Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

ANNUAL REPORT ON SAPARD PROGRAMME<br />

IMPLEMENTATION IN ROMANIA<br />

2008<br />

Revised versi<strong>on</strong><br />

ROMANIA<br />

September, 2009<br />

1


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

CONTENT<br />

EXECUTIVE SUMMARY...............................................................................................................6<br />

Introducti<strong>on</strong> ...............................................................................................................................17<br />

Chapter I - Changes <strong>in</strong> the general c<strong>on</strong>diti<strong>on</strong>s of Romania and their impact <strong>on</strong> the<br />

SAPARD Programme implementati<strong>on</strong>.....................................................................................23<br />

I. 1 Instituti<strong>on</strong>al and political framework <strong>in</strong> Romania.............................................................23<br />

I. 2 Structural characteristics of Romanian ec<strong>on</strong>omy and the macro-ec<strong>on</strong>omic<br />

development ..............................................................................................................................23<br />

I. 3 Demographic developments and populati<strong>on</strong> characteristics <strong>in</strong> Romania.....................25<br />

I. 4 The Romanian agricultural and rural development policy ..............................................27<br />

Chapter II - Assessment of the progress regard<strong>in</strong>g the implementati<strong>on</strong> of the priorities,<br />

measures and sub-measures of the SAPARD Programme ...................................................31<br />

II. 1 General Framework............................................................................................................31<br />

II. 2 Analysis of the progress recorded <strong>in</strong> the implementati<strong>on</strong> of SAPARD Programme ...34<br />

II. 2.1 Measure 1.1 „Improvement of process<strong>in</strong>g and market<strong>in</strong>g of agricultural and<br />

fisheries products” – projects not affected by natural disasters .........................................34<br />

II. 2.2 Measure 1.2 „Improv<strong>in</strong>g the structures for quality, veter<strong>in</strong>ary and plant healthc<strong>on</strong>trol,<br />

for the quality of food stuffs and for c<strong>on</strong>sumer protecti<strong>on</strong>”...................................36<br />

II. 2.3 Measure 2.1 „Development and improvement of rural <strong>in</strong>frastructure” - projects<br />

not affected by natural disasters .............................................................................................37<br />

II. 2.4 Measure 3.1 „Investments <strong>in</strong> agricultural hold<strong>in</strong>gs” - projects not affected by<br />

natural disasters........................................................................................................................39<br />

II. 2.5 Measure 3.2 „Sett<strong>in</strong>g up of the producers groups” .....................................................41<br />

II. 2.6 Measure 3.3 „Agricultural producti<strong>on</strong> methods designed to protect the<br />

envir<strong>on</strong>ment and ma<strong>in</strong>ta<strong>in</strong> the countryside” ..........................................................................41<br />

II. 2.7 Measure 3.4 “Development and diversificati<strong>on</strong> of ec<strong>on</strong>omic activities generat<strong>in</strong>g<br />

multiple activities and alternative <strong>in</strong>come”-projects not affected by natural disasters .....42<br />

II. 2.8 Measure 3.5 „Forestry”...................................................................................................44<br />

II. 2.9 Measure 4.1 „Improvement of vocati<strong>on</strong>al tra<strong>in</strong><strong>in</strong>g” .....................................................45<br />

II. 2.10 Measure 4.2 “Technical Assistance”...........................................................................46<br />

II. 3 Expenditures by measures................................................................................................46<br />

II. 3.1. Paid projects...................................................................................................................46<br />

II. 3.2. Approved projects..........................................................................................................54<br />

II. 3.3 F<strong>in</strong>alized projects ............................................................................................................58<br />

II. 3. 4 Sensitive sectors............................................................................................................60<br />

II. 3.5 Sancti<strong>on</strong>ed and cancelled projects ...............................................................................65<br />

2


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

II. 4 Achievement stage for the proposed objective...............................................................69<br />

II. 4.1 Measure 1.1 “The Improvement of process<strong>in</strong>g and market<strong>in</strong>g of agricultural and<br />

fisheries products” ...................................................................................................................69<br />

II. 4.2 Measure 1.2 „Improv<strong>in</strong>g the structures for quality, veter<strong>in</strong>ary and plant healthc<strong>on</strong>trol,<br />

for the quality of food stuffs and for c<strong>on</strong>sumer protecti<strong>on</strong>”...................................72<br />

II. 4.3 Measure 2.1 „ Development and improvement of rural <strong>in</strong>frastructure” .....................72<br />

II. 4.4 Measure 3.1 “Investments <strong>in</strong> agricultural hold<strong>in</strong>gs”....................................................75<br />

II. 4.5 Measure 3.4 „Development and diversificati<strong>on</strong> of ec<strong>on</strong>omic activities generat<strong>in</strong>g<br />

multiple activities and alternative <strong>in</strong>come”.............................................................................77<br />

II. 4.6 Measure 3.5 „Forestry”...................................................................................................78<br />

II. 5 C<strong>on</strong>clusi<strong>on</strong>s <strong>on</strong> the differences between Regi<strong>on</strong>s/Measures/Sub-Measures found<br />

<strong>in</strong> the projects implementati<strong>on</strong> ................................................................................................79<br />

Chapter III - Measures to improve quality and efficiency of SAPARD Programme<br />

implementati<strong>on</strong>........................................................................................................................106<br />

III. 1 Activities of the Manag<strong>in</strong>g Authority .............................................................................106<br />

III. 2 Competent Authority – Nati<strong>on</strong>al Fund Activities..........................................................108<br />

III. 2.1 F<strong>in</strong>ancial aspects regard<strong>in</strong>g the implement<strong>in</strong>g status of SAPARD Programme ....108<br />

III. 2.2 Accreditati<strong>on</strong> m<strong>on</strong>itor<strong>in</strong>g dur<strong>in</strong>g 2008........................................................................111<br />

III. 2.3 Clearance of accounts .................................................................................................114<br />

III. 2.4 Irregularities <str<strong>on</strong>g>report</str<strong>on</strong>g> ......................................................................................................114<br />

III. 3 Pay<strong>in</strong>g Agency for Rural Development and Fishery activities....................................115<br />

III. 3.1. Audit missi<strong>on</strong>s performed by the Internal Audit Directorate .................................115<br />

III. 3.2 C<strong>on</strong>trol missi<strong>on</strong>s performed by C<strong>on</strong>trol and Antifraud Directorate ........................123<br />

III. 4 The activities of the SAPARD Programme M<strong>on</strong>itor<strong>in</strong>g Committee.............................129<br />

III. 5 M<strong>on</strong>itor<strong>in</strong>g and evaluati<strong>on</strong> system ................................................................................130<br />

III. 6 Measures taken to correct problems identified <strong>in</strong> Programme’s implementati<strong>on</strong> ....131<br />

III. 7 Assur<strong>in</strong>g the promoti<strong>on</strong> of SAPARD Programme <strong>in</strong> Romania....................................136<br />

III. 8 Us<strong>in</strong>g the Technical Assistance.....................................................................................139<br />

III. 9 Compliance of the complementarity pr<strong>in</strong>ciple between community funds and<br />

nati<strong>on</strong>al funds..........................................................................................................................140<br />

Chapter IV - Coord<strong>in</strong>ati<strong>on</strong> of SAPARD Programme with Other F<strong>in</strong>ancial Instruments for<br />

Internati<strong>on</strong>al Support ..............................................................................................................144<br />

IV. 1 General framework .........................................................................................................144<br />

IV. 2 Assistance under PHARE Programme..........................................................................145<br />

IV. 3 Other f<strong>in</strong>ancial <strong>in</strong>struments ...........................................................................................147<br />

IV. 3.1 The Rural Development Project for the Apuseni Mounta<strong>in</strong>s funded by IFAD ........147<br />

IV. 3.2 Projects f<strong>in</strong>anced by the World Bank................................................................................149<br />

3


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Acr<strong>on</strong>yms<br />

approx. - approximate<br />

AFD – Antifraud Fight Department<br />

AFA – Annual F<strong>in</strong>anc<strong>in</strong>g Agreement<br />

Art. – Article<br />

CAD – C<strong>on</strong>trol and Antifraud Directorate - Pay<strong>in</strong>g Agency for Rural Development<br />

and Fishery<br />

CAP – Comm<strong>on</strong> Agricultural Policy<br />

CCIR – Chamber of Commerce and Industry of Romania<br />

CGFSME – Credit Guarantee Fund for Small and Medium Enterprises<br />

COAC – County Offices for Agriculture C<strong>on</strong>sultancy<br />

CICGS – Council for the Implementati<strong>on</strong> of the Competitive Grant Schemes<br />

CPORDF - County Pay<strong>in</strong>g Offices for Rural Development and Fishery<br />

CU/S - C<strong>on</strong>tract<strong>in</strong>g Unit/Service<br />

DARD – Directorate for Agriculture and Rural Development<br />

DC - Coord<strong>in</strong>ati<strong>on</strong> Directorate<br />

DG Agri – Directorate General for Agriculture and Rural Development – European<br />

Commissi<strong>on</strong><br />

DGRD – Directorate General for Rural Development – Romanian M<strong>in</strong>istry of<br />

Agriculture and Rural Development<br />

DNA – Directorate Nati<strong>on</strong>al Anti-Corrupti<strong>on</strong><br />

EAFRD – European Agricultural Fund for Rural Development<br />

EAGF – European Agricultural Guarantee Fund<br />

EAGGF – European Agricultural Guidance and Guarantee Fund<br />

EC – European Community<br />

EIB – European Investment Bank<br />

EU – European Uni<strong>on</strong><br />

FIFG – F<strong>in</strong>ancial Instrument for Fishery Guarantee<br />

FOP – Fishery Operati<strong>on</strong>al Programme<br />

GD – Government Decisi<strong>on</strong><br />

GDP – Gross Domestic Product<br />

GEO – Government Emergency Ord<strong>in</strong>ance<br />

GO – Government Ord<strong>in</strong>ance<br />

IAD – Internal Audit Directorate – Pay<strong>in</strong>g Agency for Rural Development and<br />

Fishery<br />

IBRD – Internati<strong>on</strong>al Bank for Rec<strong>on</strong>structi<strong>on</strong> and Development<br />

IC – Info-Centres<br />

ICT – Informati<strong>on</strong> and Communicati<strong>on</strong> Technology<br />

IFAD – Internati<strong>on</strong>al Fund for Agricultural Development<br />

ISPA – Instrument for Structural Policies for Pre-Accessi<strong>on</strong><br />

IWUA – Irrigati<strong>on</strong> Water User Associati<strong>on</strong><br />

JMC – Jo<strong>in</strong>t M<strong>on</strong>itor<strong>in</strong>g Committee<br />

MA – Manag<strong>in</strong>g Authority for SAPARD Programme<br />

4


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

MAFA – Multi-Annual F<strong>in</strong>anc<strong>in</strong>g Agreement<br />

MAFRD – M<strong>in</strong>istry of Agriculture, Forests and Rural Development<br />

MAI – M<strong>in</strong>istry of Adm<strong>in</strong>istrati<strong>on</strong> and Interior<br />

MC – M<strong>on</strong>itor<strong>in</strong>g Committee<br />

ME – M<strong>in</strong>istry of Envir<strong>on</strong>ment<br />

MPF – M<strong>in</strong>istry of Public F<strong>in</strong>ance<br />

MH – M<strong>in</strong>istry of Health<br />

MT – M<strong>in</strong>istry of Transport and Infrastructure<br />

NAAC – Nati<strong>on</strong>al Agency for Agricultural C<strong>on</strong>sultancy<br />

NAFA – Nati<strong>on</strong>al Agency for Fishery and Aquaculture<br />

NALC – Nati<strong>on</strong>al Agency for Land C<strong>on</strong>solidati<strong>on</strong><br />

NAO – Nati<strong>on</strong>al Authoris<strong>in</strong>g Officer<br />

NF-Nati<strong>on</strong>al Fund<br />

NFI – N<strong>on</strong>-bank<strong>in</strong>g F<strong>in</strong>ancial Instituti<strong>on</strong><br />

NGO – N<strong>on</strong>-Governmental Organisati<strong>on</strong>s<br />

No. - number<br />

NPARD – Nati<strong>on</strong>al Programme for Agriculture and Rural Development<br />

NRDP - Nati<strong>on</strong>al Rural Development Programme 2007-2013<br />

NSVFSA – Nati<strong>on</strong>al Sanitary Veter<strong>in</strong>ary and Food Safety Authority<br />

OG – Official Gazette<br />

PARDF – Pay<strong>in</strong>g Agency for Rural Development and Fishery<br />

PAS - Payment Accountancy Service<br />

PHARE – Poland Hungary, Aid for Rec<strong>on</strong>structi<strong>on</strong> of the Ec<strong>on</strong>omy<br />

PIAA – Pay<strong>in</strong>g and Interventi<strong>on</strong> Agency for Agriculture<br />

PIAD - Public Internal Audit Directorate<br />

PPD - Project Payment Directorate<br />

PMU – Project Management Unit<br />

RCGF – Rural Credit Guarantee Fund<br />

RPCRDF – Regi<strong>on</strong>al Pay<strong>in</strong>g Centres for Rural Development and Fishery<br />

RFP – Rural F<strong>in</strong>anc<strong>in</strong>g Project<br />

SVFSD - Sanitary Veter<strong>in</strong>ary and Food Safety Directorate<br />

SAPARD – Special pre-Accessi<strong>on</strong> Programme for Agriculture and Rural<br />

Development<br />

SAD-Selecti<strong>on</strong>, Assessment Directorate<br />

SAO/S – Selecti<strong>on</strong>, Assessment Office/Service<br />

MARS- M<strong>on</strong>itor<strong>in</strong>g, Assessment, Report<strong>in</strong>g Service<br />

SDR – Special Draft Right<br />

STAR Committee – Agricultural and Rural Structures Committee<br />

TDS – Technical Delegated Services<br />

ToR – Terms of Reference<br />

TP - Technical Project<br />

UPS - Under Pressure Stati<strong>on</strong><br />

USD - US Dollar<br />

T - t<strong>on</strong>e<br />

5


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

EXECUTIVE SUMMARY<br />

In accordance with the provisi<strong>on</strong>s of Article 8, secti<strong>on</strong> B of the Annex to the Multi-<br />

Annual F<strong>in</strong>anc<strong>in</strong>g Agreement between the Government of Romania and the<br />

Commissi<strong>on</strong> of the European Communities (MAFA), signed <strong>on</strong> 2 nd of February 2001<br />

<strong>in</strong> Brussels (Agreement ratified by Law no. 316/2001 published <strong>in</strong> the Official Gazette<br />

(OG) no. 362/2001), Romania has the resp<strong>on</strong>sibility of elaborat<strong>in</strong>g and submitt<strong>in</strong>g to<br />

the European Commissi<strong>on</strong>, with<strong>in</strong> six m<strong>on</strong>ths of the end of each full calendar year of<br />

implementati<strong>on</strong>, the Annual Report <strong>on</strong> SAPARD Programme implementati<strong>on</strong> for the<br />

previous year. In this respect, the Manag<strong>in</strong>g Authority for SAPARD Programme (MA)<br />

<strong>in</strong> collaborati<strong>on</strong> with the <strong>in</strong>stituti<strong>on</strong>s <strong>in</strong>volved <strong>in</strong> the Programme’s implementati<strong>on</strong>,<br />

draws up the above menti<strong>on</strong>ed <str<strong>on</strong>g>report</str<strong>on</strong>g> and submits it for analysis and approval to the<br />

members of the M<strong>on</strong>itor<strong>in</strong>g Committee for SAPARD Programme, previous to its<br />

submissi<strong>on</strong> to the Commissi<strong>on</strong>.<br />

The current Report covers the implementati<strong>on</strong> period from the 1 st of January 2008 up<br />

to the 31 st of December 2008.<br />

In accordance with the Commissi<strong>on</strong> Decisi<strong>on</strong> EC (2000) no. 3742 of 12 th of<br />

December 2000, the Nati<strong>on</strong>al Plan for Agriculture and Rural Development (NPARD)<br />

is the basis of the SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania. NPARD was<br />

drawn up by the M<strong>in</strong>istry of Agriculture, Forests and Rural Development (MAFRD).<br />

Changes <strong>in</strong> the general c<strong>on</strong>diti<strong>on</strong>s of Romania and their impact <strong>on</strong> the SAPARD<br />

Programme implementati<strong>on</strong><br />

As regards the macro-ec<strong>on</strong>omic trends and structural characteristics of the<br />

Romanian ec<strong>on</strong>omy, it can be noticed that the country’s GDP has raised up to<br />

503,958.7 milli<strong>on</strong> lei <strong>in</strong> 2008, from 412,761.5 milli<strong>on</strong> lei <strong>in</strong> 2007. The <str<strong>on</strong>g>annual</str<strong>on</strong>g> GDP<br />

growth rate was 7.1 percent <strong>in</strong> 2008 compared to 6.2 percent <strong>in</strong> 2007.<br />

The share of the private sector with<strong>in</strong> the GDP recorded a setback <strong>in</strong> 2008,<br />

account<strong>in</strong>g for 70.8 percent of the total GDP, down from 72.2 percent <strong>in</strong> 2007. The<br />

<str<strong>on</strong>g>annual</str<strong>on</strong>g> <strong>in</strong>flati<strong>on</strong> rate marked an <strong>in</strong>crease <strong>in</strong> 2008, reach<strong>in</strong>g a 7.85 percent compared<br />

to 4.8 percent <strong>in</strong> 2007.<br />

The unemployment rate recorded an <strong>in</strong>crease <strong>in</strong> 2008, compared to the previous<br />

year, reach<strong>in</strong>g by the end of 2008 a 4.4 percent <strong>in</strong> comparis<strong>on</strong> to 4.1 percent <strong>in</strong> 2007.<br />

In 2008, the private sector share <strong>in</strong> agriculture, forestry, exploitati<strong>on</strong> and game<br />

ec<strong>on</strong>omy, reached 94.2 percent of the sector’s overall gross added value.<br />

C<strong>on</strong>cern<strong>in</strong>g the evoluti<strong>on</strong> of the agricultural producti<strong>on</strong> sector, compared to the<br />

previous year can be noticed an <strong>in</strong>crease <strong>in</strong> 2003 (up to 7.5 percent), 2004 (up to<br />

18.1 percent), 2006 (up to 2.4 percent), as well as <strong>in</strong> 2008 (up to 21.7 percent).<br />

6


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

As of July 1 st 2008, Romania’s populati<strong>on</strong> totalled 21.50 milli<strong>on</strong> <strong>in</strong>habitants, out of<br />

which the rural populati<strong>on</strong> accounted for 44.9 percent of the total.<br />

The age structure of the populati<strong>on</strong> c<strong>on</strong>firmed that the slow, but steady, trend of<br />

demographic ag<strong>in</strong>g c<strong>on</strong>t<strong>in</strong>ued, with higher numbers <strong>in</strong> rural areas. In the rural area,<br />

the female populati<strong>on</strong> is older than the male <strong>on</strong>e. The average populati<strong>on</strong> age –<br />

higher am<strong>on</strong>g the female <strong>on</strong>e – has risen <strong>in</strong> both areas compared with 2007.<br />

Educati<strong>on</strong> wise, <strong>in</strong> the third quarter of the year 2008, 62.4 percent of the populati<strong>on</strong> of<br />

15 and over has at least high-school educati<strong>on</strong> (52.7 percent high-school, and 9.7<br />

percent, higher educati<strong>on</strong> graduates), while 37.7 percent of the populati<strong>on</strong> of 15 and<br />

over presents a low educati<strong>on</strong> level.<br />

There are differences between the urban and the rural populati<strong>on</strong> structures <strong>in</strong> terms<br />

of their level of educati<strong>on</strong>. Thus a larger c<strong>on</strong>centrati<strong>on</strong> of the 15+ populati<strong>on</strong> with<br />

higher educati<strong>on</strong> is found <strong>in</strong> the urban area (with 76.9 percent of people be<strong>in</strong>g highschool<br />

or upper educati<strong>on</strong> graduates), while <strong>in</strong> the rural area, the low-educati<strong>on</strong><br />

populati<strong>on</strong> prevails (about 55.8 percent have graduated the elementary or sec<strong>on</strong>dary<br />

school or have no educati<strong>on</strong> at all). The most significant gap is found am<strong>on</strong>g higher<br />

educati<strong>on</strong> graduates, whose share is seven times higher <strong>in</strong> the urban area.<br />

Assessment of the progress regard<strong>in</strong>g the implementati<strong>on</strong> of the priorities,<br />

measures and sub-measures of the SAPARD Programme<br />

As regards measure 1.1 „Improvement of process<strong>in</strong>g and market<strong>in</strong>g of agricultural<br />

and fisheries products”, dur<strong>in</strong>g the 48 sessi<strong>on</strong>s held dur<strong>in</strong>g August 2002 - July<br />

2006, 736 projects were submitted out of which 466 were c<strong>on</strong>tracted hav<strong>in</strong>g a total<br />

eligible approved value of 1,248,222.502 thousand LEI, respectively 345.143 milli<strong>on</strong><br />

Euro.<br />

With<strong>in</strong> measure 1.2 „Improv<strong>in</strong>g the structures for quality, veter<strong>in</strong>ary and plant healthc<strong>on</strong>trol,<br />

for the quality of foodstuffs and for c<strong>on</strong>sumer protecti<strong>on</strong>”, dur<strong>in</strong>g the 5<br />

sessi<strong>on</strong>s held between May 2006 - October 2006, out of the 20 submitted projects,<br />

20 projects were c<strong>on</strong>tracted hav<strong>in</strong>g a total eligible approved value of 129,428.687<br />

thousand LEI, respectively 36.104 milli<strong>on</strong> Euro.<br />

Dur<strong>in</strong>g the 9 sessi<strong>on</strong>s held between August - November 2002 and between April –<br />

August 2006 for measure 2.1 “Development and improvement of rural<br />

<strong>in</strong>frastructure”, out of the 781 submitted projects, 762 projects were c<strong>on</strong>tracted<br />

hav<strong>in</strong>g a total eligible approved value of 2,106,678.208 thousand LEI.<br />

Out of the total number of approved projects for Measure 2.1, approximately 50% are<br />

under the sub-measure Roads <strong>in</strong> rural areas (380 approved projects, 36% are under<br />

the sub-measure Dr<strong>in</strong>kable water supply <strong>in</strong> centralised system <strong>in</strong> rural areas (273<br />

approved projects) and 11% are under the sub-measure Sewerage <strong>in</strong> centralised<br />

system <strong>in</strong> rural areas (87 approved projects) and 3% are approved projects for submeasures<br />

<strong>on</strong> preventi<strong>on</strong> and protecti<strong>on</strong> works aga<strong>in</strong>st floods (22 approved projects).<br />

Dur<strong>in</strong>g the 32 sessi<strong>on</strong>s held between December 2003 – July 2006, with<strong>in</strong> measure<br />

3.1 „Investments <strong>in</strong> agricultural hold<strong>in</strong>gs” from the total number of submitted projects<br />

– 2,984 projects, 1,921 were c<strong>on</strong>tracted with a total eligible approved value of<br />

7


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

834,372.636 thousand LEI, respectively 231.323 milli<strong>on</strong> Euro.<br />

Approximately 62% of the approved projects for this measure are for <strong>in</strong>vestments <strong>in</strong><br />

sub-measure “Field crops” (1,190 approved projects), regard<strong>in</strong>g ma<strong>in</strong>ly the<br />

procurement of mach<strong>in</strong>ery and <strong>in</strong>dependent equipments.<br />

For measure 3.2 „Sett<strong>in</strong>g up of the producers groups”, dur<strong>in</strong>g the 5 sessi<strong>on</strong>s held<br />

between July 2006 - November 2006, 4 projects were submitted, these projects were<br />

c<strong>on</strong>tracted hav<strong>in</strong>g a total eligible approved value of 304.608 thousand LEI,<br />

respectively 0.086 milli<strong>on</strong> Euro.<br />

About 75% of the approved projects for this measure refer to the <strong>in</strong>vestments <strong>on</strong><br />

submeasure Milk (3 approved projects).<br />

Dur<strong>in</strong>g the 5 sessi<strong>on</strong>s held between July 2006 - November 2006, with<strong>in</strong> measure 3.3<br />

„Agricultural producti<strong>on</strong> methods designed to protect the envir<strong>on</strong>ment and ma<strong>in</strong>ta<strong>in</strong><br />

the countryside”, 48 projects were submitted, out of which 47 were c<strong>on</strong>tracted with a<br />

total eligible approved amount of 764.719 thousand LEI, namely 0.217 milli<strong>on</strong> Euro.<br />

The 47 c<strong>on</strong>tracted projects aim at types of activities regard<strong>in</strong>g the preserv<strong>in</strong>g the<br />

biodiversity by us<strong>in</strong>g the traditi<strong>on</strong>al agriculture practices.<br />

For measure 3.4 “Development and diversificati<strong>on</strong> of ec<strong>on</strong>omic activities generat<strong>in</strong>g<br />

multiple activities and alternative <strong>in</strong>come”, dur<strong>in</strong>g the 32 sessi<strong>on</strong>s held between<br />

December 2003 – July 2006, from the total number of 1,658 submitted projects,<br />

1,080 projects were c<strong>on</strong>tracted, with a total eligible approved value of 251,672.724<br />

thousand LEI, respectively 69.610 milli<strong>on</strong> Euro.<br />

Approximately 60% of the approved projects for this measure is for <strong>in</strong>vestments <strong>in</strong><br />

sub-measure “Rural Tourism” (643 approved projects). Likewise sub-measure “Other<br />

Activities” holds a quota of 31% (335 c<strong>on</strong>tracts), out of total number of approved<br />

projects for measure 3.4, most of the <strong>in</strong>vestments are made <strong>in</strong> bee-keep<strong>in</strong>g (214<br />

c<strong>on</strong>tracts represent<strong>in</strong>g 64% out of the total number for this sub-measure) and to a<br />

smaller extent <strong>in</strong> snail and frog breed<strong>in</strong>g (88 c<strong>on</strong>tracts represent<strong>in</strong>g 26% of the total<br />

number for this sub-measure).<br />

Dur<strong>in</strong>g the 3 sessi<strong>on</strong>s held between May - July 2006, with<strong>in</strong> measure 3.5 „Forestry”,<br />

out of the 158 submitted projects, 114 projects was c<strong>on</strong>tracted hav<strong>in</strong>g a total eligible<br />

approved value of 236,504.634 thousand LEI, respectively 66.677 milli<strong>on</strong> Euro.<br />

As regards measure 4.1 “Improvement of vocati<strong>on</strong>al tra<strong>in</strong><strong>in</strong>g”, by the end of 2008,<br />

5 projects with a total value of 10,521.610 thousand LEI were approved, mean<strong>in</strong>g<br />

2.901 milli<strong>on</strong> Euro; all these projects were c<strong>on</strong>tracted dur<strong>in</strong>g 2005.<br />

By the end of 2008, 10 projects, with a total value of 5,214.570 thousand LEI,<br />

mean<strong>in</strong>g 1.374 milli<strong>on</strong> Euro, were approved under measure 4.2 “Technical<br />

Assistance”.<br />

The approved projects ensure technical assistance for: M<strong>on</strong>itor<strong>in</strong>g Committee<br />

meet<strong>in</strong>g (1 project), nati<strong>on</strong>al sem<strong>in</strong>ars (2 projects), <strong>in</strong>formative and publicity<br />

campaigns (2 projects), mak<strong>in</strong>g preparatory studies for other measures (3 projects)<br />

and mak<strong>in</strong>g the mid-term evaluati<strong>on</strong> of the Programme (2 projects).<br />

8


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Until 31 st of December 2008, the amount of the paid projects <strong>on</strong> measures was of<br />

1,278.744 milli<strong>on</strong> Euro, respectively 254.030 milli<strong>on</strong> Euro for year 2008, out of which:<br />

• 340.683 milli<strong>on</strong> Euro for measure 1.1, represent<strong>in</strong>g 26.64% of the total<br />

amount of the executed payments;<br />

• 17.853 milli<strong>on</strong> Euro for measure 1.2, represent<strong>in</strong>g 1.40% of the total<br />

amount of the executed payments;<br />

• 578.747 milli<strong>on</strong> Euro for measure 2.1, represent<strong>in</strong>g 45.26% of the total<br />

amount of the executed payments;<br />

• 229.412 milli<strong>on</strong> Euro for measure 3.1, represent<strong>in</strong>g 17.94% of the total<br />

amount of the executed payments;<br />

• In 2008 the payments for measure 3.2 started. The payments executed<br />

were <strong>in</strong> value of 0.029 milli<strong>on</strong> Euro, represent<strong>in</strong>g 0.002% of the total amount<br />

of the executed payments;<br />

• 0.187 milli<strong>on</strong> Euro for measure 3.3, represent<strong>in</strong>g 0.01% of the total amount<br />

of the executed payments;<br />

• 64.832 milli<strong>on</strong> Euro for measure 3.4, represent<strong>in</strong>g 5.07% of the total amount<br />

of the executed payments;<br />

• 42.548 milli<strong>on</strong> Euro for measure 3.5, represent<strong>in</strong>g 3.33% of the total<br />

amount of the executed payments;<br />

• 3.028 milli<strong>on</strong> Euro for measure 4.1, represent<strong>in</strong>g 0.24% of the total amount<br />

of the executed payments;<br />

• 1.424 milli<strong>on</strong> Euro for measure 4.2, represent<strong>in</strong>g 0.11% of the total amount<br />

of the executed payments;<br />

Regard<strong>in</strong>g the approved projects, until December 31 st 2008, 4.414 projects were<br />

approved with a public value of 1,322.391 milli<strong>on</strong> Euro, <strong>on</strong> the <strong>in</strong>vestment measures,<br />

out of which 10.56% represent c<strong>on</strong>tracts under Measure 1.1, 0.45% represents<br />

c<strong>on</strong>tracts under Measure 1.2, 17.26% represent c<strong>on</strong>tracts under Measure 2.1,<br />

