EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...
EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...
EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Rapid <strong>EIA</strong> <strong>Studies</strong> <strong>of</strong> 3 <strong>Pre</strong>-identified <strong>Hazardous</strong> <strong>Waste</strong> <strong>Disposal</strong> <strong>Sites</strong> <strong>in</strong> NCT - Delhi<br />
Page No.135<br />
No. ACTIVITY ENVIRONMENTAL<br />
HAZARDS<br />
construction<br />
MANAGEMENT ACTION TO BE TAKEN<br />
• Green belt (<strong>of</strong> appropriate species)<br />
should be developed surround<strong>in</strong>g the<br />
site.<br />
Transportation<br />
4. Load<strong>in</strong>g/unloadi<br />
ng<br />
&<br />
Transportation<br />
<strong>of</strong> waste<br />
Storage<br />
5. Temporary<br />
storage <strong>of</strong> the<br />
waste at the<br />
site<br />
<strong>Disposal</strong><br />
6. <strong>Disposal</strong> <strong>of</strong> the<br />
waste <strong>in</strong>to<br />
secured landfill<br />
Leakage/spillage<br />
<strong>of</strong> the <strong>of</strong> waste<br />
<strong>Disposal</strong> <strong>of</strong> the<br />
waste at unwanted<br />
places<br />
Tyres gett<strong>in</strong>g<br />
tarnished with waste<br />
while load<strong>in</strong>g &<br />
unload<strong>in</strong>g operation and<br />
caus<strong>in</strong>g further land<br />
pollution as they move<br />
• Adverse health<br />
impacts on the<br />
labourers<br />
• As far as possible waste should be<br />
transported <strong>in</strong> the sacks and<br />
conta<strong>in</strong>ers<br />
• Loaded waste should be fully covered<br />
with HDPE sheet<br />
• Body <strong>of</strong> the lorry should be leak pro<strong>of</strong><br />
or it should be l<strong>in</strong>ed at bottom with<br />
bitumen<br />
• Follow waste track<strong>in</strong>g system<br />
• After load<strong>in</strong>g/unload<strong>in</strong>g the waste,<br />
Tyres <strong>of</strong> the lorry should be washed<br />
and wash water should be sent for<br />
treatment<br />
Labourers should be provided with<br />
gloves and gum boots<br />
Labourers should be given primary<br />
tra<strong>in</strong><strong>in</strong>g<br />
• Periodic medical check ups should be<br />
carried out.<br />
Leachate generation • Temporary facility should have<br />
impermeable floor<strong>in</strong>g and proper<br />
leachate collection arrangement.,<br />
Leachate has to be treated before<br />
discharge<br />
• Blow<strong>in</strong>g away <strong>of</strong> Spray water<br />
waste dust with w<strong>in</strong>d Enclose the storage facility<br />
• Violent reaction, fire<br />
or explosion<br />
Develop compatibility matrix and<br />
place only compatible wastes together<br />
• Develop sound emergency plan to<br />
meet any unwanted accident<br />
• Provide fire fight<strong>in</strong>g facilities and<br />
alarm system<br />
• Violent reaction, fire Develop compatibility matrix and<br />
or explosion place only compatible wastes together.<br />
Develop sound emergency plan to<br />
meet any unwanted accident<br />
• Provide fire fight<strong>in</strong>g facilities and<br />
alarm system<br />
• Excessive leachate • Cover the sub-cells <strong>of</strong> the facility with<br />
Environment Division, National Productivity Council, New Delhi<br />
7