Planning Commissioners' Procedures Manual - Hamilton County, Ohio
Planning Commissioners' Procedures Manual - Hamilton County, Ohio
Planning Commissioners' Procedures Manual - Hamilton County, Ohio
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
INTRODUCTION<br />
Anderson Township’s approximately 6.5<br />
miles of <strong>Ohio</strong> River frontage is one of the<br />
most important and dynamic sections of<br />
the <strong>Ohio</strong> River with Riverbend, River<br />
Downs, and Coney Island adjacent. The<br />
study area extends from the <strong>Ohio</strong> River<br />
north to Interstate 275. This unique area<br />
consists of environmentally sensitive<br />
areas, scenic and visual resources, and<br />
dynamic existing developments. These<br />
developments serve as catalysts to<br />
development adjacent to the proposed<br />
<strong>Ohio</strong> River Shared Use Trail planned to<br />
run along the U.S. Route 52 corridor.<br />
One of the preliminary goals of this land<br />
use plan for the Anderson Township<br />
Riverfront Area is to preserve and<br />
enhance environmental quality, views<br />
and land use value along<br />
Anderson Township’s <strong>Ohio</strong> River corridor.<br />
An additional goal of the planning<br />
process was to recommend land uses<br />
that will capitalize on the existing<br />
entertainment/recreational uses west of<br />
U.S. Route 52. The Township’s vision for<br />
the <strong>Ohio</strong> River and surrounding areas<br />
then seeks to incorporate the planning<br />
studies being conducted by numerous<br />
regional planning organizations with the<br />
unique natural resources and land form<br />
of Anderson Township. Assessments of<br />
the natural and infrastructure<br />
characteristics of the corridor were<br />
conducted to help guide the public<br />
involvement process.<br />
The purpose of this study was to develop<br />
a land use plan as part of a<br />
“comprehensive plan” that will guide<br />
development along Anderson<br />
Township’s <strong>Ohio</strong> Riverfront in the best<br />
interest of the community.<br />
It is anticipated that this Riverfront Plan<br />
will be made part of an updated<br />
Anderson Township Comprehensive Plan<br />
in the future.<br />
ANDERSON TOWNSHIP OHIO RIVERFRONT AREA LAND USE PLAN<br />
Page 1