43.52% are projects c<strong>on</strong>tracted under Measure 3.1, 0.09% are projects c<strong>on</strong>tracted<br />

under Measure 3.2, 1.07% are projects c<strong>on</strong>tracted under Measure 3.3, 24.47% are<br />

projects c<strong>on</strong>tracted under Measure 3.4 and 2.58% are projects c<strong>on</strong>tracted under<br />

Measure 3.5.<br />

The public c<strong>on</strong>tracted value, afferent to the c<strong>on</strong>tracts <strong>on</strong> Measure 1.1, was of<br />

345.143 milli<strong>on</strong> Euro, represent<strong>in</strong>g 26.10% out of the total commitments of the<br />

PARDF. On Measure 1.2 the public c<strong>on</strong>tracted value was of 36.104 milli<strong>on</strong> Euro i.e.<br />

2.73% out of the total commitments of the PARDF. On Measure 2.1, the public<br />

c<strong>on</strong>tracted value was of 573.231 milli<strong>on</strong> Euro i.e. 43.35% out of the total<br />

commitments of the PARDF. On Measure 3.1, the public c<strong>on</strong>tracted value was<br />

231.323 milli<strong>on</strong> Euro i.e. 17.49% out of the total commitments. On Measure 3.2, the<br />

public c<strong>on</strong>tracted value was 0.086 milli<strong>on</strong> Euro i.e. 0.01% out of the total<br />

commitments. On Measure 3.3, the public c<strong>on</strong>tracted value was 0.217 milli<strong>on</strong> Euro<br />

i.e. 0.02% out of the total commitments. On Measure 3.4, the public c<strong>on</strong>tracted value<br />

was 69.610 milli<strong>on</strong> Euro i.e. 5.26% out of the total commitments of the PARDF. On<br />

Measure 3.5 the public c<strong>on</strong>tracted value was 66.677 milli<strong>on</strong> Euro i.e. 5.04% out of the<br />

total commitments of the PARDF.<br />

At the same time, by 31 December 2008, a number of 120 projects affected by<br />

natural disasters were approved hav<strong>in</strong>g a public value of 73.846 milli<strong>on</strong> Euro <strong>on</strong> the<br />

<strong>in</strong>vestments measures. Out of these projects, 2.50% represent c<strong>on</strong>tracts <strong>on</strong> Measure<br />

9


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

1.1, 69.17% represent c<strong>on</strong>tracts <strong>on</strong> Measure 2.1 and 25.83% represent c<strong>on</strong>tracts <strong>on</strong><br />

Measure 3.1, respectively 2.50% are projects c<strong>on</strong>tracted <strong>on</strong> Measure 3.4.<br />

The c<strong>on</strong>tracted public value afferent to the c<strong>on</strong>tracts affected by disasters <strong>on</strong><br />

Measure 1.1 was of 6.315 milli<strong>on</strong> Euro, represent<strong>in</strong>g 8.55% from the total PARDF<br />

commitments. On Measure 2.1, the public c<strong>on</strong>tracted value was of 59.898 milli<strong>on</strong><br />

Euro, respectively 81.11% from the total PARDF commitments. On Measure 3.1, the<br />

public c<strong>on</strong>tracted value was of 7.183 milli<strong>on</strong> Euro, respectively 9.73% from the total<br />

commitments and <strong>on</strong> Measure 3.4, the public c<strong>on</strong>tracted value was of 0.450 milli<strong>on</strong><br />

Euro, respectively 0.61% from the total PARDF commitments.<br />

For the entire Programme, at the end of 2008 the total committed amount (1,400.512<br />

milli<strong>on</strong> Euro) shows a commitment degree of 92.05% from the 2000-2006<br />

allocati<strong>on</strong>s.<br />

By December 31 st 2008, 3,965 projects were f<strong>in</strong>alized, out of which 430 <strong>on</strong><br />

Measure 1.1, out of which <strong>on</strong>e f<strong>in</strong>alized project be<strong>in</strong>g projects affected by natural<br />

disasters, 6 projects were f<strong>in</strong>alized <strong>on</strong> Measure 1.2, 749 projects were f<strong>in</strong>alized <strong>on</strong><br />

Measure 2.1 out of which 50 f<strong>in</strong>alized projects be<strong>in</strong>g projects affected by natural<br />

disasters, 1,807 projects <strong>on</strong> Measure 3.1 out of which 31 f<strong>in</strong>alized projects be<strong>in</strong>g<br />

projects affected by natural disasters, 902 projects <strong>on</strong> Measure 3.4, out of which 2<br />

f<strong>in</strong>alized projects be<strong>in</strong>g projects affected by natural disasters, 56 projects <strong>on</strong><br />

Measure 3.5, 5 projects <strong>on</strong> Measure 4.1 and 10 projects were f<strong>in</strong>alized <strong>on</strong> Measure<br />

4.2.<br />

Out of 3,965 projects, 777 projects were f<strong>in</strong>alized <strong>in</strong> 2008 as follows: 120 projects<br />

under Measure 1.1, 6 projects under Measure 1.2, 148 projects under Measure<br />

2.1, 184 projects under Measure 3.1, 289 projects under Measure 3.4, 26 projects<br />

under Measure 3.5, 3 projects under Measure 4.1 and 1 projects under Measure<br />

4.2.<br />

By December 31 st 2008, accord<strong>in</strong>g to the official data, 806 projects were cancelled<br />

and sancti<strong>on</strong>ed due to irregularities, out of which 99 projects <strong>on</strong> Measure 1.1, 2<br />

projects <strong>on</strong> Measure 1.2, 228 projects <strong>on</strong> Measure 2.1, 168 projects <strong>on</strong> Measure 3.1,<br />

45 projects <strong>on</strong> Measure 3.3, 247 projects <strong>on</strong> Measure 3.4, 6 projects <strong>on</strong> Measure 3.5,<br />

2 projects <strong>on</strong> Measure 4.1 and 9 projects <strong>on</strong> Measure 4.2.<br />

Measures to improve quality and efficiency of SAPARD Programme<br />

implementati<strong>on</strong><br />

Accord<strong>in</strong>g to its specific tasks, <strong>in</strong> 2008, the Manag<strong>in</strong>g Authority for SAPARD<br />

Programme (MA) organized a number of activities to help <strong>in</strong>crease the effectiveness<br />

of the Programme implementati<strong>on</strong>, by ensur<strong>in</strong>g the coord<strong>in</strong>ati<strong>on</strong> of the m<strong>on</strong>itor<strong>in</strong>g<br />

and <str<strong>on</strong>g>report</str<strong>on</strong>g><strong>in</strong>g activities.<br />

Given that art. 2 of the Multi-Annual F<strong>in</strong>ancial Agreement stipulates that the EC<br />

c<strong>on</strong>tributi<strong>on</strong> is determ<strong>in</strong>ed through Annual F<strong>in</strong>ancial Agreements, the MA has taken<br />

the necessary steps to c<strong>on</strong>clude, ratify, and notify the ratificati<strong>on</strong> of Annual F<strong>in</strong>ancial<br />

Agreement 2006.<br />

On December 4 th , 2008, the Agreement between the Romanian Government and the<br />

European Communities’ Commissi<strong>on</strong>, <strong>on</strong> behalf of the European Community, was<br />

10


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

signed at Bucharest and Bruxelles, to amend the Annual F<strong>in</strong>anc<strong>in</strong>g Agreement 2006.<br />

The agreement extends the validity deadl<strong>in</strong>e of the Community’s f<strong>in</strong>ancial<br />

commitment for 2006 up to December 31 st , 2009. Thus, the decommitment of funds<br />

allocated to Romania under SAPARD Programme for 2006 is avoided.<br />

In 2008, the Manag<strong>in</strong>g Authority organized the 16 th reuni<strong>on</strong> of the M<strong>on</strong>itor<strong>in</strong>g<br />

Committee for SAPARD Programme (MC), <strong>on</strong> the 25 th of November. The approval by<br />

the MC members, <strong>in</strong> written procedure, of the 2007 SAPARD <str<strong>on</strong>g>annual</str<strong>on</strong>g> <str<strong>on</strong>g>report</str<strong>on</strong>g> was<br />

c<strong>on</strong>sidered the 15 th reuni<strong>on</strong>.<br />

The Manag<strong>in</strong>g Authority ensured the secretariat Committee’s reuni<strong>on</strong>s and<br />

ma<strong>in</strong>ta<strong>in</strong>ed a permanent c<strong>on</strong>tact with the representative bodies of the MC, <strong>in</strong> order to<br />

identify the problems they are fac<strong>in</strong>g.<br />

In accordance with Art. 8 - Secti<strong>on</strong> B <strong>in</strong> MAFA, the MA elaborated the Annual Report<br />

<strong>on</strong> the SAPARD Programme implementati<strong>on</strong> <strong>in</strong> Romania for 2007, which was<br />

submitted to the M<strong>on</strong>itor<strong>in</strong>g Committee members, for approval, <strong>in</strong> written procedure,<br />

<strong>on</strong> 16 th of June 2008.<br />

The <str<strong>on</strong>g>report</str<strong>on</strong>g> was sent for further approval to the European Commissi<strong>on</strong> <strong>on</strong> 20 th of June<br />

2008.<br />

Also, SAPARD MA proposed for approval of the MC members the modificati<strong>on</strong> of<br />

NPARD, c<strong>on</strong>cern<strong>in</strong>g the reallocati<strong>on</strong> with<strong>in</strong> measure 2.1 “Development and<br />

improvement of rural <strong>in</strong>frastructure”, for 2006, of an amount of 45.00 milli<strong>on</strong> Euro<br />

from the Community c<strong>on</strong>tributi<strong>on</strong> from the affected areas to the not affected areas,<br />

without modify<strong>in</strong>g the <strong>in</strong>itially allocated amount for this measure, respectively the<br />

value of 524.81 milli<strong>on</strong> Euro.<br />

Also, the MA proposed the <strong>in</strong>crease with 0.1 milli<strong>on</strong> Euro, Community c<strong>on</strong>tributi<strong>on</strong> for<br />

measure 4.2 “Technical Assistance”, for 2005, through redistributi<strong>on</strong> from measure<br />

1.2 “Improv<strong>in</strong>g the structures for quality, veter<strong>in</strong>ary, and plant-health c<strong>on</strong>trol, for the<br />

quality of foodstuffs and for c<strong>on</strong>sumer protecti<strong>on</strong>” <strong>in</strong> order for the f<strong>in</strong>ancial allocati<strong>on</strong><br />

level to corresp<strong>on</strong>d to the value foreseen <strong>in</strong> the acquisiti<strong>on</strong> <strong>programme</strong> elaborated for<br />

this measure.<br />

The Nati<strong>on</strong>al Fund with<strong>in</strong> the M<strong>in</strong>istry of Public F<strong>in</strong>ances submitted <strong>in</strong> 2008 to the<br />

European Commissi<strong>on</strong> – DG Agri Declarati<strong>on</strong>s of expenditure and payment<br />

applicati<strong>on</strong>s for a total amount of 152,050,058.27 Euro.<br />

Accord<strong>in</strong>g to the supplementary Declarati<strong>on</strong> of expenditure and the Request of Funds<br />

no. 36, with cut off date of 30th November 2008, the total amount of expenditures<br />

from European Uni<strong>on</strong>’s SAPARD funds from the beg<strong>in</strong>n<strong>in</strong>g of the <strong>programme</strong> up to<br />

31 st November 2008, is 909.963.876,79 Euro. This sum also <strong>in</strong>cludes the amount of<br />

685.167,89 Euro represent<strong>in</strong>g payments effectuated from the <strong>in</strong>terest gathered <strong>in</strong> the<br />

Euro SAPARD account.<br />

Dur<strong>in</strong>g 2008 the European Commissi<strong>on</strong> reimbursed to the Nati<strong>on</strong>al Fund a total<br />

amount of 10.549.598, 00 Euro from the total eligible amount requested <strong>in</strong> 2008.<br />

The difference from the requested amount and the transferred <strong>on</strong>e <strong>in</strong> amount of<br />

141.500.460.27 Euro, will be subjected to the transfers from the European<br />

11


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Commissi<strong>on</strong> from the budget of 2009, after the implementati<strong>on</strong> of the ”Acti<strong>on</strong> plan for<br />

the implementati<strong>on</strong> of DG AGRI’s recommendati<strong>on</strong>s follow<strong>in</strong>g the m<strong>on</strong>itor<strong>in</strong>g missi<strong>on</strong><br />

from June, 3rd-13th 2008”.<br />

Due to the exhaust<strong>in</strong>g of the available amount <strong>in</strong> Euro SAPARD account, determ<strong>in</strong>ed<br />

by the time difference between its use and their reimbursement by the European<br />

Commissi<strong>on</strong> (EC), and of the suspensi<strong>on</strong> of the payments by EC, the Nati<strong>on</strong>al Fund<br />

transferred to PARDF an amount of 141.629.043, 84 Euro. On 31.12.2008 it should<br />

have been replenished the buffer fund account with the amount of 117.663.669,13<br />

Euro. This amount is to be returned to the state budget as so<strong>on</strong> as it will be restarted<br />

the EC payments to Romania.<br />

Accord<strong>in</strong>g to the stipulati<strong>on</strong>s of art. 6 of the EC Regulati<strong>on</strong> no. 248/2007 regard<strong>in</strong>g<br />

the measures c<strong>on</strong>cern<strong>in</strong>g the multi-<str<strong>on</strong>g>annual</str<strong>on</strong>g> f<strong>in</strong>anc<strong>in</strong>g agreements and the <str<strong>on</strong>g>annual</str<strong>on</strong>g><br />

f<strong>in</strong>anc<strong>in</strong>g agreements signed <strong>on</strong> the basis of SAPARD Programme, as well as to the<br />

transiti<strong>on</strong> from the SAPARD Programme to the <strong>programme</strong>s for rural development,<br />

the Nati<strong>on</strong>al Authoris<strong>in</strong>g Officer (NAO) <strong>in</strong>formed the European Commissi<strong>on</strong> as so<strong>on</strong><br />

as it was proposed any modificati<strong>on</strong> <strong>in</strong> the implement<strong>in</strong>g of SAPARD Programme<br />

dur<strong>in</strong>g 2008.<br />

Follow<strong>in</strong>g the recommendati<strong>on</strong>s submitted by the auditors EC-DG AGRI, as a result<br />

of the m<strong>on</strong>itor<strong>in</strong>g missi<strong>on</strong> of SAPARD Programme <strong>in</strong> Romania, dur<strong>in</strong>g 3-13 June,<br />

2008, the nati<strong>on</strong>al payments to the beneficiaries were suspended. NAO imposed to<br />

PARDF some c<strong>on</strong>diti<strong>on</strong>s accord<strong>in</strong>g to which these payments will be realised from the<br />

state budget.<br />

These c<strong>on</strong>diti<strong>on</strong>s were ma<strong>in</strong>ly po<strong>in</strong>t<strong>in</strong>g out the improvement of PARDF procedures<br />

and also to ensure a sufficient number of tra<strong>in</strong>ed staff so that it is ensured that the<br />

large number of requests of funds, registered by PARDF dur<strong>in</strong>g the period when the<br />

payments were suspended, will be processed <strong>in</strong> time and accord<strong>in</strong>gly. Only after the<br />

fulfilment of the c<strong>on</strong>diti<strong>on</strong>s and the communicati<strong>on</strong> to EC of the Instructi<strong>on</strong> no. 118,<br />

<strong>on</strong> 25.09.2008, it has been restarted the nati<strong>on</strong>al payments from funds bel<strong>on</strong>g<strong>in</strong>g to<br />

the state budget for the beneficiaries of SAPARD Programme.<br />

Dur<strong>in</strong>g 2008, the activities and audit missi<strong>on</strong>s performed by the Internal Audit<br />

Directorate with<strong>in</strong> the Pay<strong>in</strong>g Agency for Rural Development and Fishery, <strong>in</strong><br />

accordance with the Annual Audit Plan for 2008 and <strong>in</strong> accordance with the Strategic<br />

Audit Plan for period 2008-2010 for SAPARD Programme and <strong>in</strong>cluded checks as<br />

regards:<br />

• The manner the procedures for the implementati<strong>on</strong> of the Measures 1.2, 3.2,<br />

3.3 („100% Re-performance”) are observed and the follow up of the<br />

recommendati<strong>on</strong>s related to these verificati<strong>on</strong>s;<br />

• The completeness, the accuracy and the veracity of the Agency’s accounts for<br />

the years 2006 and 2007;<br />

• The manner the public procurement procedure for the projects related to the<br />

Measure 2.1 of the regi<strong>on</strong>s affected by natural disasters is observed;<br />

• Assess<strong>in</strong>g the PROSYS software applicati<strong>on</strong>;<br />

• Assess<strong>in</strong>g the manner of establish<strong>in</strong>g the public procurement procedure (G3<br />

ACP) applicable to the procurements performed by the beneficiaries of the<br />

Measures 1.2 and 2.1 dur<strong>in</strong>g 2007;<br />

• Identify<strong>in</strong>g the causes which led to the emergence of the differences between<br />

12


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

the Agency’s directorates records for the projects f<strong>in</strong>anced by SAPARD<br />

Programme;<br />

• Assess<strong>in</strong>g the audit trail for the <strong>in</strong>structi<strong>on</strong>s and circulars letters issued <strong>in</strong> order<br />

to amend the procedures for the SAPARD Programme’s implementati<strong>on</strong>;<br />

• Assess<strong>in</strong>g the Procedure Manual for record<strong>in</strong>g and recover<strong>in</strong>g the debts G8<br />

IRD;<br />

• Assess<strong>in</strong>g the proposals to amend the payments’ executi<strong>on</strong> procedure, G6 –<br />

EP;<br />

• Assess<strong>in</strong>g the proposals to amend the procedures drawn up for the<br />

implementati<strong>on</strong> of the SAPARD Programme <strong>in</strong> compliance with the provisi<strong>on</strong>s<br />

of the MARD’s Order no. 63/2008;<br />

• Assess<strong>in</strong>g the proposals for the modificati<strong>on</strong>s and completi<strong>on</strong>s of the<br />

procedures drawn up for the implementati<strong>on</strong> of the SAPARD Programme <strong>in</strong><br />

compliance with the European Commissi<strong>on</strong>’s recommendati<strong>on</strong>s by letter no.<br />

16.859/09.07.2008;<br />

• Follow<strong>in</strong>g up the recommendati<strong>on</strong>s and observati<strong>on</strong>s made by authorized<br />

external entities, namely: European Court of Auditors, European<br />

Commissi<strong>on</strong>’s auditors, Audit Authority from the Romanian Court of Accounts,<br />

M<strong>in</strong>istry of Public F<strong>in</strong>ances – Internal Public Audit Directorate, C<strong>on</strong>trol<br />

Department of the Government, MARFD’s General Directorate for Technical<br />

Inspecti<strong>on</strong>s and C<strong>on</strong>trol;<br />

Follow<strong>in</strong>g these audit missi<strong>on</strong>s, the Internal Audit Directorate issued audit <str<strong>on</strong>g>report</str<strong>on</strong>g>s that<br />

were submitted to the management of Pay<strong>in</strong>g Agency for Rural Development and<br />

Fishery, to the Nati<strong>on</strong>al Authoriz<strong>in</strong>g Officer, to the Audit Directorate with<strong>in</strong> MAFRD, to<br />

the external auditors with<strong>in</strong> Audit Authority - Romanian Court of Accounts, the<br />

M<strong>in</strong>istry of Public F<strong>in</strong>ance – Internal Public Audit Directorate and European<br />

Commissi<strong>on</strong>.<br />

The ma<strong>in</strong> f<strong>in</strong>d<strong>in</strong>gs and recommendati<strong>on</strong>s with the high level of importance drawn up<br />

as a result of the audit missi<strong>on</strong>s and presented <strong>in</strong> the audit <str<strong>on</strong>g>report</str<strong>on</strong>g>s for year 2008<br />

address to the follow<strong>in</strong>g deficiencies:<br />

• Executi<strong>on</strong> of an overpayment;<br />

• The pr<strong>in</strong>ciple of sound f<strong>in</strong>ancial management was not observed accord<strong>in</strong>g to<br />

MAFA’s provisi<strong>on</strong>s, Secti<strong>on</strong> B, article. 4;<br />

• Fill<strong>in</strong>g <strong>in</strong> and/ or clarify<strong>in</strong>g the procurements procedures;<br />

• The discrepancies between the procedures’ manual G8 - IRD and the other<br />

PARDF procedures elaborated for the SAPARD Program or other documents<br />

from the nati<strong>on</strong>al legislati<strong>on</strong>;<br />

• The provisi<strong>on</strong>s of the nati<strong>on</strong>al legislati<strong>on</strong> <strong>in</strong> force regard<strong>in</strong>g the public<br />

procurements have not been observed;<br />

• Lack of assurance measures;<br />

• Use of a procedure manual that does not observe the requirements of the<br />

European Commissi<strong>on</strong>;<br />

• Incomplete procedural provisi<strong>on</strong>s;<br />

• Deficiencies <strong>in</strong> communicati<strong>on</strong>.<br />

Accord<strong>in</strong>g to the accredited procedure, the C<strong>on</strong>trol and Antifraud Directorate (CAD),<br />

under the direct subord<strong>in</strong>ati<strong>on</strong> of the general director of PARDF, carries out technical<br />

and f<strong>in</strong>ancial verificati<strong>on</strong>s of the projects <strong>in</strong> terms of their certificati<strong>on</strong>, c<strong>on</strong>formity,<br />

eligibility, selecti<strong>on</strong> and payments, ma<strong>in</strong>tenance of the eligibility <strong>on</strong> a 5-year period of<br />

time, and also <strong>in</strong> terms of <strong>in</strong>ternal c<strong>on</strong>trol <strong>in</strong> order to prevent fraud and also to<br />

13


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

assure the proper use of funds, observ<strong>in</strong>g the quality requirements def<strong>in</strong>ed <strong>in</strong> the<br />

project.<br />

The ma<strong>in</strong> c<strong>on</strong>trol activities c<strong>on</strong>sisted <strong>in</strong>:<br />

I. The verificati<strong>on</strong> of the projects dur<strong>in</strong>g the implementati<strong>on</strong> and executi<strong>on</strong> stage;<br />

II. The verificati<strong>on</strong> of the projects after the last payment (the ex-post verificati<strong>on</strong>);<br />

The activities of the SAPARD Programme M<strong>on</strong>itor<strong>in</strong>g Committee<br />

Dur<strong>in</strong>g the 2001-2008 period, sixteen reuni<strong>on</strong>s of the M<strong>on</strong>itor<strong>in</strong>g Committee have<br />

been carried out, of which the last two dur<strong>in</strong>g 2008. Dur<strong>in</strong>g 2008, was organized a<br />

M<strong>on</strong>itor<strong>in</strong>g Committee meet<strong>in</strong>g, and also a written procedure of the Annual Report<br />

approval.<br />

Follow<strong>in</strong>g the c<strong>on</strong>sultati<strong>on</strong>s with the European Commissi<strong>on</strong>’s officials it was decided<br />

that the approval of the 2007 SAPARD <str<strong>on</strong>g>annual</str<strong>on</strong>g> <str<strong>on</strong>g>report</str<strong>on</strong>g> by the M<strong>on</strong>itor<strong>in</strong>g Committee<br />

members, <strong>in</strong> written procedure, to be c<strong>on</strong>sidered a reuni<strong>on</strong> of the M<strong>on</strong>itor<strong>in</strong>g<br />

Committee, namely the 15 th .<br />

M<strong>on</strong>itor<strong>in</strong>g and evaluati<strong>on</strong> system<br />

The m<strong>on</strong>itor<strong>in</strong>g of SAPARD Programme is performed us<strong>in</strong>g the <strong>in</strong>dicators<br />

corresp<strong>on</strong>d<strong>in</strong>g to the specific character of the assistance and socio-ec<strong>on</strong>omic<br />

structural and envir<strong>on</strong>mental situati<strong>on</strong> <strong>in</strong> Romania.<br />

At PARDF’s level, the m<strong>on</strong>itor<strong>in</strong>g <strong>in</strong>dicators are grouped as follows: regi<strong>on</strong>al<br />

<strong>in</strong>dicators, f<strong>in</strong>ancial m<strong>on</strong>itor<strong>in</strong>g <strong>in</strong>dicators, and achievement <strong>in</strong>dicators.<br />

To ensure an efficient system to trace and po<strong>in</strong>t out the SAPARD Programme’s<br />

implementati<strong>on</strong> stage, a series of acti<strong>on</strong>s related to m<strong>on</strong>itor<strong>in</strong>g reflected <strong>in</strong> various<br />

daily, weekly or m<strong>on</strong>thly situati<strong>on</strong>s regard<strong>in</strong>g the collecti<strong>on</strong> of <strong>in</strong>formati<strong>on</strong> and<br />

<strong>in</strong>dicators <strong>in</strong> different stages a project goes through: applicati<strong>on</strong>, selecti<strong>on</strong>,<br />

notificati<strong>on</strong>, c<strong>on</strong>tract<strong>in</strong>g, payment claim applicati<strong>on</strong>, payment authorizati<strong>on</strong> and the<br />

actual payment of the <strong>in</strong>stalment.<br />

Measures taken to correct problems identified <strong>in</strong> the SAPARD Programme’s<br />

implementati<strong>on</strong><br />

In order to solve the problems identified dur<strong>in</strong>g the Programmes’ implementati<strong>on</strong>, the<br />

follow<strong>in</strong>g have been implemented:<br />

• Acti<strong>on</strong>s regard<strong>in</strong>g procedures’ improvement (improvement of the <strong>in</strong>ternal<br />

c<strong>on</strong>trol system referr<strong>in</strong>g to the management of the <strong>in</strong>structi<strong>on</strong>s, modificati<strong>on</strong> of<br />

the procurement procedures for the public beneficiaries of the SAPARD<br />

Programme).<br />

• Acti<strong>on</strong>s regard<strong>in</strong>g the sett<strong>in</strong>g up of a database which c<strong>on</strong>ta<strong>in</strong>s all the projects<br />

that were submitted with<strong>in</strong> the SAPARD Programme. On 31st of August 2008,<br />

the procedure for load<strong>in</strong>g the database with all <strong>in</strong>formati<strong>on</strong> was launched so at<br />

the moment the database c<strong>on</strong>ta<strong>in</strong>s all SAPARD projects submitted with<strong>in</strong><br />

SAPARD Programme, all addenda related to each project and also c<strong>on</strong>ta<strong>in</strong>s<br />

all the payment <strong>in</strong>stalments (<strong>in</strong>clud<strong>in</strong>g all the <strong>in</strong>formati<strong>on</strong> related to the<br />

14


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

payment order that the respective transacti<strong>on</strong> has been made).<br />

• Measures related to endowment – dur<strong>in</strong>g 2008, procurements from the<br />

Agency’s own budget <strong>in</strong> total value of 3,543.600 lei, were performed, beside<br />

the current functi<strong>on</strong><strong>in</strong>g expenditures.<br />

• Measures regard<strong>in</strong>g the ensur<strong>in</strong>g of the necessary staff (based <strong>on</strong> G.E.O. no.<br />

65/2008 <strong>on</strong> the amendment and completi<strong>on</strong> of G.E.O. 13/2006 regard<strong>in</strong>g the<br />

establishment, organizati<strong>on</strong> and functi<strong>on</strong><strong>in</strong>g of the Pay<strong>in</strong>g Agency for Rural<br />

Development and Fishery, by re-organiz<strong>in</strong>g SAPARD Agency, as well as for<br />

sett<strong>in</strong>g up of some measures regard<strong>in</strong>g the effectiveness of the Pay<strong>in</strong>g and<br />

Interventi<strong>on</strong> Agency for Agriculture), PARDF has 1613, 1461 occupied and<br />

152 are vacant. On 31 st of December 2008, the degree of fill<strong>in</strong>g <strong>in</strong> the job<br />

positi<strong>on</strong>s was of 90%.<br />

• Measures of staff tra<strong>in</strong><strong>in</strong>g - aimed at strengthen<strong>in</strong>g of the proffessi<strong>on</strong>al<br />

competences accord<strong>in</strong>g to the job positi<strong>on</strong> requirements and the strategy of<br />

Agency’s development c<strong>on</strong>cern<strong>in</strong>g the follow<strong>in</strong>g fields: security of <strong>in</strong>formati<strong>on</strong>,<br />

measures of rural development c<strong>on</strong>cern<strong>in</strong>g the evaluati<strong>on</strong>, c<strong>on</strong>tract<strong>in</strong>g,<br />

authoriz<strong>in</strong>g and payment account<strong>in</strong>g, debts recover<strong>in</strong>g, legislati<strong>on</strong>,<br />

management, communicati<strong>on</strong> processes and unitary applicati<strong>on</strong> of the work<strong>in</strong>g<br />

procedures regard<strong>in</strong>g the SAPARD and EFARD Programmes. The number of<br />

employees <strong>in</strong>cluded <strong>in</strong> the tra<strong>in</strong><strong>in</strong>g sessi<strong>on</strong>s was of 1400.<br />

• Measures regard<strong>in</strong>g the legal framework.<br />

Assur<strong>in</strong>g the SAPARD Programme promoti<strong>on</strong> <strong>in</strong> Romania<br />

