Rapid EIA Studies of 3 Pre-identified Hazardous Waste Disposal Sites in NCT - Delhi Page No.168 Chapter-6 CONCEPTUALISED PLAN FOR HAZARDOUS WASTE DISPOSAL FACILITY 6.1 CONCEPTUAL DESIGN OF SECURED LANDFILL FACILITY (SLF) Based on the findings of the EIA studies, the site near village Guman Hera has been recommended for developing it as SLF for disposal of hazardous waste. The conceptual design of SLF is proposed based on the inventorisation of hazardous wastes generated from the industrial units located in 28 approved industrial estates/ areas of Delhi carried out by NPC in the year 2001 as per the Hazardous Waste (Management & Handling) Amendment Rules, 2000. A schematic layout of the proposed facility is given in figure 6.1. 6.1.1 Design Basis for SLF Total quantity of landfill disposable HW = 87,000 m 3 /annum =.96,250 tons/annum The following basis has been considered for the design of the secured landfill facility: 1. Quantity of HW expected after 20 years = 23,25,258 tons (At the annual growth rate of 2 %) 2. Bulk density of the solid waste = 1.1 T/ m 3 (Compacted) 3. Volume of waste = 21,13,871 m 3 4. Tentative Bottom Slope (Traverse) = 3 % 5. Bottom Slope (Longitudinal) = 1.5 % 6. Side slope (inner) = 1:2 (V:H) 7. Side slope (outer) = 1:3 (V:H) 8. Landfill area (10 % excess for Buffer Zone) = 2,63,505 m 2 (26.35 ha) Environment Division, National Productivity Council, New Delhi 7
Rapid EIA Studies of 3 Pre-identified Hazardous Waste Disposal Sites in NCT - Delhi Page No.169 9. Landfill height = 10 m (8m above GL & 2m below GL) Environment Division, National Productivity Council, New Delhi 7
- Page 132 and 133: Rapid EIA Studies of 3 Pre-identifi
- Page 134 and 135: Rapid EIA Studies of 3 Pre-identifi
- Page 136 and 137: Rapid EIA Studies of 3 Pre-identifi
- Page 138 and 139: Rapid EIA Studies of 3 Pre-identifi
- Page 140 and 141: Rapid EIA Studies of 3 Pre-identifi
- Page 142 and 143: Rapid EIA Studies of 3 Pre-identifi
- Page 144 and 145: Rapid EIA Studies of 3 Pre-identifi
- Page 146 and 147: Rapid EIA Studies of 3 Pre-identifi
- Page 148 and 149: Rapid EIA Studies of 3 Pre-identifi
- Page 150 and 151: Rapid EIA Studies of 3 Pre-identifi
- Page 152 and 153: Rapid EIA Studies of 3 Pre-identifi
- Page 154 and 155: Rapid EIA Studies of 3 Pre-identifi
- Page 156 and 157: Rapid EIA Studies of 3 Pre-identifi
- Page 158 and 159: Rapid EIA Studies of 3 Pre-identifi
- Page 160 and 161: Rapid EIA Studies of 3 Pre-identifi
- Page 162 and 163: Rapid EIA Studies of 3 Pre-identifi
- Page 164 and 165: Rapid EIA Studies of 3 Pre-identifi
- Page 166 and 167: Rapid EIA Studies of 3 Pre-identifi
- Page 168 and 169: Rapid EIA Studies of 3 Pre-identifi
- Page 170 and 171: Rapid EIA Studies of 3 Pre-identifi
- Page 172 and 173: Rapid EIA Studies of 3 Pre-identifi
- Page 174 and 175: Rapid EIA Studies of 3 Pre-identifi
- Page 176 and 177: Rapid EIA Studies of 3 Pre-identifi
- Page 178 and 179: Rapid EIA Studies of 3 Pre-identifi
- Page 180 and 181: Rapid EIA Studies of 3 Pre-identifi
- Page 184 and 185: Rapid EIA Studies of 3 Pre-identifi
- Page 186 and 187: Rapid EIA Studies of 3 Pre-identifi
- Page 188 and 189: Rapid EIA Studies of 3 Pre-identifi
- Page 190 and 191: Rapid EIA Studies of 3 Pre-identifi
- Page 192 and 193: Rapid EIA Studies of 3 Pre-identifi
