User Manual - Etilize
User Manual - Etilize
User Manual - Etilize
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
This procedure applies only to server models that have hot-swap power supplies. If<br />
the server contains a non-hot-swap power supply that requires replacement, the<br />
power supply must be replaced by a service technician.<br />
When you remove or install a hot-swap power supply, observe the following<br />
precautions.<br />
Statement 8:<br />
CAUTION:<br />
Never remove the cover on a power supply or any part that has the following<br />
label attached.<br />
Hazardous voltage, current, and energy levels are present inside any<br />
component that has this label attached. There are no serviceable parts inside<br />
these components. If you suspect a problem with one of these parts, contact<br />
a service technician.<br />
To replace a hot-swap power supply, complete the following steps:<br />
1. Review the safety information that begins on page vii and “Installation<br />
guidelines” on page 29.<br />
2. Disconnect the power cord from the power supply that is to be removed.<br />
3. Press down on the orange release lever and pull the power supply out of the<br />
bay, using the handle.<br />
Release lever<br />
Hot-swap power<br />
supply<br />
Chapter 2. Installing optional devices 59