checklist - ERAU ETA - Embry-Riddle Aeronautical University
checklist - ERAU ETA - Embry-Riddle Aeronautical University
checklist - ERAU ETA - Embry-Riddle Aeronautical University
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PA-28R-201 SOP 79<br />
CRUISE CHECKLIST<br />
Not required if remaining in the traffic pattern.<br />
1. CRUISE POWER ............................................................................ SET<br />
2. MIXTURE ..................................................................................... LEAN<br />
3. LANDING LIGHT .................................................................... ON (OFF)<br />
4. CRUISE CHECKLIST ......................................................... COMPLETE<br />
1. CRUISE POWER SET<br />
Reduce the throttle then the propeller control to SET the desired CRUISE<br />
POWER setting. For training purposes, 23” MP/2300 RPM should be used.<br />
Otherwise, reference the power setting table in the <strong>ERAU</strong> PA-28R-201<br />
Checklist for an appropriate manifold pressure and RPM setting. The<br />
maximum recommended cruise power setting is 75% MCP.<br />
2. MIXTURE LEAN<br />
After setting cruise power, LEAN the MIXTURE in accordance with the<br />
appropriate Leaning Procedures on page 17.<br />
NOTE<br />
When maneuvering in the <strong>ERAU</strong> local practice areas, the<br />
Mixture Control will be left in the established lean position.<br />
NOTE<br />
The Mixture Control must be set to full rich for cruise power<br />
settings above 75% MCP.<br />
3. LANDING LIGHT ON (OFF)<br />
Verify that the LANDING LIGHT is ON for collision avoidance precautions.<br />
The strobe lights should remain ON. Turn the lights OFF only when<br />
operating in clouds, low visibility conditions, at night, or in any other<br />
condition where having the lights ON would compromise safety of flight.<br />
4. CRUISE CHECKLIST COMPLETE<br />
Upon completion of the CRUISE CHECKLIST, verify that all items have<br />
been accomplished and that the <strong>checklist</strong> is COMPLETE.<br />
Rev 06 © <strong>Embry</strong>-<strong>Riddle</strong> <strong>Aeronautical</strong> <strong>University</strong> Revised 07-01-2012