EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...
EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ... EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...
Rapid EIA Studies of 3 Pre-identified Hazardous Waste Disposal Sites in NCT - Delhi Page No.140 Table 5.7: Evaluation of Site-II: Wazirpur CETP Site Attribute Attribute Measurement Sensitivity Weightag Index * e Attribute Remark Score Receptor Related Population within 500 meters Distance to nearest drinking water well Use of site by nearby residents Distance to nearest off site building Presence of major transportation route > 1000 0.75 80 60 J. J. cluster is almosted encroaching the site beyond 1 km 0.5 60 30 There is no drinking water well within 1 km radius. Drinking water is supplied to the residents by the municipality Not used 0 50 0 The site is under the ownership of Commisioner of Industries. 300m 0 20 0 The depth to bedrock at the site is beyond 200 m bgl. Susceptibility to erosion & run-off No erosion 0 15 0 Environment Division, National Productivity Council, New Delhi 5
Rapid EIA Studies of 3 Pre-identified Hazardous Waste Disposal Sites in NCT - Delhi Page No.141 Climatic features with respect to Air pollution Susceptibility to seismic activity No problem 0 15 0 The wind speeds are high in this region ( 9.9 - 13.7 kmph) during summer and midmonsoon and are associated with higher mixing heights thereby providing high dispersion. Moderately high 0.75 15 11.25 Subtotal 280 93 Waste Characteristics Related 0 Toxicity Sax level 1 0.25 50 12.5 Mostly ETP sludge generated from metal finishing industries. Radioactivity Not radioactive 0 30 0 Persistence Metals 1 30 30 Ignitability No ignitable 0 20 0 Reactivity Stable and reacts very slowly 0.25 20 5 Corrosivity pH of 6 - 8 0.25 20 5 Solubility Slightly soluble 0.5 20 10 Volatility Least volatile 0.25 15 3.75 Physical state Solid/sludge 0.25 15 3.75 Subtotal 220 70 Waste Management Practice Related 0 Hazardous waste quantity/ annum > 2000 tonnes 1 45 45 The total quantity of hazardous waste generated from approved industrial estates/areas in NCT - Delhi is approx. 50 MT per annum. Waste Incompatibility Hazardous 0.25 30 7.5 Co-disposal with Municipal wastes waste Non degradable 1 25 25 Use of liners Composite liner 0.25 20 5 Incineration with offgas cleaning Leachate Treatment Site Security No incineration of waste Complete collection & treatment Secured fence with lock 0 20 0 0.25 20 5 0.25 10 2.5 Safety measures Adequate 0.25 10 2.5 Subtotal 180 92.5 Total 1000 405.5 * Sensitivity Index (SI) varies from 0 to 1 (in a segment of 0.0 - 0.25, 0.25 - 0.5, 0.5 - 0.75 & 0.75 - 1.0) for each parameter as given in MOEF guideline (Refer table 3.1). Higher value of SI indicates higher potential hazard. Environment Division, National Productivity Council, New Delhi 5
- Page 110 and 111: Rapid EIA Studies of 3 Pre-identifi
- Page 112 and 113: Rapid EIA Studies of 3 Pre-identifi
- Page 114 and 115: Rapid EIA Studies of 3 Pre-identifi
- Page 116 and 117: Rapid EIA Studies of 3 Pre-identifi
- Page 118 and 119: Rapid EIA Studies of 3 Pre-identifi
- Page 120 and 121: Rapid EIA Studies of 3 Pre-identifi
- Page 122 and 123: Rapid EIA Studies of 3 Pre-identifi
- Page 124 and 125: Rapid EIA Studies of 3 Pre-identifi
- Page 126 and 127: Rapid EIA Studies of 3 Pre-identifi
- Page 128 and 129: Rapid EIA Studies of 3 Pre-identifi
- Page 130 and 131: Rapid EIA Studies of 3 Pre-identifi
- Page 132 and 133: Rapid EIA Studies of 3 Pre-identifi
- Page 134 and 135: Rapid EIA Studies of 3 Pre-identifi
