EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...
EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ... EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...
Abbreviations CPCB : Central Pollution Control Board CGWB : Central Ground Water Board C.E.T.P : Common Effluent Treatment Plant DOE : Department of Environment DPCC : Delhi Pollution Control Committee DSIDC : Delhi State Industrial Development Corporation DGCA : Directorate General of Civil Aviation EIA : Rapid Environmental Impact Assessment HW Landfill : Hazardous Waste Landfill IAE : Industrial areas/estates MCD : Municipal Corporation of Delhi MOEF : Ministry of Environment & Forest NCT - Delhi : National Capital Territory of Delhi NPC : National Productivity Council NBSS&LUP : National Burea of Soil Survey And landuse planning SLF : Secured Landfill facility TSDF : Treatment, storage and disposal faciity UNEP : United Nations Environment Protection Agency
STUDY TEAM (Environment Division) PROJECT CO-ORDINATOR Dr. A. K. Saxena, Director TEAM LEADER Mr. Yogesh Gupta, Dy. Director TEAM MEMBERS FROM HQRS., New Delhi Ms. Shukla Pal, Assistant Director Mr. Dinesh Aggarwal, Assistant Director Mr. Hemant Kumar, Assistant Director Mr. Dilip Kr. Bera, Assistant Director Mr. Debajit Das, Assistant Director LABORATORY SERVICES SECRETARIAL ASSISTANCE Mr. S. K. Jain Mr. Bhupendra Kumar Mrs. H. K. Sarana Mr. R.K. Ahuja Mr. S. K. Sharma,
- Page 1: Rapid Environmental Impact Assessme
- Page 5 and 6: TABLE OF CONTENT Sl. No. Descriptio
- Page 7 and 8: Sl. No. Description Page No. 9.4 Pu
- Page 9 and 10: Table. No. Content 4.22 Ambient air
- Page 11 and 12: 4.24 Permeability versus depth of s
- Page 13 and 14: Executive Summary Page No 1(9) EXEC
- Page 15 and 16: Area required for developing engine
- Page 17 and 18: generating industrial estates. Ther
- Page 19 and 20: Κ Κ Executive Summary Page No 7(9
- Page 21 and 22: Executive Summary Page No 9(9) area
- Page 23 and 24: Rapid EIA Studies of 3 Pre-identifi
- Page 25 and 26: Rapid EIA Studies of 3 Pre-identifi
- Page 27 and 28: Rapid EIA Studies of 3 Pre-identifi
- Page 29 and 30: Rapid EIA Studies of 3 Pre-identifi
- Page 31 and 32: Rapid EIA Studies of 3 Pre-identifi
- Page 33 and 34: Rapid EIA Studies of 3 Pre-identifi
- Page 35 and 36: Rapid EIA Studies of 3 Pre-identifi
- Page 37 and 38: Rapid EIA Studies of 3 Pre-identifi
- Page 39 and 40: Rapid EIA Studies of 3 Pre-identifi
- Page 41 and 42: Rapid EIA Studies of 3 Pre-identifi
- Page 43 and 44: Rapid EIA Studies of 3 Pre-identifi
- Page 45 and 46: Rapid EIA Studies of 3 Pre-identifi
- Page 47 and 48: Rapid EIA Studies of 3 Pre-identifi
- Page 49 and 50: Rapid EIA Studies of 3 Pre-identifi
- Page 51 and 52: Rapid EIA Studies of 3 Pre-identifi
STUDY TEAM<br />
(Environment Division)<br />
PROJECT CO-ORDINATOR<br />
Dr. A. K. Saxena, Director<br />
TEAM LEADER<br />
Mr. Yogesh Gupta, Dy. Director<br />
TEAM MEMBERS<br />
FROM HQRS., New Delhi<br />
Ms. Shukla Pal, Assistant Director<br />
Mr. D<strong>in</strong>esh Aggarwal, Assistant Director<br />
Mr. Hemant Kumar, Assistant Director<br />
Mr. Dilip Kr. Bera, Assistant Director<br />
Mr. Debajit Das, Assistant Director<br />
LABORATORY SERVICES<br />
SECRETARIAL ASSISTANCE<br />
Mr. S. K. Ja<strong>in</strong><br />
Mr. Bhupendra Kumar<br />
Mrs. H. K. Sarana<br />
Mr. R.K. Ahuja<br />
Mr. S. K. Sharma,