Rapid EIA Studies of 3 Pre-identified Hazardous Waste Disposal Sites in NCT - Delhi Page No.146 Wazirpur CETP site Old Bawana site Guman Hera site away from the projected growth boundary of the settlement for (atleast a decade) • 1/2 km away from railway line or highway Conforms to all Conforms to all Conforms to all Conforms to Conforms to all • The site shall be more than 25 Km away from ecologically and or other sensitive areas • The site shall be 25 km away from the projected growth boundary of the settlement for (atleast a decade) all . Conforms to all Further, detailed investigations of these sites were carried out and ranked as per MOEF guidelines as well as by the criteria adapted by NPC followed internationally. The ranking of the sites w.r.t MOEF and NPC's criteria is as given below: Potential site As per MOEF guidelines Sensitivit Hazard y Index potential As per criteria developed by NPC Ideal Rank score for selectio n Rank Score Minimu m score for selectio n Site I 417 Low III 322 300 400 III Site II 406 Low II 339 II Site III 360 Low I 347 I Site IV 473.75 Moderate IV 320 IV Site III located near village Guman Hera has the lowest sensitvity index (as per MOEF's ranking system) and highest score ( as per NPC's criteria). Further, the area available at site III is sufficient for developing a secured landfill facilty for 15 years life. Also additional area around the site could be procured for extension of the facility. Therefore site III located near village Guman Hera is recommended for development of secured landfill facility for disposal of hazardous waste generated from approved industrial estates/areas of NCT - Delhi. However, as "no site can be perfect", the mitigation measures have been proposed to mitigate the adverse environmental impacts. Accordingly, Environmental Management Plan (EMP) has been prepared which shall be followed at the sites for disposal of hazardous waste in environmentally sound manner. The mitigation measures to be taken are summarised in the following action points: - Environment Division, National Productivity Council, New Delhi 7
Rapid EIA Studies of 3 Pre-identified Hazardous Waste Disposal Sites in NCT - Delhi Page No.147 Κ Κ Κ Κ Κ Κ Provide Protective Gears (such as Full sleeve apron, gumboots, mask, Gloves etc) to workers Training to workers for safe handling of wastes. Leachate collection, treatment and disposal (systematic collection and treatment of the leachate generated in the landfill facility). Periodic Environmental Quality monitoring for ground water and ambient air around site. Green belt development surrounding the facility in order to abate air & noise pollution and to reduce the storm water drainage. Periodic water spray in order to suppress dust while carrying out excavation and construction activities After implementation of proposed EMP and mitigation measures, the disposal of hazardous waste at the recommended site shall be considered as environmentally sound process as it will care of the following: • Ground water and soil protection through the provisions of an impermeable base of the facility, lined drain and disposal of non compatible waste in different cells. • Surface water protection through diversion of surface run-on and installation of leachate treatment plant. ----------------------- Environment Division, National Productivity Council, New Delhi 7
- Page 168 and 169: Rapid EIA Studies of 3 Pre-identifi
- Page 170 and 171: Rapid EIA Studies of 3 Pre-identifi
- Page 172 and 173: Rapid EIA Studies of 3 Pre-identifi
- Page 174 and 175: Rapid EIA Studies of 3 Pre-identifi
- Page 176 and 177: Rapid EIA Studies of 3 Pre-identifi
- Page 178 and 179: Rapid EIA Studies of 3 Pre-identifi
- Page 180 and 181: Rapid EIA Studies of 3 Pre-identifi
- Page 182 and 183: Rapid EIA Studies of 3 Pre-identifi
- Page 184 and 185: Rapid EIA Studies of 3 Pre-identifi
- Page 186 and 187: Rapid EIA Studies of 3 Pre-identifi
- Page 188 and 189: Rapid EIA Studies of 3 Pre-identifi
- Page 190 and 191: Rapid EIA Studies of 3 Pre-identifi
- Page 192 and 193: Rapid EIA Studies of 3 Pre-identifi
- Page 194 and 195: Rapid EIA Studies of 3 Pre-identifi
- Page 196 and 197: Rapid EIA Studies of 3 Pre-identifi
