March 09<br />

CAUTION<br />

Oxygen enrichment should never be carried out while diving is in progress.<br />

1. Ensure GAS BOOSTER IS RUNNING.<br />

2. Set the O 2 regulator on the oxygen panel to 40 bar.<br />

3. Shut the vent valve.<br />

4. Open the supply-cross connect valve on the control panel. The gas booster will<br />

now circulate gas from the volume tank to the reprocessing unit inlet.<br />

5. Measure the time required to increase the oxygen content to the desired level<br />

from Table .8.5.7<br />

6. Open the O 2 supply valve on the make-up panel <strong>and</strong> note the time.<br />

7. Shut the O 2 supply valve when the appropriate amount of time has elapsed or<br />

when the O 2 analyser indicates that the desired mix has been obtained.<br />

8. Open the vent valve.<br />

9. Allow the system to continue to cycle through the supply-exhaust cross connect<br />

valve for several minutes, while monitoring the O 2 analyser ensuring a steady reading<br />

<strong>and</strong> complete mixing of the gas.<br />

Helium dilution may be achieved by venting the system, partially or completely <strong>and</strong> repressurising<br />

with gas of the appropriate mixture.<br />