25.12.2014 Views

EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...

EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...

EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Annex II, Page No ii<br />

south <strong>of</strong> the site there is a shallow surface water stream (1-1.5 m wide)<br />

used ma<strong>in</strong>ly for wash<strong>in</strong>g etc. Just adjacent to the northwest boundary<br />

<strong>of</strong> the site construction work go<strong>in</strong>g on for a 60-m wide road (as a part <strong>of</strong><br />

master plan work by DSIDC).The eastern boundary is a brick wall.<br />

Adjacent to this wall, on the other side is a Rice mill. The northern<br />

boundary is fenced.<br />

Observations:<br />

As high-tension l<strong>in</strong>e is pass<strong>in</strong>g through the site, the site would require<br />

clearance from Electricity Authority. Also, the ground water table near<br />

the site is around 1 meter below the exist<strong>in</strong>g ground level which would<br />

be hav<strong>in</strong>g a negative bear<strong>in</strong>g on site selection as CPCB criteria<br />

suggest a m<strong>in</strong>imum distance <strong>of</strong> 2 meter between the ground water<br />

table and base <strong>of</strong> the landfill. Both factors will reduce the capacity <strong>of</strong><br />

landfill tremendously even though site is selected for development.<br />

As DSIDC has already carried out soil <strong>in</strong>vestigations around the<br />

proposed site recently, the follow<strong>in</strong>g <strong>in</strong>formation /data may be<br />

requested by Deptt. <strong>of</strong> Environment to DSIDC:<br />

∗ The detailed site map with survey numbers/khasra numbers <strong>of</strong> the<br />

proposed site<br />

∗ The names <strong>of</strong> the villages located around the 10-km radius <strong>of</strong> the<br />

site, if possible.<br />

∗ Geo-technical details <strong>of</strong> the proposed site, if available, as they have<br />

already selected the neighbor<strong>in</strong>g site for a proposed CETP at<br />

Bawana..<br />

The Contact person at DSIDC is - Mr.S.K.Chabba, Executive Eng<strong>in</strong>eer<br />

DSIDC, Bawana<br />

(Ph.No.-7753490, Fax No.-7752955)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!