The promoti<strong>on</strong> activity of SAPARD Programme dur<strong>in</strong>g 2008 was achieved ma<strong>in</strong>ly<br />

through the presentati<strong>on</strong> of the Programme’s implementati<strong>on</strong> stage, by press<br />

releases and public <strong>in</strong>formati<strong>on</strong>, successful projects implemented us<strong>in</strong>g SAPARD<br />

funds and also achieved with<strong>in</strong> the specific public events.<br />

In this respect, PARDF carried out a series of <strong>in</strong>formati<strong>on</strong> activities, namely:<br />

• Presentati<strong>on</strong> of models of projects implemented under SAPARD;<br />

• Draw<strong>in</strong>g up and distribut<strong>in</strong>g <strong>in</strong>formative materials;<br />

• Participati<strong>on</strong> <strong>in</strong> promoti<strong>on</strong> events;<br />

• Fil<strong>in</strong>g <strong>in</strong> and updat<strong>in</strong>g PARDF’s website.<br />

In additi<strong>on</strong> to the accessi<strong>on</strong> and implementati<strong>on</strong> of the Nati<strong>on</strong>al Programme of Rural<br />

Development 2007 – 2013, the <strong>in</strong>formati<strong>on</strong> provided by the specialized department<br />

(Promoti<strong>on</strong>, Communicati<strong>on</strong> and Mass-Media Relati<strong>on</strong>s Directorate - PCMMRD) and<br />

by the resp<strong>on</strong>sible for the advertis<strong>in</strong>g campaigns at regi<strong>on</strong>al and county levels was<br />

focused <strong>on</strong> the progress of SAPARD Programme, especially as regards the<br />

payments executi<strong>on</strong> process.<br />

Therefore, the Pay<strong>in</strong>g Agency for Rural Development and Fishery has allocated a<br />

special attenti<strong>on</strong> for this type of communicati<strong>on</strong>, ensur<strong>in</strong>g the mediat<strong>in</strong>g of the<br />

SAPARD Programme and of the EFARD through: press releases and efficient<br />

communicati<strong>on</strong> with mass-media.<br />

Us<strong>in</strong>g the Technical Assistance<br />

As regards Measure 4.1 “Improvement of vocati<strong>on</strong>al tra<strong>in</strong><strong>in</strong>g”, 5 projects had been<br />

approved by the end of 2008, <strong>in</strong> value of 13,287.55 thousand lei, represent<strong>in</strong>g 3.65<br />

milli<strong>on</strong> Euro. All these projects had been c<strong>on</strong>tracted <strong>in</strong> 2005.<br />

10 projects <strong>in</strong> value of 5,839.98 thousand lei, represent<strong>in</strong>g 1.54 milli<strong>on</strong> Euro, had<br />

15


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

been approved by the end of 2008 under the technical assistance measure.<br />

Observ<strong>in</strong>g the pr<strong>in</strong>ciple of complementarity of the Community funds with<br />

nati<strong>on</strong>al funds<br />

Accord<strong>in</strong>g to the provisi<strong>on</strong>s of the art. 3 ”Complementarity and technical assistance“<br />

from the Council Regulati<strong>on</strong> (EC). 1268/1999 <strong>on</strong> the f<strong>in</strong>ancial aid of the preaccessi<strong>on</strong><br />

measures for agriculture and rural development <strong>in</strong> the candidate countries<br />

of Central and Eastern Europe <strong>in</strong> the pre-accessi<strong>on</strong> period, "Community acti<strong>on</strong><br />

complements nati<strong>on</strong>al acti<strong>on</strong>s appropriate or c<strong>on</strong>tribute to them." To these provisi<strong>on</strong>s,<br />

the Romanian Government promotes a policy to support the agricultural producers.<br />

In order to support producers <strong>in</strong> the crop and livestock sectors, about 3,127,090,019<br />

lei were allocated from the 2008 MAFRD approved budget through the f<strong>in</strong>ancial aid<br />

<strong>programme</strong> promoted by the M<strong>in</strong>istry, for payment of state support to farmers.<br />

Coord<strong>in</strong>ati<strong>on</strong> of SAPARD Programme with Other F<strong>in</strong>ancial Instruments for<br />

Internati<strong>on</strong>al Support<br />

In order to accomplish the coord<strong>in</strong>ati<strong>on</strong> of the Programme with other f<strong>in</strong>ancial<br />

<strong>in</strong>struments and <strong>in</strong> order to avoid overlaps and to ensure a transparent use of<br />

<strong>in</strong>ternati<strong>on</strong>al fund<strong>in</strong>g <strong>in</strong>struments, Romania has created the needed structures for<br />

assur<strong>in</strong>g the coord<strong>in</strong>ati<strong>on</strong>, <strong>in</strong>formati<strong>on</strong> and m<strong>on</strong>itor<strong>in</strong>g of the <strong>in</strong>ternati<strong>on</strong>al f<strong>in</strong>ancial<br />

assistance.<br />

As regards the technical assistance provided under PHARE Programmes, <strong>in</strong> 2008<br />

PARDF benefited of a series of projects under PHARE Programme:<br />

• Tra<strong>in</strong><strong>in</strong>g for the staff of the Manag<strong>in</strong>g Authority and for the bodies <strong>in</strong>volved <strong>in</strong><br />

the programm<strong>in</strong>g process and the sett<strong>in</strong>g up of the implementati<strong>on</strong> system;<br />

• Tra<strong>in</strong><strong>in</strong>g the staff of the <strong>in</strong>stituti<strong>on</strong>s <strong>in</strong>volved <strong>in</strong> design<strong>in</strong>g and implementati<strong>on</strong><br />

of the Rural Development Programme and the Fishery Operati<strong>on</strong>al<br />

Programme 2007 – 2013 and communicati<strong>on</strong> activities of the bodies<br />

resp<strong>on</strong>sible for the implementati<strong>on</strong> of the <strong>programme</strong>s;<br />

• Technical Assistance for the elaborati<strong>on</strong> of the software necessary for the<br />

implementati<strong>on</strong> of the Rural Development and Fishery Funds<br />

• Tw<strong>in</strong>n<strong>in</strong>g to set-up adequate structures assur<strong>in</strong>g the absorpti<strong>on</strong> of EU Rural<br />

Development and Fishery funds after the Accessi<strong>on</strong>.<br />

Also, through other <strong>in</strong>ternati<strong>on</strong>al f<strong>in</strong>ancial <strong>in</strong>struments, the follow<strong>in</strong>g projects have<br />

been f<strong>in</strong>anced:<br />

• The IFAD - funded Rural Development Project for the Apuseni Mounta<strong>in</strong>s;<br />

• The “Rehabilitati<strong>on</strong> and Reform<strong>in</strong>g of the Irrigati<strong>on</strong> Sector” project f<strong>in</strong>anced by<br />

the IBRD;<br />

• The “Moderniz<strong>in</strong>g the Agricultural Knowledge and Informati<strong>on</strong> Systems”<br />

(MAKIS) project funded by the World Bank.<br />

16


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Introducti<strong>on</strong><br />

In accordance with the provisi<strong>on</strong>s of Article 8, secti<strong>on</strong> B of the Annex to the Multi-<br />

Annual F<strong>in</strong>anc<strong>in</strong>g Agreement between the Government of Romania and the<br />

Commissi<strong>on</strong> of the European Community (MAFA), signed <strong>on</strong> 2 nd of February 2001 <strong>in</strong><br />

Brussels (Agreement ratified by Law no. 316/2001 published <strong>in</strong> the Official Gazette<br />

(OG) no. 362/2001), Romania has the resp<strong>on</strong>sibility of elaborat<strong>in</strong>g and submitt<strong>in</strong>g to<br />

the European Commissi<strong>on</strong>, with<strong>in</strong> six m<strong>on</strong>ths of the end of each full calendar year of<br />

implementati<strong>on</strong>, the Annual Report <strong>on</strong> SAPARD Programme implementati<strong>on</strong> for the<br />

previous year.<br />

In this respect, the Manag<strong>in</strong>g Authority for SAPARD Programme (MA) <strong>in</strong> collaborati<strong>on</strong><br />

with the <strong>in</strong>stituti<strong>on</strong>s <strong>in</strong>volved <strong>in</strong> the Programme’s implementati<strong>on</strong>, draws up the above<br />

menti<strong>on</strong>ed <str<strong>on</strong>g>report</str<strong>on</strong>g> and submits it for analysis and approval to the members of the<br />

M<strong>on</strong>itor<strong>in</strong>g Committee for SAPARD Programme, previous to its submissi<strong>on</strong> to the<br />

Commissi<strong>on</strong>.<br />

Up to date, Romania has drawn up five <str<strong>on</strong>g>annual</str<strong>on</strong>g> <str<strong>on</strong>g>report</str<strong>on</strong>g>s <strong>on</strong> SAPARD Programme<br />

implementati<strong>on</strong>, the first <strong>on</strong>e cover<strong>in</strong>g the 1 st of August 2002 – the 31 st of December<br />

2003 implementati<strong>on</strong> period, the sec<strong>on</strong>d <strong>on</strong>e: 1 st of January 2004 –31 st of December<br />

2004, the third: 1 st of January 2005 – 31 st of December 2005, the fourth: 1 st of<br />

January 2006–31 st of December 2006 and the fifth: 1 st of January 2007 –31 st of<br />

December 2007.<br />

The Annual Report <strong>on</strong> SAPARD Programme implementati<strong>on</strong> for 2007 was<br />

transmitted by the Manag<strong>in</strong>g Authority to the M<strong>on</strong>itor<strong>in</strong>g Committee members, for<br />

analysis, <strong>on</strong> 5 th of June 2008 and was approved by them, <strong>in</strong> written procedure, <strong>on</strong><br />

16 th of June 2008. The Report has been submitted to the European Commissi<strong>on</strong>, <strong>in</strong><br />

accordance with MAFA’s provisi<strong>on</strong>s, <strong>on</strong> the 20 th of June 2008.<br />

Follow<strong>in</strong>g the analysis performed by the Commissi<strong>on</strong>, the MA has received a series<br />

of suggesti<strong>on</strong>s and comments regard<strong>in</strong>g the text of the Report, through letter no.<br />

SV/fa D(2009)4569 of 14 th of April 2009. After complet<strong>in</strong>g and clarify<strong>in</strong>g the<br />

Commissi<strong>on</strong>’s highlighted issues, the c<strong>on</strong>solidated versi<strong>on</strong> of the Annual Report<br />

regard<strong>in</strong>g the SAPARD Programme Implementati<strong>on</strong> for 2007, is to be sent to the<br />

European Commissi<strong>on</strong>.<br />

The Annual Report <strong>on</strong> SAPARD Programme implementati<strong>on</strong> <strong>in</strong> Romania for 2008<br />

covers the implementati<strong>on</strong> period s<strong>in</strong>ce 1 st of January 2008 until 31 st of December<br />

2008 and, <strong>in</strong> compliance with Article 8 (5), Secti<strong>on</strong> B of MAFA, <strong>in</strong>cludes <strong>in</strong>formati<strong>on</strong><br />

<strong>on</strong>:<br />

• the changes <strong>in</strong> general c<strong>on</strong>diti<strong>on</strong>s of relevance to the implementati<strong>on</strong> of the<br />

Programme, <strong>in</strong> particular, the ma<strong>in</strong> socio-ec<strong>on</strong>omic trends, changes <strong>in</strong><br />

nati<strong>on</strong>al, regi<strong>on</strong>al or sector policies and, where applicable, their implicati<strong>on</strong>s<br />

for the c<strong>on</strong>sistency between SAPARD assistance and that from other<br />

Community f<strong>in</strong>ancial <strong>in</strong>struments;<br />

17


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

• the progress <strong>in</strong> the implementati<strong>on</strong> of the priorities and the measures <strong>in</strong><br />

relati<strong>on</strong> to the atta<strong>in</strong>ment of the objectives of the Programme, their specific<br />

targets <strong>in</strong> the Programme, which allows for a quantificati<strong>on</strong> of the physical<br />

<strong>in</strong>dicators and <strong>in</strong>dicators of results and of impact, <strong>in</strong> the Programme;<br />

• the steps taken by the Manag<strong>in</strong>g Authority, the Pay<strong>in</strong>g Agency for Rural<br />

Development and Fishery (the former SAPARD Agency) and, where<br />

appropriate, by the M<strong>on</strong>itor<strong>in</strong>g Committee to ensure the quality and the<br />

effectiveness of the implementati<strong>on</strong>;<br />

• the steps taken to ensure the co-ord<strong>in</strong>ati<strong>on</strong> of the entire Community preaccessi<strong>on</strong><br />

assistance;<br />

• the f<strong>in</strong>ancial tables show<strong>in</strong>g the expenditure per measure and, where<br />

appropriate, per sub-measure.<br />

The Implementati<strong>on</strong> of SAPARD Programme <strong>in</strong> Romania<br />

The Special pre-Accessi<strong>on</strong> Programme for Agriculture and Rural Development –<br />

SAPARD represents a f<strong>in</strong>ancial c<strong>on</strong>tributi<strong>on</strong> of the European Community (EC),<br />

provided for <strong>in</strong> the Council Regulati<strong>on</strong> (EC) no. 1268/21 st of June 1999 <strong>on</strong><br />

Community support for pre-accessi<strong>on</strong> measures for agriculture and rural<br />

development <strong>in</strong> the applicant countries of central and eastern Europe <strong>in</strong> the preaccessi<strong>on</strong><br />

period.<br />

Accord<strong>in</strong>g to Article 1(2) of Regulati<strong>on</strong> no. 1268/1999, the Community support for the<br />

2000 – 2006 period, aims to c<strong>on</strong>tribute to the achievement of the follow<strong>in</strong>g general<br />

objectives:<br />

a) the implementati<strong>on</strong> of the acquis communautaire c<strong>on</strong>cern<strong>in</strong>g the comm<strong>on</strong><br />

agricultural policy and related policies;<br />

b) solv<strong>in</strong>g the priority and specific problems for the susta<strong>in</strong>able adaptati<strong>on</strong> of<br />

the agricultural sector and rural areas <strong>in</strong> the applicant countries.<br />

The purpose of SAPARD Programme is to lay dawn the necessary framework for the<br />

implementati<strong>on</strong> of a perform<strong>in</strong>g agriculture and a susta<strong>in</strong>able development of the<br />

rural areas <strong>in</strong> the candidate countries. The SAPARD Programme promotes the<br />

undertak<strong>in</strong>g of the acquis communautaire and the progressive adaptability of the<br />

market mechanisms to the pr<strong>in</strong>ciples govern<strong>in</strong>g the Comm<strong>on</strong> Agricultural Policy.<br />

The SAPARD Programme grants to the candidate countries full resp<strong>on</strong>sibilities<br />

regard<strong>in</strong>g the management of the <strong>in</strong>vestment projects, beg<strong>in</strong>n<strong>in</strong>g with the selecti<strong>on</strong><br />

stage until the payment executi<strong>on</strong>, with the purpose of accumulat<strong>in</strong>g experience <strong>in</strong><br />

the implementati<strong>on</strong> of EU practices and rules, as well as <strong>in</strong> the appropriate<br />

management of the post-accessi<strong>on</strong> funds.<br />

On the basis of performance criteria for all the candidate countries (agricultural<br />

surface, populati<strong>on</strong> occupied <strong>in</strong> agriculture, gross domestic product, specific territorial<br />

situati<strong>on</strong>, less favoured areas), the Commissi<strong>on</strong> Decisi<strong>on</strong> no. 595/EC/1999 lays down<br />

the <str<strong>on</strong>g>annual</str<strong>on</strong>g> <strong>in</strong>dicative allocati<strong>on</strong>s granted to the applicant countries; thus the f<strong>in</strong>ancial<br />

community c<strong>on</strong>tributi<strong>on</strong> for Romania represents about 151 milli<strong>on</strong> Euro/year<br />

(prices/1999).<br />

In accordance with the Commissi<strong>on</strong> Decisi<strong>on</strong> EC (2000) no. 3742 of 12 th of<br />

December 2000, the Nati<strong>on</strong>al Plan for Agriculture and Rural Development (NPARD)<br />

is the basis of the SAPARD Programme implementati<strong>on</strong> <strong>in</strong> Romania. NPARD was<br />

18


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

drawn up by the M<strong>in</strong>istry of Agriculture Forests and Rural Development (MAFRD) and<br />

classifies the Romanian priorities regard<strong>in</strong>g the susta<strong>in</strong>able development of rural<br />

areas <strong>in</strong> four axes:<br />

Priority 1: Improv<strong>in</strong>g the access to markets and the competitiveness of agricultural<br />

processed products;<br />

Priority 2: Improv<strong>in</strong>g <strong>in</strong>frastructures for rural development and agriculture;<br />

Priority 3: Development of rural ec<strong>on</strong>omy;<br />

Priority 4: Development of human resources.<br />

In Romania, these priority axes are susta<strong>in</strong>ed through 11 measures (from a total of<br />

15 provided for <strong>in</strong> the Council Regulati<strong>on</strong> (EC) no. 1268/1999) c<strong>on</strong>sidered by the<br />

Romanian authorities as be<strong>in</strong>g relevant for rural development priorities, as follows:<br />

Measure 1.1: Improvement of process<strong>in</strong>g and market<strong>in</strong>g of agricultural and<br />

fishery products;<br />

Measure 1.2: Improv<strong>in</strong>g the structures for quality, veter<strong>in</strong>ary and plant-health<br />

c<strong>on</strong>trols, for the quality of foodstuffs and c<strong>on</strong>sumer protecti<strong>on</strong>;<br />

Measure 2.1: Development and improvement of rural <strong>in</strong>frastructure;<br />

Measure 2.2: Water resources management;<br />

Measure 3.1: Investments <strong>in</strong> agricultural hold<strong>in</strong>gs;<br />

Measure 3.2: Sett<strong>in</strong>g-up producers groups;<br />

Measure 3.3: Agricultural producti<strong>on</strong> methods designed to protect the<br />

envir<strong>on</strong>ment and ma<strong>in</strong>ta<strong>in</strong> the countryside;<br />

Measure 3.4: Development and diversificati<strong>on</strong> of ec<strong>on</strong>omic activities, provid<strong>in</strong>g<br />

for multiple activities and alternative <strong>in</strong>come;<br />

Measure 3.5: Forestry;<br />

Measure 4.1: Improvement of vocati<strong>on</strong>al tra<strong>in</strong><strong>in</strong>g;<br />

Measure 4.2: Technical assistance.<br />

The implementati<strong>on</strong> of NPARD measures began gradually, start<strong>in</strong>g <strong>on</strong> the 31 st of July<br />

2002, when the European Commissi<strong>on</strong> adopted the Decisi<strong>on</strong> 2002/638/EC c<strong>on</strong>ferr<strong>in</strong>g<br />

the management of SAPARD aid implement<strong>in</strong>g agencies for the first three measures,<br />

respectively, measure 1.1 “Improvement of process<strong>in</strong>g and market<strong>in</strong>g of agricultural<br />

and fisheries products”, measure 2.1 “Development and improvement of rural<br />

<strong>in</strong>frastructure” and measure 4.2 “Technical assistance”.<br />

On 5th of December 2003, the Commissi<strong>on</strong> adopted the Decisi<strong>on</strong> 2003/846/EC<br />

c<strong>on</strong>ferr<strong>in</strong>g the management of SAPARD aid implement<strong>in</strong>g agencies for three more<br />

measures, respectively, measure 3.1 “Investments <strong>in</strong> agricultural hold<strong>in</strong>gs”, measure<br />

3.4 “Development and diversificati<strong>on</strong> of ec<strong>on</strong>omic activities, provid<strong>in</strong>g for multiple<br />

activities and alternative <strong>in</strong>come” and measure 4.1 “Improvement of vocati<strong>on</strong>al<br />

tra<strong>in</strong><strong>in</strong>g”.<br />

Dur<strong>in</strong>g 2006, the last 4 measures of NPARD 1 were accredited, respectively measure<br />

1.2 “Improv<strong>in</strong>g the structures for quality, veter<strong>in</strong>ary and plant-health c<strong>on</strong>trols, for the<br />

quality of foodstuffs and c<strong>on</strong>sumer protecti<strong>on</strong>”, measure 3.2 “Sett<strong>in</strong>g-up producers<br />

1 After the c<strong>on</strong>sultati<strong>on</strong> with the Community, the Romanian authorities have decided not to implement<br />

measure 2.2. MAFRD, submitted to complete the measure 2.1 “Development and improvement of rural<br />

<strong>in</strong>frastructure” with a new sub-measure “Infrastructure for the prevent<strong>in</strong>g and the protecti<strong>on</strong> aga<strong>in</strong>st<br />

floods”.<br />

19


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

groups”, measure 3.3 “Agricultural producti<strong>on</strong> methods designed to protect the<br />

envir<strong>on</strong>ment and ma<strong>in</strong>ta<strong>in</strong> the countryside” and measure 3.5 „Forestry”, after the<br />

submissi<strong>on</strong> to the European Commissi<strong>on</strong> <strong>on</strong> 30 th January 2006 of the f<strong>in</strong>al versi<strong>on</strong> of<br />

the procedures manual for their implementati<strong>on</strong>. The European Commissi<strong>on</strong> Decisi<strong>on</strong><br />

no. EC/298/2006 of c<strong>on</strong>ferr<strong>in</strong>g the assistance management for the above menti<strong>on</strong>ed<br />

measures was adopted <strong>on</strong> 20 th of April 2006.<br />

In order to def<strong>in</strong>e the rules and the management c<strong>on</strong>diti<strong>on</strong>s of the SAPARD<br />

Programme <strong>in</strong> Romania, the Government of Romania and the Commissi<strong>on</strong> of the<br />

European Communities signed, <strong>in</strong> Brussels, <strong>on</strong> 2 nd of February 2001, the SAPARD<br />

Multi-Annual F<strong>in</strong>anc<strong>in</strong>g Agreement (MAFA). This agreement was ratified by Law no.<br />

316/ 2001 (OG no. 362/05.07.2001).<br />

Accord<strong>in</strong>g to the provisi<strong>on</strong>s of MAFA, the Community f<strong>in</strong>ancial c<strong>on</strong>tributi<strong>on</strong>, as well as<br />

the validity period of this c<strong>on</strong>tributi<strong>on</strong> is <str<strong>on</strong>g>annual</str<strong>on</strong>g>ly established, <strong>in</strong> the <str<strong>on</strong>g>annual</str<strong>on</strong>g> f<strong>in</strong>anc<strong>in</strong>g<br />

agreements.<br />

Up to the present, the Romanian Government and the Commissi<strong>on</strong> of the European<br />

Communities signed the Annual F<strong>in</strong>anc<strong>in</strong>g Agreements (AFA) afferent to the years<br />

2000, 2001, 2002, 2003, 2004, 2005 and 2006 as follows:<br />

• AFA 2000 signed <strong>on</strong> 27 th of February 2001 and ratified by Law no. 317/2001<br />

(OG no. 338/26.06.2001) – provid<strong>in</strong>g for a Community f<strong>in</strong>ancial c<strong>on</strong>tributi<strong>on</strong> of<br />

153,214,194 Euro;<br />

• AFA 2001 signed <strong>on</strong> 30 th of January 2002 and ratified by Law no. 416/2002<br />

(OG no. 508/15.07,2002) – provid<strong>in</strong>g for a Community f<strong>in</strong>ancial c<strong>on</strong>tributi<strong>on</strong> of<br />

156,328,303 Euro;<br />

• AFA 2002 signed <strong>on</strong> 1 st of April 2003 and ratified by Government Emergency<br />

Ord<strong>in</strong>ance no. 26/2003 (OG no. 283/23.04.2003) – provid<strong>in</strong>g for a Community<br />

f<strong>in</strong>ancial c<strong>on</strong>tributi<strong>on</strong> of 160,630,119 Euro;<br />

• AFA 2003 signed <strong>on</strong> 31 st of July 2003 and ratified by Law no. 496/2003 (OG<br />

no. 843/26.11.2003) – provid<strong>in</strong>g for a Community f<strong>in</strong>ancial c<strong>on</strong>tributi<strong>on</strong> of<br />

162,223,385 Euro. This agreement was amended by AFA 2003/II signed <strong>on</strong><br />

24 th of December 2004 and ratified by Law no. 258/2005 (OG no.<br />

861/23.09.2005) – provid<strong>in</strong>g for an <strong>in</strong>crease of Community f<strong>in</strong>ancial<br />

c<strong>on</strong>tributi<strong>on</strong> to 163,339,076 Euro.<br />

• AFA 2004 signed <strong>on</strong> 12 th of May 2005 and ratified by Law no. 265/2005 (OG<br />

no. 920/14.10.2005) – provid<strong>in</strong>g for a Community f<strong>in</strong>ancial c<strong>on</strong>tributi<strong>on</strong> of<br />

157,640,000 Euro. AFA 2004 <strong>in</strong>troduced <strong>in</strong> MAFA the provisi<strong>on</strong>s of Council<br />

Regulati<strong>on</strong> no. 2008/2004 <strong>on</strong> the new limits for the rates of aid, establish<strong>in</strong>g<br />

that, <strong>in</strong> respect of <strong>in</strong>vestments <strong>in</strong> projects except those <strong>in</strong> <strong>in</strong>frastructure of a<br />

type not generat<strong>in</strong>g substantial net revenue, the public aid (cumulative) of<br />

granted from all sources cannot exceed 50% of total eligible cost. Provisi<strong>on</strong>s<br />

c<strong>on</strong>cern<strong>in</strong>g the possibility of grant<strong>in</strong>g nati<strong>on</strong>al subsidies of a nature to facilitate<br />

access to credits granted without the benefit of any Community c<strong>on</strong>tributi<strong>on</strong>,<br />

which should not be taken <strong>in</strong>to c<strong>on</strong>siderati<strong>on</strong> <strong>in</strong> determ<strong>in</strong><strong>in</strong>g the rate of public<br />

aid are also <strong>in</strong>troduced <strong>in</strong> MAFA. The other amendments brought to MAFA<br />

c<strong>on</strong>sist <strong>in</strong> the applicati<strong>on</strong> of the Commissi<strong>on</strong> manual entitled “Rules and<br />

Procedures for Service, Supply and Works C<strong>on</strong>tracts f<strong>in</strong>anced from the<br />

General Budget of the European Communities <strong>in</strong> the c<strong>on</strong>text of Cooperati<strong>on</strong><br />

with Third Countries” for all the public procurement procedures <strong>in</strong>itiated from<br />

20


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

the entry <strong>in</strong>to force of the Agreement. The above menti<strong>on</strong>ed Agreement was<br />

amended by AFA 2004/II signed <strong>on</strong> 7 th of July 2005 and ratified by Law no.<br />

25/2006 (OG no. 205/06.03.2006) that provides for a <strong>in</strong>crement of the EC<br />

c<strong>on</strong>tributi<strong>on</strong> for 2004, up to 158,690,000 Euro.<br />

• AFA 2005 signed <strong>on</strong> 29 th December 2005 at Bucharest and <strong>on</strong> 3 rd of January<br />

2006 at Brussels foresees a f<strong>in</strong>ancial c<strong>on</strong>tributi<strong>on</strong> of 175,210,000 Euro. The<br />

amendments brought to MAFA c<strong>on</strong>sist <strong>in</strong> the modificati<strong>on</strong> of the f<strong>in</strong>ancial rules<br />

regard<strong>in</strong>g the public procurements, <strong>in</strong> compliance with the new F<strong>in</strong>ancial<br />

Regulati<strong>on</strong> <strong>in</strong> force <strong>in</strong> the European Community, as well as <strong>in</strong> <strong>in</strong>troduc<strong>in</strong>g<br />

specific rules of reduc<strong>in</strong>g the community co-f<strong>in</strong>anc<strong>in</strong>g for the cases where the<br />

<strong>in</strong>terval between receiv<strong>in</strong>g the support<strong>in</strong>g documents needed to make the<br />

payment and issu<strong>in</strong>g of the payment order exceeds three m<strong>on</strong>ths. AFA 2005<br />

provides, also, the compulsor<strong>in</strong>ess of us<strong>in</strong>g the account<strong>in</strong>g and f<strong>in</strong>ancial<br />

<str<strong>on</strong>g>report</str<strong>on</strong>g><strong>in</strong>g system which meets the <strong>in</strong>ternati<strong>on</strong>ally accepted account<strong>in</strong>g<br />

standards and <strong>in</strong>ternati<strong>on</strong>ally accepted audit<strong>in</strong>g standards.<br />

• The Romanian Government and the European Communities Commissi<strong>on</strong><br />

signed <strong>on</strong> 31 st December 2006 at Bucharest and respectively at Brussels, the<br />

Annual F<strong>in</strong>anc<strong>in</strong>g Agreement 2006 (AFA 2006). The agreement was ratified by<br />

Law no. 66/2007 (OG no. 228/03.04.2007).<br />

AFA 2006 entered <strong>in</strong>to force <strong>on</strong> the 12 th of April 2007, when the European<br />

Commissi<strong>on</strong> received the official notificati<strong>on</strong> regard<strong>in</strong>g the ratificati<strong>on</strong> of the<br />

Agreement by Romania.<br />

The provisi<strong>on</strong>s comprised <strong>in</strong> AFA 2006 refer both to establish<strong>in</strong>g the f<strong>in</strong>ancial<br />

commitment of the Community for Romania for 2006, as well as amend<strong>in</strong>g the<br />

MAFA and the Annual F<strong>in</strong>ancial Agreements for the years 2000-2005.<br />

Therefore, the maximal yearly c<strong>on</strong>tributi<strong>on</strong> foreseen for Romania for 2006 is<br />

192,374,000 Euro.<br />

The agreement also foresees the extensi<strong>on</strong> of the validity term of the f<strong>in</strong>ancial<br />

commitments established through the Annual F<strong>in</strong>ancial Agreements 2003,<br />

