Rapid EIA Studies of 3 Pre-identified Hazardous Waste Disposal Sites in NCT - Delhi Page No.182 Potential Impact Area Construction Phase Operation Phase Post Closure Phase Adve No Benefi Adv No Bene Adv No Ben rse cial erse ficial erse efici al J. AESHETIC 3 3(L) 3(L) Legend : S = Short term, L = Long term. Each impact is classified as either short-term or long-term impact in the table-7.1 above. 7.4.2 Criteria for Rating the Impacts Impact Rating Criteria Following criteria has been considered for rating of the impacts. For each impact area, the magnitude and importance of impact has been rated on the scale of 1 to 3 Magnitude • High Impact = 3 • Moderate Impact = 2 • Less Impact = 1 Importance • Very Important = 3 • Moderately Important = 2 • Less important = 1 Ranking Criteria Keeping in view, seven major activities having an impact on the environment and considering nine major impact areas (as shown in Tables 7.2 & 7.3) the criteria for overall ranking of the secured landfill facility is developed as follows:- Total Score, if Above 500 The WMF is having very high adverse Impact 500 - 100 The WMF is having Moderate Adverse Impact Below 100 The WMF is having Less Adverse Impact WMF: Waste management facility 7.4.3 Weighted Impacts Without Considering Mitigation Measures Based on the criteria for rating the impacts, the weighted impacts without taking any mitigation measures have been presented in Table 7.2 for major activities in the construction and operation phase of the secured landfill facility. Environment Division, National Productivity Council, New Delhi 7
Rapid EIA Studies of 3 Pre-identified Hazardous Waste Disposal Sites in NCT - Delhi Page No.183 In this weighted impact table the entries are presented in the form x(y), where" x" denotes the magnitude of the impact and "y" denotes the importance of the impact while "+" denotes beneficial, " - " denotes adverse impacts and "N" depicts no impact. Therefore total impact value for any activity on environment will be the multiplication of 'x' & 'y'. The activities to be carried out during development and operation of SLF are given below: Construction Phase Code Operation phase Code Excavation/soil filling, embankment and road construction Construction of buildings for personnel facilities, maintenance shop, washing area, storage, treatment facility. A Transportation of waste E B Collection and storage of waste F Bottom liner & cover liner and drainage system construction C Spreading, compaction & consolidation of the waste G Development of green belt D Collection & treatment of leachate H Closure & Post Closure Phase Monitoring of landfill facility I Decommissioning and closure of disposal facility J Environment Division, National Productivity Council, New Delhi 7
- Page 146 and 147: Rapid EIA Studies of 3 Pre-identifi
- Page 148 and 149: Rapid EIA Studies of 3 Pre-identifi
- Page 150 and 151: Rapid EIA Studies of 3 Pre-identifi
- Page 152 and 153: Rapid EIA Studies of 3 Pre-identifi
- Page 154 and 155: Rapid EIA Studies of 3 Pre-identifi
- Page 156 and 157: Rapid EIA Studies of 3 Pre-identifi
- Page 158 and 159: Rapid EIA Studies of 3 Pre-identifi
- Page 160 and 161: Rapid EIA Studies of 3 Pre-identifi
- Page 162 and 163: Rapid EIA Studies of 3 Pre-identifi
- Page 164 and 165: Rapid EIA Studies of 3 Pre-identifi
- Page 166 and 167: Rapid EIA Studies of 3 Pre-identifi
- Page 168 and 169: Rapid EIA Studies of 3 Pre-identifi
- Page 170 and 171: Rapid EIA Studies of 3 Pre-identifi
- Page 172 and 173: Rapid EIA Studies of 3 Pre-identifi
- Page 174 and 175: Rapid EIA Studies of 3 Pre-identifi
- Page 176 and 177: Rapid EIA Studies of 3 Pre-identifi
- Page 178 and 179: Rapid EIA Studies of 3 Pre-identifi
- Page 180 and 181: Rapid EIA Studies of 3 Pre-identifi
- Page 182 and 183: Rapid EIA Studies of 3 Pre-identifi
- Page 184 and 185: Rapid EIA Studies of 3 Pre-identifi
