Rapid EIA Studies of 3 Pre-identified Hazardous Waste Disposal Sites in NCT - Delhi: Table 4.19: Ambient Air Quality around Site I & Site IV Page No.98 Station SPM, µg/m 3 Sox, µg/m 3 NOx, µg/m 3 Min Max Avg Min Max Avg Min Max Avg Bawana 129 532 322 13.4 30.5 20.8 37 49.7 42.9 Narela 121 371 221 6.8 28.4 16 15.1 44.8 33.6 Ghoga 157 421 315 6.8 16.8 10.7 6.8 38.4 20.3 Holambikalan 126 428 237 6.8 14.8 10.7 7.5 26.4 18.3 Source: Project titled REIA of proposed new Indl. Areas in Delhi, by CES for DSIDC. Primary Data Site –I : Bawana industry relocation site The ambient air quality and noise level was monitored at the site on 24 hourly basis continuosly for 3 days. Photo plate 15 shows the ambient air monitoring set up at the proposed site. The results of ambient air quality and noise monitoring at the site are given in Table 4.20 & 4.21 Table 4.20 : Ambient Air Quality Monitoring Results at Bawana Industry Relocation Site Date Time period Sox , ug /m 3 06/02/02 - 07/02/02 07/02/02 - 08/02/02 08/02/02 - 09/02/02 SOx, (24-hr avg.) NOx , ug /m 3 NOx, (24- hr avg.) *SPM, ug/m 3 (24 - hr avg.) 1400 - 2200 7.6 8 69 59 1000 2200 - 0600 7.3 55 0600 - 1400 8.7 54 1400 - 2200 8.2 7.7 38 42 600 2200 - 0600 7.1 50 0600 - 1400 7.9 39 1400 - 2200 6.1 6 40 34 400 2200 - 0600 5.5 32 0600 - 1400 6 29 The high SPM concentration is due to the presence of a rice mill adjacent to the proposed site in Bawana industry relocation site. The SOx and NOx concentration is well within the prescribed standards. Table 4.21: Noise level monitored near proposed site in Bawana Time Observed Leq, Limits in residential Limits in Industrial dB(A) area area Day (0600 - 2100) 52 55 75 Night (2100 - 0600) 40 45 70 Environment Division, National Productivity Council, New Delhi 4
Rapid EIA Studies of 3 Pre-identified Hazardous Waste Disposal Sites in NCT - Delhi: Page No.99 Noise level was found to be well within the stipulated standards for industrial as well as residential areas. Site –II (Wazirpur CETP Site) The ambient air quality and noise level was monitored at the site on 24 hourly basis continuosly for 3 days. Photo plate 16 shows the ambient air monitoring set up at the proposed site. The results of ambient air quality and noise monitoring at the site are given in Table 4.22 & 4.23 Table 4.22: Ambient Air Quality of Wazirpur CETP Site Date Time period Sox , ug /m 3 SOx, 24-hr avg NOx , ug /m3 NOx, 24-hr avg 4/3/02 0600 - 1400 12.30 27 55.40 56 582 1400 - 2200 40.20 48.20 2200 - 0600 29.40 63.30 5/3/02 0600 - 1400 14.50 29 49.71 53 322 1400 - 2200 42.00 50.00 2200 - 0600 31.00 60.00 SPM, ug/m3 (24 - hr avg.) 6/3/02 0600 - 1400 10.60 25 40.30 51 382 1400 - 2200 35.00 56.30 2200 - 0600 30.10 55.10 Table 4.23: Noise level at Wazirpur CETP site Time Observed Leq, dB(A) Limits in Commercial Area Day (0600 - 2100) 58 65 Night (2100 - 0600) 57 55 Site –III (Guman Hera Site) The ambient air quality and noise level was monitored at the site on 24 