Seaford Rail Extension Vegetation Management Plan Table 13. Revegetation description, Management Area 5 – Zone G. Zone G Revegetation Area Ecological Zone Target community Revegetation methods Site preparation required Total number of plants, clusters or direct seeding required Location and layout of plantings One location – Total area = .11ha Riparian Muehlenbeckia florulenta (Lignum) Shrubland Shrubs – bowl, treeguard and stake required Review weed control section for primary weed control requirements Secondary weed control – spray area for weeds prior to planting Plants - 55 Plant in groups of 3 to 5. Revegetation species Stratum Species name Common name Number Shrubs >1m Muehlenbeckia florulenta Lignum 55 (1 every 20 m 2 ) Total revegetation hectares for Management Area 5 = 7.03 ha. 37
Seaford Rail Extension Vegetation Management Plan Table 14. Revegetation Works Program - Management Area 5. Activity Zone Details Timing Cost Details Cost Year 1: Site preparation & Revegetation Pre planting weed control A,B,C,D,E,F,G Control of herbaceous weeds within planting areas; include spraying individual planting locations for species requiring treeguards April / May 70 hrs $3,850 Total area = 5.58 ha Plant supply A,B,C,D,E,F,G Tube stock Plants – 23,360 June $1.10 each $25, 696 Site preparation Plant bowl, Treeguards, Stake (Refer individual zones for details) C,D,E,F,G Total = 2,300 plants Prepare bowls prior to planting. Supply and fit treeguard and stake during planting Prepare supply and fit = $3.50 per plant $8,050 Planting A,B,C,D,E,F,G Labour (planting 23,360 plants) June/July/ August $1.30 each plant $30,368 Maintenance event A,B,C,D,E,F,G Follow up weed control / slashing around plantings Sept-Oct 50hrs $2,750 Total $70,714 Contingency 10% Total $77,786 Year 2: Site preparation, revegetation, ongoing maintenance and weed control Maintenance event Pre planting weed control A,B,C,D,E,F,G Follow up weed control / slashing around plantings A1, C1 Control of herbaceous weeds within planting areas; include spraying individual planting locations for species requiring treeguards. Total area = 1.45 ha April / May 50hrs $2,750 April / May 20 hrs $1,100 Plant supply A1, C1 Tube stock Plants – 8,525 June $1.10 each $9,378 38
- Page 2 and 3: Transport Services Division ENVIRON
- Page 4 and 5: Seaford Rail Extension Vegetation M
- Page 6 and 7: Seaford Rail Extension Vegetation M
- Page 8 and 9: Seaford Rail Extension Vegetation M
- Page 10 and 11: Seaford Rail Extension Vegetation M
- Page 12 and 13: Seaford Rail Extension Vegetation M
- Page 14 and 15: Seaford Rail Extension Vegetation M
- Page 16 and 17: Seaford Rail Extension Vegetation M
- Page 18 and 19: Seaford Rail Extension Vegetation M
- Page 20 and 21: Seaford Rail Extension Vegetation M
- Page 22 and 23: Seaford Rail Extension Vegetation M
- Page 24 and 25: Seaford Rail Extension Vegetation M
- Page 26 and 27: Seaford Rail Extension Vegetation M
- Page 28 and 29: Seaford Rail Extension Vegetation M
- Page 30 and 31: Seaford Rail Extension Vegetation M
- Page 32 and 33: Seaford Rail Extension Vegetation M
- Page 34 and 35: Seaford Rail Extension Vegetation M
- Page 36 and 37: Seaford Rail Extension Vegetation M
- Page 40 and 41: Seaford Rail Extension Vegetation M
- Page 42 and 43: Seaford Rail Extension Vegetation M
- Page 44 and 45: Seaford Rail Extension Vegetation M
- Page 46 and 47: Seaford Rail Extension Vegetation M
- Page 48 and 49: Seaford Rail Extension Vegetation M
- Page 50 and 51: Seaford Rail Extension Vegetation M
- Page 52 and 53: Seaford Rail Extension Vegetation M
- Page 54 and 55: Seaford Rail Extension Vegetation M
- Page 56 and 57: Seaford Rail Extension Vegetation M
- Page 58 and 59: Seaford Rail Extension Vegetation M
- Page 60 and 61: Seaford Rail Extension Vegetation M
- Page 62 and 63: Seaford Rail Extension Vegetation M
- Page 64 and 65: Seaford Rail Extension Vegetation M
- Page 66 and 67: Seaford Rail Extension Vegetation M
- Page 68 and 69: Seaford Rail Extension Vegetation M
- Page 70 and 71: Seaford Rail Extension Vegetation M
- Page 72 and 73: Seaford Rail Extension Vegetation M
- Page 74 and 75: Seaford Rail Extension Vegetation M
- Page 76 and 77: Seaford Rail Extension Vegetation M
- Page 78 and 79: Seaford Rail Extension Vegetation M
- Page 80 and 81: Seaford Rail Extension Vegetation M
- Page 82 and 83: Seaford Rail Extension Vegetation M
- Page 84 and 85: Seaford Rail Extension Vegetation M
- Page 86 and 87: Seaford Rail Extension Vegetation M
<strong>Seaford</strong> <strong>Rail</strong> Extension <strong>Vegetation</strong> <strong>Management</strong> <strong>Plan</strong><br />
Table 14. Revegetation Works Program - <strong>Management</strong> Area 5.<br />
Activity Zone Details Timing Cost Details Cost<br />
Year 1: Site preparation & Revegetation<br />
Pre planting weed<br />
control<br />
A,B,C,D,E,F,G<br />
Control of herbaceous<br />
weeds within planting<br />
areas; include spraying<br />
individual planting<br />
locations for species<br />
requiring treeguards<br />
April / May 70 hrs $3,850<br />
Total area = 5.58 ha<br />
<strong>Plan</strong>t supply A,B,C,D,E,F,G Tube stock<br />
<strong>Plan</strong>ts – 23,360<br />
June $1.10 each $25, 696<br />
Site preparation<br />
<strong>Plan</strong>t bowl,<br />
Treeguards,<br />
Stake<br />
(Refer individual<br />
zones for details)<br />
C,D,E,F,G Total = 2,300 plants Prepare bowls<br />
prior to planting.<br />
Supply and fit<br />
treeguard and<br />
stake during<br />
planting<br />
Prepare<br />
supply and fit<br />
= $3.50 per<br />
plant<br />
$8,050<br />
<strong>Plan</strong>ting A,B,C,D,E,F,G Labour (planting 23,360<br />
plants)<br />
June/July/<br />
August<br />
$1.30 each<br />
plant<br />
$30,368<br />
Maintenance<br />
event<br />
A,B,C,D,E,F,G Follow up weed control /<br />
slashing around plantings<br />
Sept-Oct 50hrs $2,750<br />
Total $70,714<br />
Contingency 10% Total $77,786<br />
Year 2: Site preparation, revegetation, ongoing maintenance and weed control<br />
Maintenance<br />
event<br />
Pre planting weed<br />
control<br />
A,B,C,D,E,F,G Follow up weed control /<br />
slashing around plantings<br />
A1, C1 Control of herbaceous<br />
weeds within planting<br />
areas; include spraying<br />
individual planting<br />
locations for species<br />
requiring treeguards.<br />
Total area = 1.45 ha<br />
April / May 50hrs $2,750<br />
April / May 20 hrs $1,100<br />
<strong>Plan</strong>t supply A1, C1 Tube stock<br />
<strong>Plan</strong>ts – 8,525<br />
June $1.10 each $9,378<br />
38