2004 and 2005, namely until 31 st December 2007 for AFA 2003 and 2004 and,<br />

respectively, until 31 st December 2008 for AFA 2005.<br />

At the same time, AFA 2006 foresees a provisi<strong>on</strong> that is also <strong>in</strong>cluded <strong>in</strong> article<br />

3 of the Annual F<strong>in</strong>ancial Agreements 2000-2005 accord<strong>in</strong>g to which no<br />

c<strong>on</strong>tract that <strong>in</strong>volves Community funds for AFA 2000-2006 shall be c<strong>on</strong>cluded<br />

by PARDF with a beneficiary after the date Romania beg<strong>in</strong>s to c<strong>on</strong>clude<br />

c<strong>on</strong>tracts through EAFRD.<br />

AFA 2006 also foresees the amend<strong>in</strong>g of the Multi-Annual F<strong>in</strong>ancial<br />

Agreement, both by <strong>in</strong>troduc<strong>in</strong>g new provisi<strong>on</strong>s regard<strong>in</strong>g Secti<strong>on</strong> A, B and F<br />

of the Annex to the Multi-Annual F<strong>in</strong>ancial Agreement, and also by add<strong>in</strong>g a<br />

new Secti<strong>on</strong> H, that has as ma<strong>in</strong> purpose to establish rules regard<strong>in</strong>g the<br />

Community external assistance.<br />

• The Romanian Government and the European Communities Commissi<strong>on</strong><br />

signed <strong>on</strong> 4 th of December 2008 at Bucharest and respectively at Brussels, the<br />

Agreement between the Romanian Government and the European<br />

Communities Commissi<strong>on</strong>, <strong>on</strong> behalf of the European Commissi<strong>on</strong>, regard<strong>in</strong>g<br />

the modificati<strong>on</strong> of the Annual F<strong>in</strong>anc<strong>in</strong>g Agreement 2006. The agreement<br />

was ratified by Government Emergency Ord<strong>in</strong>ance no. 213/2008 (Official<br />

Gazette no.842/ 15.12.2008) and approved by Law no. 82/2009 published <strong>in</strong><br />

the Official Gazette no. 230/08.04.2009.<br />

AFA 2006 / II came <strong>in</strong> force <strong>on</strong> 13 th of January 2009, date <strong>on</strong> which the<br />

European Commissi<strong>on</strong> sent the official notificati<strong>on</strong> regard<strong>in</strong>g the fulfilment of<br />

21


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

all the necessary formalities c<strong>on</strong>cern<strong>in</strong>g the ratify<strong>in</strong>g of the Agreement.<br />

The agreement also foresees the extensi<strong>on</strong> of the validity term of the<br />

Community’s f<strong>in</strong>ancial commitments up to 31 st of December 2009, thus<br />

allow<strong>in</strong>g to avoid the decommitment of the funds allocated to Romania under<br />

the SAPARD Programme for 2006.<br />

22


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Chapter I<br />

Changes <strong>in</strong> the general c<strong>on</strong>diti<strong>on</strong>s of Romania and their impact <strong>on</strong> the<br />

SAPARD Programme implementati<strong>on</strong><br />

I. 1 Instituti<strong>on</strong>al and political framework <strong>in</strong> Romania<br />

At the end of 2008, several changes occurred with<strong>in</strong> the public <strong>in</strong>stituti<strong>on</strong>s. Thus,<br />

through Government Emergency Ord<strong>in</strong>ance no. 221/2008 regard<strong>in</strong>g the sett<strong>in</strong>g out of<br />

reorganizati<strong>on</strong> measures for the central public adm<strong>in</strong>istrati<strong>on</strong> (O.G no.<br />

882/24.12.2008) the structure and compositi<strong>on</strong> of the Romanian Government was<br />

modified.<br />

In this regard, at the beg<strong>in</strong>n<strong>in</strong>g of 2009, the M<strong>in</strong>istry of Agriculture, Forests and Rural<br />

Development was submitted to a re-organizati<strong>on</strong>, <strong>on</strong> the basis of Government<br />

Decisi<strong>on</strong> no. 8/2009 <strong>on</strong> the organizati<strong>on</strong> and functi<strong>on</strong><strong>in</strong>g of the M<strong>in</strong>istry of Agriculture,<br />

Forests and Rural Development, published <strong>in</strong> the O.G. no. 38/21.01.2009.<br />

I. 2 Structural characteristics of Romanian ec<strong>on</strong>omy and the macro-ec<strong>on</strong>omic<br />

development<br />

Between 2002 and 2008, the Romanian ec<strong>on</strong>omy recorded a significant growth, as<br />

well as deflati<strong>on</strong> and an unemployment rate decrease (registered by the Nati<strong>on</strong>al<br />

Agency for Employment), hence c<strong>on</strong>firm<strong>in</strong>g the progress made towards a susta<strong>in</strong>able<br />

ec<strong>on</strong>omic development.<br />

The country’s GDP has raised up to 503,958.7 milli<strong>on</strong> lei <strong>in</strong> 2008, from 412,761.5<br />

milli<strong>on</strong> lei <strong>in</strong> 2007. The <str<strong>on</strong>g>annual</str<strong>on</strong>g> GDP growth rate was 7.1 percent <strong>in</strong> 2008 compared to<br />

6.2 percent with 2007.<br />

The share of the private sector with<strong>in</strong> the GDP recorded a setback <strong>in</strong> 2008,<br />

account<strong>in</strong>g for 70.8 percent of the total GDP, compared to 72.2 percent <strong>in</strong> 2007.<br />

The <str<strong>on</strong>g>annual</str<strong>on</strong>g> <strong>in</strong>flati<strong>on</strong> rate marked an <strong>in</strong>crease <strong>in</strong> 2008, <strong>in</strong>creas<strong>in</strong>g to 7.85 percent<br />

compared to 4.8 percent <strong>in</strong> 2007.<br />

The 2008 unemployment rate <strong>in</strong>creased from the previous year, reach<strong>in</strong>g, at the end<br />

of 2008 at 4.4 percent <strong>in</strong> comparis<strong>on</strong> with 4.1 percent registered <strong>in</strong> 2007. Dur<strong>in</strong>g<br />

2002-2007 a decrease <strong>in</strong> the unemployment rate has been observed, as recorded by<br />

labour placement agencies.<br />

23


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

In the third quarter, <strong>in</strong> nom<strong>in</strong>al terms, total household <strong>in</strong>come 2 was m<strong>on</strong>thly 743.19<br />

lei/pers<strong>on</strong>, up with 165.48 lei compared to 2007. The <strong>in</strong>come by farm<strong>in</strong>g household<br />

<strong>in</strong>creased with 109.89 lei <strong>in</strong> comparis<strong>on</strong> with 2007.<br />

The ma<strong>in</strong> macro-ec<strong>on</strong>omic <strong>in</strong>dicators corresp<strong>on</strong>d<strong>in</strong>g to the 2002 – 2008 period are<br />

presented <strong>in</strong> Table I.1.<br />

The ma<strong>in</strong> macro-ec<strong>on</strong>omic <strong>in</strong>dicators for 2002 – 2008<br />

Table I. 1<br />

Nati<strong>on</strong>al accounts<br />

Indicators<br />

2002 2003 2004 2005 2006 2007 1) 2008 2)<br />

GDP– milli<strong>on</strong> lei;<br />

current prices<br />

152,017.0 197,427.6 247,368.0 288,954.6 344,650.6 412,761.5 503,958.7<br />

GDP/<strong>in</strong>habitant (lei) 6,974.9 9,084.0 11,413.5 13,362.8 15.967,6 19.164,7 23.435,1<br />

Private sector share<br />

with<strong>in</strong> GDP (%)<br />

69.4 67.7 71.5 70.1 71,6 72,2 70,8<br />

Annual GDP growth<br />

rate (previous year<br />

5.1 5.2 8,5 4.2 7,9 6,2 7,1<br />

=100) %<br />

Annual average<br />

<strong>in</strong>flati<strong>on</strong> rate (%)<br />

22.5 15.3 11.9 9.0 6,6 4,8 7,85<br />

Labour force<br />

Unemployment rate 5),<br />

December 31, %<br />

8.4 7.4 6.3 5.9 5,2 4,1 4,4<br />

M<strong>on</strong>thly average <strong>in</strong>come per capita (lei)<br />

Total 228.77 283.91 368.03 412.55 473.29 577.71 743.19 3)<br />

Rural 194.54 246.02 326.2 339.73 375.75 465.71 596.18 3)<br />

Farmer households<br />

Gross value added share with<strong>in</strong> GDP dur<strong>in</strong>g 2002-2008<br />

155.82 200.46 286.89 293.77 307.36 382.38 492.27 3)<br />

Indicators 2002 2003 2004 2005 2006 2007 1) 2008 2)<br />

Industry 27.0 24.7 24.9 24.8 24.5 23.9 22.9<br />

Agriculture, forestry,<br />

game ec<strong>on</strong>omics<br />

11.4 11.6 12.6 8.4 7.8 5.7 6.5<br />

C<strong>on</strong>structi<strong>on</strong><br />

5.7 5.7 5.9 6.5 7.4 8.9 10.5<br />

4)<br />

Services<br />

46.0 47.0 45.9 48.6 48.6 50.2 49.5<br />

Source: Nati<strong>on</strong>al Statistics Institute of Romania<br />

1) Semi-f<strong>in</strong>al data<br />

2) Provisi<strong>on</strong>al data<br />

3) Data referred to third quarter 2008<br />

4)<br />

Includes: trade; transports; postal services and telecommunicati<strong>on</strong>; tourism; hotels and restaurants; public<br />

adm<strong>in</strong>istrati<strong>on</strong> and defence; educati<strong>on</strong>; health care and social welfare; as well as other services provided to<br />

companies and populati<strong>on</strong><br />

5)<br />

Source: Nati<strong>on</strong>al Agency for Employment.<br />

In 2008, the private sector share <strong>in</strong> agriculture, forestry, forestry exploitati<strong>on</strong> and<br />

game ec<strong>on</strong>omy reached 94.2 percent of the sector’s overall gross added value.<br />

2 Includes revenues from salaries, agriculture, <strong>in</strong>dependent n<strong>on</strong>-agricultural activities, social services, ownership,<br />

sale of household assets, and other f<strong>in</strong>ancial <strong>in</strong>come, as well as <strong>in</strong>come <strong>in</strong> k<strong>in</strong>d (equivalent <strong>in</strong> lei);<br />

24


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

In the agricultural producti<strong>on</strong> sector, compared to the previous year, dur<strong>in</strong>g 2002-<br />

2007, were recorded <strong>in</strong>creases <strong>in</strong> 2003 (up 7.5 percent), 2004 (up 18.1 percent),<br />

2006 (up 2.4 percent), as well as <strong>in</strong> the year 2008 (up to 21.7 percent).<br />

In 2008, the livestock producti<strong>on</strong> decreased by 5.2% while the vegetal producti<strong>on</strong><br />

recorded an <strong>in</strong>crease by 39.6% <strong>in</strong> comparis<strong>on</strong> with the previous year.<br />

Table I.2 presents the ma<strong>in</strong> <strong>in</strong>formati<strong>on</strong> c<strong>on</strong>cern<strong>in</strong>g the evoluti<strong>on</strong> of agriculture <strong>in</strong><br />

2002-2008.<br />

Agriculture and rural development: basic data (2002-2008)<br />

Table I. 2<br />

Indicators<br />

2002 2003 2004 2005 2006 2007 2008 2)<br />

The share of private sector<br />

agriculture, forestry,<br />

forestry exploitati<strong>on</strong> and<br />

game ec<strong>on</strong>omy <strong>in</strong> the gross<br />

98.3 98.0 97.7 96.9 96.7 94.1 1) 94.2 2 )<br />

Added Value of the Branch<br />

(%)<br />

Agricultural branch producti<strong>on</strong> - milli<strong>on</strong> lei; current prices<br />

Total 31,585 40,412 55,314 46,540 50,650 47,700 67,389<br />

- Crops 18,084 25,919 38,097 27,959 31,327 28,723 45,626<br />

- Livestock 13,139 14,118 16,825 18,186 18,849 18,292 21,056<br />

- Agricultural services 362 375 392 395 474 685 707<br />

Agricultural branch producti<strong>on</strong> <strong>in</strong>dices (previous year = 100) – %<br />

Total 96.5 107.5 118.1 86.9 102.4 82.3 121.7<br />

- Crops 88.7 110.0 126.8 82.5 102.2 71.3 139.6<br />

- Livestock 110.2 104.6 102.9 96.9 102.4 99.4 94.8<br />

- Agricultural services 91.1 84.7 86.4 86.0 107.0 132.5 91.9<br />

Livestock numbers – thousand head 3)<br />

Cattle – total 2,877.8 2,897.1 2,808.1 2,861.7 2,933.5 2.818,9 2.698,7<br />

- cows, heifers and<br />

buffaloes<br />

1,759.3 1,756.7 1,755.5 1,812.0 1,809.8 1.732,2 1.519,7<br />

Sw<strong>in</strong>e – total 5,058.2 5,145.5 6,494.7 6,622.3 6,814.6 6.564,9 6.149,2<br />

- breed<strong>in</strong>g sows 361.6 334.8 425.7 494.5 520.4 442,4 397,8<br />

Sheep and goats – total 7,945.4 8,124.9 8,086.0 8,297.7 8,405.6 9.334,3 10.497,2<br />

Equ<strong>in</strong>es – total 879.4 896.9 839.6 834.0 804.8 862,4 810,4<br />

Poultry – total 77,378.9 76,616.3 87,014.4 86,552.2 84,990.6 82.035,6 84.568,0<br />

Layer hens 44,666.5 44,121.8 51,888.9 49,724.5 50.278,2 45.207,9 40.766,0<br />

Bee families – thousand 781.2 840.0 888.2 888.2 891,0 982,4 1.003,5<br />

Source: Nati<strong>on</strong>al Statistics Institute of Romania<br />

1 ) Semi-f<strong>in</strong>al data<br />

2) Provisi<strong>on</strong>al data<br />

3)<br />

Livestock numbers as of December 1, 2004, 2005, 2006, 2007 and 2008 and December 31, 2002 - 2003.<br />

I. 3 Demographic developments and populati<strong>on</strong> characteristics <strong>in</strong> Romania<br />

25


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

As of July 1 st 2008, Romania’s populati<strong>on</strong> totalled 21.50 milli<strong>on</strong> <strong>in</strong>habitants, its rural<br />

populati<strong>on</strong> account<strong>in</strong>g for 44.9 percent of the total.<br />

A negative birth growth rate comb<strong>in</strong>ed with external migrati<strong>on</strong> led to a c<strong>on</strong>t<strong>in</strong>ued<br />

decl<strong>in</strong>e <strong>in</strong> Romania’s populati<strong>on</strong> (down 33.121 thousand <strong>in</strong>habitants <strong>in</strong> July 1 st 2007 -<br />

July 1 st 2008). In 2008, the drop was triggered also by the populati<strong>on</strong> decl<strong>in</strong>e <strong>in</strong> the<br />

urban area (down 42.331 thousand <strong>in</strong>habitants compared to 2007). In 2008, the rural<br />

populati<strong>on</strong> <strong>in</strong>creased by 9.21 thousand <strong>in</strong>habitants compared to the previous year.<br />

The age structure of the populati<strong>on</strong> c<strong>on</strong>firmed that the slow, but steady, trend of<br />

demographic ag<strong>in</strong>g c<strong>on</strong>t<strong>in</strong>ued, with higher numbers <strong>in</strong> rural areas. In the rural area,<br />

the female populati<strong>on</strong> is older than the male <strong>on</strong>e. The average populati<strong>on</strong> age –<br />

higher am<strong>on</strong>g the female <strong>on</strong>e – has risen <strong>in</strong> both areas compared with 2007 (Table<br />

I.3).<br />

Table I. 3<br />

Populati<strong>on</strong> &<br />

Populati<strong>on</strong> -1 st of July 1) (number)<br />

density 2003 2004 2005 2006 2007 2008<br />

Romania 21,733,556 21,673,328 21,623,849 21,584,365 21,537,563 21,504,442<br />

Rural<br />

(absolute 10,133.399 9,777,730 9,743,952 9,670,427 9,659,904 9,669,114<br />

numbers)<br />

- % 46.6 45.1 45.1 44.8 44.8 44.9<br />

Density<br />

(<strong>in</strong>h./Km 2 ) 2003 2004 2005 2006 2007 2008<br />

Romania 91.2 90.9 90.7 90.5 90.3 90.4<br />

Rural<br />

(absolute<br />

numbers)<br />

47.7 47.1 47.0 46.6 46.5 46.6<br />

1) Data were calculated based <strong>on</strong> the Populati<strong>on</strong> and Homes Census compiled <strong>on</strong> March 18, 2002.<br />

Populati<strong>on</strong><br />

structure by<br />

age<br />

Romania<br />

0-14 15-64<br />

65 and<br />

over<br />

Of which: rural<br />

0-14 15-64 65 and over<br />

2003 16.7 69.0 14.3 18.7 63.0 18.3<br />

2004 16.1 69.4 14.5 18.3 63.2 18.5<br />

2005 15.6 69.6 14.8 17.8 63.4 18.8<br />

2006 15.4 69.8 14.8 17.7 63.6 18.7<br />

2007 15.3 69.9 14.8 17.4 63.9 18.7<br />

2008 15.2 69.9 14.9 17.4 64.0 18.6<br />

Average age<br />

2003 2004 2005<br />

of populati<strong>on</strong> Total Male Female Total Male Female Total Male Female<br />

Romania 38.1 36.7 39.4 38.3 36.9 39.7 38.6 37.1 39.9<br />

Rural 39.0 37.4 40.7 39.3 37.6 40.9 39.4 37.7 41.0<br />

Average age<br />

2006 2007 2008<br />

of populati<strong>on</strong> Total Male Female Total Male Female Total Male Female<br />

Romania 38.8 37.3 40.1 39.0 37.6 40.4 39.2 37.8 40.7<br />

Rural 39.6 37.9 41.2 39.8 38.1 41.4 39.9 38.3 41.6<br />

Source: Nati<strong>on</strong>al Statistics Institute of Romania<br />

Educati<strong>on</strong> wise, <strong>in</strong> the third quarter of the year 2008, 62.4 percent of the populati<strong>on</strong> of<br />

15 and over has at least high-school educati<strong>on</strong> (52.7 percent high-school, and<br />

26


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

9.7 percent higher educati<strong>on</strong> graduates), while 37.7 percent of the populati<strong>on</strong> of 15<br />

and over presents a low educati<strong>on</strong> level.<br />

There are differences between the urban and the rural populati<strong>on</strong> structures <strong>in</strong> terms<br />

of their level of educati<strong>on</strong>. Thus a larger c<strong>on</strong>centrati<strong>on</strong> of the 15+ populati<strong>on</strong> with<br />

higher educati<strong>on</strong> is found <strong>in</strong> the urban area (with 76.9 percent of people be<strong>in</strong>g highschool<br />

or upper educati<strong>on</strong> graduates), while <strong>in</strong> the rural area, the low-educati<strong>on</strong><br />

populati<strong>on</strong> prevails (about 55.8 percent have graduated the elementary or sec<strong>on</strong>dary<br />

school or have no educati<strong>on</strong> at all). The most significant gap is found am<strong>on</strong>g higher<br />

educati<strong>on</strong> graduates, whose share is seven times higher <strong>in</strong> the urban area.<br />

I. 4 The Romanian agricultural and rural development policy<br />

Start<strong>in</strong>g with the 1 st of January 2007, the date of Romania’s accessi<strong>on</strong> to the<br />

European Uni<strong>on</strong>, the ma<strong>in</strong> objective of Romanian has been the c<strong>on</strong>solidati<strong>on</strong> of the<br />

progresses and reforms carried out <strong>in</strong> order to <strong>in</strong>sure a successful <strong>in</strong>tegrati<strong>on</strong> <strong>in</strong> the<br />

Community structures.<br />

Thus, for the rural development sector, Romania will c<strong>on</strong>t<strong>in</strong>ue the implementati<strong>on</strong> of<br />

the SAPARD Programme but, at the same time, <strong>in</strong>itiated the implementati<strong>on</strong> of the<br />

new nati<strong>on</strong>al rural development <strong>programme</strong> which benefits from a Community<br />

f<strong>in</strong>ancial c<strong>on</strong>tributi<strong>on</strong> of approximately 8 billi<strong>on</strong> Euro from the European Agricultural<br />

Fund for Rural Development (EAFRD).<br />

As regards the forms of direct support, <strong>in</strong> 2008 they were set out for agricultural<br />

producers as premiums and subventi<strong>on</strong>s <strong>in</strong> order to qualitatively and quantitatively<br />

<strong>in</strong>crease the agricultural producti<strong>on</strong>. The implementati<strong>on</strong> system, specific c<strong>on</strong>diti<strong>on</strong>s<br />

and eligibility criteria were also set out for the direct payment schemes and<br />

complementary nati<strong>on</strong>al direct payments <strong>in</strong> the vegetable system, as well as the<br />

amount of the s<strong>in</strong>gle area payments, complementary nati<strong>on</strong>al direct payments,<br />

energy crops payments and of the separate sugar payments which are granted <strong>in</strong><br />

agriculture for the vegetable sector.<br />

Thus, SAPS support has been granted for the crops planted <strong>on</strong> SAPS eligible, arable<br />

terra<strong>in</strong>: cereals (comm<strong>on</strong> wheat, hard wheat, rye, barley, oat, corn, sorghum, rice,<br />

triticals, sweet corn and other cereals), prote<strong>in</strong> crops (peas, field beans, sweet lup<strong>in</strong>e<br />

and lentil), <strong>in</strong>dustrial plants (sunflower, rape, c<strong>on</strong>venti<strong>on</strong>al Soya, flax and hemp,<br />

tobacco, flax for oil, medic<strong>in</strong>al plants and other <strong>in</strong>dustrial plants), root crops (fodder<br />

beet, sugar beet), potatoes, fresh vegetables, strawberries, mel<strong>on</strong>s, flowers and<br />

ornamental plants, fodder plants, seed-bear<strong>in</strong>g lots, other arable land crops, natural<br />

pastures, hayfields, permanent crops (trees, v<strong>in</strong>eyards), n<strong>on</strong> cultivated land.<br />

Decoupled nati<strong>on</strong>al complementary payments were granted for the follow<strong>in</strong>g crops:<br />

wheat and rye, barley, oat, corn and sorghum, rice, sunflower, rape, c<strong>on</strong>venti<strong>on</strong>al<br />

Soya, sugar beet, vegetables for beans, potatoes, medic<strong>in</strong>al and aromatic plants,<br />

field and solarium vegetables, greenhouse vegetables, other arable crops while the<br />

producti<strong>on</strong> decoupled payments for flax and hemp for fibber, hops and tobacco.<br />

The support for sugar beet dest<strong>in</strong>ed for sugar producti<strong>on</strong> and for the energy crops<br />

dest<strong>in</strong>ed for bio-fuel producti<strong>on</strong> has been ensured through separate payment<br />

schemes.<br />

27


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Hav<strong>in</strong>g <strong>in</strong> regard the necessity to restart the producti<strong>on</strong> cycle while apply<strong>in</strong>g the<br />

technology specific to each agricultural crop and the lack of f<strong>in</strong>ancial resources of the<br />

agricultural producers a f<strong>in</strong>ancial support of 1 leu/liter for purchas<strong>in</strong>g the gasol<strong>in</strong>e<br />

necessary for sett<strong>in</strong>g up the 2008 crops. Also <strong>in</strong> this c<strong>on</strong>text, <strong>in</strong> order to reduce the<br />

tax for the gasol<strong>in</strong>e used for agricultural mechanized works, follow<strong>in</strong>g the<br />

c<strong>on</strong>sultati<strong>on</strong>s <strong>in</strong>itiated by the M<strong>in</strong>istry of Agriculture, Forests and Rural Development<br />

with the M<strong>in</strong>istry of Public F<strong>in</strong>ances, for the gasol<strong>in</strong>e purchased for agricultural use<br />

dur<strong>in</strong>g the August-December 2008 period <strong>in</strong> order to carry out the agricultural<br />

mechanized works for 2008 a reduced tax was applied of 80.971 euro/1000 litters,<br />

respectively 0.27 lei/litter.<br />

For sett<strong>in</strong>g up the 2008 autumn crops a de m<strong>in</strong>imis aid was granted for approximately<br />

1.4 milli<strong>on</strong> ha.<br />

The commodity producti<strong>on</strong> was supported sugar beet, rice, fibber flax and hemp and<br />

Soya crops, while for the primary process<strong>in</strong>g of fibber flax and hemp stems<br />

Community support was granted for the 2008-2009 market year.<br />

Follow<strong>in</strong>g the meteorological phenomena for the period July – August 2008,<br />

registered <strong>in</strong> some geographical areas, the agricultural natural calamity state was<br />

declared for the crops seeded <strong>in</strong> autumn 2007 and spr<strong>in</strong>g 2008, and the maximum<br />

ceil<strong>in</strong>g which can be granted as damage was established.<br />

As regards the fruits and vegetables sector, the support was directed towards the<br />

implementati<strong>on</strong> of the EUREPGAP Good Practices System, vegetables and<br />

mushrooms <strong>in</strong> acclimatized areas, fruits and vegetables dest<strong>in</strong>ed for <strong>in</strong>dustrial<br />

process<strong>in</strong>g, packages and other materials necessary for wrapp<strong>in</strong>g fruits and<br />

vegetables for fresh delivery, expenditure for the stor<strong>in</strong>g of agricultural products.<br />

For the producers from the fruits and vegetables and ecological agriculture sector,<br />

de m<strong>in</strong>imis aid was granted.<br />

Also, the legal framework was elaborated for grant<strong>in</strong>g f<strong>in</strong>ancial support to the<br />

prelim<strong>in</strong>ary recognised producer groups and the producers’ organizati<strong>on</strong>s from the<br />

fruits and vegetable sector.<br />

For w<strong>in</strong>egrowers, amounts were allocated for the authorizati<strong>on</strong> of v<strong>in</strong>eyard<br />

plantati<strong>on</strong>s <strong>in</strong> order to produce w<strong>in</strong>e grapes with a c<strong>on</strong>trolled orig<strong>in</strong>, certify and mark<br />

w<strong>in</strong>es with a name of c<strong>on</strong>trolled orig<strong>in</strong>, plant-health treatments <strong>in</strong> the v<strong>in</strong>eyard<br />

plantati<strong>on</strong>s with noble grapes for c<strong>on</strong>sumpti<strong>on</strong> and w<strong>in</strong>e, <strong>in</strong>clud<strong>in</strong>g w<strong>in</strong>e with a<br />

c<strong>on</strong>trolled orig<strong>in</strong>.<br />

Also, for the v<strong>in</strong>eyard sector, the legal framework was established for grant<strong>in</strong>g<br />

f<strong>in</strong>ancial support from Community funds for promot<strong>in</strong>g <strong>on</strong> third markets, restructur<strong>in</strong>g<br />

and rec<strong>on</strong>vert<strong>in</strong>g v<strong>in</strong>eyards, ensur<strong>in</strong>g the crops, us<strong>in</strong>g the c<strong>on</strong>centrated grape must,<br />

first deforestati<strong>on</strong>.<br />

The producers of potatoes for <strong>in</strong>dustrial purposes, hops, aromatic and medic<strong>in</strong>al<br />

plants, flowers, dendrological and ornamental plats also benefited from support.<br />

The species and the value of the f<strong>in</strong>ancial support were set out for the <strong>in</strong>ternal<br />

producti<strong>on</strong> of seeds and plant<strong>in</strong>g material , officially certified, dest<strong>in</strong>ed for seed<strong>in</strong>g<br />

28


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

or plant<strong>in</strong>g <strong>in</strong> the agricultural campaigns from the fall of 2008 and spr<strong>in</strong>g of 2009.<br />

The plant-health treatments of nati<strong>on</strong>al <strong>in</strong>terest were supported for straw cereal<br />

crops, potatoes, v<strong>in</strong>eyard, orchards and alignments.<br />

In the zoo-technical sector complementary nati<strong>on</strong>al direct payments were granted for<br />

cattle, sheep and goats.<br />

The animal raisers which fulfilled certa<strong>in</strong> c<strong>on</strong>diti<strong>on</strong>s received form state budget a<br />

f<strong>in</strong>ancial support for the purchase of reproducti<strong>on</strong> rams and/or male goats of 60% of<br />

the purchase price (but not more than 1000 lei) for each specimen.<br />

The improvement of the animal populati<strong>on</strong>s was supported (through the genealogic<br />

registers for cattle and sheep, carry<strong>in</strong>g out official c<strong>on</strong>trols for the producti<strong>on</strong><br />

performances for sheep and goats, <strong>in</strong>troduc<strong>in</strong>g, at farm level, the techniques, biotechniques<br />

and modern reproducti<strong>on</strong> practices for the animal species, respectively<br />

the purchase of c<strong>on</strong>ta<strong>in</strong>ers for stor<strong>in</strong>g frozen sem<strong>in</strong>al material, support<strong>in</strong>g the test<strong>in</strong>g<br />

costs for reproductive males, carry<strong>in</strong>g out the analysis of the animal product quality<br />

for the genetic evaluati<strong>on</strong> of animals, elaborat<strong>in</strong>g and ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g the <strong>in</strong>formatic<br />

system, sett<strong>in</strong>g up the data bases and estimat<strong>in</strong>g the improvement value of animals)<br />

as well as the improvement of the quality of animal products (by f<strong>in</strong>ancially support<strong>in</strong>g<br />

the implementati<strong>on</strong> of the carcasses classificati<strong>on</strong> system, support<strong>in</strong>g the producti<strong>on</strong><br />

of meat and eggs for c<strong>on</strong>sumpti<strong>on</strong>, of compliant delivered milk and of bee families)<br />

