26.12.2014 Views

checklist - ERAU ETA - Embry-Riddle Aeronautical University

checklist - ERAU ETA - Embry-Riddle Aeronautical University

checklist - ERAU ETA - Embry-Riddle Aeronautical University

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PA-28R-201 SOP 149<br />

7. ELECTRICAL LOAD REDUCE<br />

REDUCE the ELECTRICAL LOAD as much as possible.<br />

NOTE<br />

All electrical load is being supplied by the battery.<br />

8. AIRPORT LAND<br />

LAND at the nearest suitable AIRPORT as soon as practical.<br />

9. ELECTRICAL FAILURE CHECKLIST COMPLETE<br />

Upon completion of the ELECTRICAL FAILURE CHECKLIST, verify that all<br />

items have been accomplished and that the <strong>checklist</strong> is COMPLETE.<br />

Rev 06 © <strong>Embry</strong>-<strong>Riddle</strong> <strong>Aeronautical</strong> <strong>University</strong> Revised 07-01-2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!