- Page 136 and 137: Rapid EIA Studies of 3 Pre-identifi
- Page 138 and 139: Rapid EIA Studies of 3 Pre-identifi
- Page 140 and 141: Rapid EIA Studies of 3 Pre-identifi
- Page 142 and 143: Rapid EIA Studies of 3 Pre-identifi
- Page 144 and 145: Rapid EIA Studies of 3 Pre-identifi
- Page 146 and 147: Rapid EIA Studies of 3 Pre-identifi
- Page 148 and 149: Rapid EIA Studies of 3 Pre-identifi
- Page 150 and 151: Rapid EIA Studies of 3 Pre-identifi
- Page 152 and 153: Rapid EIA Studies of 3 Pre-identifi
- Page 154 and 155: Rapid EIA Studies of 3 Pre-identifi
- Page 156 and 157: Rapid EIA Studies of 3 Pre-identifi
- Page 158 and 159: Rapid EIA Studies of 3 Pre-identifi
- Page 162 and 163: Rapid EIA Studies of 3 Pre-identifi
- Page 164 and 165: Rapid EIA Studies of 3 Pre-identifi
- Page 166 and 167: Rapid EIA Studies of 3 Pre-identifi
- Page 168 and 169: Rapid EIA Studies of 3 Pre-identifi
- Page 170 and 171: Rapid EIA Studies of 3 Pre-identifi
- Page 172 and 173: Rapid EIA Studies of 3 Pre-identifi
- Page 174 and 175: Rapid EIA Studies of 3 Pre-identifi
- Page 176 and 177: Rapid EIA Studies of 3 Pre-identifi
- Page 178 and 179: Rapid EIA Studies of 3 Pre-identifi
- Page 180 and 181: Rapid EIA Studies of 3 Pre-identifi
- Page 182 and 183: Rapid EIA Studies of 3 Pre-identifi
- Page 184 and 185: Rapid EIA Studies of 3 Pre-identifi
- Page 186 and 187: Rapid EIA Studies of 3 Pre-identifi
- Page 188 and 189: Rapid EIA Studies of 3 Pre-identifi
- Page 190 and 191: Rapid EIA Studies of 3 Pre-identifi
- Page 192 and 193: Rapid EIA Studies of 3 Pre-identifi
- Page 194 and 195: Rapid EIA Studies of 3 Pre-identifi
- Page 196 and 197: Rapid EIA Studies of 3 Pre-identifi
- Page 198 and 199: Rapid EIA Studies of 3 Pre-identifi
- Page 200 and 201: Rapid EIA Studies of 3 Pre-identifi
- Page 202 and 203: Rapid EIA Studies of 3 Pre-identifi
- Page 204 and 205: Rapid EIA Studies of 3 Pre-identifi
- Page 206 and 207: Rapid EIA Studies of 3 Pre-identifi
- Page 208 and 209: Rapid EIA Studies of 3 Pre-identifi
Rapid <strong>EIA</strong> <strong>Studies</strong> <strong>of</strong> 3 <strong>Pre</strong>-identified <strong>Hazardous</strong> <strong>Waste</strong> <strong>Disposal</strong> <strong>Sites</strong> <strong>in</strong> NCT - Delhi<br />
Page No.140<br />
Table 5.7: Evaluation <strong>of</strong> Site-II: Wazirpur CETP Site<br />
Attribute<br />
Attribute<br />
Measurement<br />
Sensitivity Weightag<br />
Index * e<br />
Attribute Remark<br />
Score<br />
Receptor Related<br />
Population with<strong>in</strong> 500<br />
meters<br />
Distance to nearest<br />
dr<strong>in</strong>k<strong>in</strong>g water well<br />
Use <strong>of</strong> site by nearby<br />
residents<br />
Distance to nearest <strong>of</strong>f<br />
site build<strong>in</strong>g<br />
<strong>Pre</strong>sence <strong>of</strong> major<br />
transportation route<br />
> 1000 0.75 80 60 J. J. cluster is almosted encroach<strong>in</strong>g the<br />
site<br />
beyond 1 km 0.5 60 30 There is no dr<strong>in</strong>k<strong>in</strong>g water well with<strong>in</strong> 1<br />
km radius. Dr<strong>in</strong>k<strong>in</strong>g water is supplied to<br />
the residents by the municipality<br />
Not used 0 50 0 The site is under the ownership <strong>of</strong><br />
Commisioner <strong>of</strong> Industries.<br />
300m 0 20 0 The depth to bedrock at the site is beyond<br />
200 m bgl.<br />
Susceptibility to<br />
erosion & run-<strong>of</strong>f<br />
No erosion 0 15 0<br />
Environment Division, National Productivity Council, New Delhi<br />
5