26.12.2014 Views

checklist - ERAU ETA - Embry-Riddle Aeronautical University

checklist - ERAU ETA - Embry-Riddle Aeronautical University

checklist - ERAU ETA - Embry-Riddle Aeronautical University

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PA-28R-201 SOP 91<br />

SHUTDOWN CHECKLIST<br />

1. PARKING BRAKE ........................................................................... SET<br />

2. MIXTURE CONTROL .................................................... IDLE CUT-OFF<br />

3. IGNITION SWITCH ........................................................................ OFF<br />

4. ALTERNATOR SWITCH ................................................................ OFF<br />

5. SHUTDOWN CHECKLIST ................................................. COMPLETE<br />

1. PARKING BRAKE SET<br />

SET the PARKING BRAKE by pulling the Parking Brake Lever aft, and then<br />

pushing the button. Do not depress the brake pedals while trying to<br />

engage the parking brake, as this will prevent the parking brake from<br />

working.<br />

2. MIXTURE CONTROL IDLE CUT-OFF<br />

Advance the engine to 1000 RPM, and then move the MIXTURE<br />

CONTROL to the IDLE CUT-OFF position.<br />

3. IGNITION SWITCH OFF<br />

After the engine (propeller) has come to a complete stop, turn the<br />

IGNITION SWITCH key to the OFF position. Remove the key from the<br />

ignition switch.<br />

WARNING<br />

If the magnetos are turned off before the engine stops<br />

completely, non-ignited fuel will remain in the engine cylinders,<br />

creating a potential hazard of the non-ignited fuel igniting<br />

unexpectedly (i.e., the propeller rotated with a “hot mag”), or of<br />

having an over-primed engine during the next engine start (i.e.,<br />

an engine fire).<br />

4. ALTERNATOR SWITCH OFF<br />

Depress the ALTERNATOR SWITCH to the OFF position.<br />

5. SHUTDOWN CHECKLIST COMPLETE<br />

Upon completion of the SHUTDOWN CHECKLIST, verify that all items<br />

have been accomplished and that the <strong>checklist</strong> is COMPLETE.<br />

Rev 06 © <strong>Embry</strong>-<strong>Riddle</strong> <strong>Aeronautical</strong> <strong>University</strong> Revised 07-01-2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!