25.12.2014 Views

EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...

EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...

EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Rapid <strong>EIA</strong> <strong>Studies</strong> <strong>of</strong> 3 <strong>Pre</strong>-identified <strong>Hazardous</strong> <strong>Waste</strong> <strong>Disposal</strong> <strong>Sites</strong> <strong>in</strong> NCT - Delhi<br />

Page No.136<br />

No. ACTIVITY ENVIRONMENTAL<br />

HAZARDS<br />

generation<br />

monsoon season<br />

7. Sanitary<br />

facilities for the<br />

staff<br />

8. Laboratory<br />

facility<br />

9. Monitor<strong>in</strong>g<br />

activity<br />

(Monitor<strong>in</strong>g<br />

activity should<br />

cont<strong>in</strong>ue even<br />

after closure <strong>of</strong><br />

the facility)<br />

10. Operation<br />

ma<strong>in</strong>tenance &<br />

closure <strong>of</strong> the<br />

facility<br />

<strong>in</strong><br />

• Blow<strong>in</strong>g away <strong>of</strong> the<br />

waste dust with the<br />

w<strong>in</strong>d<br />

MANAGEMENT ACTION TO BE TAKEN<br />

HDPE sheets and ensure that ra<strong>in</strong><br />

water does not come <strong>in</strong> contact with<br />

the waste<br />

• Spray water with dust suppress<strong>in</strong>g<br />

chemicals<br />

Cover the waste layer with fresh soil<br />

and compact it<br />

• <strong>Disposal</strong> <strong>of</strong> waste at<br />

wrong place<br />

Erect <strong>in</strong>dicators and sign boards for<br />

systematic operation<br />

• Leachate generation • Provide leachate collection and<br />

conveyance system. Leachate has to<br />

be treated before discharge<br />

Generation <strong>of</strong> waste<br />

water<br />

Generation <strong>of</strong> the<br />

waste water<br />

• Broken glassware<br />

and other solid<br />

wastes<br />

• Ground water<br />

pollution<br />

• Soil pollution due to<br />

leachate<br />

• Air Pollution<br />

• Contam<strong>in</strong>ation <strong>of</strong><br />

environment<br />

• <strong>Waste</strong>water has to be given suitable<br />

treatment prior to discharge or it can<br />

be mixed with leachate and taken for<br />

treatment.<br />

• <strong>Waste</strong>water has to be given suitable<br />

treatment before discharge or it can<br />

be mixed with leachate after study<strong>in</strong>g<br />

the compatibility.<br />

• Dispose them <strong>of</strong>f <strong>in</strong> the facility<br />

• Dig/drill bore wells around the site<br />

based upon ground water flow and<br />

take samples <strong>of</strong> ground water<br />

periodically for analysis. In case <strong>of</strong><br />

pollution <strong>of</strong> ground water is noticed,<br />

develop adequate redemption plan<br />

and execute it and keep monitor<strong>in</strong>g<br />

• In case any pollution <strong>of</strong> ground water<br />

is noticed, then soil samples at<br />

various depths around the SLF should<br />

be analysed and suitable remediation<br />

steps be undertaken.<br />

• Ambient air monitor<strong>in</strong>g should be<br />

carried out periodically & if air<br />

pollution is found, appropriate action<br />

has to be taken.<br />

• As a compensatory measure, green<br />

belt has to be developed <strong>in</strong> 10 - 15 mt<br />

Strip <strong>of</strong> land encircl<strong>in</strong>g the site.<br />

• On both sides <strong>of</strong> the approach road,<br />

at least 5 m wide green belt has to be<br />

developed.<br />

8.2 ENVIRONMENTAL QUALITY MONITORING<br />

Environment Division, National Productivity Council, New Delhi<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!