- Page 198 and 199: Rapid EIA Studies of 3 Pre-identifi
- Page 200 and 201: Rapid EIA Studies of 3 Pre-identifi
- Page 202 and 203: Rapid EIA Studies of 3 Pre-identifi
- Page 204 and 205: Rapid EIA Studies of 3 Pre-identifi
- Page 206 and 207: Rapid EIA Studies of 3 Pre-identifi
- Page 208 and 209: Rapid EIA Studies of 3 Pre-identifi
- Page 210 and 211: Rapid EIA Studies of 3 Pre-identifi
- Page 212 and 213: Rapid EIA Studies of 3 Pre-identifi
- Page 214 and 215: Rapid EIA Studies of 3 Pre-identifi
- Page 216 and 217: Rapid EIA Studies of 3 Pre-identifi
- Page 220 and 221: Rapid EIA Studies of 3 Pre-identifi
- Page 222 and 223: Annex I, Page No ii Topography: In
- Page 224 and 225: Annex I, Page No iv locate the site
- Page 226 and 227: Annex I, Page No vi 0.2 Bad (1) Lan
- Page 228 and 229: Annex II, Page No ii south of the s
- Page 230 and 231: Annex II, Page No iv is a open area
- Page 232 and 233: Annex II, Page No vi the site where
- Page 234 and 235: Annex III, Page No ii PRIMARY WATER
- Page 236 and 237: Annex IV, Page No ii Mappin Descrip
- Page 238 and 239: Mappin g Unit Description with loam
Rapid <strong>EIA</strong> <strong>Studies</strong> <strong>of</strong> 3 <strong>Pre</strong>-identified <strong>Hazardous</strong> <strong>Waste</strong> <strong>Disposal</strong> <strong>Sites</strong> <strong>in</strong> NCT - Delhi<br />
Page No.146<br />
Wazirpur<br />
CETP site<br />
Old Bawana<br />
site<br />
Guman Hera<br />
site<br />
away from the projected<br />
growth boundary <strong>of</strong> the<br />
settlement for (atleast a<br />
decade)<br />
• 1/2 km away from<br />
railway l<strong>in</strong>e or highway<br />
Conforms to all Conforms to<br />
all<br />
Conforms to all Conforms to<br />
Conforms to all<br />
• The site shall be more<br />
than 25 Km away from<br />
ecologically and or other<br />
sensitive areas<br />
• The site shall be 25 km<br />
away from the projected<br />
growth boundary <strong>of</strong> the<br />
settlement for (atleast a<br />
decade)<br />
all .<br />
Conforms to<br />
all<br />
Further, detailed <strong>in</strong>vestigations <strong>of</strong> these sites were carried out and ranked as per<br />
MOEF guidel<strong>in</strong>es as well as by the criteria adapted by NPC followed <strong>in</strong>ternationally.<br />
The rank<strong>in</strong>g <strong>of</strong> the sites w.r.t MOEF and NPC's criteria is as given below:<br />
Potential<br />
site<br />
As per MOEF guidel<strong>in</strong>es<br />
Sensitivit Hazard<br />
y Index potential<br />
As per criteria developed by NPC<br />
Ideal Rank<br />
score<br />
for<br />
selectio<br />
n<br />
Rank Score M<strong>in</strong>imu<br />
m score<br />
for<br />
selectio<br />
n<br />
Site I 417 Low III 322 300 400 III<br />
Site II 406 Low II 339 II<br />
Site III 360 Low I 347 I<br />
Site IV 473.75 Moderate IV 320<br />
IV<br />
Site III located near village Guman Hera has the lowest sensitvity <strong>in</strong>dex (as per<br />
MOEF's rank<strong>in</strong>g system) and highest score ( as per NPC's criteria). Further, the<br />
area available at site III is sufficient for develop<strong>in</strong>g a secured landfill facilty for<br />
15 years life. Also additional area around the site could be procured for<br />
extension <strong>of</strong> the facility.<br />
Therefore site III located near village Guman Hera is recommended for<br />
development <strong>of</strong> secured landfill facility for disposal <strong>of</strong> hazardous waste<br />
generated from approved <strong>in</strong>dustrial estates/areas <strong>of</strong> NCT - Delhi.<br />
However, as "no site can be perfect", the mitigation measures have been proposed<br />
to mitigate the adverse environmental impacts. Accord<strong>in</strong>gly, Environmental<br />
Management Plan (EMP) has been prepared which shall be followed at the sites for<br />
disposal <strong>of</strong> hazardous waste <strong>in</strong> environmentally sound manner.<br />
The mitigation measures to be taken are summarised <strong>in</strong> the follow<strong>in</strong>g action po<strong>in</strong>ts: -<br />
Environment Division, National Productivity Council, New Delhi<br />
7