29.12.2014 Views

051659 - Ministerstvo obrany

051659 - Ministerstvo obrany

051659 - Ministerstvo obrany

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project Processes<br />

Project Planning<br />

Description<br />

The purpose of the Project Planning Process<br />

is to produce and communicate effective and<br />

workable project plans.<br />

Project Assessment<br />

ČOS <strong>051659</strong><br />

1. vydání<br />

Příloha C<br />

Zákonem předepsané zabezpečování<br />

informací.<br />

Správa informací v mezích zákonů a<br />

předpisů – řízení obsahu informací.<br />

Dohled nad informacemi.<br />

Metody a postupy managementu zdrojů<br />

informací. Dohled nad informacemi se týká<br />

uživatelů informací, postupů managementu<br />

informací a dostupnosti informací.<br />

Activities<br />

Detailed planning for the current life cycle<br />

stage and overall planning for all life cycle<br />

stages. This planning should include:<br />

- scope definition<br />

- activity definition<br />

- activity sequencing<br />

- activity duration estimating<br />

- cost estimating<br />

- schedule estimating<br />

- cost budgeting<br />

- project plan documentation<br />

Description<br />

Activities<br />

The purpose of the Project Assessment Activity completion assessment<br />

Process is to determine the status of the Schedule assessment<br />

project. This process evaluates, periodically<br />

Cost assessment<br />

and at major events, the progress and<br />

achievements against requirements, plans<br />

and overall business objectives.<br />

Project Control<br />

Description<br />

The purpose of the Project Control Process<br />

is to direct project plan execution and ensure<br />

that the project performs according to plans<br />

and schedules, within projected budgets and<br />

satisfies technical objectives for technical<br />

requirements. This process includes<br />

redirecting the project activities, as<br />

appropriate, to correct identified deviations<br />

and variations from other project<br />

management or technical processes.<br />

Redirection may include replanning as<br />

Activities<br />

Maintain momentum in the project in<br />

accordance with the project plan through<br />

proactive management.<br />

131

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!