The beekeepers have been supported <strong>in</strong> order to purchase medicati<strong>on</strong> for combat<strong>in</strong>g<br />

the varooza disease and repopulate the beehives by purchas<strong>in</strong>g queen bees from the<br />

<strong>in</strong>digenous breed.<br />

The silk worm breeders have received Community support for each used box of silk<br />

worm eggs (at least 20,000 eggs).<br />

C<strong>on</strong>servati<strong>on</strong> and use <strong>programme</strong>s have been f<strong>in</strong>anced for animal populati<strong>on</strong> <strong>in</strong><br />

critical status, <strong>in</strong> danger of disappear<strong>in</strong>g or vulnerable, by species and races and the<br />

genetic patrim<strong>on</strong>y of horses has been supported.<br />

Damages have been granted for the elim<strong>in</strong>ati<strong>on</strong> of transmissible diseases centres<br />

and the expenditure for neutraliz<strong>in</strong>g the animal waste has been supported.<br />

The agricultural associati<strong>on</strong>s set up accord<strong>in</strong>g G.D. no. 26/2000 have been<br />

supported <strong>in</strong> order to attend the organizati<strong>on</strong>s set up at the European Uni<strong>on</strong> by fully<br />

cover<strong>in</strong>g the necessary subscripti<strong>on</strong>.<br />

On the basis of Law no. 150/2004 regard<strong>in</strong>g the producti<strong>on</strong> credit the grants for the<br />

2008 producti<strong>on</strong> credits have been set out, thus provid<strong>in</strong>g public funds totall<strong>in</strong>g 50<br />

milli<strong>on</strong> lei. The c<strong>on</strong>tracted agricultural credits for 2008 benefited from an average<br />

public fund c<strong>on</strong>tributi<strong>on</strong> of 17% from the total volume of awarded credits, c<strong>on</strong>tributi<strong>on</strong><br />

<strong>in</strong>creased to 30% for the crops set up <strong>in</strong> fall 2008.<br />

For the Programme for <strong>in</strong>creas<strong>in</strong>g the competitiveness of agri-food products, <strong>in</strong> 2008,<br />

120 projects have been approved and the amount of 21 mil. lei has been allocated.<br />

In the field of agricultural research 64 projects have been submitted with<strong>in</strong> the sector<br />

research plan, <strong>in</strong>vestments have been supported and 33 grants have been<br />

29


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

signed through the Competitive grant scheme.<br />

Legal framework<br />

For harm<strong>on</strong>iz<strong>in</strong>g the nati<strong>on</strong>al legislati<strong>on</strong> with the Community <strong>on</strong>e, as regards<br />

agriculture and rural development, <strong>in</strong> the 1 st of January – 31 st of December 2008, a<br />

series of normative papers have been elaborated and adopted, the most important<br />

be<strong>in</strong>g the follow<strong>in</strong>g:<br />

• Government Emergency Ord<strong>in</strong>ance no. 213/2008 for the ratificati<strong>on</strong> of the<br />

Agreement between the Government of Romania and the Commissi<strong>on</strong> of the<br />

European Communities, signed <strong>in</strong> Bucharest and, respectively, Brussels <strong>on</strong><br />

December 4 th 2008, for the amendment of the 2006 Annual F<strong>in</strong>anc<strong>in</strong>g<br />

Agreement between the Government of Romania and the Commissi<strong>on</strong> of the<br />

European Communities, <strong>on</strong> behalf of the European Community, signed <strong>in</strong><br />

Bucharest and, respectively, Brussels <strong>on</strong> the 31 st of October 2006 (O.J. no.<br />

842 from 15.12.2008);<br />

• Government Emergency Ord<strong>in</strong>ance no. 65/2008 for the amendment and<br />

completi<strong>on</strong> of Government Emergency Ord<strong>in</strong>ance no. 13/2006 regard<strong>in</strong>g the<br />

sett<strong>in</strong>g up, organizati<strong>on</strong> and functi<strong>on</strong><strong>in</strong>g of the Pay<strong>in</strong>g Agency for Rural<br />

Development and Fishery, by reorganiz<strong>in</strong>g the SAPARD Agency and<br />

establish<strong>in</strong>g several measures for <strong>in</strong>creas<strong>in</strong>g the efficiency of activity of the<br />

Pay<strong>in</strong>g and Interventi<strong>on</strong> Agency for Agriculture (O.J. no. 418 from<br />

04.06.2008);<br />

• Government Emergency Ord<strong>in</strong>ance no. 104/2008 for the amendment of art. 5<br />

of G.E.O no. 59/2006 <strong>on</strong> <strong>in</strong>sur<strong>in</strong>g from state budget the public n<strong>on</strong>-refundable<br />

co-f<strong>in</strong>anc<strong>in</strong>g funds for the SAPARD Programme <strong>in</strong>vestment projects (O.J. no.<br />

658/18.09.2008);<br />

• Government Decisi<strong>on</strong> no. 688/2008 <strong>on</strong> the amendment of Government<br />

Decisi<strong>on</strong> no. 876/2005 for the approval of the methodological norms for<br />

apply<strong>in</strong>g Law no. 218/2005 <strong>on</strong> the stimulati<strong>on</strong> of the absorpti<strong>on</strong> of the<br />

SAPARD funds by undertak<strong>in</strong>g the risk by the guarantee funds (O.J. no.<br />

493/02.07.2008);<br />

• Government Ord<strong>in</strong>ance no. 20/2008 <strong>on</strong> the amendment and completi<strong>on</strong> of<br />

Government Ord<strong>in</strong>ance no. 79/2003 regard<strong>in</strong>g the c<strong>on</strong>trol and recovery of<br />

Community funds, as well as of corresp<strong>on</strong>d<strong>in</strong>g co-f<strong>in</strong>anc<strong>in</strong>g funds, improperly<br />

used (O.J. no. 613/20.08.2008).<br />

30


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Chapter II<br />

Assessment of the progress regard<strong>in</strong>g the implementati<strong>on</strong> of the priorities,<br />

measures and sub-measures of the SAPARD Programme<br />

II. 1 General Framework<br />

Thus, for the 10 measures accredited under SAPARD Programme, dur<strong>in</strong>g 2008 the<br />

implementati<strong>on</strong> of the c<strong>on</strong>tracted projects was c<strong>on</strong>t<strong>in</strong>ued by execut<strong>in</strong>g a number of<br />

1898 payment <strong>in</strong>stallments to the beneficiaries of the SAPARD Programme reach<strong>in</strong>g<br />

a total value of 254.030 milli<strong>on</strong> euro.<br />

At the end of 2008, the total value of the f<strong>in</strong>ancial commitments under SAPARD<br />

Programme was of 1,400.512 milli<strong>on</strong> euro, result<strong>in</strong>g <strong>in</strong> a coverage degree of 100% of<br />

AFA for 2000 – 2005 and of 50.65% for AFA 2006. As regards the c<strong>on</strong>sumpti<strong>on</strong> rate<br />

of the allocated funds, at the end of 2008, the total value of the payments executed to<br />

the beneficiaries of the SAPARD Programme was of 1,278.744 milli<strong>on</strong> Euro,<br />

represent<strong>in</strong>g a c<strong>on</strong>sumpti<strong>on</strong> rate of 100% of AFA for 2000 – 2005 and of 0.94% for<br />

AFA 2006 (Table II.1).<br />

Allocati<strong>on</strong><br />

Allocated Amount<br />

(milli<strong>on</strong> euro)<br />

C<strong>on</strong>tracted<br />

Absorbed<br />

Table II.1<br />

Deadl<strong>in</strong>e for the<br />

absorpti<strong>on</strong> of<br />

funds<br />

AFA 2000 204.235 100% 100% Absorbed<br />

AFA 2001 208.420 100% 100% Absorbed<br />

AFA 2002 214.164 100% 100% Absorbed<br />

AFA 2003 217.776 100% 100 % Absorbed<br />

AFA 2004 211.578 100% 100 % Absorbed<br />

AFA 2005 220.264 100% 100 % Absorbed<br />

AFA 2006 245.013<br />

Total<br />

* AFA 2006 = n+3<br />

1,521.450 milli<strong>on</strong><br />

euro<br />

124.076 milli<strong>on</strong><br />

euro<br />

50.64%<br />

1,400.512<br />

milli<strong>on</strong> euro<br />

92.05%<br />

2.31 milli<strong>on</strong><br />

euro<br />

0.94%<br />

1,278.744<br />

milli<strong>on</strong> euro<br />

84.05%<br />

December 2009*<br />

Note: The quantum of allocati<strong>on</strong>s reflects the public value – EC c<strong>on</strong>tributi<strong>on</strong> and nati<strong>on</strong>al<br />

c<strong>on</strong>tributi<strong>on</strong><br />

On the whole <strong>programme</strong>, the total committed amount (1,400.512 milli<strong>on</strong><br />

31


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Euro), resulted <strong>in</strong> a degree of absorpti<strong>on</strong> of 92.05% at the end of 2008, as compared<br />

to the 2000-2006 allocati<strong>on</strong>s.<br />

Divided <strong>on</strong> measures, the situati<strong>on</strong> of the commitments with<strong>in</strong> SAPARD Programme<br />

is as follows (Table II.2):<br />

- <strong>on</strong> measure 1.1, the total c<strong>on</strong>tracted public value related to the c<strong>on</strong>tracts<br />

was of 351.458 milli<strong>on</strong> Euro, represent<strong>in</strong>g 25.09 % from the total committed<br />

amount of SAPARD Programme.<br />

- <strong>on</strong> measure 1.2, the total c<strong>on</strong>tracted public value was of 36.104 milli<strong>on</strong><br />

Euro represent<strong>in</strong>g 2.58% from the total committed amount of SAPARD<br />

Programme.<br />

- <strong>on</strong> measure 2.1, the total c<strong>on</strong>tracted public value was of 633.129 milli<strong>on</strong><br />

Euro represent<strong>in</strong>g 45.21% from the total committed amount of SAPARD<br />

Programme.<br />

- <strong>on</strong> measure 3.1, the total c<strong>on</strong>tracted public value was of 238.506 milli<strong>on</strong><br />

Euro represent<strong>in</strong>g 17.03% from the total committed amount of SAPARD<br />

Programme.<br />

- <strong>on</strong> measure 3.2, the total c<strong>on</strong>tracted public value was of 0.086 milli<strong>on</strong> Euro<br />

represent<strong>in</strong>g 0.01% from the total committed amount of SAPARD<br />

Programme.<br />

- <strong>on</strong> measure 3.3, the total c<strong>on</strong>tracted public value was of 0.217 milli<strong>on</strong> Euro<br />

represent<strong>in</strong>g 0.02% from the total committed amount of SAPARD<br />

Programme.<br />

- <strong>on</strong> measure 3.4, the total c<strong>on</strong>tracted public value was of 70.060 milli<strong>on</strong><br />

Euro represent<strong>in</strong>g 5.00% from the total committed amount of SAPARD<br />

Programme.<br />

- <strong>on</strong> measure 3.5, the total c<strong>on</strong>tracted public value was of 66.677 milli<strong>on</strong><br />

Euro represent<strong>in</strong>g 4.76% from the total committed amount of SAPARD<br />

Programme.<br />

- <strong>on</strong> measure 4.1, the total c<strong>on</strong>tracted public value was of 2.901 milli<strong>on</strong> Euro<br />

represent<strong>in</strong>g 0.21% from the total committed amount of SAPARD<br />

Programme.<br />

- <strong>on</strong> measure 4.2, the total c<strong>on</strong>tracted public value was of 1.374 milli<strong>on</strong> Euro<br />

represent<strong>in</strong>g 0.10% of the total committed amount of SAPARD Programme.<br />

32


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

MEASURE<br />

No. of projects<br />

c<strong>on</strong>tracted by<br />

31 st December<br />

2007<br />

2007 2008<br />

Committed<br />

amounts by<br />

31 st December<br />

2007<br />

(milli<strong>on</strong> euro)<br />

No. of projects<br />

c<strong>on</strong>tracted by<br />

31 st December<br />

2008<br />

Table II.2<br />

Committed<br />

amounts by<br />

31 st December<br />

2008<br />

(milli<strong>on</strong> euro)<br />

Measure 1.1 485 370.878 469 351.458<br />

Measure 1.2 20 37.613 20 36.104<br />

Measure 2.1 850 658.621 845 633.129<br />

Measure 3.1 2,018 251.088 1,952 238.506<br />

Measure 3.2* 4 0.187 4 0.086<br />

Measure 3.3* 47 0.869 47 0.217<br />

Measure 3.4 1,148 76.544 1,083 70.060<br />

Measure 3.5 117 74.263 114 66.677<br />

Measure 4.1 5 3.649 5 2.901<br />

Measure 4.2 10 1.537 10 1.374<br />

TOTAL 4,704 1,475.249 4,549 1,400.512<br />

* As regards Measures 3.2 and 3.3, the c<strong>on</strong>tracted values are lower than the <strong>on</strong>es previously <str<strong>on</strong>g>report</str<strong>on</strong>g>ed due to the<br />

fact that the previous <str<strong>on</strong>g>report</str<strong>on</strong>g>s c<strong>on</strong>sidered as c<strong>on</strong>tracted the amount related to the entire implementati<strong>on</strong> period<br />

(2007 – 2011). Tak<strong>in</strong>g <strong>in</strong>to account that <strong>in</strong> the records kept by the Payment Account<strong>in</strong>g Unit and the C<strong>on</strong>tract<strong>in</strong>g<br />

Unit are c<strong>on</strong>sidered as committed <strong>on</strong>ly the amounts related to 2007 and 2008, the M<strong>on</strong>itor<strong>in</strong>g, Evaluati<strong>on</strong>,<br />

Report<strong>in</strong>g Unit (MERU) adopted the same l<strong>in</strong>e of keep<strong>in</strong>g records. MERU’s records shall be updated when the<br />

addenda related to each year are signed.<br />

As regards the payments executed to beneficiaries, the total amount registered at the<br />

end of 2008 (1,278.744 milli<strong>on</strong> Euro) is reflected by an absorpti<strong>on</strong> degree of 84.05%<br />

as compared to the 2000-2006 allocati<strong>on</strong>s. The situati<strong>on</strong> divided <strong>on</strong> measures is the<br />

follow<strong>in</strong>g (Table II.3):<br />

• 340.683 milli<strong>on</strong> Euro for measure 1.1, represent<strong>in</strong>g 26.64% of the total<br />

amount of the executed payments;<br />

• 17.853 milli<strong>on</strong> Euro for measure 1.2, represent<strong>in</strong>g 1.40% of the total amount<br />

of the executed payments;<br />

• 578.747 milli<strong>on</strong> Euro for measure 2.1, represent<strong>in</strong>g 45.26% of the total<br />

amount of the executed payments;<br />

• 229.412 milli<strong>on</strong> Euro for measure 3.1, represent<strong>in</strong>g 17.94% of the total<br />

amount of the executed payments;<br />

• In 2008 the payments for measure 3.2 started. The payments executed<br />

were <strong>in</strong> value of 0.029 milli<strong>on</strong> Euro, represent<strong>in</strong>g 0.002% of the total amount<br />

of the executed payments;<br />

• 0.187 milli<strong>on</strong> Euro for measure 3.3, represent<strong>in</strong>g 0.01% of the total amount<br />

of the executed payments;<br />

• 64.832 milli<strong>on</strong> Euro for measure 3.4, represent<strong>in</strong>g 5.07% of the total amount<br />

of the executed payments;<br />

• 42.548 milli<strong>on</strong> Euro for measure 3.5, represent<strong>in</strong>g 3.33% of the total<br />

amount of the executed payments;<br />

• 3.028 milli<strong>on</strong> Euro for measure 4.1, represent<strong>in</strong>g 0.24% of the total amount<br />

of the executed payments;<br />

33


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

• 1.424 milli<strong>on</strong> Euro for measure 4.2, represent<strong>in</strong>g 0.11% of the total amount<br />

of the executed payments.<br />

MEASURE<br />

No. of<br />

payments by<br />

31 st December<br />

2007<br />

2007 2008<br />

Payments<br />

amount by 31 st<br />

December 2007<br />

(milli<strong>on</strong> euro)<br />

No. of<br />

payments by<br />

31 st December<br />

2008<br />

Table II.3<br />

Payments<br />

amount by 31 st<br />

December 2008<br />

(milli<strong>on</strong> euro)<br />

Measure 1.1 1,330 284.622 1,594 340.683<br />

Measure 1.2 6 1.346 41 17.853<br />

Measure 2.1 2,490 479.316 3,043 578.747<br />

Measure 3.1 2,837 198.658 3,169 229.412<br />

Measure 3.2 0 0 3 0.029<br />

Measure 3.3 47 0.182 48 0.187<br />

Measure 3.4 1,941 50.558 2,448 64.832<br />

Measure 3.5 66 6.8169 261 42.548<br />

Measure 4.1** 8 1.800 15 3.028<br />

Measure 4.2** 21 1.408 22 1.424<br />

TOTAL 8,746 1,024.714 10,644 1,278.744<br />

** As regards Measures 4.1 and 4.2, the value of the payments <strong>in</strong> lei is equal to the value of the<br />

c<strong>on</strong>tracts signed <strong>in</strong> lei. The difference occurs due to the fact that different ex-change rates were used<br />

<strong>in</strong> order to express the amount of the c<strong>on</strong>tracts and payments <strong>in</strong> euros. For the same reas<strong>on</strong> there are<br />

differences between the total paid values expressed <strong>in</strong> euros and the values of the c<strong>on</strong>tracts<br />

expressed <strong>in</strong> euros.<br />

II. 2 Analysis of the progress recorded <strong>in</strong> the implementati<strong>on</strong> of SAPARD<br />

Programme<br />

II. 2.1 Measure 1.1 „Improvement of process<strong>in</strong>g and market<strong>in</strong>g of agricultural<br />

and fisheries products” – projects not affected by natural disasters<br />

Dur<strong>in</strong>g the 48 sessi<strong>on</strong>s held dur<strong>in</strong>g August 2002 - July 2006, 736 projects were<br />

submitted out of which 466 were c<strong>on</strong>tracted hav<strong>in</strong>g a total eligible approved value<br />

of 1,248,222.502 thousand LEI, respectively 345.143 milli<strong>on</strong> Euro.<br />

Approximately 43% of the projects approved under this measure c<strong>on</strong>cerns meat,<br />

meat products and eggs sector focuss<strong>in</strong>g ma<strong>in</strong>ly <strong>on</strong> the improvement of the<br />

process<strong>in</strong>g standards for the mixed units (141 approved projects), for abattoirs (54<br />

approved projects), for sw<strong>in</strong>e units (2 approved project), for poultry process<strong>in</strong>g units<br />

(4 approved projects), and for the improvement of the c<strong>on</strong>diti<strong>on</strong>s for eggs stor<strong>in</strong>g<br />

and packag<strong>in</strong>g (1 approved project).<br />

Milk and dairy products sector holds 20% out of all the approved projects under<br />

Measure 1.1, ma<strong>in</strong>ly envisag<strong>in</strong>g units for milk process<strong>in</strong>g for which 89 projects<br />

were approved. The diagram below (Diagram II.1) presents the stage of the<br />

34


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

submitted, approved and rejected projects under Measure 1.1 <strong>in</strong> the related period<br />

and accord<strong>in</strong>g to the related sector: milk and dairy products (1), meat, meat<br />

products and eggs (2), fruits, vegetables and potatoes (3), w<strong>in</strong>e (4), fishery (5),<br />

cereals (6), oil seeds (7).<br />

Number of submitted, rejected and approved projects <strong>on</strong> Measure 1.1<br />

Diagram II. 1<br />

350<br />

300<br />

305<br />

Submitted<br />

Rejected<br />

Approved<br />

250<br />

Number of Projects<br />

200<br />

150<br />

174<br />

202<br />

100<br />

92<br />

95<br />

70<br />

65<br />

64<br />

50<br />

41 45<br />

0<br />

11<br />

Milk and milk<br />

products<br />

21<br />

Meat products and<br />

eggs<br />

2 5<br />

Fruits, vegetables<br />

and potatoes<br />

W<strong>in</strong>e<br />

22<br />

18<br />

0 1 0<br />

Fish and fishery<br />

products<br />

1<br />

6<br />

4 0 3 0 0 0<br />

Textile Plants Cereals Oil seads Sugar<br />

Sub-measure<br />

In terms of the project objective, the approved projects have as ma<strong>in</strong> objective the<br />

improvement or the rati<strong>on</strong>alizati<strong>on</strong> of the process<strong>in</strong>g (approx. 45%) and the<br />

achievement of new <strong>in</strong>vestments <strong>in</strong> process<strong>in</strong>g, stor<strong>in</strong>g and market<strong>in</strong>g capacities<br />

(approx 36%). The rest of 19% projects approved under Measure 1.1 have as<br />

objective the alignment to the European Uni<strong>on</strong> standards <strong>on</strong> food hygiene, food stuff<br />

quality and envir<strong>on</strong>ment, improvement of product presentati<strong>on</strong> and prepar<strong>in</strong>g,<br />

improvement and c<strong>on</strong>trol of the producti<strong>on</strong> quality and the adopti<strong>on</strong> of technologies<br />

for the new products, for improv<strong>in</strong>g the packag<strong>in</strong>g, the storage capacities and for<br />

improv<strong>in</strong>g the m<strong>on</strong>itor<strong>in</strong>g quality and for a better use and remov<strong>in</strong>g of the by-products<br />

or residua resulted after process<strong>in</strong>g and other.<br />

II. 2.1.1 Measure 1.1 „Improvement of process<strong>in</strong>g and market<strong>in</strong>g for agricultural<br />

and fishery products” – projects affected by natural disasters<br />

Dur<strong>in</strong>g the 3 sessi<strong>on</strong>s held between May-July 2006, out of the 4 submitted projects, 3<br />

projects were c<strong>on</strong>tracted hav<strong>in</strong>g a total eligible approved value of 22,296.097<br />

thousands LEI, respectively 6.315 milli<strong>on</strong> Euro.<br />

The 3 c<strong>on</strong>tracted projects bel<strong>on</strong>g to the cereals submeasure (2 projects) and meat,<br />

meat products and eggs submeasure (1 project), from the objective po<strong>in</strong>t of view of,<br />

these aim at improv<strong>in</strong>g the storage capacities, improv<strong>in</strong>g or rati<strong>on</strong>aliz<strong>in</strong>g of the<br />

process<strong>in</strong>g procedures and new <strong>in</strong>vestments <strong>in</strong> process<strong>in</strong>g, stor<strong>in</strong>g and market<strong>in</strong>g<br />

capacities.<br />

35


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Diagram presented below (Diagram II. 2) shows the situati<strong>on</strong> of the submitted,<br />

approved and rejected projects <strong>on</strong> Measure 1.1, dur<strong>in</strong>g the period <strong>in</strong> questi<strong>on</strong>, and<br />

tak<strong>in</strong>g <strong>in</strong>to account the sector referred to:<br />

2,5<br />

Number of submitted, rejected and approved projects <strong>on</strong> Measure 1.1<br />

(Affected by natural disasters)<br />

Diagram II. 2<br />

Submitted<br />

Rejected<br />

2<br />

2<br />

2<br />

2<br />

Approved<br />

Number of Projects<br />

1,5<br />

1<br />

1<br />

0,5<br />

0<br />

0<br />

0 0<br />

0 0 0 0 0 0 0 0 0 0 0 0 0<br />

0 0 0 0 0 0 0<br />

Milk and milk<br />

products<br />

Meat products and<br />

eggs<br />

Fruits, vegetables<br />

and potatoes<br />

W<strong>in</strong>e<br />

Fish and fishery<br />

products<br />

Sub-measure<br />

Textile Plants Cereals Oil seads Sugar<br />

II. 2.2 Measure 1.2 „Improv<strong>in</strong>g the structures for quality, veter<strong>in</strong>ary and plant<br />

health-c<strong>on</strong>trol, for the quality of food stuffs and for c<strong>on</strong>sumer protecti<strong>on</strong>”<br />

Dur<strong>in</strong>g the 5 sessi<strong>on</strong>s held between May 2006 - October 2006, out of the 20<br />

submitted projects, 20 projects were c<strong>on</strong>tracted hav<strong>in</strong>g a total eligible approved value<br />

of 129,428.687 thousand LEI, respectively 36.104 milli<strong>on</strong> Euro.<br />

With<strong>in</strong> this measure, the highest rate is held by the sanitary-veter<strong>in</strong>ary c<strong>on</strong>trol submeasure<br />

hav<strong>in</strong>g 85% (17 approved projects), submeasure fitosanitary c<strong>on</strong>trol has a<br />

weight of 10% (2 approved projects), and the submeasure C<strong>on</strong>trol of foods staff<br />

quality c<strong>on</strong>trol has a weight of 5%. All the 20 c<strong>on</strong>tracted projects aim at c<strong>on</strong>structi<strong>on</strong><br />

extend<strong>in</strong>g, moderniz<strong>in</strong>g and endow<strong>in</strong>g with equipment and specialized <strong>in</strong>struments<br />

(18 projects) and the IT nati<strong>on</strong>al network, procurement of specific IT equipment (2<br />

projects).<br />

The diagram presented below (Diagram II. 3) shows the situati<strong>on</strong> of the submitted,<br />

approved and rejected projects <strong>on</strong> Measure 1.2 dur<strong>in</strong>g the period <strong>in</strong> questi<strong>on</strong>:<br />

36


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Diagram II. 3<br />

Number of submitted, rejected and approved projects <strong>on</strong> Measure 1.2<br />

18<br />

16<br />

17<br />

17<br />

Submitted<br />

Rejected<br />

Approved<br />

14<br />

12<br />

Number of Projects<br />

10<br />

8<br />

6<br />

4<br />

2<br />

0<br />

2<br />

2<br />

1<br />

1<br />

0 0 0<br />

Sanitary-veter<strong>in</strong>ary c<strong>on</strong>trol Plant-health c<strong>on</strong>trol Food stuffs quality c<strong>on</strong>trol<br />

Sub-measure<br />

II. 2.3 Measure 2.1 „Development and improvement of rural <strong>in</strong>frastructure” -<br />

projects not affected by natural disasters<br />

Dur<strong>in</strong>g the 9 sessi<strong>on</strong>s held between August - November 2002 and between April –<br />

August 2006 for Measure 2.1 Development and improvement of rural <strong>in</strong>frastructure,<br />

out of the 781 submitted projects, 762 projects were c<strong>on</strong>tracted hav<strong>in</strong>g a total eligible<br />

approved value of 2,106,678.208 thousand LEI.<br />

The diagram presented below (Diagram II. 4) shows the situati<strong>on</strong> of the submitted,<br />

rejected and c<strong>on</strong>tracted projects <strong>on</strong> sub-measure:<br />

Diagram II. 4<br />

Number of submitted, rejected and approved projects <strong>on</strong> Measure 2.1<br />

450<br />

400<br />

389<br />

380<br />

Submitted<br />

Rejected<br />

Approved<br />

350<br />

Number of Projects<br />

300<br />

250<br />

200<br />

150<br />

278<br />

273<br />

100<br />

89<br />

87<br />

50<br />

0<br />

48<br />

Roads <strong>in</strong> rural areas<br />

41<br />

Dr<strong>in</strong>kable water supply through rural area<br />

district networks<br />

7<br />

District system sewage <strong>in</strong> rural areas<br />

24<br />

0<br />

22<br />

Works of preventi<strong>on</strong> and protecti<strong>on</strong><br />

aga<strong>in</strong>st floods<br />

Sub-measure<br />

37


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Out of the total number of approved projects for Measure 2.1, approximately 50% are<br />

under the sub-measure Roads <strong>in</strong> rural areas (380 approved projects, 36% are under<br />

the sub-measure Dr<strong>in</strong>kable water supply <strong>in</strong> centralised system <strong>in</strong> rural areas (273<br />

approved projects) and 11% are under the sub-measure Sewerage <strong>in</strong> centralised<br />

system <strong>in</strong> rural areas (87 approved projects) and 3% are approved projects for submeasures<br />

<strong>on</strong> preventi<strong>on</strong> and protecti<strong>on</strong> works aga<strong>in</strong>st floods (22 approved projects).<br />

93% of the projects under sub-measure Roads <strong>in</strong> rural areas have as objective the<br />

modernisati<strong>on</strong> of the exist<strong>in</strong>g roads; 67% and respectively 82% of the approved<br />

projects under sub-measures Dr<strong>in</strong>kable water supply <strong>in</strong> centralised system <strong>in</strong> rural<br />

areas and Sewerage <strong>in</strong> centralised system <strong>in</strong> rural areas have as objective the<br />

executi<strong>on</strong> of new works.<br />

II. 2.3.1 Measure 2.1 „Development and improvement of rural <strong>in</strong>frastructure” –<br />

projects affected by natural disasters<br />

Dur<strong>in</strong>g the 4 sessi<strong>on</strong>s held between April – July 2006 for Measure 2.1 Development<br />

and improvement of rural <strong>in</strong>frastructure, out of the 96 submitted projects, 83 projects<br />

were c<strong>on</strong>tracted hav<strong>in</strong>g a total eligible approved value of 213,989.272 thousand LEI,<br />

respectively 59.898 milli<strong>on</strong> Euro.<br />

The diagram presented below (Diagram II. 5) shows the situati<strong>on</strong> of the submitted,<br />

rejected and c<strong>on</strong>tracted projects affected by natural disasters <strong>on</strong> sub-measures:<br />

