27.12.2014 Views

Download Operating Manual - NY Tech Supply

Download Operating Manual - NY Tech Supply

Download Operating Manual - NY Tech Supply

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Maintenance Instructions<br />

UL CIRUIT CALIBRATION (continued)<br />

NOTE: Certified weights can be added to check positive response and then<br />

removed to check negative response.<br />

7. Reassemble oil bottle and shoud back on the unit.<br />

8. While the circuit calibration is now finished, the scale must still be calibrated<br />

to complete the calibrating procedure.<br />

* The P-1 POT (Potentiometer) is located below the keypad at the front of the<br />

circuit board.<br />

NOTE: This entire procedure must be completed to update the scale calibration<br />

memory of the unit. turning off the power at any time dureing the procedure returns<br />

the unit to the previous calibration values and the procedure must be started again<br />

from the beginning.<br />

30<br />

© 1998 Robinair, SPX Corporation

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!