March 09<br />

8.3.1 Start up Procedure<br />

1. Change Soda lime canisters as described in Section 8.5.5 <strong>and</strong> note time of canister<br />

change on Control Console panel.<br />

2. Ensure that all shut off valves in the system are open <strong>and</strong> one Soda lime canister<br />

is on line.<br />

3. Check booster oil level <strong>and</strong> top up with recommended lubricant if necessary.<br />

4. Check water level in booster header tank, top up with glycol water mix if<br />

necessary.<br />

5. Turn on seawater cooling supply booster.<br />

6. Turn on cooling supply to Reprocessing Unit.<br />

7. Set Control Console BPR loader, O 2 regulator <strong>and</strong> make-up regulator for the<br />

proposed diving depth according to Section 8.6.<br />

8. Crack the exhaust cross-connect valve <strong>and</strong> allow the exhaust umbilical pressure<br />

to rise to the correct value for the proposed dive, then close valve. This is the BPR<br />

loader pressure specified in Section 8.6.<br />

9. Ensuring that both stop/lock buttons are pulled out, switch on main isolator on<br />

booster starter panel. (Fault lights will illuminate).<br />

10. Press reset button on booster starter panel. (fault lights will go out).<br />

11. Select local or remote operation.<br />

12. Start booster from the indicated station.<br />

13. Check booster oil pressure. If gauge does not reach 50 psi (3.4 bar) within 30<br />

seconds, stop machine <strong>and</strong> investigate cause. (with excessively low oil pressure the<br />

booster will stop automatically due to pressure switches in the control circuit).<br />

14. Check gas quality by allowing gas to flow from the Reprocessing Unit sample<br />

regulator through the O 2 <strong>and</strong> CO 2 analysers in dive control.<br />

15. The unit is now ready to supply reclaimed gas to the diver.<br />

16. The gas booster will circulate gas around itself until such time as a diver starts<br />

breathing on recovery at which time the booster will automatically adjust to meet the<br />

diver’s breathing requirements.<br />

17. Initiate pre dive check off Bell Equipment <strong>and</strong> diver equipment (see bell check off<br />

lists in the following pages).<br />

OM002 Rev 5 Page 78 of 168 Chap 8