hourly basis continuosly for 3 days. Photo plate 17 shows the ambient air monitoring set up at the proposed site. The results of ambient air quality and noise monitoring at the site are given in Table 4.24 & 4.25 Table 4.24: Ambient Air Quality of Guman Hera Site Date Time period SOx , ug /m 3 Sox, (24- hr avg.) NOx , ug /m3 NOx, 24- hr avg SPM, ug/m3 (24 - hr avg) 19/3/2002 0700 - 1500 1.66 1.8 2.61 2.1 152.7931 1500 - 2300 2.68 1.52 2300 - 0700 1.07 2.12 20/3/2002 0700 - 1500 1.08 1.7 1.84 1.6 160.23 1500 - 2300 2.79 1.91 Environment Division, National Productivity Council, New Delhi 4
- Page 67 and 68: Rapid EIA Studies of 3 Pre-identifi
- Page 69 and 70: Rapid EIA Studies of 3 Pre-identifi
- Page 71 and 72: Rapid EIA Studies of 3 Pre-identifi
- Page 73 and 74: Rapid EIA Studies of 3 Pre-identifi
- Page 75 and 76: Rapid EIA Studies of 3 Pre-identifi
- Page 77 and 78: Rapid EIA Studies of 3 Pre-identifi
- Page 79 and 80: Rapid EIA Studies of 3 Pre-identifi
- Page 81 and 82: Rapid EIA Studies of 3 Pre-identifi
- Page 83 and 84: Rapid EIA Studies of 3 Pre-identifi
- Page 85 and 86: Rapid EIA Studies of 3 Pre-identifi
- Page 87 and 88: Rapid EIA Studies of 3 Pre-identifi
- Page 89 and 90: Rapid EIA Studies of 3 Pre-identifi
- Page 91 and 92: Rapid EIA Studies of 3 Pre-identifi
- Page 93 and 94: Rapid EIA Studies of 3 Pre-identifi
- Page 95 and 96: Rapid EIA Studies of 3 Pre-identifi
- Page 97 and 98: Rapid EIA Studies of 3 Pre-identifi
- Page 99 and 100: Rapid EIA Studies of 3 Pre-identifi
- Page 101 and 102: Rapid EIA Studies of 3 Pre-identifi
- Page 103 and 104: Rapid EIA Studies of 3 Pre-identifi
- Page 105 and 106: Rapid EIA Studies of 3 Pre-identifi
- Page 107: Rapid EIA Studies of 3 Pre-identifi
- Page 110 and 111: Rapid EIA Studies of 3 Pre-identifi
- Page 112 and 113: Rapid EIA Studies of 3 Pre-identifi
- Page 114 and 115: Rapid EIA Studies of 3 Pre-identifi
- Page 116 and 117: Rapid EIA Studies of 3 Pre-identifi
- Page 120 and 121: Rapid EIA Studies of 3 Pre-identifi
- Page 122 and 123: Rapid EIA Studies of 3 Pre-identifi
- Page 124 and 125: Rapid EIA Studies of 3 Pre-identifi
- Page 126 and 127: Rapid EIA Studies of 3 Pre-identifi
- Page 128 and 129: Rapid EIA Studies of 3 Pre-identifi
- Page 130 and 131: Rapid EIA Studies of 3 Pre-identifi
- Page 132 and 133: Rapid EIA Studies of 3 Pre-identifi
- Page 134 and 135: Rapid EIA Studies of 3 Pre-identifi
- Page 136 and 137: Rapid EIA Studies of 3 Pre-identifi
- Page 138 and 139: Rapid EIA Studies of 3 Pre-identifi
- Page 140 and 141: Rapid EIA Studies of 3 Pre-identifi
- Page 142 and 143: Rapid EIA Studies of 3 Pre-identifi
- Page 144 and 145: Rapid EIA Studies of 3 Pre-identifi
- Page 146 and 147: Rapid EIA Studies of 3 Pre-identifi
- Page 148 and 149: Rapid EIA Studies of 3 Pre-identifi
- Page 150 and 151: Rapid EIA Studies of 3 Pre-identifi
- Page 152 and 153: Rapid EIA Studies of 3 Pre-identifi
- Page 154 and 155: Rapid EIA Studies of 3 Pre-identifi