- Page 186 and 187: Rapid EIA Studies of 3 Pre-identifi
- Page 188 and 189: Rapid EIA Studies of 3 Pre-identifi
- Page 190 and 191: Rapid EIA Studies of 3 Pre-identifi
- Page 192 and 193: Rapid EIA Studies of 3 Pre-identifi
- Page 194 and 195: Rapid EIA Studies of 3 Pre-identifi
- Page 198 and 199: Rapid EIA Studies of 3 Pre-identifi
- Page 200 and 201: Rapid EIA Studies of 3 Pre-identifi
- Page 202 and 203: Rapid EIA Studies of 3 Pre-identifi
- Page 204 and 205: Rapid EIA Studies of 3 Pre-identifi
- Page 206 and 207: Rapid EIA Studies of 3 Pre-identifi
- Page 208 and 209: Rapid EIA Studies of 3 Pre-identifi
- Page 210 and 211: Rapid EIA Studies of 3 Pre-identifi
- Page 212 and 213: Rapid EIA Studies of 3 Pre-identifi
- Page 214 and 215: Rapid EIA Studies of 3 Pre-identifi
- Page 216 and 217: Rapid EIA Studies of 3 Pre-identifi
- Page 218 and 219: Rapid EIA Studies of 3 Pre-identifi
- Page 220 and 221: Rapid EIA Studies of 3 Pre-identifi
- Page 222 and 223: Annex I, Page No ii Topography: In
- Page 224 and 225: Annex I, Page No iv locate the site
- Page 226 and 227: Annex I, Page No vi 0.2 Bad (1) Lan
- Page 228 and 229: Annex II, Page No ii south of the s
- Page 230 and 231: Annex II, Page No iv is a open area
- Page 232 and 233: Annex II, Page No vi the site where
- Page 234 and 235: Annex III, Page No ii PRIMARY WATER
- Page 236 and 237: Annex IV, Page No ii Mappin Descrip
- Page 238 and 239: Mappin g Unit Description with loam
Rapid <strong>EIA</strong> <strong>Studies</strong> <strong>of</strong> 3 <strong>Pre</strong>-identified <strong>Hazardous</strong> <strong>Waste</strong> <strong>Disposal</strong> <strong>Sites</strong> <strong>in</strong> NCT - Delhi<br />
Page No.182<br />
Potential Impact<br />
Area<br />
Construction Phase Operation Phase Post Closure<br />
Phase<br />
Adve No Benefi Adv No Bene Adv No Ben<br />
rse<br />
cial erse ficial erse efici<br />
al<br />
J. AESHETIC 3 3(L) 3(L)<br />
Legend : S = Short term, L = Long term.<br />
Each impact is classified as either short-term or long-term impact <strong>in</strong> the table-7.1<br />
above.<br />
7.4.2 Criteria for Rat<strong>in</strong>g the Impacts<br />
Impact Rat<strong>in</strong>g Criteria<br />
Follow<strong>in</strong>g criteria has been considered for rat<strong>in</strong>g <strong>of</strong> the impacts.<br />
For each impact area, the magnitude and importance <strong>of</strong> impact has been rated on<br />
the scale <strong>of</strong> 1 to 3<br />
Magnitude<br />
• High Impact = 3<br />
• Moderate Impact = 2<br />
• Less Impact = 1<br />
Importance<br />
• Very Important = 3<br />
• Moderately Important = 2<br />
• Less important = 1<br />
Rank<strong>in</strong>g Criteria<br />
Keep<strong>in</strong>g <strong>in</strong> view, seven major activities hav<strong>in</strong>g an impact on the environment and<br />
consider<strong>in</strong>g n<strong>in</strong>e major impact areas (as shown <strong>in</strong> Tables 7.2 & 7.3) the criteria for<br />
overall rank<strong>in</strong>g <strong>of</strong> the secured landfill facility is developed as follows:-<br />
Total Score, if<br />
Above 500<br />
The WMF is hav<strong>in</strong>g very high adverse Impact<br />
500 - 100 The WMF is hav<strong>in</strong>g Moderate Adverse Impact<br />
Below 100<br />
The WMF is hav<strong>in</strong>g Less Adverse Impact<br />
WMF: <strong>Waste</strong> management facility<br />
7.4.3 Weighted Impacts Without Consider<strong>in</strong>g Mitigation Measures<br />
Based on the criteria for rat<strong>in</strong>g the impacts, the weighted impacts without tak<strong>in</strong>g any<br />
mitigation measures have been presented <strong>in</strong> Table 7.2 for major activities <strong>in</strong> the<br />
construction and operation phase <strong>of</strong> the secured landfill facility.<br />
Environment Division, National Productivity Council, New Delhi<br />
7