26.12.2014 Views

checklist - ERAU ETA - Embry-Riddle Aeronautical University

checklist - ERAU ETA - Embry-Riddle Aeronautical University

checklist - ERAU ETA - Embry-Riddle Aeronautical University

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

36 PA-28R-201 SOP<br />

residual water from inside of sampler cup and continue to take fuel samples<br />

until water is no longer present in any fuel sample.<br />

NOTE<br />

DO NOT DUMP FUEL ON THE RAMP.<br />

12. FORWARD FUSELAGE CHECKLIST COMPLETE<br />

Upon completion of the FORWARD FUSELAGE CHECKLIST, verify that all<br />

items have been accomplished and that the <strong>checklist</strong> is COMPLETE.<br />

Revised 07-01-2012 © <strong>Embry</strong>-<strong>Riddle</strong> <strong>Aeronautical</strong> <strong>University</strong> Rev 06

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!