Diagram II. 5<br />

80<br />

Number of submitted, rejected and approved projects <strong>on</strong> Measure 2.1<br />

(Affected by natural disasters)<br />

70<br />

60<br />

70<br />

60<br />

Submitted<br />

Rejected<br />

Approved<br />

Number of Projects<br />

50<br />

40<br />

30<br />

20<br />

22<br />

19<br />

10<br />

0<br />

10<br />

Roads <strong>in</strong> rural areas<br />

3<br />

Dr<strong>in</strong>kable water supply through rural area<br />

district networks<br />

Sub-measure<br />

4<br />

4<br />

0 0 0<br />

District system sewage <strong>in</strong> rural areas<br />

Works of preventi<strong>on</strong> and protecti<strong>on</strong><br />

aga<strong>in</strong>st floods<br />

0<br />

38


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Out of the total number of approved projects affected by natural disasters under<br />

Measure 2.1, approximately 72% bel<strong>on</strong>g to roads <strong>in</strong> rural area sub-measure (60<br />

approved projects), 23% bel<strong>on</strong>g to water supply sub-measure (19 approved projects),<br />

5% are projects approved under sewerage sub-measure (4 approved projects).<br />

As compared to the case of roads sub-measure, under which, out of the total number<br />

of projects, 83% aimed at moderniz<strong>in</strong>g of the exist<strong>in</strong>g roads, <strong>in</strong> the case of water<br />

supply sub-measure out of the total number of approved projects 63% aim at<br />

execut<strong>in</strong>g of new works and as regards the sewerage sub-measure, 50% of projects<br />

aim at repair<strong>in</strong>g the sewerage systems.<br />

II. 2.4 Measure 3.1 „Investments <strong>in</strong> agricultural hold<strong>in</strong>gs” - projects not affected<br />

by natural disasters<br />

Dur<strong>in</strong>g the 32 sessi<strong>on</strong>s held between December 2003 – July 2006, from the total<br />

number of submitted projects – 2,984 projects, 1,921 were c<strong>on</strong>tracted with a total<br />

eligible approved value of 834,372.636 thousand LEI, respectively 231.323 milli<strong>on</strong><br />

Euro.<br />

Approximately 62% of the approved projects for this measure are for <strong>in</strong>vestments <strong>in</strong><br />

sub-measure “Field crops” (1,190 approved projects), regard<strong>in</strong>g ma<strong>in</strong>ly the<br />

procurement of mach<strong>in</strong>ery and <strong>in</strong>dependent equipments.<br />

Likewise, sub-measure “Dairy cows/buffalo cows” holds a quota of 12% (229<br />

c<strong>on</strong>tracts), out of the total number of approved projects for measure 3.1 most of the<br />

<strong>in</strong>vestments have as objective the build<strong>in</strong>g of stables for cattle and buffalo cows (71%<br />

of the <strong>in</strong>vestments under this submeasure, respectively 163 c<strong>on</strong>tracts) and <strong>on</strong>ly 12%,<br />

respectively <strong>on</strong>ly 28 c<strong>on</strong>tracted projects have as objective the procurement of<br />

animals with high-quality genetic value.<br />

With reference to the two sub-measures aforementi<strong>on</strong>ed, 55% of the total number,<br />

respectively 325 young farmers are beneficiaries of <strong>in</strong>vestments <strong>in</strong> field crops and<br />

13%, respectively 75 young farmers are beneficiaries of <strong>in</strong>vestments <strong>in</strong> dairy<br />

cows/buffalo cows.<br />

The diagram bellow (Diagram II.6) presents the situati<strong>on</strong> of the submitted projects,<br />

approved and rejected <strong>on</strong>es for measure 3.1 dur<strong>in</strong>g the reference period and<br />

depend<strong>in</strong>g <strong>on</strong> the field of activity: Field crops (1), Horticulture (2), V<strong>in</strong>eyards (3), Fruit<br />

cultivati<strong>on</strong> (4), Greenhouses (5), Dairy cows/buffaloes (6), Cattle-rear<strong>in</strong>g and<br />

fatten<strong>in</strong>g (7), Sheep/goats farms (8), Young mutt<strong>on</strong>s fatten<strong>in</strong>g farms (9), Pig farms<br />

(10), Poultry farms (11), Other vegetal and animal poultry breed<strong>in</strong>g farms (12).<br />

39


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Number of submitted, rejected and approved projects <strong>on</strong> Measure 3.1<br />

Diagram II.6<br />

2.000<br />

1.800<br />

1.600<br />

1.750<br />

Submitted<br />

Rejected<br />

Approved<br />

Number of Projects<br />

1.400<br />

1.200<br />

1.000<br />

800<br />

600<br />

1.190<br />

525<br />

400<br />

200<br />

0<br />

35<br />

229<br />

169<br />

126<br />

84 76 70 63 82 72<br />

90 89 82<br />

44<br />

17 39<br />

1 3 3 4 17 0 16 1<br />

31 11 0 10 6 2 22 0 18<br />

Field crops Horticulture V<strong>in</strong>eyard Fruit tree<br />

farm<strong>in</strong>g<br />

Green<br />

Houses<br />

Milk animal<br />

farm<strong>in</strong>g<br />

Cattle<br />

bread<strong>in</strong>g and<br />

fatten<strong>in</strong>g<br />

Sub-measure<br />

Goats and<br />

sheep<br />

fatten<strong>in</strong>g<br />

Young rams<br />

fatten<strong>in</strong>g<br />

Sw<strong>in</strong>e Poultry Other type of<br />

vegetable,<br />

animals and<br />

poultry<br />

farm<strong>in</strong>g<br />

II. 2.4.1 Measure 3.1 „Investments <strong>in</strong> agricultural hold<strong>in</strong>gs”- projects affected by<br />

natural disasters<br />

Dur<strong>in</strong>g the 5 sessi<strong>on</strong>s held between March 2006 - July 2006, out of the 45 submitted<br />

projects, 31 projects were c<strong>on</strong>tracted hav<strong>in</strong>g a total eligible approved value of<br />

25,476.492 thousand LEI, respectively 7.183 milli<strong>on</strong> Euro.<br />

The diagram presented below (Diagram II.7) shows the situati<strong>on</strong> of the submitted,<br />

approved and rejected projects <strong>on</strong> Measure 3.1, for the period <strong>in</strong> questi<strong>on</strong>:<br />

Diagram II.7<br />

Number of submitted, rejected and approved projects <strong>on</strong> Measure 3.1<br />

(Affected by natural disasters)<br />

35<br />

30<br />

31<br />

27<br />

Submitted<br />

Rejected<br />

Approved<br />

25<br />

Number of Projects<br />

20<br />

15<br />

10<br />

11<br />

5<br />

0<br />

2<br />

1<br />

0 0 0 0 0 0 0 0 0 0 0<br />

Field crops Horticulture V<strong>in</strong>eyard Fruit tree<br />

farm<strong>in</strong>g<br />

Green<br />

Houses<br />

3 3<br />

Milk animal<br />

farm<strong>in</strong>g<br />

1 1<br />

1 1<br />

0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Cattle<br />

bread<strong>in</strong>g and<br />

fatten<strong>in</strong>g<br />

Sub-measure<br />

Goats and<br />

sheep<br />

fatten<strong>in</strong>g<br />

Young rams<br />

fatten<strong>in</strong>g<br />

Sw<strong>in</strong>e Poultry Other type of<br />

vegetable,<br />

animals and<br />

poultry<br />

farm<strong>in</strong>g<br />

Approximately 87% of the projects, out of the approved projects under this measure,<br />

40


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

refer to <strong>in</strong>vestments <strong>on</strong> field crops sub-measure (27 approved projects), mostly<br />

aim<strong>in</strong>g at procur<strong>in</strong>g of mach<strong>in</strong>es and <strong>in</strong>dependent equipment.<br />

II. 2.5 Measure 3.2 „Sett<strong>in</strong>g up of the producers groups”<br />

Dur<strong>in</strong>g the 5 sessi<strong>on</strong>s held between July 2006 - November 2006, 4 projects were<br />

submitted, these projects were c<strong>on</strong>tracted hav<strong>in</strong>g a total eligible approved value of<br />

304.608 thousand LEI, respectively 0.086 milli<strong>on</strong> Euro.<br />

About 75% of the approved projects for this measure refer to the <strong>in</strong>vestments <strong>on</strong><br />

submeasure Milk (3 approved projects).<br />

The diagram below (Diagram II.8) presents the stage of the projects submitted and<br />

approved <strong>on</strong> Measure 3.2 <strong>in</strong> the reference period:<br />

Number of submitted, rejected and approved projects <strong>on</strong> Measure 3.2<br />

Diagram II.8<br />

4<br />

3<br />

3<br />

3<br />

Submitted<br />

Rejected<br />

Approved<br />

Completed<br />

3<br />

Number of Projects<br />

2<br />

2<br />

1<br />

1<br />

1<br />

1<br />

0<br />

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Cereals and<br />

Technical<br />

Plants<br />

Medic<strong>in</strong>al<br />

and aromatic<br />

plants<br />

Specialized<br />

crops<br />

(tobacco,<br />

hops)<br />

Vegetables<br />

and Potatoes<br />

Fruits,<br />

<strong>in</strong>clud<strong>in</strong>g<br />

grapes<br />

W<strong>in</strong>e grapes Mushrooms Flowers and<br />

decorative<br />

plants<br />

Sub-measure<br />

Milk Meat Eggs for H<strong>on</strong>ey and<br />

c<strong>on</strong>sumpti<strong>on</strong> beekeep<strong>in</strong>g<br />

products<br />

Fishery<br />

Products<br />

Forestry<br />

Products<br />

II. 2.6 Measure 3.3 „Agricultural producti<strong>on</strong> methods designed to protect the<br />

41


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

envir<strong>on</strong>ment and ma<strong>in</strong>ta<strong>in</strong> the countryside”<br />

Dur<strong>in</strong>g the 5 sessi<strong>on</strong>s held between July 2006 - November 2006, 48 projects were<br />

submitted, out of which 47 were c<strong>on</strong>tracted with a total eligible approved amount of<br />

764.719 thousand LEI, namely 0.217 milli<strong>on</strong> Euro.<br />

The 47 c<strong>on</strong>tracted projects aim at types of activities regard<strong>in</strong>g the preserv<strong>in</strong>g the<br />

biodiversity by us<strong>in</strong>g the traditi<strong>on</strong>al agriculture practices<br />

The below diagram (Diagram II.9) presents the stage of projects submitted and<br />

approved <strong>on</strong> Measure 3.3, <strong>in</strong> the reference period.<br />

Number of submitted, rejected and approved projects <strong>on</strong> Measure 3.3<br />

Diagram II.9<br />

50<br />

45<br />

47<br />

47<br />

Submitted<br />

Rejected<br />

Approved<br />

40<br />

35<br />

Number of Projects<br />

30<br />

25<br />

20<br />

15<br />

10<br />

5<br />

0<br />

1 1<br />

0<br />

Preservati<strong>on</strong> of soil and protecti<strong>on</strong> aga<strong>in</strong>st erosi<strong>on</strong><br />

0 0 0<br />

Preservati<strong>on</strong> of biodiversity by traditi<strong>on</strong>al agriculture<br />

methods<br />

Organic Farm<strong>in</strong>g<br />

0<br />

Sub-measure<br />

II. 2.7 Measure 3.4 “Development and diversificati<strong>on</strong> of ec<strong>on</strong>omic activities<br />

generat<strong>in</strong>g multiple activities and alternative <strong>in</strong>come”-projects not affected by<br />

natural disasters<br />

Dur<strong>in</strong>g the 32 sessi<strong>on</strong>s held between December 2003 – July 2006, from the total<br />

number of 1,658 submitted projects, 1,080 projects were c<strong>on</strong>tracted, with a total<br />

eligible approved value of 251,672.724 thousand LEI, respectively 69.610 milli<strong>on</strong><br />

Euro.<br />

Approximately 60% of the approved projects for this measure is for <strong>in</strong>vestments <strong>in</strong><br />

42


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

sub-measure “Rural Tourism” (643 approved projects). Likewise sub-measure “Other<br />

Activities” holds a quota of 31% (335 c<strong>on</strong>tracts), out of total number of approved<br />

projects for measure 3.4, most of the <strong>in</strong>vestments are made <strong>in</strong> bee-keep<strong>in</strong>g (214<br />

c<strong>on</strong>tracts represent<strong>in</strong>g 64% out of the total number for this sub-measure) and to a<br />

smaller extent <strong>in</strong> snail and frog breed<strong>in</strong>g (88 c<strong>on</strong>tracts represent<strong>in</strong>g 26% of the total<br />

number for this sub-measure).<br />

The diagram II 10 presents the situati<strong>on</strong> of the projects submitted, approved and<br />

rejected for measure 3.4 dur<strong>in</strong>g the related period and depend<strong>in</strong>g <strong>on</strong> the envisaged<br />

sub measure: Rural tourism (1), Other types of tourism <strong>in</strong> rural area (2), Handcraft<br />

activities (3), Aquaculture (4), Other activities (5) – Snails and Frogs, Beekeep<strong>in</strong>g,<br />

Mushrooms, Wild berries and fruit bushes process<strong>in</strong>g.<br />

Number of submitted, rejected and approved projects <strong>on</strong> Measure 3.4<br />

Diagram II.10<br />

1000<br />

900<br />

800<br />

877<br />

Submitted<br />

Rejected<br />

Approved<br />

j ects<br />

700<br />

600<br />

643<br />

Number of Pro<br />

500<br />

400<br />

300<br />

200<br />

179<br />

159<br />

289<br />

214<br />

100<br />

0<br />

2 0 2<br />

Agriculture<br />

Services<br />

57<br />

Rural turism<br />

88<br />

64<br />

51<br />

51<br />

33<br />

9 2<br />

18 7 17 8<br />

24<br />

1 0 1 2 5 8 0 6 7 0 2 1 0 1<br />

Other types of<br />

turist activities<br />

<strong>in</strong> rural area<br />

Handcraft<br />

acrivities<br />

Acvaculture<br />

Snails and<br />

frogs<br />

Sub-measure<br />

Sericulture Bee keep<strong>in</strong>g Mushrooms Wildberry<br />

fruits and tree<br />

fruits<br />

process<strong>in</strong>g<br />

Medic<strong>in</strong>al and<br />

aromatic<br />

plants<br />

process<strong>in</strong>g<br />

Process<strong>in</strong>g at<br />

farm's level of<br />

the certified<br />

traditi<strong>on</strong>al<br />

and/ or<br />

organic<br />

products<br />

43


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

II. 2.7.1 Measure 3.4 „Development and diversificati<strong>on</strong> of ec<strong>on</strong>omic activities,<br />

provid<strong>in</strong>g for multiple activities and alternative <strong>in</strong>comes” – projects affected by<br />

natural disasters<br />

Dur<strong>in</strong>g the 2 sessi<strong>on</strong>s held between June - July 2006, out of the 7 submitted projects,<br />

3 projects were c<strong>on</strong>tracted hav<strong>in</strong>g a total eligible approved value of 1,644.780<br />

thousand LEI, respectively 0.450 milli<strong>on</strong> Euro.<br />

The Diagram II.11 presented below shows the situati<strong>on</strong> of the submitted, approved<br />

and rejected projects <strong>on</strong> Measure 3.4, for the period <strong>in</strong> questi<strong>on</strong> and tak<strong>in</strong>g <strong>in</strong>to<br />

account the respective sub-measure:<br />

Diagram II.11<br />

Number of submitted, rejected and approved projects <strong>on</strong> Measure 3.4<br />

(Affected by natural disasters)<br />

5<br />

4<br />

4<br />

Submitted<br />

Rejected<br />

Approved<br />

4<br />

Number of Projects<br />

3<br />

3<br />

2<br />

2<br />

3<br />

2<br />

1<br />

1<br />

1<br />

0<br />

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Agriculture<br />

Services<br />

Rural turism<br />

Other types of<br />

turist activities<br />

<strong>in</strong> rural area<br />

Handcraft<br />

acrivities<br />

Acvaculture<br />

Snails and<br />

frogs<br />

Sub-measure<br />

Sericulture Bee keep<strong>in</strong>g Mushrooms Wildberry<br />

fruits and tree<br />

fruits<br />

process<strong>in</strong>g<br />

Medic<strong>in</strong>al and<br />

aromatic<br />

plants<br />

process<strong>in</strong>g<br />

Process<strong>in</strong>g at<br />

farm's level of<br />

the certified<br />

traditi<strong>on</strong>al and/<br />

or organic<br />

products<br />

II. 2.8 Measure 3.5 „Forestry”<br />

44


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Dur<strong>in</strong>g the 3 sessi<strong>on</strong>s held between May - July 2006, out of the 158 submitted<br />

projects, 114 projects was c<strong>on</strong>tracted hav<strong>in</strong>g a total eligible approved value of<br />

236,504.634 thousand LEI, respectively 66.677 milli<strong>on</strong> Euro.<br />

With<strong>in</strong> this Measure the highest weight is represented by the <strong>in</strong>vestments <strong>in</strong> forestry<br />

roads, namely 68% (76 approved projects).<br />

The diagram II.12 presented below shows the situati<strong>on</strong> of the submitted approved<br />

and rejected projects <strong>on</strong> Measure 3.5, for the period <strong>in</strong> questi<strong>on</strong> and tak<strong>in</strong>g <strong>in</strong>to<br />

account the respective sub-measure:<br />

Number of submitted, rejected and approved projects <strong>on</strong> Measure 3.5<br />

Diagram II.12<br />

140<br />

120<br />

116<br />

Submitted<br />

Rejected<br />

Approved<br />

100<br />

Number of Projects<br />

80<br />

60<br />

76<br />

40<br />

38<br />

34<br />

34<br />

20<br />

0<br />

3<br />

3<br />

0 1 0 1<br />

1<br />

Afforestati<strong>on</strong> Nurseries Investments for the improvement of<br />

primary wood process<strong>in</strong>g and<br />

market<strong>in</strong>g of forest products<br />

Forestry roads<br />

0 0 0<br />

Forest exploitati<strong>on</strong><br />

Sub-measure<br />

II. 2.9 Measure 4.1 „Improvement of vocati<strong>on</strong>al tra<strong>in</strong><strong>in</strong>g”<br />

As regards measure 4.1, by the end of 2008, 5 projects with a total value of<br />

10,521.610 thousand LEI were approved mean<strong>in</strong>g 2.901 milli<strong>on</strong> Euro; all these<br />

projects were c<strong>on</strong>tracted dur<strong>in</strong>g 2005.<br />

The approved projects ensure improvement of vocati<strong>on</strong>al tra<strong>in</strong><strong>in</strong>g for producti<strong>on</strong><br />

practices, agriculture and forestry hold<strong>in</strong>gs management <strong>in</strong> the ec<strong>on</strong>omic, technical<br />

and legal, diversificati<strong>on</strong> or rec<strong>on</strong>vert<strong>in</strong>g of different activities <strong>in</strong> rural area,<br />

process<strong>in</strong>g and market<strong>in</strong>g of agriculture and fishery products <strong>in</strong> compliance with<br />

the specific technologies, envir<strong>on</strong>ment protecti<strong>on</strong>.<br />

45


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

II. 2.10 Measure 4.2 “Technical Assistance”<br />

By the end of 2008, 10 projects, with a total value of 5,214.570 thousand LEI,<br />

mean<strong>in</strong>g 1.374 milli<strong>on</strong> Euro, were approved under Measure 4.2.<br />

The approved projects ensure technical assistance for: M<strong>on</strong>itor<strong>in</strong>g Committee<br />

meet<strong>in</strong>g (1 project), nati<strong>on</strong>al sem<strong>in</strong>ars (2 projects), <strong>in</strong>formative and publicity<br />

campaigns (2 projects), mak<strong>in</strong>g preparatory studies for other measures (3 projects)<br />

and mak<strong>in</strong>g the mid-term evaluati<strong>on</strong> of the Programme (2 projects).<br />

II. 3 Expenditures by measures<br />

II. 3.1. Paid projects<br />

Until 31 st of December 2008, the amount of the paid projects <strong>on</strong> measures was of<br />

1,278.744 milli<strong>on</strong> Euro, respectively 254.030 milli<strong>on</strong> Euro for year 2008, out of which:<br />

• 340.683 milli<strong>on</strong> Euro for Measure 1.1, 56.060 milli<strong>on</strong> Euro for the year 2008,<br />

respectively. The amount of executed payments <strong>on</strong> 2008 shows off an<br />

<strong>in</strong>crease with 20% as compared to the amount of the projects paid until 31 st<br />

of December 2007; out of the total of executed payments for Measure 1.1,<br />

the amount of 4.518 milli<strong>on</strong> Euro represents the executed payments for the<br />

projects affected by floods;<br />

• 17.853 milli<strong>on</strong> Euro for Measure 1.2, 16.506 milli<strong>on</strong> Euro for the year 2008,<br />

respectively. The amount of executed payments <strong>on</strong> 2008 shows off an<br />

<strong>in</strong>crease with 1,226% as compared to the amount of the projects paid until<br />

31st of December 2007;<br />

• 578.747 milli<strong>on</strong> Euro for Measure 2.1, 99.431 milli<strong>on</strong> Euro for 2008,<br />

respectively. The amount of executed payments for year 2008 shows off an<br />

<strong>in</strong>crease with 21% as compared to the value of the projects paid prior to 31st<br />

of December 2007; out of the total executed payments for Measure 2.1; the<br />

amount of 49.920 milli<strong>on</strong> Euro represents the amount of executed payments<br />

for the projects affected by floods;<br />

• 229.412 milli<strong>on</strong> Euro for Measure 3.1, 30.753 milli<strong>on</strong> Euro for 2008,<br />

respectively. The amount of the payments executed for year 2008 shows off<br />

an <strong>in</strong>crease with 15% as compared to the value of the projects paid prior to<br />

31st of December 2007; out of the total executed payments for Measure 3.1,<br />

7.525 milli<strong>on</strong> Euro represents the value of the payments executed for the<br />

projects affected by disasters;<br />

• 0.029 milli<strong>on</strong> Euro for Measure 3.2, payments executed <strong>in</strong> 2008;<br />

• 0.187 milli<strong>on</strong> Euro for Measure 3.3, 0.005 milli<strong>on</strong> Euro for the year 2008,<br />

respectively. The amount of executed payments <strong>on</strong> 2008 shows off an<br />

<strong>in</strong>crease with 2% as compared to the amount of the projects paid until 31st<br />

of December 2007;<br />

• 64.832 milli<strong>on</strong> Euro for Measure 3.4, 14.273 milli<strong>on</strong> Euro for year 2008,<br />

respectively. The amount of the payments executed for year 2008 shows off<br />

an <strong>in</strong>crease of 28% as compared to the amount of projects paid prior to 31st<br />

of December 2007; out of the total of executed payments for Measure 3.4,<br />

0.420 milli<strong>on</strong> Euro represents the amount of payments executed for the<br />

46


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

projects affected by floods;<br />

• 42.548 milli<strong>on</strong> Euro for Measure 3.5, 35.728 milli<strong>on</strong> Euro for the year 2008,<br />

respectively. The amount of executed payments <strong>on</strong> 2008 shows off an<br />

<strong>in</strong>crease with 524% as compared to the amount of the projects paid until<br />

31st of December 2007;<br />

• 3.028 milli<strong>on</strong> Euro for Measure 4.1, 1.228 milli<strong>on</strong> Euro for the year 2008,<br />

respectively. The amount of executed payments <strong>on</strong> 2008 shows off an<br />

<strong>in</strong>crease with 68% as compared to the amount of the projects paid until 31st<br />

of December 2007;<br />

• 1.424 milli<strong>on</strong> Euro for Measure 4.2, 0.016 milli<strong>on</strong> Euro for 2008, respectively.<br />

The amount of the payments executed for year 2008 shows off an <strong>in</strong>crease<br />

of 1% as compared to the amount of projects paid prior to 31 st of December<br />

2007.<br />

The diagram II.13 presents the comparative stage by measures. The values are<br />

expressed <strong>in</strong> milli<strong>on</strong> Euro.<br />

Diagram II.13<br />

600,00<br />

Diagram <strong>on</strong> payments comparative stage by measures<br />

578,75<br />

2003-2008<br />

2008<br />

500,00<br />

400,00<br />

340,68<br />

Mili<strong>on</strong>s EURO<br />

300,00<br />

229,41<br />

200,00<br />

100,00<br />

56,06<br />

17,85<br />

16,51<br />

99,43<br />

30,75<br />

0,03<br />

0,03<br />

0,19<br />

0,00 64,83<br />

14,27<br />

42,55<br />

35,73<br />

3,03<br />

1,23<br />

1,42<br />

0,02<br />

0,00<br />

Measure 1.1 Measure 1.2 Measure 2.1 Measure 3.1 Measure 3.2 Measure 3.3 Measure 3.4 Measure 3.5 Measure 4.1 Measure 4.2<br />

As regards the distributi<strong>on</strong> of the overall expenditures by each submeasure the<br />

situati<strong>on</strong> is presented below. The amounts are expressed <strong>in</strong> milli<strong>on</strong> Euro.<br />

47


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Diagram II.14<br />

M EASURE 1.1 - Value of paid projects by submeasures<br />

174,67<br />

Value of paid projects (MEURO)<br />

180,00<br />

160,00<br />

140,00<br />

120,00<br />

100,00<br />

80,00<br />

49,99<br />

60,00<br />

35,41<br />

29,70 31,69<br />

40,00<br />

10 , 5 0<br />

20,00<br />

3,47<br />

0,00 0,73<br />

0,00<br />

Meat pr oducts and<br />

Milk and milk<br />

Cer eal s Oi l seeds Wi ne Fr ui ts, vegetabl es Fi sh and f i sher y<br />

Sugar<br />

Textil e pl ants<br />

eggs<br />

pr oducts<br />

and potatoes<br />

pr oducts<br />

Diagram II.15<br />

M EASURE 1.1 - Value of paid projects by submeasures<br />

(Affected by natural disasters)<br />

3,00<br />

2,56<br />

Value of paid projects<br />

(MEURO)<br />

2,50<br />

1, 9 6<br />

2,00<br />

1,50<br />

1,00<br />

0,50<br />

0,00<br />

0,00<br />

0,00 0,00<br />

0,00 0,00 0,00<br />

0,00<br />

Meat pr oducts and<br />

eggs<br />

Milk and milk<br />

pr oducts<br />

Cer eal s Oi l seeds Wi ne Fr ui ts, vegetabl es Fi sh and f i sher y<br />

and potatoes pr oducts<br />

Sugar<br />

Textil e pl ants<br />

Diagram II.16<br />

48


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

M EASURE 1.2- Value of paid projects by submeasures<br />

14,92<br />

Value of paid project s (M EURO)<br />

16,00<br />

14,00<br />

12,00<br />

10,00<br />

8,00<br />

6,00<br />

4,00<br />

1,31<br />

1,62<br />

2,00<br />

0,00<br />

Sanitary-vet er<strong>in</strong>ary c<strong>on</strong>t rol Plant -healt h c<strong>on</strong>t rol Food st uff s qualit y c<strong>on</strong>t rol<br />

Diagram II.17<br />

MEASURE 2.1 - Value of paid projects by submeasures<br />

300,00<br />

274,34<br />

Value of paid project s (MEURO)<br />

250,00<br />

200,00<br />

161,69<br />

150,00<br />

100,00<br />

70,26<br />

50,00<br />

22,54<br />

0,00<br />

Roads <strong>in</strong> rural areas<br />

Dr<strong>in</strong>kable wat er supply <strong>in</strong><br />

cent ralized net work <strong>in</strong> rural<br />

areas<br />

Sewerage <strong>in</strong> cent ralized syst em<br />

<strong>in</strong> rural areas<br />

Works of prevent i<strong>on</strong> and<br />

prot ect i<strong>on</strong> aga<strong>in</strong>st f loods<br />

Diagram II.18<br />

49


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

MEASURE 2.1 - Value of paid project s by submeasures<br />

(Affected by natural disasters)<br />

45,00<br />

39,77<br />

Value of paid project s (MEURO)<br />

40,00<br />

35,00<br />

30,00<br />

25,00<br />

20,00<br />

15,00<br />

9,08<br />

10,00<br />

5,00<br />

1,06<br />

0,00<br />

0,00<br />

Roads <strong>in</strong> rural areas<br />

Dr<strong>in</strong>kable wat er supply <strong>in</strong><br />

cent ralized net work <strong>in</strong> rural<br />

areas<br />

Sewerage <strong>in</strong> cent ralized syst em<br />

<strong>in</strong> rural areas<br />

Works of prevent i<strong>on</strong> and<br />

prot ect i<strong>on</strong> aga<strong>in</strong>st f loods<br />

Diagram II.19<br />

MEASURE 3.1 - Value of paid project s by submeasures<br />

120,00<br />

106,34<br />

Value of paid projects (MEURO)<br />

100,00<br />

80,00<br />

60,00<br />

40,00<br />

28,45<br />

28,49 26,41<br />

2,69<br />

20,00<br />

3,14<br />

7,74<br />

5,33 5,45<br />

3,16 2,72 1,96<br />

0,00<br />

Fi el d cr ops Hor ticul tur e Vi neyar ds Fr ui t gr owi ng Gr eenhouses Mi l k Cattle-<br />

ear i ng and farms f atteni ng<br />

vegetabl e,<br />

Sheep/ goats Young r ams Pigs f ar ms Poultr y f ar ms Other type of<br />

(out of which<br />

cows/buffalor<br />

f l or i cul tur e<br />

cows f ar ms fatten<strong>in</strong>g<br />

ani mal s and<br />

1,5%)<br />

poultr y<br />

farm<strong>in</strong>g<br />

Diagram II.20<br />

50


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

M EASURE 3.1 - Value of paid projects by submeasures<br />

(Affected by natural disasters)<br />

8,00<br />

Value of paid projects (MEURO)<br />

7,00<br />

6,52<br />

6,00<br />

5,00<br />

4,00<br />

3,00<br />

2,00<br />

1,00<br />

0,00<br />

0,00<br />

0,00<br />

0,11<br />

0,63<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,27<br />

0,00<br />

Fi el d cr ops<br />

Hor ti cul tur e Vi neyar ds Fr ui t gr owi ng Gr eenhouses Milk Cattle-<br />

and farms f atteni ng<br />

Sheep/ goats Young r ams<br />

(out of whi ch<br />

cows/buffalorear<strong>in</strong>g<br />

floriculture<br />

cows f ar ms f atten<strong>in</strong>g<br />

1,5%)<br />

Pigs f ar ms Poultr y f ar ms Other type of<br />

vegetabl e,<br />

ani mal s and<br />

poul tr y<br />

farm<strong>in</strong>g<br />

Diagram II.21<br />

MEASURE 3.2- Value of paid projects by submeasures<br />

Value of paid projects (MEURO)<br />

0,04<br />

0,03<br />

0,03<br />

0,02<br />

0,02<br />

0,01<br />

0,01<br />

0,00<br />

Cereals and<br />

Technical<br />

Plants<br />

Vegetables<br />

and<br />

Potatoes<br />

W<strong>in</strong>e grapes M ushrooms M ilk M eat<br />

51


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Diagram II.22<br />

M EASURE 3.3- V alue of paid projects by submeasures<br />

Value of paid projects (MEURO)<br />

0,22<br />

0,19<br />

0,17<br />

0,12<br />

0,07<br />

0,00<br />

0,00<br />

0,02<br />

-0,03<br />

Preservati<strong>on</strong> of soil and<br />

protect i<strong>on</strong> aga<strong>in</strong>st erosi<strong>on</strong><br />

