March 09<br />

damaged prior to fitting a GASMIZER system by closing the bell exhaust valve with the<br />

dive control exhaust valve open.<br />

3. Suitable locations for the Reprocessing Unit, Electric Gas Booster, Volume Tank,<br />

Control Console <strong>and</strong> Bell Equipment should also be identified during this preliminary<br />

survey.<br />

8.2.2 Equipment Installation <strong>and</strong> Interconnection<br />

There are essentially five items of equipment to be accommodated.<br />

Reprocessing Unit Ideally should be sited in a compressor room or other machinery<br />

space.<br />

Electric Gas Booster Ideally should be sited close to the reprocessing unit for ease of<br />

installation <strong>and</strong> also to reduce pressure losses between the units.<br />

Volume Tank Siting is non-critical. It can be either beside the reprocessing unit or,<br />

alternatively in the ship’s gas storage area.<br />

Bell Equipment Should be mounted in the bell as close as possible to diver gas supply<br />

pressure gauge <strong>and</strong> shut-off valve. The bellman should have easy access to the water<br />

trap.<br />

Control Panel Should be mounted in a prominent position in dive control. During diving,<br />

the volume tank pressure <strong>and</strong> BPR pressure are probably the two most important<br />

gauges for the dive supervisor.<br />

The system may be installed with rigid stainless or tungum pipework (apart from O 2<br />

pipework which will be copper or tungum). Installations will be purged to remove all<br />

swarf, cuttings etc. <strong>and</strong> O 2 cleaned after installation.<br />

8.2.3 Commissioning<br />

The following steps should be carried out after installation:<br />

1. Pressurise system <strong>and</strong> check for leaks.<br />

2. Carry out hydraulic/pneumatic pressure testing as required by client. It is<br />

recommended that the system be tested to its full working pressure.<br />

Gas Supply System<br />

Gas Exhaust System<br />

O 2 System<br />

Full working pressure 100 bar (1500 psi)<br />

Full working pressure 68 bar (1000 psi)<br />

Full working pressure 50 bar (725 psi)<br />

3. Purge the system by pressurising with desired heliox mix to 10 bar using the<br />

make- up panel <strong>and</strong> vent to atmospheric pressure. Connect O 2 supply to Reprocessing<br />

Unit by opening isolating valve.<br />

4. Check that exhaust <strong>and</strong> supply umbilical as fitted comply with the table shown<br />

below for the proposed diving depth.<br />

OM002 Rev 5 Page 76 of 168 Chap 8