Rapid EIA Studies of 3 Pre-identified Hazardous Waste Disposal Sites in NCT - Delhi Page No.184 No . Table 7.2 Weighted Impacts without Mitigation Measures Potential Impact Area Construction Phase Operation Phase Closure Phase ACTIVITY A B C D E F G H I J Total 1 Air Quality -1(2) -2(2) -1(2) +2(3) -1(2) -2(2) -1(2) N N -1(2) -12 2. Surface N N N +2(1) -2(1) N N -1(1) N N -1 Water 3 Ground N N N N N -3(3) -2(3) -2(2) N N -19 Water 4. Land -1(2) -1(2) N +1(1) -1(2) -1(1) N -1(1) N +2(2) -3 5. Noise -2(2) -2(2) -1(1) N -1(2) N -1(2) N N -2(2) -17 6. Vegetation N N N +1(2) N N N +1(1) N +2(1) +5 7. Environment al Health 8. Aesthetic Value -3(2) -2(2) -2(1) +3(2) -2(1) -3(3) -1(1) N +2(2) N -14 -1(2) +2(2) +1(2) +3(2) -3(2) -2(2) -1(1) N N N -1 9. Socioeconomic +2(3) +2(3) +2(3) +1(1) +2(2) +2(2) +1(1) N N +1(1) +29 TOTAL -48 Environment Division, National Productivity Council, New Delhi 7
Rapid EIA Studies of 3 Pre-identified Hazardous Waste Disposal Sites in NCT - Delhi Page No.127 Outcome of Weighted Impact Analysis without Mitigation Measures As per the developed criteria, the waste management facility has been rated as less adversely impacting facility. However, certain mitigation measures have been recommended in order to minimise the impact on the environment. 7.4.4 Mitigation Measures In order to minimise the adverse environmental impacts arising out of the various activities pertaining to the development and operation of the waste management facility the following mitigation measures have been recommended. (1) Excavation/ soil filling. ♦ ♦ ♦ ♦ Periodic spray of water to suppress dust. Restriction of unnecessary movement of heavy machinery. Use the extra excavated soil to fill low lying areas. Develop green belt surrounding the site. (2) Construction of bottom liner, cover liner and drainage system. ♦ Spray of water to suppress dust. (3) Construction of buildings for personnel facilities, maintenance shop, washing area. ♦ Spray water to suppress the dust while excavation is going on. ♦ Use construction waste for filling low lying areas in the vicinity of the site. (4) Loading/Unloading and transportation of waste ♦ Dumpers/ tractors used for shifting waste should be checked for leakages. If leakages are found, they have to be sealed. ♦ After loading the waste, it has to be covered tightly with PVC sheet in order to prevent spillage and blowing of the waste ♦ Regular health checks have to be carried out for the labourers, who are involved directly or indirectly in the shifting of the waste. Labourers should be provided with masks, rubber gloves and gum-boots. Environment Division, National Productivity Council, New Delhi 7
- Page 148 and 149: Rapid EIA Studies of 3 Pre-identifi
- Page 150 and 151: Rapid EIA Studies of 3 Pre-identifi
- Page 152 and 153: Rapid EIA Studies of 3 Pre-identifi
- Page 154 and 155: Rapid EIA Studies of 3 Pre-identifi
- Page 156 and 157: Rapid EIA Studies of 3 Pre-identifi
- Page 158 and 159: Rapid EIA Studies of 3 Pre-identifi
- Page 160 and 161: Rapid EIA Studies of 3 Pre-identifi
- Page 162 and 163: Rapid EIA Studies of 3 Pre-identifi
- Page 164 and 165: Rapid EIA Studies of 3 Pre-identifi
- Page 166 and 167: Rapid EIA Studies of 3 Pre-identifi
