducted with this variable-speed, adjustable-pitch, 2,500-kW rated output turbine with<br />
whose development NORDEX broke new ground. A lack <strong>of</strong> wind delayed testing and thus also selective<br />
marketing <strong>of</strong> this product. Therefore, a second, identical pro<strong>to</strong>type will by year-end be installed on the<br />
test wind farm <strong>of</strong> Wilhelmshaven where wind conditions are more favorable.<br />
The NORDEX Control, developed by the Company as from the summer <strong>of</strong> 1999, has so far been installed<br />
in more than 160 wind turbines.<br />
Significant subsequent events<br />
No significant reportable events occurred subsequent <strong>to</strong> the balance sheet date.<br />
Head <strong>of</strong>fice relocation<br />
NORDEX will close down its Rerik location and move with all its and NPV’s corporate functions<br />
(Finance, Sales, Purchasing, R&D, Project Management, Management) <strong>to</strong> a new, central location in<br />
Norderstedt near Hamburg (State <strong>of</strong> Schleswig-Holstein). Cus<strong>to</strong>mer Service along with the Remote<br />
Plant Control Center will move <strong>to</strong> the Ros<strong>to</strong>ck Wind Turbine Competence Center.<br />
The Company expects Hamburg <strong>to</strong> provide a far better human resources potential for administrative<br />
and executive staff, improved traffic links and a wide variety <strong>of</strong> operational synergies from the<br />
concentration <strong>of</strong> all decision-making functions at one site.<br />
Besides the existing branches in Denmark, Spain, China (sales <strong>of</strong>fice in Beijing, a limited company for<br />
cus<strong>to</strong>mer service in Shanghai, a joint venture in Xian), and Turkey, the following new operations were<br />
set <strong>up</strong>:<br />
– on 12-27-1999 an independent US company, NORDEX USA Inc., near Dallas, Texas<br />
– on 10-26-1999 a branch in Cairo, NORDEX GmbH Egypt Branch, <strong>to</strong> handle two Egyptian<br />
megaorders<br />
– on 8-7-2000 an independent company in Athens, NORDEX Hellas L.L.C., <strong>to</strong> handle a major Greek<br />
contract<br />
NORDEX is still seeking joint venturers for establishing a company in Turkey.<br />