28.12.2014 Views

Gasmizer Manual - Submarine Manufacturing and Products Ltd

Gasmizer Manual - Submarine Manufacturing and Products Ltd

Gasmizer Manual - Submarine Manufacturing and Products Ltd

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

March 2009<br />

Dive Depth<br />

(m)<br />

Inlet<br />

Pressure<br />

Barg<br />

Interstage<br />

Pressure<br />

Barg<br />

Delivery<br />

Pressure<br />

Barg<br />

Typical Plant<br />

Throughput --<br />

CFM<br />

30 1 3.6 18 10.3 17.2<br />

50 2.5 7.2 22 8.9 17.2<br />

100 7 16.5 30 7.1 17.2<br />

150 11.5 15.0 40 6.7 17.2<br />

Compressor<br />

Flow Actual CFM<br />

Both stages<br />

compressing<br />

200 16 16 47 6.4 6.6<br />

250 20.5 20.5 56 6.3 6.6<br />

300 25 25 65 6.2 6.6<br />

350 29.5 29.5 73 6.1 6.6<br />

400 34.5 34.5 82 6.0 6.6<br />

Stage two only<br />

compressing.<br />

Stage one<br />

recirculating.<br />

*450 39 39 91 6.0 6.6<br />

*500 44 44 100 6.0 6.6<br />

**Based on 2 divers at a heavy work rate (75 1/min RMV)<br />

9.1.1 Unloader Circuit<br />

Fig 2 Unloader Circuit<br />

The unloader circuit allows automatic dumping of any moisture which is condensed out<br />

of the gas by the inter cooler <strong>and</strong> after cooler. It also completely unloads the booster in<br />

the event of the booster being stopped.<br />

Chap 9 Page 99 of 168 OM002 Rev 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!