Rapid <strong>EIA</strong> <strong>Studies</strong> <strong>of</strong> 3 <strong>Pre</strong>-identified <strong>Hazardous</strong> <strong>Waste</strong> <strong>Disposal</strong> <strong>Sites</strong> <strong>in</strong> NCT - Delhi<br />

Page No.135<br />

No. ACTIVITY ENVIRONMENTAL<br />

HAZARDS<br />

construction<br />

MANAGEMENT ACTION TO BE TAKEN<br />

• Green belt (<strong>of</strong> appropriate species)<br />

should be developed surround<strong>in</strong>g the<br />

site.<br />

Transportation<br />

4. Load<strong>in</strong>g/unloadi<br />

ng<br />

&<br />

Transportation<br />

<strong>of</strong> waste<br />

Storage<br />

5. Temporary<br />

storage <strong>of</strong> the<br />

waste at the<br />

site<br />

<strong>Disposal</strong><br />

6. <strong>Disposal</strong> <strong>of</strong> the<br />

waste <strong>in</strong>to<br />

secured landfill<br />

Leakage/spillage<br />

<strong>of</strong> the <strong>of</strong> waste<br />

<strong>Disposal</strong> <strong>of</strong> the<br />

waste at unwanted<br />

places<br />

Tyres gett<strong>in</strong>g<br />

tarnished with waste<br />

while load<strong>in</strong>g &<br />

unload<strong>in</strong>g operation and<br />

caus<strong>in</strong>g further land<br />

pollution as they move<br />

• Adverse health<br />

impacts on the<br />

labourers<br />

• As far as possible waste should be<br />

transported <strong>in</strong> the sacks and<br />

conta<strong>in</strong>ers<br />

• Loaded waste should be fully covered<br />

with HDPE sheet<br />

• Body <strong>of</strong> the lorry should be leak pro<strong>of</strong><br />

or it should be l<strong>in</strong>ed at bottom with<br />

bitumen<br />

• Follow waste track<strong>in</strong>g system<br />

• After load<strong>in</strong>g/unload<strong>in</strong>g the waste,<br />

Tyres <strong>of</strong> the lorry should be washed<br />

and wash water should be sent for<br />

treatment<br />

Labourers should be provided with<br />

gloves and gum boots<br />

Labourers should be given primary<br />

tra<strong>in</strong><strong>in</strong>g<br />

• Periodic medical check ups should be<br />

carried out.<br />

Leachate generation • Temporary facility should have<br />

impermeable floor<strong>in</strong>g and proper<br />

leachate collection arrangement.,<br />

Leachate has to be treated before<br />

discharge<br />

• Blow<strong>in</strong>g away <strong>of</strong> Spray water<br />

waste dust with w<strong>in</strong>d Enclose the storage facility<br />

• Violent reaction, fire<br />

or explosion<br />

Develop compatibility matrix and<br />

place only compatible wastes together<br />

• Develop sound emergency plan to<br />

meet any unwanted accident<br />

• Provide fire fight<strong>in</strong>g facilities and<br />

alarm system<br />

• Violent reaction, fire Develop compatibility matrix and<br />

or explosion place only compatible wastes together.<br />

Develop sound emergency plan to<br />

meet any unwanted accident<br />

• Provide fire fight<strong>in</strong>g facilities and<br />

alarm system<br />

• Excessive leachate • Cover the sub-cells <strong>of</strong> the facility with<br />

Environment Division, National Productivity Council, New Delhi<br />

7