FP7 Project Work Packages WP3: Dissemination Outreach and Training Leading participant: CSC Scientific Computing Ltd., Finland Objectives: ● Dissemination to the major HPC stakeholders: the European scientific and research communities, Research Infrastructure organizations, Universities and Centres for higher education, and the general public ● Liaise with industrial and business partners as potential HPC users ● Implement an education and training program aiming at scalable computing Portugal, October 12th, 2007 30
FP7 Project Work Packages WP4: Distributed System Management Leading participant: ETH Zürich – CSCS, Switzerland Objectives: ● Deployment of existing solutions on the prototype systems; analysis, evaluation, and deployment of the existing solutions for system management for the future distributed tier-0 systems; provisioning of missing components ● Requirements analysis and uptake of the technologies for the integration with the HPC ecosystem especially with tier-1 including end users’ applications ● Planning and design of the necessary solution for distributed system management for the permanent Research Infrastructure Portugal, October 12th, 2007 31
- Page 1 and 2: Portugal, October 12th, 2007 France
- Page 3 and 4: The beginnings ● Informal discuss
- Page 5 and 6: The Scientific Case ● The Scienti
- Page 7 and 8: The Scientific Case ● The Scienti
- Page 9 and 10: The Scientific Case ● The Scienti
- Page 11 and 12: ESFRI ● European HPC infrastructu
- Page 13 and 14: EU-FP7project ● May 2th, 2007: 16
- Page 15 and 16: PRACE is embedded in the European E
- Page 17 and 18: Why do we need a PRACE-MoU ● Intr
- Page 19 and 20: 14 countries already joined PRACE G
- Page 21 and 22: Other PRACE MoU stakeholders: ●
- Page 23 and 24: FP7-Project Partners 1 (Coordinator
- Page 25 and 26: Support by Research Infrastructures
- Page 27 and 28: Management structure PRACE-Project
- Page 29: FP7 Project Work Packages WP2: Orga
- Page 33 and 34: FP7 Project Work Packages WP6: Soft
- Page 35 and 36: FP7 Project Work Packages WP8: Futu
- Page 37 and 38: PRACE Roadmap ● 4Q2007 - 2Q2009:
FP7 Project Work Packages<br />
WP4: Distributed System Management<br />
Leading participant: ETH Zürich – CSCS,<br />
Switzerland<br />
Objectives:<br />
● Deployment of existing solutions on the prototype systems;<br />
analysis, evaluation, and deployment of the existing solutions for<br />
system management for the future distributed tier-0 systems;<br />
provisioning of missing components<br />
● Requirements analysis and uptake of the technologies for the<br />
integration with the <strong>HPC</strong> ecosystem especially with tier-1 including<br />
end users’ applications<br />
● Planning and design of the necessary solution for distributed<br />
system management for the permanent Research <strong>Infrastructure</strong><br />