EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...
EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ... EIA Studies of 3 Pre-Identified Hazardous Waste Disposal Sites in ...
Rapid EIA Studies of 3 Pre-identified Hazardous Waste Disposal Sites in NCT - Delhi: 4.6 GEOTECHNICAL INVESTIGATION Page No.82 Geotechnical properties of the proposed sites were assessed as per the criteria laid down by CPCB ( refer Chapter III, section ). Following procedure was adopted for geotechnical investigation of the sites: • A bore hole of 100 – 150 mm diameter below existing ground surface through normal soil i.e sandy, clayey strata ( excluding hard/boudary/rock) using shell and auger method was drilled at the proposed sites up to 20 m depth below existing ground surface. Photoplate 11, 12, 13 & 14 shows drilling arrangement at Wazirpur and Guman Hera site. • Undisturbed soil samples were collected at 1.5 m interval in depth or change of strata whichever occurred earlier using straight open end sampling tubes fitted to an adapter with ball and socket arrangement and using a standard SPT set up. • Similarly disturbed soil samples were collected at regular interval in depth. • The depth of groundwater table in the bore hole whenever encountered, was recorded. • The soil samples collected were analysed for following: - Soil type and stratification - Permeability test for each strata Site I: Bawana relocation Industry Site: The geotechnical investigation of the site was carried out from 23.02.2002 to 25.02.2002. The test results are tabulated in table 4.13 below. Environment Division, National Productivity Council, New Delhi 4
Rapid EIA Studies of 3 Pre-identified Hazardous Waste Disposal Sites in NCT - Delhi: Page No.83 Environment Division, National Productivity Council, New Delhi 4
- Page 51 and 52: Rapid EIA Studies of 3 Pre-identifi
- Page 53 and 54: Rapid EIA Studies of 3 Pre-identifi
- Page 55 and 56: Rapid EIA Studies of 3 Pre-identifi
- Page 57 and 58: Rapid EIA Studies of 3 Pre-identifi
- Page 59 and 60: Rapid EIA Studies of 3 Pre-identifi
- Page 61 and 62: Rapid EIA Studies of 3 Pre-identifi
- Page 63 and 64: Rapid EIA Studies of 3 Pre-identifi
- Page 65 and 66: Rapid EIA Studies of 3 Pre-identifi
- Page 67 and 68: Rapid EIA Studies of 3 Pre-identifi
- Page 69 and 70: Rapid EIA Studies of 3 Pre-identifi
- Page 71 and 72: Rapid EIA Studies of 3 Pre-identifi
- Page 73 and 74: Rapid EIA Studies of 3 Pre-identifi
- Page 75 and 76: Rapid EIA Studies of 3 Pre-identifi
- Page 77 and 78: Rapid EIA Studies of 3 Pre-identifi
- Page 79 and 80: Rapid EIA Studies of 3 Pre-identifi
- Page 81 and 82: Rapid EIA Studies of 3 Pre-identifi
- Page 83 and 84: Rapid EIA Studies of 3 Pre-identifi
- Page 85 and 86: Rapid EIA Studies of 3 Pre-identifi
- Page 87 and 88: Rapid EIA Studies of 3 Pre-identifi
- Page 89 and 90: Rapid EIA Studies of 3 Pre-identifi
- Page 91 and 92: Rapid EIA Studies of 3 Pre-identifi
- Page 93 and 94: Rapid EIA Studies of 3 Pre-identifi
- Page 95 and 96: Rapid EIA Studies of 3 Pre-identifi
- Page 97 and 98: Rapid EIA Studies of 3 Pre-identifi
- Page 99 and 100: Rapid EIA Studies of 3 Pre-identifi
- Page 101: Rapid EIA Studies of 3 Pre-identifi
- Page 105 and 106: Rapid EIA Studies of 3 Pre-identifi
- Page 107: Rapid EIA Studies of 3 Pre-identifi
- Page 110 and 111: Rapid EIA Studies of 3 Pre-identifi
- Page 112 and 113: Rapid EIA Studies of 3 Pre-identifi
- Page 114 and 115: Rapid EIA Studies of 3 Pre-identifi
- Page 116 and 117: Rapid EIA Studies of 3 Pre-identifi
- Page 118 and 119: Rapid EIA Studies of 3 Pre-identifi
- Page 120 and 121: Rapid EIA Studies of 3 Pre-identifi
- Page 122 and 123: Rapid EIA Studies of 3 Pre-identifi
- Page 124 and 125: Rapid EIA Studies of 3 Pre-identifi
- Page 126 and 127: Rapid EIA Studies of 3 Pre-identifi
- Page 128 and 129: Rapid EIA Studies of 3 Pre-identifi
- Page 130 and 131: Rapid EIA Studies of 3 Pre-identifi
- Page 132 and 133: Rapid EIA Studies of 3 Pre-identifi
- Page 134 and 135: Rapid EIA Studies of 3 Pre-identifi
- Page 136 and 137: Rapid EIA Studies of 3 Pre-identifi
- Page 138 and 139: Rapid EIA Studies of 3 Pre-identifi
- Page 140 and 141: Rapid EIA Studies of 3 Pre-identifi
- Page 142 and 143: Rapid EIA Studies of 3 Pre-identifi
- Page 144 and 145: Rapid EIA Studies of 3 Pre-identifi
- Page 146 and 147: Rapid EIA Studies of 3 Pre-identifi
- Page 148 and 149: Rapid EIA Studies of 3 Pre-identifi
- Page 150 and 151: Rapid EIA Studies of 3 Pre-identifi
Rapid <strong>EIA</strong> <strong>Studies</strong> <strong>of</strong> 3 <strong>Pre</strong>-identified <strong>Hazardous</strong> <strong>Waste</strong> <strong>Disposal</strong> <strong>Sites</strong> <strong>in</strong> NCT - Delhi:<br />
Page No.83<br />
Environment Division, National Productivity Council, New Delhi<br />
4