- Page 156 and 157: Rapid EIA Studies of 3 Pre-identifi
- Page 158 and 159: Rapid EIA Studies of 3 Pre-identifi
- Page 160 and 161: Rapid EIA Studies of 3 Pre-identifi
- Page 162 and 163: Rapid EIA Studies of 3 Pre-identifi
- Page 164 and 165: Rapid EIA Studies of 3 Pre-identifi
- Page 166 and 167: Rapid EIA Studies of 3 Pre-identifi
Rapid <strong>EIA</strong> <strong>Studies</strong> <strong>of</strong> 3 <strong>Pre</strong>-identified <strong>Hazardous</strong> <strong>Waste</strong> <strong>Disposal</strong> <strong>Sites</strong> <strong>in</strong> NCT - Delhi:<br />
Table 4.19: Ambient Air Quality around Site I & Site IV<br />
Page No.98<br />
Station SPM, µg/m 3<br />
Sox, µg/m 3<br />
NOx, µg/m 3<br />
M<strong>in</strong> Max Avg M<strong>in</strong> Max Avg M<strong>in</strong> Max Avg<br />
Bawana 129 532 322 13.4 30.5 20.8 37 49.7 42.9<br />
Narela 121 371 221 6.8 28.4 16 15.1 44.8 33.6<br />
Ghoga 157 421 315 6.8 16.8 10.7 6.8 38.4 20.3<br />
Holambikalan 126 428 237 6.8 14.8 10.7 7.5 26.4 18.3<br />
Source: Project titled R<strong>EIA</strong> <strong>of</strong> proposed new Indl. Areas <strong>in</strong> Delhi, by CES for DSIDC.<br />
Primary Data<br />
Site –I : Bawana <strong>in</strong>dustry relocation site<br />
The ambient air quality and noise level was monitored at the site on 24 hourly basis<br />
cont<strong>in</strong>uosly for 3 days. Photo plate 15 shows the ambient air monitor<strong>in</strong>g set up at<br />
the proposed site. The results <strong>of</strong> ambient air quality and noise monitor<strong>in</strong>g at the site<br />
are given <strong>in</strong> Table 4.20 & 4.21<br />
Table 4.20 : Ambient Air Quality Monitor<strong>in</strong>g Results at Bawana Industry<br />
Relocation Site<br />
Date Time period Sox ,<br />
ug /m 3<br />
06/02/02<br />
-<br />
07/02/02<br />
07/02/02<br />
-<br />
08/02/02<br />
08/02/02<br />
-<br />
09/02/02<br />
SOx,<br />
(24-hr<br />
avg.)<br />
NOx ,<br />
ug /m 3 NOx, (24-<br />
hr avg.)<br />
*SPM, ug/m 3<br />
(24 - hr avg.)<br />
1400 - 2200 7.6 8 69 59 1000<br />
2200 - 0600 7.3 55<br />
0600 - 1400 8.7 54<br />
1400 - 2200 8.2 7.7 38 42 600<br />
2200 - 0600 7.1 50<br />
0600 - 1400 7.9 39<br />
1400 - 2200 6.1 6 40 34 400<br />
2200 - 0600 5.5 32<br />
0600 - 1400 6 29<br />
The high SPM concentration is due to the presence <strong>of</strong> a rice mill adjacent to the<br />
proposed site <strong>in</strong> Bawana <strong>in</strong>dustry relocation site. The SOx and NOx concentration is<br />
well with<strong>in</strong> the prescribed standards.<br />
Table 4.21: Noise level monitored near proposed site <strong>in</strong> Bawana<br />
Time Observed Leq, Limits <strong>in</strong> residential Limits <strong>in</strong> Industrial<br />
dB(A)<br />
area<br />
area<br />
Day (0600 - 2100) 52 55 75<br />
Night (2100 - 0600) 40 45 70<br />
Environment Division, National Productivity Council, New Delhi<br />
4