Annex II, Page No i<br />

Annexure – 2<br />

<strong>Pre</strong>lim<strong>in</strong>ary Visit Reports<br />

Site I: Bawana Industrial Area Relocation Site<br />

A site visit was made on 17.01.2002 <strong>in</strong> order to assess the prima facie suitability <strong>of</strong><br />

the above-proposed site.<br />

The site visit was made by the follow<strong>in</strong>g <strong>of</strong>ficials:<br />

No. NAME /DESIGNATION ORGANISATION<br />

1. Mr. Pankaj Kumar Department <strong>of</strong> Environment<br />

Deputy Secretary<br />

Govt <strong>of</strong> N.C.T. <strong>of</strong> Delhi<br />

2. Dr. K. Kumar Department <strong>of</strong> environment<br />

Sr. Scientist<br />

Govt. <strong>of</strong> N.C.T. <strong>of</strong> Delhi<br />

3 Mr. Yogesh Gupta (Environment Division)<br />

Deputy Director<br />

National Productivity Council<br />

4. Ms. Shukla Pal (Environment Division)<br />

Assistant Director<br />

NPC<br />

5. Mr Shyam Lal DSIDC<br />

Junior Eng<strong>in</strong>eer<br />

The description <strong>of</strong> site is as follows:<br />

SITE - 1 :<br />

Bawana Industrial Area Relocation Site<br />

The proposed site is located with<strong>in</strong> Bawana Industrial Area closed to<br />

CETP. The site falls between the Ghoga dra<strong>in</strong> and the Bawana<br />

Escape. The ma<strong>in</strong> access road to the site is the road go<strong>in</strong>g to Sanoth<br />

village on the right side <strong>of</strong> the Bawana -Narela road. This road is<br />

almost opposite to the 91 MLD water treatment plant <strong>of</strong> Delhi Jal Board<br />

(DJB) located on the left side. The site is situated almost 18 km from<br />

Samai pur Badli. The total area <strong>of</strong> the site proposed for the<br />

development <strong>of</strong> hazardous waste disposal facility is 15 acres. A 220 KV<br />

high-tension l<strong>in</strong>e passes through the site.<br />

The site has flat topography and the soil is observed to be mixture <strong>of</strong><br />

yellow and grey colour. The ground water table closed to the site is<br />

observed/reported to be around 1 meter below the exist<strong>in</strong>g ground<br />

level as some excavation work for bridge was <strong>in</strong> progress. There are<br />

some trees ma<strong>in</strong>ly eucalyptuses on and near the site. Towards the