- Page 168 and 169: Rapid EIA Studies of 3 Pre-identifi
- Page 170 and 171: Rapid EIA Studies of 3 Pre-identifi
- Page 172 and 173: Rapid EIA Studies of 3 Pre-identifi
- Page 174 and 175: Rapid EIA Studies of 3 Pre-identifi
- Page 176 and 177: Rapid EIA Studies of 3 Pre-identifi
- Page 178 and 179: Rapid EIA Studies of 3 Pre-identifi
- Page 180 and 181: Rapid EIA Studies of 3 Pre-identifi
- Page 182 and 183: Rapid EIA Studies of 3 Pre-identifi
- Page 184 and 185: Rapid EIA Studies of 3 Pre-identifi
- Page 186 and 187: Rapid EIA Studies of 3 Pre-identifi
- Page 188 and 189: Rapid EIA Studies of 3 Pre-identifi
- Page 190 and 191: Rapid EIA Studies of 3 Pre-identifi
- Page 192 and 193: Rapid EIA Studies of 3 Pre-identifi
- Page 194 and 195: Rapid EIA Studies of 3 Pre-identifi
- Page 196 and 197: Rapid EIA Studies of 3 Pre-identifi
- Page 200 and 201: Rapid EIA Studies of 3 Pre-identifi
- Page 202 and 203: Rapid EIA Studies of 3 Pre-identifi
- Page 204 and 205: Rapid EIA Studies of 3 Pre-identifi
- Page 206 and 207: Rapid EIA Studies of 3 Pre-identifi
- Page 208 and 209: Rapid EIA Studies of 3 Pre-identifi
- Page 210 and 211: Rapid EIA Studies of 3 Pre-identifi
- Page 212 and 213: Rapid EIA Studies of 3 Pre-identifi
- Page 214 and 215: Rapid EIA Studies of 3 Pre-identifi
- Page 216 and 217: Rapid EIA Studies of 3 Pre-identifi
- Page 218 and 219: Rapid EIA Studies of 3 Pre-identifi
- Page 220 and 221: Rapid EIA Studies of 3 Pre-identifi
- Page 222 and 223: Annex I, Page No ii Topography: In
- Page 224 and 225: Annex I, Page No iv locate the site
- Page 226 and 227: Annex I, Page No vi 0.2 Bad (1) Lan
- Page 228 and 229: Annex II, Page No ii south of the s
- Page 230 and 231: Annex II, Page No iv is a open area
- Page 232 and 233: Annex II, Page No vi the site where
- Page 234 and 235: Annex III, Page No ii PRIMARY WATER
- Page 236 and 237: Annex IV, Page No ii Mappin Descrip
- Page 238 and 239: Mappin g Unit Description with loam
Rapid <strong>EIA</strong> <strong>Studies</strong> <strong>of</strong> 3 <strong>Pre</strong>-identified <strong>Hazardous</strong> <strong>Waste</strong> <strong>Disposal</strong> <strong>Sites</strong> <strong>in</strong> NCT - Delhi<br />
Page No.184<br />
No<br />
.<br />
Table 7.2 Weighted Impacts without Mitigation Measures<br />
Potential<br />
Impact<br />
Area<br />
Construction Phase Operation Phase Closure<br />
Phase<br />
ACTIVITY<br />
A B C D E F G H I J<br />
Total<br />
1 Air Quality -1(2) -2(2) -1(2) +2(3) -1(2) -2(2) -1(2) N N -1(2) -12<br />
2. Surface N N N +2(1) -2(1) N N -1(1) N N -1<br />
Water<br />
3 Ground N N N N N -3(3) -2(3) -2(2) N N -19<br />
Water<br />
4. Land -1(2) -1(2) N +1(1) -1(2) -1(1) N -1(1) N +2(2) -3<br />
5. Noise -2(2) -2(2) -1(1) N -1(2) N -1(2) N N -2(2) -17<br />
6. Vegetation N N N +1(2) N N N +1(1) N +2(1) +5<br />
7. Environment<br />
al Health<br />
8. Aesthetic<br />
Value<br />
-3(2) -2(2) -2(1) +3(2) -2(1) -3(3) -1(1) N +2(2) N -14<br />
-1(2) +2(2) +1(2) +3(2) -3(2) -2(2) -1(1) N N N -1<br />
9. Socioeconomic<br />
+2(3) +2(3) +2(3) +1(1) +2(2) +2(2) +1(1) N N +1(1) +29<br />
TOTAL -48<br />
Environment Division, National Productivity Council, New Delhi<br />
7