26.12.2014 Views

Fabric Manager Users Guide, Version 6.1, Revision A - QLogic

Fabric Manager Users Guide, Version 6.1, Revision A - QLogic

Fabric Manager Users Guide, Version 6.1, Revision A - QLogic

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2–Advanced <strong>Fabric</strong> <strong>Manager</strong> Capabilities<br />

Mesh/Torus Topology Support<br />

To permit this, the <strong>QLogic</strong> <strong>Fabric</strong> <strong>Manager</strong> allows LMC>1 to be configured for<br />

Mesh/Torus fabrics. In which case one LID is used for the Up/Down route and all<br />

the remaining routes are used for DOR routes. So for example an LMC of two will<br />

cause four LIDs per Channel Adapter. One will be for Up/Down and the remaining<br />

three will be for optimized DOR routes. When the SM is queried for a PathRecord<br />

it will report only the three DOR LIDs for non-disrupted paths and only the one<br />

Up/Down LID for disrupted paths.<br />

All alternate DOR routes will be optimized per the LMC and fabric resiliency<br />

section above.<br />

NOTE:<br />

In order to take advantage of multi-path routing in a mesh/torus, there must<br />

be more than one ISL between switches per dimension. In order to avoid<br />

credit loops, all multi-path routes configured by the <strong>QLogic</strong> <strong>Fabric</strong> <strong>Manager</strong><br />

will obey the DOR routing rules. Use of distinct switch chassis is not<br />

available for DOR alternate routes.<br />

Switch and Host Channel Adapter VLs<br />

When operating a Mesh/Torus fabric, more than one VL is always required. Many<br />

devices ship by default with only one VL enabled. Prior to running with the<br />

dor-updown algorithm, the switches and Host Channel Adapters must first be<br />

configured for the proper number of VLs and the appropriate MTU. Refer to<br />

Appendix D for more information on the number of VLs that are needed for<br />

various combinations.<br />

Bootstraping the fabric<br />

For fabrics with <strong>QLogic</strong> Externally Managed switches, it will be necessary to have<br />

the SM operational in order to configure the switches. Also other verification<br />

operations, such as topology verification may be needed prior to putting the fabric<br />

into normal operation.<br />

Due to the stricter topology and VL requirements of the <strong>Fabric</strong> <strong>Manager</strong> for<br />

Mesh/Torus fabrics, it can be helpful to pre-configure and verify this information<br />

prior to enabling the dor-updown routing algorithm in the <strong>Fabric</strong> <strong>Manager</strong>.<br />

2-14 IB0054608-01 B

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!