Rapid EIA Studies of 3 Pre-identified Hazardous Waste Disposal Sites in NCT - Delhi Page No.140 Chapter-9 PUBLIC CONSULTATION PROCESS Environment Division, National Productivity Council, New Delhi 7
Rapid EIA Studies of 3 Pre-identified Hazardous Waste Disposal Sites in NCT - Delhi Page No.141 9.1 INTRODUCTION Experience from the successful project show that consulting with the public is a important as performing good technical studies. Public consultation process involves the participation of the public in the process of developing the composting facility site for the scientific management of municipal waste. Effective public involvement requires integrating public concerns and values at every stage of the process. This process communicates to the public what to expect, providing a kind of “contract” with the public that helps to establish the credibility of the sponsoring agency. 9.2 STAKEHOLDERS TO THE PROJECT The following stakeholders to be involved in the public participation process: Community Based Organisations, Local Bodies The village societies near the composting facility site have to be involved in the consultation process. They should be informed of the advantages and disadvantages of having the facility in that area for the community and environment as a whole. Environmental NGO NGOs have to be engaged in carrying out public consultation process. The NGO will help in preparing and disseminating public information in the local language both prior to and after the EIA study on project objectives and summary of the report respectively. Local Media Local media will help in building up the public opinion by publishing the articles in local language regarding composting project. A public notice regarding the public consultation meeting has also to be published in the same daily. Medical Professionals The prominent medical professionals (local doctors) may explain to the local people the benefits of having a waste treatment (composting) facility rather than dumping the waste in a haphazard manner. Traditional Leaders The head of Panchayats of nearby villages should be involved in the public consultation process. They have to be invited to the Public Consultation meeting and have to be briefed about the facility and its affects on their lives and their livelihood at an early stage. Waste generators Industrial units/Group of waste generators shall take initiatives in approaching the Government/DOE and Financial Institutions for setting up the SLF. DOE/DPCC shall provide necessary information regarding the quantity and type of waste generated, Environment Division, National Productivity Council, New Delhi 7
- Page 162 and 163: Rapid EIA Studies of 3 Pre-identifi
- Page 164 and 165: Rapid EIA Studies of 3 Pre-identifi
- Page 166 and 167: Rapid EIA Studies of 3 Pre-identifi
- Page 168 and 169: Rapid EIA Studies of 3 Pre-identifi
- Page 170 and 171: Rapid EIA Studies of 3 Pre-identifi
- Page 172 and 173: Rapid EIA Studies of 3 Pre-identifi
- Page 174 and 175: Rapid EIA Studies of 3 Pre-identifi
- Page 176 and 177: Rapid EIA Studies of 3 Pre-identifi
- Page 178 and 179: Rapid EIA Studies of 3 Pre-identifi
- Page 180 and 181: Rapid EIA Studies of 3 Pre-identifi
- Page 182 and 183: Rapid EIA Studies of 3 Pre-identifi
- Page 184 and 185: Rapid EIA Studies of 3 Pre-identifi
- Page 186 and 187: Rapid EIA Studies of 3 Pre-identifi
- Page 188 and 189: Rapid EIA Studies of 3 Pre-identifi
- Page 190 and 191: Rapid EIA Studies of 3 Pre-identifi
- Page 192 and 193: Rapid EIA Studies of 3 Pre-identifi
- Page 194 and 195: Rapid EIA Studies of 3 Pre-identifi
- Page 196 and 197: Rapid EIA Studies of 3 Pre-identifi
- Page 198 and 199: Rapid EIA Studies of 3 Pre-identifi
- Page 200 and 201: Rapid EIA Studies of 3 Pre-identifi
- Page 202 and 203: Rapid EIA Studies of 3 Pre-identifi
- Page 204 and 205: Rapid EIA Studies of 3 Pre-identifi
- Page 206 and 207: Rapid EIA Studies of 3 Pre-identifi
- Page 208 and 209: Rapid EIA Studies of 3 Pre-identifi
- Page 210 and 211: Rapid EIA Studies of 3 Pre-identifi
- Page 214 and 215: Rapid EIA Studies of 3 Pre-identifi
- Page 216 and 217: Rapid EIA Studies of 3 Pre-identifi
- Page 218 and 219: Rapid EIA Studies of 3 Pre-identifi
- Page 220 and 221: Rapid EIA Studies of 3 Pre-identifi
- Page 222 and 223: Annex I, Page No ii Topography: In
- Page 224 and 225: Annex I, Page No iv locate the site
- Page 226 and 227: Annex I, Page No vi 0.2 Bad (1) Lan
- Page 228 and 229: Annex II, Page No ii south of the s
- Page 230 and 231: Annex II, Page No iv is a open area
- Page 232 and 233: Annex II, Page No vi the site where
- Page 234 and 235: Annex III, Page No ii PRIMARY WATER
- Page 236 and 237: Annex IV, Page No ii Mappin Descrip
- Page 238 and 239: Mappin g Unit Description with loam
Rapid <strong>EIA</strong> <strong>Studies</strong> <strong>of</strong> 3 <strong>Pre</strong>-identified <strong>Hazardous</strong> <strong>Waste</strong> <strong>Disposal</strong> <strong>Sites</strong> <strong>in</strong> NCT - Delhi<br />
Page No.140<br />
Chapter-9<br />
PUBLIC CONSULTATION PROCESS<br />
Environment Division, National Productivity Council, New Delhi<br />
7