Preservat i<strong>on</strong> of biodiversity by<br />

traditi<strong>on</strong>al agriculture met hods<br />

Organic Farm<strong>in</strong>g<br />

Diagram II.23<br />

MEASURE 3.4 -Value of paid project s by submeasures<br />

60,00<br />

Val ue of pai d pr oj ects (MEURO)<br />

50,89<br />

50,00<br />

40,00<br />

30,00<br />

20,00<br />

10,00<br />

0,20<br />

4,77<br />

1,17<br />

1,49<br />

0,87<br />

0,02<br />

2,61<br />

1,60<br />

0,56<br />

0,19<br />

0,04<br />

0,00<br />

Agr i cul tur al<br />

ser vices<br />

Rur al<br />

tourism<br />

Other types Handi cr af t Aquacul tur e Snai l s and Ser i cul tur e Bee keepi ng Mushr ooms Wi l dber r y<br />

of tour i sm<br />

f r ogs<br />

f r ui ts and<br />

tr ee f r ui ts<br />

pr ocessi ng<br />

Medi ci nal<br />

and ar omatic<br />

pl ants<br />

pr ocessi ng<br />

Pr ocessi ng<br />

at f ar m's<br />

level of the<br />

certified<br />

tr adi ti<strong>on</strong>al<br />

pr oducts<br />

52<br />

Diagram II.24


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

MEASURE 3.4 -Value of paid projects by submeasures<br />

(Affected by natural disasters)<br />

0,45<br />

0,42<br />

Val ue of pai d pr oj ects (MEURO)<br />

0,40<br />

0,35<br />

0,30<br />

0,25<br />

0,20<br />

0,15<br />

0,10<br />

0,05<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

Agr i cul tur al<br />

ser vices<br />

Rur al<br />

tourism<br />

Other types Handi cr af t Aquacul tur e Snai l s and Ser i cul tur e Bee keepi ng Mushr ooms Wi l dber r y<br />

of tour i sm<br />

frogs<br />

fruits and<br />

tree f ruits<br />

pr ocessi ng<br />

Medi ci nal<br />

and ar omatic<br />

pl ants<br />

pr ocessi ng<br />

Pr ocessi ng<br />

at f ar m's<br />

level of the<br />

certified<br />

traditi<strong>on</strong>al<br />

pr oducts<br />

Diagram II.25<br />

MEASURE 3.5-Value of paid projects by submeasures<br />

Value of paid projects (MEURO)<br />

40,00<br />

36,04<br />

35,00<br />

30,00<br />

25,00<br />

20,00<br />

15,00<br />

10,00<br />

6,39<br />

5,00<br />

0,09 0,02<br />

0,00<br />

0,00<br />

Afforestati<strong>on</strong> Nurseries Investments for the<br />

improvement of<br />

primary wood<br />

process<strong>in</strong>g and<br />

market <strong>in</strong>g of f orest<br />

products<br />

Forest ry roads<br />

Forest exploitat i<strong>on</strong><br />

53<br />

Diagram II.26


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

MEASURE 4.1- Value of paid projects<br />

3,50<br />

3,03<br />

Value of paid projects (MEURO)<br />

3,00<br />

2,50<br />

2,00<br />

1,50<br />

1,00<br />

0,50<br />

0,00<br />

Improv<strong>in</strong>g of vocati<strong>on</strong>al tra<strong>in</strong><strong>in</strong>g<br />

MEASURE 4.2 - Value of paid projects<br />

Diagram II.27<br />

1,60<br />

1,42<br />

Value of paid projects (MEURO)<br />

1,40<br />

1,20<br />

1,00<br />

0,80<br />

0,60<br />

0,40<br />

0,20<br />

0,00<br />

Technical Assistance<br />

II. 3.2. Approved projects<br />

54


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Until December 31 st 2008, 4.414 projects were approved with a public value of<br />

1,322.391 milli<strong>on</strong> Euro, <strong>on</strong> the <strong>in</strong>vestment measures. Out of these projects 10.56%<br />

represent c<strong>on</strong>tracts under Measure 1.1, 0.45% represents c<strong>on</strong>tracts under Measure<br />

1.2, 17.26% represent c<strong>on</strong>tracts under Measure 2.1, 43.52% are projects c<strong>on</strong>tracted<br />

under Measure 3.1, 0.09% are projects c<strong>on</strong>tracted under Measure 3.2, 1.07% are<br />

projects c<strong>on</strong>tracted under Measure 3.3, 24.47% are projects c<strong>on</strong>tracted under<br />

Measure 3.4 and 2.58% are projects c<strong>on</strong>tracted under Measure 3.5.<br />

The public c<strong>on</strong>tracted value, afferent to the c<strong>on</strong>tracts <strong>on</strong> Measure 1.1, was of<br />

345.143 milli<strong>on</strong> Euro, represent<strong>in</strong>g 26.10% out of the total commitments of the<br />

PARDF. On Measure 1.2 the public c<strong>on</strong>tracted value was of 36.104 milli<strong>on</strong> Euro i.e.<br />

2.73% out of the total commitments of the PARDF. On Measure 2.1, the public<br />

c<strong>on</strong>tracted value was of 573.231 milli<strong>on</strong> Euro i.e. 43.35% out of the total<br />

commitments of the PARDF. On Measure 3.1, the public c<strong>on</strong>tracted value was<br />

231.323 milli<strong>on</strong> Euro i.e. 17.49% out of the total commitments. On Measure 3.2, the<br />

public c<strong>on</strong>tracted value was 0.086 milli<strong>on</strong> Euro i.e. 0.01% out of the total<br />

commitments. On Measure 3.3, the public c<strong>on</strong>tracted value was 0.217 milli<strong>on</strong> Euro<br />

i.e. 0.02% out of the total commitments. On Measure 3.4, the public c<strong>on</strong>tracted value<br />

was 69.610 milli<strong>on</strong> Euro i.e. 5.26% out of the total commitments of the PARDF. On<br />

Measure 3.5 the public c<strong>on</strong>tracted value was 66.677 milli<strong>on</strong> Euro i.e. 5.04% out of the<br />

total commitments.<br />

At the same time, by 31 December 2008, a number of 120 projects affected by<br />

natural disasters were approved hav<strong>in</strong>g a public value of 73.846 milli<strong>on</strong> Euro <strong>on</strong> the<br />

<strong>in</strong>vestments measures. Out of these projects, 2.50% represent c<strong>on</strong>tracts <strong>on</strong> Measure<br />

1.1, 69.17% represent c<strong>on</strong>tracts <strong>on</strong> Measure 2.1 and 25.83% represent c<strong>on</strong>tracts <strong>on</strong><br />

Measure 3.1, respectively 2.50% are projects c<strong>on</strong>tracted <strong>on</strong> Measure 3.4.<br />

The c<strong>on</strong>tracted public value afferent to the c<strong>on</strong>tracts affected by disasters <strong>on</strong><br />

Measure 1.1 was of 6.315 milli<strong>on</strong> Euro, represent<strong>in</strong>g 8.55% from the total PARDF<br />

commitments. On Measure 2.1, the public c<strong>on</strong>tracted value was of 59.898 milli<strong>on</strong><br />

Euro, respectively 81.11% from the total PARDF commitments. On Measure 3.1, the<br />

public c<strong>on</strong>tracted value was of 7.183 milli<strong>on</strong> Euro, respectively 9.73% from the total<br />

commitments and <strong>on</strong> Measure 3.4, the public c<strong>on</strong>tracted value was of 0.450 milli<strong>on</strong><br />

Euro, respectively 0.61% from the total PARDF commitments.<br />

Details c<strong>on</strong>cern<strong>in</strong>g the approved projects (project code, beneficiary, project value)<br />

are <strong>in</strong>cluded <strong>in</strong> the Annex 3 “Approved Projects”.<br />

55


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Table II.4 Summary table of approved projects<br />

Regi<strong>on</strong><br />

1 North-<br />

East Iasi<br />

2 South<br />

East<br />

C<strong>on</strong>stanta<br />

No.<br />

M 1.1 M 1.2 M 2.1<br />

C<strong>on</strong>tracted<br />

value (EURO)<br />

No.<br />

C<strong>on</strong>tracted<br />

value (EURO)<br />

No.<br />

C<strong>on</strong>tracted value<br />

(EURO)<br />

No.<br />

M 3.1 M 3.2 M 3.3 M 3.4<br />

C<strong>on</strong>tracted C<strong>on</strong>tracted<br />

C<strong>on</strong>tracted<br />

No. value No. value No.<br />

value (EURO)<br />

(EURO)<br />

(EURO)<br />

C<strong>on</strong>tracted<br />

value (EURO)<br />

74 48.163.233,08 3 5.774.260,79 203 156.604.367,36 309 34.887.545,62 0 0,00 0 0,00 180 12.398.983,45 17 7.583.449,27<br />

81 51.344.138,78 2 3.954.047,25 125 88.341.828,77 476 45.633.305,64 1 10.781,46 0 0,00 87 4.892.082,66 0 0,00<br />

No.<br />

proj<br />

ects<br />

M 3.5<br />

C<strong>on</strong>tracted<br />

value (EURO)<br />

3 South<br />

Muntenia<br />

71 59.434.178,95 2 3.899.125,15 147 115.334.036,41 366 53.382.336,39 0 0,00 0 0,00 73 4.481.801,58 2 493.422,63<br />

Targoviste<br />

4 South<br />

West<br />

Oltenia<br />

29 25.408.513,67 2 3.570.292,30 104 71.122.556,63 122 17.111.642,91 0 0,00 0 0,00 148 6.288.989,21 5 2.970.918,36<br />

Craiova<br />

5 West<br />

Timisoara<br />

44 43.489.929,87 2 3.668.794,11 56 41.116.122,14 218 26.280.812,65 0 0,00 0 0,00 89 5.716.802,27 18 11.771.021,15<br />

6 North -<br />

West Satu 58 31.641.958,76 2 3.135.310,80 59 46.163.791,86 242 29.587.482,19 0 0,00 0 0,00 145 9.684.441,63 34 22.169.692,41<br />

Mare<br />

7 Centre<br />

Alba Iulia<br />

81 58.352.273,52 3 5.631.578,93 61 48.642.272,70 167 21.122.523,55 3 75.114,60 47 216.864,73 347 25.600.960,68 38 21.688.179,90<br />

8<br />

Bucharest 28 27.309.166,61 4 6.470.111,27 7 5.906.045,86 21 3.317.410,55 0 0,00 0 0,00 11 545.998,69 0 0,00<br />

Ilf ov<br />

TOTAL 466 345.143.393,25 20 36.103.520,61 762 573.231.021,72 1.921 231.323.059,50 4 85.896,06 47 216.864,73 1.080 69.610.060,17 114 66.676.683,72<br />

* Euro c<strong>on</strong>versi<strong>on</strong> was made at the exchange rate <strong>on</strong> the date of sign<strong>in</strong>g the selecti<strong>on</strong> <str<strong>on</strong>g>report</str<strong>on</strong>g>.<br />

56


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Table II.5. Summary table of projects affected by natural disasters<br />

Regi<strong>on</strong><br />

No. projects<br />

M 1.1 M 2.1 M 3.1<br />

C<strong>on</strong>tracted value<br />

(EURO)<br />

No. projects<br />

C<strong>on</strong>tracted value<br />

(EURO)<br />

No. projects<br />

C<strong>on</strong>tracted value<br />

(EURO)<br />

M 3.4<br />

C<strong>on</strong>tracted value<br />

No. projects<br />

(EURO)<br />

1 North-East Iasi 0 0,00 17 12.525.944,83 2 233.900,35 0 0,00<br />

2 South East<br />

C<strong>on</strong>stanta<br />

3 South Muntenia<br />

Targoviste<br />

0 0,00 12 6.230.830,22 0 0,00 0 0,00<br />

0 0,00 17 13.238.770,04 2 739.400,66 0 0,00<br />

4 South West<br />

Oltenia Craiova<br />

1 319.003,84 16 11.876.574,87 1 45.862,94 0 0,00<br />

5 West Timisoara 1 2.998.638,42 1 999.896,96 23 5.303.128,49 0 0,00<br />

6 North -West<br />

Satu Mare<br />

0 0,00 8 6.305.676,76 0 0,00 0 0,00<br />

7 Centre Alba Iulia 1 2.997.437,24 9 6.425.418,26 3 861.025,94 3 450.000,00<br />

8 Bucharest Ilfov 0 0,00 3 2.294.682,76 0 0,00 0 0,00<br />

TOTAL 3 6.315.079,50 83 59.897.794,69 31 7.183.318,39 3 450.000,00<br />

57


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

II. 3.3 F<strong>in</strong>alized projects<br />

By December 31 st 2008, 3,965 projects were f<strong>in</strong>alized, out of which 430 <strong>on</strong><br />

Measure 1.1, out of which <strong>on</strong>e f<strong>in</strong>alized project be<strong>in</strong>g projects affected by natural<br />

disasters, 6 projects were f<strong>in</strong>alized <strong>on</strong> Measure 1.2, 749 projects were f<strong>in</strong>alized <strong>on</strong><br />

Measure 2.1 out of which 50 f<strong>in</strong>alized projects be<strong>in</strong>g projects affected by natural<br />

disasters, 1,807 projects <strong>on</strong> Measure 3.1 out of which 31 f<strong>in</strong>alized projects be<strong>in</strong>g<br />

projects affected by natural disasters, 902 projects <strong>on</strong> Measure 3.4, out of which 2<br />

f<strong>in</strong>alized projects be<strong>in</strong>g projects affected by natural disasters, 56 projects <strong>on</strong><br />

Measure 3.5, 5 projects <strong>on</strong> Measure 4.1 and 10 projects were f<strong>in</strong>alized <strong>on</strong> Measure<br />

4.2.<br />

Out of 3,965 projects, 777 projects were f<strong>in</strong>alized <strong>in</strong> 2008 as follows: 120 projects<br />

under Measure 1.1, 6 projects under Measure 1.2, 148 projects under Measure<br />

2.1, 184 projects under Measure 3.1, 289 projects under Measure 3.4, 26 projects<br />

under Measure 3.5, 3 projects under Measure 4.1 and 1 projects under Measure<br />

4.2.<br />

At the end of 2008, the follow<strong>in</strong>g situati<strong>on</strong> resulted for the entire program <strong>on</strong> the<br />

f<strong>in</strong>alized projects:<br />

‣ On Measure 1.1, the f<strong>in</strong>alized projects <strong>on</strong> sub measures are as follows:<br />

• Milk and dairy products – 89 projects;<br />

• Meat, meat products and eggs – 182 projects;<br />

• Fruit, vegetables and potatoes – 39 projects;<br />

• W<strong>in</strong>e - 42 projects;<br />

• Fish – 16 projects;<br />

• Textile Plants – 1 project;<br />

• Cereal – 58 projects, out of which 1 project is affected by natural disasters;<br />

• Oil seeds – 3 projects.<br />

‣ On Measure 1.2, the f<strong>in</strong>alized projects <strong>on</strong> sub measures are as follows:<br />

• Sanitary-veter<strong>in</strong>ary c<strong>on</strong>trol – 4 projects;<br />

• Phyto-sanitary c<strong>on</strong>trol – 1 project;<br />

• Food quality c<strong>on</strong>trol –1 project.<br />

‣ On Measure 2.1, the c<strong>on</strong>cluded projects <strong>on</strong> sub measures are as follows:<br />

• Roads <strong>in</strong> the rural area – 396 projects, out of which 40 projects are<br />

affected by natural disasters;<br />

• Supply<strong>in</strong>g with dr<strong>in</strong>k<strong>in</strong>g water through centralized networks <strong>in</strong> the rural<br />

areas – 259 projects, out of which 10 projects are affected by natural<br />

disasters;<br />

• Sewerage <strong>in</strong> centralized system <strong>in</strong> the rural areas – 77 projects;<br />

• Works for floods preventi<strong>on</strong> and protecti<strong>on</strong> – 17 projects.<br />

‣ On Measure 3.1, the f<strong>in</strong>alized projects <strong>on</strong> sub measures are as follows:<br />

• Field crops – 1,197 projects, out of which 27 projects are affected by<br />

natural disasters;<br />

• Horticulture – 76 projects;<br />

• W<strong>in</strong>e-grow<strong>in</strong>g – 62 projects;<br />

58


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

• Fruit grow<strong>in</strong>g – 71 projects;<br />

• Greenhouses – 42 projects;<br />

• Milk<strong>in</strong>g animals – 163 projects, out of which 3 projects are affected by<br />

natural disasters;<br />

• Cattle-rear<strong>in</strong>g and fatten<strong>in</strong>g – 13 projects;<br />

• Sheep/goats breed<strong>in</strong>g – 15 projects;<br />

• Young mutt<strong>on</strong> fatten<strong>in</strong>g – 8 projects;<br />

• Pigs – 73 projects;<br />

• Poultry – 73 projects;<br />

• Other vegetal and animal poultry breed<strong>in</strong>g farms – 14 projects, out of<br />

which <strong>on</strong>e project is affected by natural disasters.<br />

‣ On Measure 3.4, the f<strong>in</strong>alized projects <strong>on</strong> sub measures are as follows:<br />

• Agriculture Services – 2 projects;<br />

• Rural tourism – 502 projects, out of which 2 projects are affected by<br />

natural disasters;<br />

• Other types of tourism activities <strong>in</strong> the rural space – 49 projects;<br />

• Handcraft – 17 projects;<br />

• Aquaculture – 13 projects;<br />

• Frogs and Snails – 81 projects;<br />

• Sericulture – 1 project;<br />

• Apiculture – 207 projects;<br />

• Mushrooms – 21 projects;<br />

• Wild berry fruits and wild berry bushes process<strong>in</strong>g – 6 projects;<br />

• Medic<strong>in</strong>al and aromatic plants – process<strong>in</strong>g – 2 projects;<br />

• Process<strong>in</strong>g at farm's level of the certified traditi<strong>on</strong>al and/or organic<br />

products – <strong>on</strong>e project.<br />

‣ On Measure 3.5, the f<strong>in</strong>alized projects <strong>on</strong> sub measures are as follows:<br />

• Afforestati<strong>on</strong> – 3 projects;<br />

• Nurseries – 1 project;<br />

• Investments for the improvement of primary wood process<strong>in</strong>g and<br />

market<strong>in</strong>g of forest products – 30 projects;<br />

• Forestry roads – 22 projects.<br />

‣ On Measure 4. 1 5 projects were f<strong>in</strong>alized.<br />

‣ On Measure 4.2, the f<strong>in</strong>alized projects <strong>on</strong> category of expenditures are as<br />

follows:<br />

• Informati<strong>on</strong> and promoti<strong>on</strong> campaign – 2 projects;<br />

• Sem<strong>in</strong>ars – 2 projects;<br />

• M<strong>on</strong>itor<strong>in</strong>g Committee Meet<strong>in</strong>g – 1 project;<br />

• Preparative studies for other measures – 3 projects;<br />

• Mid term evaluati<strong>on</strong> – 2 projects.<br />

We menti<strong>on</strong> that there were taken <strong>in</strong>to c<strong>on</strong>siderati<strong>on</strong> as f<strong>in</strong>alized projects <strong>on</strong>ly the<br />

projects 100% implemented and to which the f<strong>in</strong>al payment was executed.<br />

59


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Detailed <strong>in</strong>formati<strong>on</strong> is <strong>in</strong>cluded <strong>in</strong> the annexed m<strong>on</strong>itor<strong>in</strong>g tables (Annex No. 2)<br />

which c<strong>on</strong>ta<strong>in</strong> the m<strong>on</strong>itor<strong>in</strong>g <strong>in</strong>dicators.<br />

II. 3. 4 Sensitive sectors<br />

Situati<strong>on</strong> of the projects f<strong>in</strong>anced related to <strong>in</strong>vestments <strong>in</strong> the sensitive sectors under<br />

the SAPARD Programme is presented <strong>in</strong> the below table (Table II.6):<br />

60


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Table II.6<br />

Period August 1 st 2002 – December 31 st 2008<br />

Sensitive sectors - for <strong>in</strong>vestments <strong>in</strong> improv<strong>in</strong>g the process<strong>in</strong>g and market<strong>in</strong>g of<br />

agricultural and fishery products<br />

Sector Activity/product Reference unit<br />

Meat<br />

Capacity of slaughter house<br />

for:<br />

Nati<strong>on</strong>al<br />

capacity 1 <strong>in</strong><br />

2004<br />

Capacity<br />

supported under<br />

the SAPARD<br />

Programme<br />

start<strong>in</strong>g with<br />

2000*<br />

Total 000 t<strong>on</strong>e/year 728.500 421.050<br />

mixed 000 t<strong>on</strong>e/year 203.913<br />

sw<strong>in</strong>e 000 t<strong>on</strong>e/year 39.784<br />

cattle 000 t<strong>on</strong>e/year 33.922<br />

sheep 000 t<strong>on</strong>e/year 2.700<br />

poultry 000 t<strong>on</strong>e/year 140.731<br />

Eggs Capacity of pack<strong>in</strong>g Milli<strong>on</strong> eggs/year<br />

Capacity of global use 000 hl/year 18,667.700 4,460.888<br />

Capacity of produc<strong>in</strong>g dr<strong>in</strong>k<strong>in</strong>g milk 000 hl/ year 962.989<br />

Milk<br />

Centrifuged<br />

Capacity of produc<strong>in</strong>g powder<br />

000 t<strong>on</strong>s/year 0.322<br />

milk<br />

milk out of which:<br />

Whole milk 000 t<strong>on</strong>s/year 0.326<br />

Capacity of produc<strong>in</strong>g cheese<br />

(<strong>on</strong> range of products)<br />

000 t<strong>on</strong>s/year 42.627<br />

Capacity of produc<strong>in</strong>g butter 000 t<strong>on</strong>s/year 1.952<br />

Capacity of produc<strong>in</strong>g case<strong>in</strong> 000 t<strong>on</strong>s/year 0.000<br />

Capacity of produc<strong>in</strong>g churn powder 000 t<strong>on</strong>s/year 1.080<br />

milk, out of which: liquid 000 t<strong>on</strong>s/year 256.830<br />

Total of nati<strong>on</strong>al<br />

capacity start<strong>in</strong>g<br />

with 2000 3<br />

61


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Starch<br />

Mill<strong>in</strong>g<br />

Capacity of produc<strong>in</strong>g starch<br />

from:<br />

Capacity of mill<strong>in</strong>g for:<br />

potatoes 000 t<strong>on</strong>s/ year 0.000<br />

corn 000 t<strong>on</strong>s/ year 0.000<br />

wheat 000 t<strong>on</strong>s/ year 0.000<br />

other cereal 000 t<strong>on</strong>s/ year 0.000<br />

ord<strong>in</strong>ary<br />

wheat<br />

000 t<strong>on</strong>s/year 293.607<br />

hard wheat 000 t<strong>on</strong>s/ year 0.000<br />

rice 000 t<strong>on</strong>s/ year 0.000<br />

other cereal 000 t<strong>on</strong>s/ year 91.625<br />

Malt Capacity of produc<strong>in</strong>g malt 000 t<strong>on</strong>s/ year 0.000<br />

Capacity per<br />

Sugar<br />

W<strong>in</strong>e<br />

Capacity of produc<strong>in</strong>g sugar:<br />

Capacity of produc<strong>in</strong>g the w<strong>in</strong>e<br />

out of which:<br />

day<br />

t<strong>on</strong>s/day 10.885 0.000<br />

Agricultural 000 t<strong>on</strong>s/seed<br />

campaign age<br />

0.000<br />

Total hectolitres/ year 19,195,000.000 464,644.589<br />

V<strong>in</strong>e – noble<br />

breed hectolitres/ year 277,890.019<br />

(QWPSR 4 )<br />

Table w<strong>in</strong>e hectolitres/ year 186,754.570<br />

* The new sett<strong>in</strong>g up capacities and capacity <strong>in</strong>creases with<strong>in</strong> the modernizati<strong>on</strong> projects are taken <strong>in</strong>to c<strong>on</strong>siderati<strong>on</strong>. The menti<strong>on</strong>ed capacities <strong>in</strong> this column are different from those <strong>in</strong>cluded<br />

<strong>in</strong> table 6.a.1.1. With<strong>in</strong> table 6.a.1.1, total capacities <strong>in</strong>volved <strong>in</strong> the c<strong>on</strong>tracted projects are accounted, whereas <strong>in</strong> this table, the total <strong>in</strong>volved capacities are accounted with regard to<br />

c<strong>on</strong>tracted projects for new <strong>in</strong>vestments. As regards modernizati<strong>on</strong>, <strong>on</strong>ly the difference between the capacity to be obta<strong>in</strong>ed at the project f<strong>in</strong>alizati<strong>on</strong> and the capacity exist<strong>in</strong>g at the moment of<br />

SAPARD funds request is accounted.<br />

1<br />

- "Capacity" to be used shall be the same for the related columns.<br />

2<br />

– If for 2000 any <strong>in</strong>formati<strong>on</strong> is not available, to be <strong>in</strong>cluded the most recent data, specify<strong>in</strong>g the reference year.<br />

3<br />

– To be menti<strong>on</strong>ed the capacity supported under the SAPARD Programme, <strong>in</strong>crease of capacity realized without SAPARD aid and clos<strong>in</strong>g of capacities.<br />

62


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Table II.7<br />

Sensitive sectors - for <strong>in</strong>vestments <strong>in</strong> improv<strong>in</strong>g the process<strong>in</strong>g and market<strong>in</strong>g of<br />

agricultural and fishery products – projects affected by natural disasters<br />

Period April 1 st 2006 – December 31 st 2008<br />

Sector Activity/product Reference unit<br />

Nati<strong>on</strong>al<br />

capacity 1<br />

<strong>in</strong> 2004<br />

Capacity<br />

supported<br />

under the<br />

SAPARD<br />

Programme<br />

start<strong>in</strong>g with<br />

2000*<br />

Total of<br />

nati<strong>on</strong>al<br />

capacity<br />

start<strong>in</strong>g with<br />

2000 3<br />

Meat<br />

Capacity of slaughter house<br />

for:<br />

Total 000 t<strong>on</strong>e/year 11.250<br />

mixed 000 t<strong>on</strong>e/year 11.250<br />

sw<strong>in</strong>e 000 t<strong>on</strong>e/year 0.000<br />

cattle 000 t<strong>on</strong>e/year 0.000<br />

sheep 000 t<strong>on</strong>e/year 0.000<br />

poultry 000 t<strong>on</strong>e/year 0.000<br />

Eggs Capacity of pack<strong>in</strong>g Milli<strong>on</strong> eggs/year<br />

Capacity of global use 000 hl/year 0.000<br />

Capacity of produc<strong>in</strong>g dr<strong>in</strong>k<strong>in</strong>g milk 000 hl/ year 0.000<br />

Centrifuged<br />

Milk<br />

Capacity of produc<strong>in</strong>g powder<br />

000 t<strong>on</strong>s/year 0.000<br />

milk<br />

milk out of which:<br />

Whole milk 000 t<strong>on</strong>s/year 0.000<br />

Capacity of produc<strong>in</strong>g cheese<br />

(<strong>on</strong> range of products)<br />

000 t<strong>on</strong>s/year 0.000<br />

Capacity of produc<strong>in</strong>g butter 000 t<strong>on</strong>s/year 0.000<br />

Capacity of produc<strong>in</strong>g case<strong>in</strong> 000 t<strong>on</strong>s/year 0.000<br />

