EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...
EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...
EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Rapid <strong>EIA</strong> <strong>Studies</strong> <strong>of</strong> 3 <strong>Pre</strong>-identified <strong>Hazardous</strong> <strong>Waste</strong> <strong>Disposal</strong> <strong>Sites</strong> <strong>in</strong> NCT - Delhi<br />
Page No.141<br />
9.1 INTRODUCTION<br />
Experience from the successful project show that consult<strong>in</strong>g with the public is a<br />
important as perform<strong>in</strong>g good technical studies. Public consultation process <strong>in</strong>volves<br />
the participation <strong>of</strong> the public <strong>in</strong> the process <strong>of</strong> develop<strong>in</strong>g the compost<strong>in</strong>g facility site<br />
for the scientific management <strong>of</strong> municipal waste. Effective public <strong>in</strong>volvement<br />
requires <strong>in</strong>tegrat<strong>in</strong>g public concerns and values at every stage <strong>of</strong> the process. This<br />
process communicates to the public what to expect, provid<strong>in</strong>g a k<strong>in</strong>d <strong>of</strong> “contract”<br />
with the public that helps to establish the credibility <strong>of</strong> the sponsor<strong>in</strong>g agency.<br />
9.2 STAKEHOLDERS TO THE PROJECT<br />
The follow<strong>in</strong>g stakeholders to be <strong>in</strong>volved <strong>in</strong> the public participation process:<br />
Community Based Organisations, Local Bodies<br />
The village societies near the compost<strong>in</strong>g facility site have to be <strong>in</strong>volved <strong>in</strong> the<br />
consultation process. They should be <strong>in</strong>formed <strong>of</strong> the advantages and disadvantages<br />
<strong>of</strong> hav<strong>in</strong>g the facility <strong>in</strong> that area for the community and environment as a whole.<br />
Environmental NGO<br />
NGOs have to be engaged <strong>in</strong> carry<strong>in</strong>g out public consultation process. The NGO will<br />
help <strong>in</strong> prepar<strong>in</strong>g and dissem<strong>in</strong>at<strong>in</strong>g public <strong>in</strong>formation <strong>in</strong> the local language both<br />
prior to and after the <strong>EIA</strong> study on project objectives and summary <strong>of</strong> the report<br />
respectively.<br />
Local Media<br />
Local media will help <strong>in</strong> build<strong>in</strong>g up the public op<strong>in</strong>ion by publish<strong>in</strong>g the articles <strong>in</strong><br />
local language regard<strong>in</strong>g compost<strong>in</strong>g project. A public notice regard<strong>in</strong>g the public<br />
consultation meet<strong>in</strong>g has also to be published <strong>in</strong> the same daily.<br />
Medical Pr<strong>of</strong>essionals<br />
The prom<strong>in</strong>ent medical pr<strong>of</strong>essionals (local doctors) may expla<strong>in</strong> to the local people<br />
the benefits <strong>of</strong> hav<strong>in</strong>g a waste treatment (compost<strong>in</strong>g) facility rather than dump<strong>in</strong>g<br />
the waste <strong>in</strong> a haphazard manner.<br />
Traditional Leaders<br />
The head <strong>of</strong> Panchayats <strong>of</strong> nearby villages should be <strong>in</strong>volved <strong>in</strong> the public<br />
consultation process. They have to be <strong>in</strong>vited to the Public Consultation meet<strong>in</strong>g and<br />
have to be briefed about the facility and its affects on their lives and their livelihood at<br />
an early stage.<br />
<strong>Waste</strong> generators<br />
Industrial units/Group <strong>of</strong> waste generators shall take <strong>in</strong>itiatives <strong>in</strong> approach<strong>in</strong>g the<br />
Government/DOE and F<strong>in</strong>ancial Institutions for sett<strong>in</strong>g up the SLF. DOE/DPCC shall<br />
provide necessary <strong>in</strong>formation regard<strong>in</strong>g the quantity and type <strong>of</strong> waste generated,<br />
Environment Division, National Productivity Council, New Delhi<br />
7