25.12.2014 Views

EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...

EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...

EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Rapid <strong>EIA</strong> <strong>Studies</strong> <strong>of</strong> 3 <strong>Pre</strong>-identified <strong>Hazardous</strong> <strong>Waste</strong> <strong>Disposal</strong> <strong>Sites</strong> <strong>in</strong> NCT - Delhi<br />

Page No.183<br />

In this weighted impact table the entries are presented <strong>in</strong> the form x(y), where" x"<br />

denotes the magnitude <strong>of</strong> the impact and "y" denotes the importance <strong>of</strong> the impact<br />

while "+" denotes beneficial, " - " denotes adverse impacts and "N" depicts no<br />

impact. Therefore total impact value for any activity on environment will be the<br />

multiplication <strong>of</strong> 'x' & 'y'. The activities to be carried out dur<strong>in</strong>g development and<br />

operation <strong>of</strong> SLF are given below:<br />

Construction Phase Code Operation phase Code<br />

Excavation/soil<br />

fill<strong>in</strong>g,<br />

embankment and road<br />

construction<br />

Construction <strong>of</strong> build<strong>in</strong>gs for<br />

personnel facilities, ma<strong>in</strong>tenance<br />

shop, wash<strong>in</strong>g area, storage,<br />

treatment facility.<br />

A Transportation <strong>of</strong> waste E<br />

B Collection and storage <strong>of</strong> waste F<br />

Bottom l<strong>in</strong>er & cover l<strong>in</strong>er and<br />

dra<strong>in</strong>age system construction<br />

C Spread<strong>in</strong>g, compaction &<br />

consolidation <strong>of</strong> the waste<br />

G<br />

Development <strong>of</strong> green belt D Collection & treatment <strong>of</strong> leachate H<br />

Closure & Post Closure Phase<br />

Monitor<strong>in</strong>g <strong>of</strong> landfill facility I Decommission<strong>in</strong>g and closure <strong>of</strong><br />

disposal facility<br />

J<br />

Environment Division, National Productivity Council, New Delhi<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!