Area required for develop<strong>in</strong>g eng<strong>in</strong>eered landfill facility<br />

Executive Summary<br />

Page No 3(9)<br />

For develop<strong>in</strong>g a SLF for disposal <strong>of</strong> 87,000 m 3 /annum <strong>of</strong> hazardous waste, 26.35<br />

hectares <strong>of</strong> land is required for 20 years.<br />

Assessment and Evaluation <strong>of</strong> <strong>Sites</strong> from Environmental angle<br />

All the four pre-identified sites were assessed with respect to the locational criterias<br />

stipulated by CPCb, MOEf and that adapted by NPC. The compliance <strong>of</strong> the criterias<br />

by the four sites is summarised below:<br />

Site CPCB Criteria MOEF Guidel<strong>in</strong>e Internationally<br />

followed Criteria<br />

adapted by NPC<br />

Bawana<br />

relocation<br />

al<br />

<strong>in</strong>dustrial<br />

site<br />

Conforms to<br />

all<br />

Does not conform to -<br />

• The site shall be more than 25<br />

Km away from ecologically and<br />

or other sensitive areas<br />

Conforms to all<br />

Wazirpur<br />

CETP site<br />

Old<br />

Bawana<br />

site<br />

Conforms<br />

all<br />

Conforms<br />

all<br />

to<br />

to<br />

• The site shall be 25 km away<br />

from the projected growth<br />

boundary <strong>of</strong> the settlement for<br />

(atleast a decade)<br />

• 1/2 km away from railway l<strong>in</strong>e<br />

or highway<br />

Conforms to all<br />

Conforms to all .<br />

Guman<br />

Hera site<br />

Conforms to<br />

all<br />

• The site shall be more than 25<br />

Km away from ecologically and<br />

or other sensitive areas<br />

Conforms to all<br />

• The site shall be 25 km away<br />

from the projected growth<br />

boundary <strong>of</strong> the settlement for<br />

(atleast a decade)<br />

Further, detailed site <strong>in</strong>vestigation was carried out for all the four sites with respect to<br />

geotechnical properties, hydrological/hydrogeological, geological, soil, ambient air<br />

quality, landuse/landcover, meteorology, demography,etc.<br />

Based on the environmental sett<strong>in</strong>gs, the sites were evaluated as per the Delphi<br />

technique stipulated by MOEF and by the <strong>in</strong>ternationally followed criteria adapted by<br />