- Page 194 and 195: Rapid EIA Studies of 3 Pre-identifi
- Page 196 and 197: Rapid EIA Studies of 3 Pre-identifi
- Page 198 and 199: Rapid EIA Studies of 3 Pre-identifi
- Page 200 and 201: Rapid EIA Studies of 3 Pre-identifi
- Page 202 and 203: Rapid EIA Studies of 3 Pre-identifi
- Page 204 and 205: Rapid EIA Studies of 3 Pre-identifi
- Page 206 and 207: Rapid EIA Studies of 3 Pre-identifi
- Page 208 and 209: Rapid EIA Studies of 3 Pre-identifi
- Page 210 and 211: Rapid EIA Studies of 3 Pre-identifi
- Page 212 and 213: Rapid EIA Studies of 3 Pre-identifi
- Page 214 and 215: Rapid EIA Studies of 3 Pre-identifi
- Page 216 and 217: Rapid EIA Studies of 3 Pre-identifi
- Page 218 and 219: Rapid EIA Studies of 3 Pre-identifi
- Page 220 and 221: Rapid EIA Studies of 3 Pre-identifi
- Page 222 and 223: Annex I, Page No ii Topography: In
- Page 224 and 225: Annex I, Page No iv locate the site
- Page 226 and 227: Annex I, Page No vi 0.2 Bad (1) Lan
- Page 228 and 229: Annex II, Page No ii south of the s
- Page 230 and 231: Annex II, Page No iv is a open area
Rapid <strong>EIA</strong> <strong>Studies</strong> <strong>of</strong> 3 <strong>Pre</strong>-identified <strong>Hazardous</strong> <strong>Waste</strong> <strong>Disposal</strong> <strong>Sites</strong> <strong>in</strong> NCT - Delhi<br />
Page No.168<br />
Chapter-6<br />
CONCEPTUALISED PLAN FOR HAZARDOUS WASTE<br />
DISPOSAL FACILITY<br />
6.1 CONCEPTUAL DESIGN OF SECURED LANDFILL FACILITY<br />
(SLF)<br />
Based on the f<strong>in</strong>d<strong>in</strong>gs <strong>of</strong> the <strong>EIA</strong> studies, the site near village Guman Hera has been<br />
recommended for develop<strong>in</strong>g it as SLF for disposal <strong>of</strong> hazardous waste. The<br />
conceptual design <strong>of</strong> SLF is proposed based on the <strong>in</strong>ventorisation <strong>of</strong> hazardous<br />
wastes generated from the <strong>in</strong>dustrial units located <strong>in</strong> 28 approved <strong>in</strong>dustrial estates/<br />
areas <strong>of</strong> Delhi carried out by NPC <strong>in</strong> the year 2001 as per the <strong>Hazardous</strong> <strong>Waste</strong><br />
(Management & Handl<strong>in</strong>g) Amendment Rules, 2000. A schematic layout <strong>of</strong> the<br />
proposed facility is given <strong>in</strong> figure 6.1.<br />
6.1.1 Design Basis for SLF<br />
Total quantity <strong>of</strong> landfill disposable HW<br />
= 87,000 m 3 /annum<br />
=.96,250 tons/annum<br />
The follow<strong>in</strong>g basis has been considered for the design <strong>of</strong> the secured landfill<br />
facility:<br />
1. Quantity <strong>of</strong> HW expected after 20 years = 23,25,258 tons<br />
(At the annual growth rate <strong>of</strong> 2 %)<br />
2. Bulk density <strong>of</strong> the solid waste = 1.1 T/ m 3 (Compacted)<br />
3. Volume <strong>of</strong> waste = 21,13,871 m 3<br />
4. Tentative Bottom Slope (Traverse) = 3 %<br />
5. Bottom Slope (Longitud<strong>in</strong>al) = 1.5 %<br />
6. Side slope (<strong>in</strong>ner) = 1:2 (V:H)<br />
7. Side slope (outer) = 1:3 (V:H)<br />
8. Landfill area (10 % excess for Buffer Zone) = 2,63,505 m 2 (26.35 ha)<br />
Environment Division, National Productivity Council, New Delhi<br />
7