26.12.2014 Views

checklist - ERAU ETA - Embry-Riddle Aeronautical University

checklist - ERAU ETA - Embry-Riddle Aeronautical University

checklist - ERAU ETA - Embry-Riddle Aeronautical University

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PA-28R-201 SOP 95<br />

5. MAIN WHEELS CHOCK<br />

Securely CHOCK the MAIN WHEELS.<br />

6. PARKING BRAKE RELEASE<br />

Push the parking brake knob IN fully to RELEASE the PARKING BRAKE.<br />

7. STORM WINDOW/CABIN DOOR CLOSE/LOCK<br />

CLOSE and latch the the STORM WINDOW. CLOSE the cabin DOOR and<br />

latch the side latch first, followed by the upper latch. LOCK the cabin door<br />

with the key provided.<br />

8. POST-FLIGHT INSPECTION COMPLETE<br />

COMPLETE a POST-FLIGHT INSPECTION of the aircraft by conducting a<br />

360° walk-around, checking for any damage that may have occurred during<br />

the flight, that all lights are OFF, and that the airplane is properly secured.<br />

NOTE<br />

Verify that any and all discrepancies (if any) are recorded on the<br />

Discrepancy Record form. If more than one discrepancy exists,<br />

list each discrepancy separately in the boxes provided. Verify<br />

that Hobbs and Tach times have been recorded on the Aircraft<br />

Flight Record form. Both forms are attached to the airplane’s<br />

clipboard.<br />

9. SECURE CHECKLIST COMPLETE<br />

Upon completion of the SECURE CHECKLIST, verify that all items have<br />

been accomplished and that the <strong>checklist</strong> is COMPLETE.<br />

Rev 06 © <strong>Embry</strong>-<strong>Riddle</strong> <strong>Aeronautical</strong> <strong>University</strong> Revised 07-01-2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!