c) The applicant should demonstrate that the proposed tower is the least aesthetically intrusive<br />

facility for the neighborhood. Monopole installations painted silver or having a galvanized<br />

finish are recommended. Towers should not contain any commercial signage or be<br />

artificially lighted except as required by the FAA. It is further recommended that all<br />

buildings and structures be architecturally compatible with the architecture of the adjacent<br />

buildings and structures.<br />

d) Pole, tower and/or structure placement should be only on a lot meeting the square footage<br />

requirements of the applicable zone district, and should be a minimum of one hundred (100)<br />

feet from every property line. Guy wire anchors should be a minimum of fifty (50) feet from<br />

every property line.<br />

e) The applicant should demonstrate that the proposed tower and its antenna are safe and that<br />

the surrounding properties will not be negatively affected by tower failure, falling ice or other<br />

debris, electromagnetic fields or radio/TV frequency interference. All towers should be fitted<br />

with anti-climbing devices as approved by the manufacturers.<br />

f) Landscaping should be designed to screen as much of the support structure as possible, the<br />

fence surrounding the tower, support structure(s) and any other ground level features and, in<br />

general, soften the appearance of the site. Any combination of existing vegetation,<br />

topography, walls, decorative fences or other features may substitute for new landscape<br />

materials. All screening devices and landscape materials shall be maintained in good<br />

condition.<br />

g) The applicant (or its successors) should, within thirty (30) days of ceasing operation at the<br />

site of a telecommunications tower, give notice of such ceasing of operation to the BZA.<br />

Facilities should be removed from the site within twelve (12) months of ceasing operations.<br />

Resale or renting of facilities is permissible only to other cellular communications systems<br />

subject to obtaining approval for a zoning certificate from the BZA.<br />

h) The Conditional Use Zoning Certificate may be revoked after notice and hearing if any<br />

continuing condition of the certificate has been violated and is not remedied within thirty (30)<br />

days of written notice from the zoning inspector.<br />

Specific Standards Required by the Board of Zoning Appeals<br />

a) Any structure (except fences), parking area, or storage area shall be setback at least 100 feet<br />

from every property line.<br />

b) The architectural design and site layout of the structure and the location, nature, and height of<br />

any walls, screens, and fences are to be compatible with adjoining landuses and the<br />

residential character of the neighborhood.<br />

c) Landscaping shall be installed in accordance with Boundary Buffer B as shown in Figure 14B<br />

and Streetscape Buffer as shown in Figure 14C.<br />

d) Security measures shall be submitted as part of the application.<br />

e) The terms of continuation of this use and those under which it shall eventually be removed or<br />

terminated are to be specified in the application and contained within the approving<br />

Resolution.