EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...
EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...
EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Rapid <strong>EIA</strong> <strong>Studies</strong> <strong>of</strong> 3 <strong>Pre</strong>-identified <strong>Hazardous</strong> <strong>Waste</strong> <strong>Disposal</strong> <strong>Sites</strong> <strong>in</strong> NCT - Delhi<br />
Page No.127<br />
Chapter - 5<br />
EVALUATION OF POTENTIAL HAZARDOUS WASTE<br />
DISPOSAL SITES<br />
5.1 EVALUATION OF SITES<br />
The pre-identified hazardous wastes disposal sites <strong>in</strong> NCT - Delhi have been<br />
evaluated based on exist<strong>in</strong>g environmental sett<strong>in</strong>gs and as per the criteria developed<br />
by CPCB, MOEF and the criteria followed <strong>in</strong>ternationally. (refer Chapter 3 & 4)<br />
All the features as described <strong>in</strong> all the criteria have been <strong>in</strong>vestigated with respect to<br />
pre-identified four sites <strong>in</strong> NCT - Delhi. The evaluation <strong>of</strong> each site is given <strong>in</strong> Table<br />
5.1 through 5.4.<br />
Table 5.1: Evaluation <strong>of</strong> Bawana Relocation Industrial Site<br />
Location <strong>of</strong> Site: Near V<strong>in</strong>od Rice Mill, Holambi Kalan<br />
Village<br />
Sanoth<br />
District<br />
Sl. Criteria<br />
No.<br />
NCT - Delhi<br />
CPCB criteria<br />
1. Any Lake or pond shall be more than<br />
200 m from the site<br />
2. A navigable river or stream shall be<br />
more than 100 m away from the site<br />
3. Site shall be outside 100 year flood<br />
pla<strong>in</strong> <strong>of</strong> major rivers<br />
4. Right <strong>of</strong> way <strong>of</strong> any National or State<br />
highway shall be 500m away from the<br />
site<br />
Conformity<br />
with the<br />
criteria<br />
(Y/N)<br />
5. A notified habitat area shall be 500 Y<br />
meter away from the site<br />
6. A public park shall be 500 meter<br />
Y<br />
away from site<br />
7. No site shall be with<strong>in</strong> critical habitat Y<br />
area (like reserved forest)<br />
8. No site shall be with<strong>in</strong> wetlands Y<br />
9. No site shall be with<strong>in</strong> a zone notified Y #<br />
by aviation authority around airport<br />
10. Water supply well shall be 500 m<br />
away from the site<br />
Y<br />
11. No site shall be with<strong>in</strong> coastal<br />
Y<br />
regulation zone (closer than 500m<br />
from high tide l<strong>in</strong>e as per MOEF<br />
guidel<strong>in</strong>e)<br />
Y<br />
Y<br />
Y<br />
Y<br />
Remarks<br />
Water supply source is<br />
3 Km away<br />
12. No site <strong>in</strong> areas <strong>of</strong> groundwater table Y As per CGWB,<br />
Environment Division, National Productivity Council, New Delhi<br />
5