Capacity of produc<strong>in</strong>g churn powder 000 t<strong>on</strong>s/year 0.000<br />

milk, out of which: liquid 000 t<strong>on</strong>s/year 0.000<br />

63


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Starch<br />

Capacity of produc<strong>in</strong>g starch<br />

from:<br />

potatoes 000 t<strong>on</strong>s/ year 0.000<br />

corn 000 t<strong>on</strong>s/ year 0.000<br />

wheat 000 t<strong>on</strong>s/ year 0.000<br />

other cereal 000 t<strong>on</strong>s/ year 0.000<br />

ord<strong>in</strong>ary<br />

wheat<br />

000 t<strong>on</strong>s/year 4.875<br />

Mill<strong>in</strong>g Capacity of mill<strong>in</strong>g for:<br />

hard wheat 000 t<strong>on</strong>s/ year 0.000<br />

rice 000 t<strong>on</strong>s/ year 0.000<br />

other cereal 000 t<strong>on</strong>s/ year 0.800<br />

Malt Capacity of produc<strong>in</strong>g malt 000 t<strong>on</strong>s/ year 0.000<br />

Sugar Capacity of produc<strong>in</strong>g sugar:<br />

Capacity per<br />

t<strong>on</strong>s/day 0.000<br />

day<br />

Agricultural 000 t<strong>on</strong>s/seed<br />

0.000<br />

campaign age<br />

Total hectolitre/ year 0.000<br />

W<strong>in</strong>e<br />

V<strong>in</strong>e – noble<br />

Capacity of produc<strong>in</strong>g the w<strong>in</strong>e<br />

breed<br />

out of which:<br />

(QWPSR 4 )<br />

hectolitre/ year 0.000<br />

Table w<strong>in</strong>e hectolitre/ year 0.000<br />

* The new sett<strong>in</strong>g up capacities and capacity <strong>in</strong>creases with<strong>in</strong> the modernizati<strong>on</strong> projects are taken <strong>in</strong>to c<strong>on</strong>siderati<strong>on</strong>. The menti<strong>on</strong>ed capacities <strong>in</strong> this column are different from<br />

those <strong>in</strong>cluded <strong>in</strong> table 6.a.1.1. With<strong>in</strong> table 6.a.1.1, total capacities <strong>in</strong>volved <strong>in</strong> the c<strong>on</strong>tracted projects are accounted, whereas <strong>in</strong> this table, the total <strong>in</strong>volved capacities are<br />

accounted with regard to c<strong>on</strong>tracted projects for new <strong>in</strong>vestments. As regards modernizati<strong>on</strong>, <strong>on</strong>ly the difference between the capacity to be obta<strong>in</strong>ed at the project f<strong>in</strong>alizati<strong>on</strong><br />

and the capacity exist<strong>in</strong>g at the moment of SAPARD funds request is accounted.<br />

1<br />

- "Capacity" to be used shall be the same for the related columns.<br />

2<br />

– If for 2000 any <strong>in</strong>formati<strong>on</strong> is not available, to be <strong>in</strong>cluded the most recent data, specify<strong>in</strong>g the reference year.<br />

3<br />

– To be menti<strong>on</strong>ed the capacity supported under the SAPARD Programme, <strong>in</strong>crease of capacity realized without SAPARD aid and clos<strong>in</strong>g of capacities.<br />

64


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

II. 3.5 Sancti<strong>on</strong>ed and cancelled projects<br />

By December 31 st 2008, accord<strong>in</strong>g to the official data, 806 projects were cancelled<br />

and sancti<strong>on</strong>ed due to irregularities, out of which 99 projects <strong>on</strong> Measure 1.1, 2<br />

projects <strong>on</strong> Measure 1.2, 228 projects <strong>on</strong> Measure 2.1, 168 projects <strong>on</strong> Measure 3.1,<br />

45 projects <strong>on</strong> Measure 3.3, 247 projects <strong>on</strong> Measure 3.4, 6 projects <strong>on</strong> Measure 3.5,<br />

2 projects <strong>on</strong> Measure 4.1 and 9 projects <strong>on</strong> Measure 4.2.<br />

On Measure 1.1 “Improvement of process<strong>in</strong>g and market<strong>in</strong>g of agricultural and<br />

fishery products”, 50 f<strong>in</strong>anc<strong>in</strong>g c<strong>on</strong>tracts were cancelled, at the beneficiaries’ request<br />

or from various reas<strong>on</strong>s. For 11 projects payment had been executed, of 6,706.532<br />

thousand LEI, prior to c<strong>on</strong>tract ceas<strong>in</strong>g. In 2008, 16 projects <strong>on</strong> this measure were<br />

cancelled.<br />

Other 49 projects were sancti<strong>on</strong>ed (out of which 28 projects were sancti<strong>on</strong>ed dur<strong>in</strong>g<br />

2008) due to some irregularities <strong>in</strong> implement<strong>in</strong>g the projects, the sancti<strong>on</strong>s value<br />

be<strong>in</strong>g of 19,025.688 thousand LEI.<br />

On the Measure 1.2 „Improvement the structures for carry<strong>in</strong>g out the veter<strong>in</strong>ary, and<br />

phyto-sanitary quality c<strong>on</strong>trol for food stuff and c<strong>on</strong>sumers’ protecti<strong>on</strong>”, 2 projects<br />

were sancti<strong>on</strong>ed (out of which <strong>on</strong>e project was sancti<strong>on</strong>ed dur<strong>in</strong>g 2008), due to some<br />

irregularities found dur<strong>in</strong>g the project’s implementati<strong>on</strong> <strong>in</strong> amount of 0.220 thousand<br />

LEI.<br />

On Measure 2.1 “Development and improvement of rural <strong>in</strong>frastructure”, 19 f<strong>in</strong>anc<strong>in</strong>g<br />

c<strong>on</strong>tracts with PARDF were cancelled due to various reas<strong>on</strong>s or at the beneficiaries’<br />

request. For 6 projects payments had been executed prior the c<strong>on</strong>tract’s ceas<strong>in</strong>g, <strong>in</strong><br />

amount of 19,027.939 thousand LEI. In 2008, 5 projects were cancelled <strong>on</strong> this<br />

Measure.<br />

Other 209 projects were sancti<strong>on</strong>ed (out of which 32 projects were sancti<strong>on</strong>ed dur<strong>in</strong>g<br />

2008) due to some irregularities <strong>in</strong> implement<strong>in</strong>g the projects, the sancti<strong>on</strong>s value<br />

be<strong>in</strong>g of 31,321.520 thousand LEI.<br />

On Measure 3.1 “Investments <strong>in</strong> agricultural hold<strong>in</strong>gs”, 132 f<strong>in</strong>anc<strong>in</strong>g c<strong>on</strong>tracts with<br />

PARDF were cancelled due to various reas<strong>on</strong>s or at the beneficiaries’ request; 66<br />

beneficiaries required the projects’ cancellati<strong>on</strong> <strong>in</strong> 2008.<br />

For 9 projects payment had been executed prior to c<strong>on</strong>tract’s ceas<strong>in</strong>g, <strong>in</strong> amount of<br />

1,507.078 thousand LEI.<br />

Other 36 projects were sancti<strong>on</strong>ed (out of which 17 projects were sancti<strong>on</strong>ed dur<strong>in</strong>g<br />

2008), the sancti<strong>on</strong>s hav<strong>in</strong>g a total value of 3,665.483 thousand LEI.<br />

On Measure 3.3 “Agricultural producti<strong>on</strong> methods designed to protect the<br />

envir<strong>on</strong>ment and ma<strong>in</strong>ta<strong>in</strong> the countryside”, 45 projects were sancti<strong>on</strong>ed dur<strong>in</strong>g 2008,<br />

the sancti<strong>on</strong>s hav<strong>in</strong>g a total value of 580.126 thousand LEI.<br />

65


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

On Measure 3.4 „Development and diversificati<strong>on</strong> of ec<strong>on</strong>omic activities, provid<strong>in</strong>g<br />

for multiple activities and alternative <strong>in</strong>comes”, 188 f<strong>in</strong>anc<strong>in</strong>g c<strong>on</strong>tracts with PARDF<br />

were cancelled due to various reas<strong>on</strong>s or at the beneficiaries request; 65<br />

beneficiaries required the c<strong>on</strong>tracts cancellati<strong>on</strong> <strong>in</strong> 2008. For 32 projects payments<br />

had been executed prior to c<strong>on</strong>tracts ceas<strong>in</strong>g, <strong>in</strong> amount of 4,104.564 thousand LEI.<br />

Other 59 projects were sancti<strong>on</strong>ed (out of which 30 projects were sancti<strong>on</strong>ed dur<strong>in</strong>g<br />

2008), due to irregularities found dur<strong>in</strong>g the projects implementati<strong>on</strong>, the sancti<strong>on</strong>s<br />

hav<strong>in</strong>g a total value of 5,508.790 thousand LEI.<br />

On Measure 3.5 ”Forestry” 4 c<strong>on</strong>tracts were cancelled at the beneficiary’s request for<br />

which no payments had been executed prior to the date of c<strong>on</strong>tract’s ceas<strong>in</strong>g, 3<br />

projects were cancelled dur<strong>in</strong>g 2008<br />

2 projects were sancti<strong>on</strong>ed dur<strong>in</strong>g 2008, the sancti<strong>on</strong>s hav<strong>in</strong>g a total value of 127.704<br />

thousand LEI.<br />

On Measure 4.1 „Improvement of vocati<strong>on</strong>al tra<strong>in</strong><strong>in</strong>g” 2 c<strong>on</strong>tracts were cancelled.<br />

As regards Measure 4.2 “Technical Assistance”, 9 projects were cancelled.<br />

Follow<strong>in</strong>g the discussi<strong>on</strong>s of the 17 th meet<strong>in</strong>g of the SAPARD Programme M<strong>on</strong>itor<strong>in</strong>g<br />

Committee held <strong>on</strong> 9th of July 2009, regard<strong>in</strong>g the c<strong>on</strong>tent of the Annual<br />

Implementati<strong>on</strong> Report for SAPARD Programme for 2008, the Manag<strong>in</strong>g Authority for<br />

SAPARD Programme synthesized the causes for the significant number of c<strong>on</strong>tracts<br />

cancelled from the cut off day until the date of the <str<strong>on</strong>g>report</str<strong>on</strong>g>s presented dur<strong>in</strong>g the last<br />

MC reuni<strong>on</strong>.<br />

Follow<strong>in</strong>g the collecti<strong>on</strong> of the data held by the Agency’s technical structures, it was<br />

found that from the completi<strong>on</strong> of the c<strong>on</strong>tract<strong>in</strong>g process under the SAPARD<br />

Programme (31 st of July 2007) until now, 271 c<strong>on</strong>tracts have been cancelled totall<strong>in</strong>g<br />

the amount of 45,946,435.80 Euro.<br />

The centralizati<strong>on</strong> <strong>in</strong>cludes both <strong>in</strong>formati<strong>on</strong> supplied by the Romanian authorities<br />

resp<strong>on</strong>sible for the implementati<strong>on</strong> of the SAPARD Programme, respectively the<br />

Pay<strong>in</strong>g Agency for Rural Development and Fishery, the M<strong>on</strong>itor<strong>in</strong>g Committee<br />

members and representatives of <strong>programme</strong> beneficiaries.<br />

Thus, the comm<strong>on</strong> causes of projects cancellati<strong>on</strong> which have been identified were<br />

highlighted by the members of the M<strong>on</strong>itor<strong>in</strong>g Committee and the PARDF. The<br />

majority of cases relates to the <strong>in</strong>ability of the beneficiaries to f<strong>in</strong>alize the project, as<br />

well as to the adm<strong>in</strong>istrative problems faced by the beneficiaries.<br />

The ma<strong>in</strong> factors identified by the Romanian authorities who led to the cancellati<strong>on</strong> of<br />

the above menti<strong>on</strong>ed projects are classified as follows:<br />

I. Causes identified by the Pay<strong>in</strong>g Agency for Rural Development and Fishery<br />

‣ the beneficiaries exceeded the executi<strong>on</strong> deadl<strong>in</strong>e of the <strong>in</strong>vestment due to the<br />

lack of co-f<strong>in</strong>anc<strong>in</strong>g:<br />

66


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

• lack of own f<strong>in</strong>anc<strong>in</strong>g;<br />

• n<strong>on</strong> grant<strong>in</strong>g of credits by the f<strong>in</strong>ancial <strong>in</strong>stituti<strong>on</strong>s or n<strong>on</strong> grant<strong>in</strong>g the<br />

guarantee by the guarantee<strong>in</strong>g funds;<br />

‣ n<strong>on</strong>-compliance with the c<strong>on</strong>tractual duties by the beneficiaries:<br />

• exceed<strong>in</strong>g the deadl<strong>in</strong>e for submitt<strong>in</strong>g the acquisiti<strong>on</strong> dossiers;<br />

• modify<strong>in</strong>g the technical soluti<strong>on</strong>, as compared to the <strong>on</strong>e <strong>in</strong>itially provided <strong>in</strong><br />

the f<strong>in</strong>ancial applicati<strong>on</strong>, without the approval of the c<strong>on</strong>tract<strong>in</strong>g authority;<br />

• n<strong>on</strong>-compliance with the technical project dur<strong>in</strong>g the implementati<strong>on</strong>;<br />

• n<strong>on</strong>-compliance dur<strong>in</strong>g the implementati<strong>on</strong> of the c<strong>on</strong>tract of the eligibility<br />

criteria, <strong>on</strong>e of the most important be<strong>in</strong>g the lack of land or build<strong>in</strong>gs<br />

ownership, some beneficiaries submitt<strong>in</strong>g false documents or c<strong>on</strong>tracts that<br />

have lost their validity <strong>in</strong> time;<br />

• n<strong>on</strong>-compliance with the eligibility and selecti<strong>on</strong> criteria and the acquisiti<strong>on</strong><br />

procedure dur<strong>in</strong>g the ex-post m<strong>on</strong>itor<strong>in</strong>g period. Dur<strong>in</strong>g the m<strong>on</strong>itor<strong>in</strong>g<br />

period of the projects, when the experts of the C<strong>on</strong>trol and Antifraud<br />

Directorate carried out <strong>on</strong>-the-spot checks, it was found that the<br />

beneficiaries had not observed the c<strong>on</strong>tractual obligati<strong>on</strong>s c<strong>on</strong>cluded with<br />

SAPARD Agency (i.e. they had not observed either the schedule for works’<br />

executi<strong>on</strong> <strong>in</strong> compliance with the approved technical project, or the works<br />

accord<strong>in</strong>g to the technical project);<br />

‣ due to the current ec<strong>on</strong>omic c<strong>on</strong>text, to the ec<strong>on</strong>omic crisis, the companies which<br />

have received the community funds under SAPARD Programme and have<br />

committed by c<strong>on</strong>tract to functi<strong>on</strong> dur<strong>in</strong>g a m<strong>in</strong>imum of 5 years (m<strong>on</strong>itor<strong>in</strong>g<br />

period), are at present unable to c<strong>on</strong>t<strong>in</strong>ue their activity;<br />

‣ at the same time, there are beneficiaries who are unable to implement the project<br />

due to f<strong>in</strong>ancial problems, as they do not have sufficient funds any more for<br />

complet<strong>in</strong>g the project, the new credit c<strong>on</strong>diti<strong>on</strong>s of banks be<strong>in</strong>g too harsh, and<br />

the <strong>in</strong>terest and exchange rates too high. Therefore, the projects were cancelled<br />

at the request of the beneficiary, with parties’ agreement;<br />

‣ litigati<strong>on</strong>s (i.e. between the manufacturer and supplier, between the beneficiary<br />

and the bank, property litigati<strong>on</strong>s, enforcement, cancellati<strong>on</strong> of the build<strong>in</strong>g permit<br />

c<strong>on</strong>cluded by the court).<br />

‣ the beneficiary exceeded the c<strong>on</strong>tractual deadl<strong>in</strong>e for the procurement procedure<br />

under Measure 3.1;<br />

‣ the beneficiary entered <strong>in</strong>to the <strong>in</strong>solvency and bankruptcy proceed<strong>in</strong>gs.<br />

Note: A part of the cancellati<strong>on</strong> causes presented above have been identified also by<br />

PARDF, as well as by the beneficiaries’ representatives and the MC members.<br />

67


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

II. Causes identified by the beneficiaries of the SAPARD Programme and the<br />

MC members<br />

‣ problems caused by the relati<strong>on</strong> between the beneficiary and the builder,<br />

respectively:<br />

• n<strong>on</strong>-compliance with the executi<strong>on</strong> deadl<strong>in</strong>es;<br />

• f<strong>in</strong>ancial additi<strong>on</strong>al requests, compared with the signed c<strong>on</strong>tract, <strong>in</strong> order to<br />

c<strong>on</strong>t<strong>in</strong>ue to accomplish the work;<br />

• the c<strong>on</strong>diti<strong>on</strong><strong>in</strong>g of the beneficiaries to make advance payments <strong>in</strong> order to<br />

c<strong>on</strong>t<strong>in</strong>ue the works, even though the c<strong>on</strong>tract stipulated that the payments<br />

can be made based <strong>on</strong> the work situati<strong>on</strong>s approved by the beneficiaries.<br />

‣ higher projects costs compared with the <strong>on</strong>es <strong>in</strong>itially estimated <strong>in</strong> the project<br />

budget and frequently above the possibility of the beneficiaries due to:<br />

• the acquisiti<strong>on</strong> of services, goods and works at higher prices than the<br />

market prices and the budget of the projects;<br />

• the big periods between the submissi<strong>on</strong> of the project, sign<strong>in</strong>g of the<br />

f<strong>in</strong>anc<strong>in</strong>g c<strong>on</strong>tract, beg<strong>in</strong>n<strong>in</strong>g of the project and c<strong>on</strong>clusi<strong>on</strong> of the project;<br />

• the depreciati<strong>on</strong> of the R<strong>on</strong> compared with Euro.<br />

‣ the beneficiaries applied for support under the SAPARD Programme and after<br />

the approval of the projects they were not able to f<strong>in</strong>ancially susta<strong>in</strong> them (i.e.<br />

farmers with small hold<strong>in</strong>gs, of 5-10 ha, purchased agricultural equipments with<br />

high values);<br />

‣ the existence of large or very large c<strong>on</strong>structi<strong>on</strong>s projects (process<strong>in</strong>g units,<br />

warehouses, etc.) which have far exceeded the amount of the <strong>in</strong>vestment, the<br />

<strong>in</strong>itial assessment be<strong>in</strong>g <strong>in</strong>correctly carried out;<br />

‣ over evaluati<strong>on</strong> of <strong>in</strong>vestment, <strong>in</strong>come and expenditures related to the projects by<br />

certa<strong>in</strong> c<strong>on</strong>sultancy firms;<br />

‣ the delays <strong>in</strong> what c<strong>on</strong>cerns the payments to the beneficiaries led, <strong>in</strong> most of the<br />

case, to the <strong>in</strong>ability of the beneficiaries to pay the suppliers of equipments and<br />

the builders;<br />

‣ high bureaucracy exist<strong>in</strong>g with<strong>in</strong> the <strong>in</strong>stituti<strong>on</strong>s <strong>in</strong>volved <strong>in</strong> implementati<strong>on</strong> of<br />

SAPARD, as well as the err<strong>on</strong>eous <strong>in</strong>terpretati<strong>on</strong>s of the law;<br />

‣ big delays <strong>in</strong> the implementati<strong>on</strong> of the c<strong>on</strong>tracts, determ<strong>in</strong>ed by objective<br />

reas<strong>on</strong>s or the weak managerial capacity of the beneficiaries;<br />

‣ lack of the experience of the beneficiaries regard<strong>in</strong>g the implementati<strong>on</strong> projects<br />

with mandatory and strict rules;<br />

‣ existence of bad management <strong>in</strong> various stages of project implementati<strong>on</strong>;<br />

‣ acquisiti<strong>on</strong> problems – differences regard<strong>in</strong>g the prices of the offers as a<br />

c<strong>on</strong>sequence of the surpass of the validity period of the offer, slow receiv<strong>in</strong>g of<br />

the offers due to the high request;<br />

‣ high criteria regard<strong>in</strong>g the process<strong>in</strong>g capacities <strong>in</strong> the animal husbandry and<br />

food <strong>in</strong>dustry field, favour<strong>in</strong>g those with a lot of m<strong>on</strong>ey;<br />

68


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

‣ the state did not provided a clear policy related to the SAPARD Programme <strong>in</strong><br />

order to support the small farmers organized <strong>in</strong> associati<strong>on</strong>s for the efficient<br />

development of the producti<strong>on</strong> units;<br />

‣ the gap between the development of the <strong>in</strong>dustry and animal husbandry (the<br />

supplier of raw materials) represented another cause <strong>on</strong> the cancellati<strong>on</strong>s of<br />

SAPARD projects. Even if Romania has big slaughter capacity, a problem<br />

rema<strong>in</strong>s the decrease of the livestock (cattle, pigs) and this led to the<br />

dependence of meat import and <strong>in</strong>creased the competiti<strong>on</strong> for the purchase of an<br />

<strong>in</strong>sufficient number of animals, result<strong>in</strong>g higher costs, reduced marg<strong>in</strong>s and<br />

removal of some market operators and implicitly quitt<strong>in</strong>g the SAPARD projects<br />

which became <strong>in</strong>adequate to the market c<strong>on</strong>diti<strong>on</strong>s;<br />

‣ sw<strong>in</strong>e fever, ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g the embargo <strong>on</strong> pork and especially <strong>on</strong> derived products<br />

had a very negative <strong>in</strong>fluence <strong>on</strong> process<strong>in</strong>g and export of this k<strong>in</strong>d of projects.<br />

This is <strong>in</strong>creased by the exodus of labour force <strong>in</strong> Europe, which reduced the<br />

number of nati<strong>on</strong>al c<strong>on</strong>sumers);<br />

‣ the shadow ec<strong>on</strong>omy rema<strong>in</strong>s a first rank disturb<strong>in</strong>g factor. Persistence and even<br />

flourish<strong>in</strong>g of black ec<strong>on</strong>omy lead to severely limitati<strong>on</strong> of the correct market<br />

operators through the unfair competiti<strong>on</strong>.<br />

II. 4 Achievement stage for the proposed objective<br />

II. 4.1 Measure 1.1 “The Improvement of process<strong>in</strong>g and market<strong>in</strong>g of<br />

agricultural and fisheries products”<br />

The general objective of the measure is to <strong>in</strong>crease the efficiency of the process<strong>in</strong>g<br />

and market<strong>in</strong>g of agricultural and fishery products, hav<strong>in</strong>g as a result the <strong>in</strong>crease of<br />

the quality of the products <strong>in</strong> order to c<strong>on</strong>tribute to the implementati<strong>on</strong> of the<br />

community acquis, the <strong>in</strong>crease of competitiveness and products added value, and<br />

the creati<strong>on</strong> of new jobs.<br />

Investments made under this measure are to c<strong>on</strong>tribute to: orientat<strong>in</strong>g the producti<strong>on</strong><br />

<strong>in</strong> compliance with the predictable market tendencies, improv<strong>in</strong>g or rati<strong>on</strong>aliz<strong>in</strong>g the<br />

collect<strong>in</strong>g networks and en-gross trade, improv<strong>in</strong>g the presentati<strong>on</strong> and c<strong>on</strong>diti<strong>on</strong><strong>in</strong>g<br />

of agricultural and fishery products <strong>on</strong> the market, <strong>in</strong>creas<strong>in</strong>g the efficiency by us<strong>in</strong>g<br />

modern technology, improv<strong>in</strong>g the quality of the processed products and the quality<br />

c<strong>on</strong>trol for foodstuff by observ<strong>in</strong>g the m<strong>in</strong>imum requirements for food safety,<br />

promot<strong>in</strong>g producti<strong>on</strong> methods which do not harm the envir<strong>on</strong>ment, creat<strong>in</strong>g new jobs<br />

<strong>in</strong> rural area as well as ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g the exist<strong>in</strong>g <strong>on</strong>es.<br />

Data regard<strong>in</strong>g <strong>in</strong>vestments f<strong>in</strong>anced <strong>in</strong> the reference period per ma<strong>in</strong> objective of the<br />

project are presented <strong>in</strong> Annex no. 2 with the m<strong>on</strong>itor<strong>in</strong>g tables i.e. table a.1.1 and<br />

a.3.1 affected by natural disasters.<br />

Capacities provided to be achieved or modernized under this measure, for the<br />

projects not affected by natural disasters and for the <strong>on</strong>es affected by natural<br />

disasters, are presented <strong>in</strong> the below tables:<br />

69


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Sector<br />

Table II.8 –Projects not affected by natural disasters<br />

Number of<br />

projects<br />

Approved<br />

Reference unit for the approved projects<br />

Unit of<br />

Involved capacities<br />

measure New Improved<br />

Milk and dairy products 92 hl/year 2,691,955 6,881,813<br />

Milk collect<strong>in</strong>g 2 hl/year 9,612 120,000<br />

From which Milk process<strong>in</strong>g<br />

units<br />

89 hl/year 2,682,343 6,610,813<br />

t/year 357,918 784,683<br />

Meat and meat products and eggs<br />

202 Thousand<br />

From which<br />

pieces<br />

0 6,000<br />

eggs/year<br />

Beef 0 t/an 0 0<br />

Pork 2 ' 0 14,200<br />

process<strong>in</strong>g Mutt<strong>on</strong> 0 ' 0 0<br />

Poultry 4 ' 9,097 3,240<br />

Comb<strong>in</strong>ed 141 158,614 509,711<br />

Slaughterhouses 54 ' 190,207 257,532<br />

Laboratories 0 ' 0 0<br />

Fruits, vegetable and potatoes 41 ' 132,964 149,708<br />

From which<br />

Fresh 21 ' 125,659 27,729<br />

Processed 20 ' 7,305 121,979<br />

W<strong>in</strong>e 45 ' 54,242 254,063<br />

From which<br />

Laboratories 5 ' 3,000 3,140<br />

Storage capacity 13 19,267 136,662<br />

Fish 18 ' 19,541 22,154<br />

Textile plants 1 300 0<br />

Cereals 64 ' 2,669,758<br />

Oil seeds 3 ' 0 252,600<br />

Sugar 0 ' 0<br />

TOTAL 466<br />

Table II.9 – Projects affected by natural disasters<br />

Sector<br />

Number of<br />

projects<br />

Approved<br />

Reference unit for the approved projects<br />

Involved capacities<br />

Unit of<br />

measure New Improved<br />

Milk and dairy products 0 hl/year 0.000 0.000<br />

Milk collect<strong>in</strong>g 0 hl/year 0.000 0.000<br />

From which Milk process<strong>in</strong>g<br />

units<br />

0 hl/year 0.000 0.000<br />

70


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

t/year 11,250.000 0.000<br />

Meat and meat products and eggs<br />

1 Thousand<br />

From which<br />

pieces<br />

0 0<br />

eggs/year<br />

Beef 0 t/an 0.000 0.000<br />

Pork 0 ' 0.000 0.000<br />

process<strong>in</strong>g Mutt<strong>on</strong> 0 ' 0.000 0.000<br />

Poultry 0 ' 0.000 0.000<br />

Comb<strong>in</strong>ed 0 0.000 0.000<br />

Slaughterhouses 1 ' 11,250.000 0.000<br />

Laboratories 0 ' 0.000 0.000<br />

Fruits, vegetable and potatoes 0 ' 0.000 0.000<br />

From which<br />

Fresh 0 ' 0.000 0.000<br />

Processed 0 ' 0.000 0.000<br />

W<strong>in</strong>e 0 ' 0.000 0.000<br />

From which<br />

Laboratories 0 ' 0.000 0.000<br />

Storage capacity 0 ' 0.000 0.000<br />

Fish 0 ' 0.000 0.000<br />

Textile plants 0 ' 0.000 0.000<br />

Cereals 2 ' 18,500.000<br />

Oil seeds 0 ' 0.000 0.000<br />

Sugar 0 ' 0.000<br />

TOTAL 3<br />

Under sub-measure “Milk and dairy products”, the highest rate of <strong>in</strong>vestments is<br />

directed towards milk process<strong>in</strong>g units, with<strong>in</strong> this sector, new capacities of 2,691.955<br />

thousand hl/year for milk collect<strong>in</strong>g and process<strong>in</strong>g are provided to be achieved and<br />

capacities of 6,881.813 thousand hl/year are provided to be modernized.<br />

Under sub-measure meat, meat products and eggs a new capacity for meat<br />

process<strong>in</strong>g of approximately 357.918 thousand t<strong>on</strong>e/year are provided to be achieved<br />

and capacities with a value of 784.683 thousand t<strong>on</strong>e/year and 6.000 thousand<br />

pieces eggs /year will be modernized, and for projects affected by natural disasters a<br />

new capacity is to be made of about 11.250 thousand t<strong>on</strong>e/year. The highest quota of<br />

the capacities is focused <strong>on</strong> the comb<strong>in</strong>ed meat process<strong>in</strong>g and slaughterhouse<br />

sector.<br />

Under sub-measure Fruit, Vegetables and Potatoes, new capacities of 132.964<br />

thousand t<strong>on</strong>es are provided to be achieved, ma<strong>in</strong>ly focused <strong>on</strong> fresh vegetable<br />

storage, while modernized capacities of about 149.708 thousand t<strong>on</strong>e/ year are<br />

oriented ma<strong>in</strong>ly towards fruit, vegetable and potatoes process<strong>in</strong>g.<br />

Through w<strong>in</strong>e sub-measure, c<strong>on</strong>sist<strong>in</strong>g of 45 c<strong>on</strong>tracts, at the end of 2008, new<br />

capacities of 54.242 thousand to/year are envisaged to be created and capacities of<br />

254.063 thousand t<strong>on</strong>e/ year are envisaged to be rehabilitated.<br />

In the fishery sector new capacities of about 19.541 thousand t<strong>on</strong>e/year will be<br />

created and exist<strong>in</strong>g capacities of 22.154 thousand to/year will be rehabilitated.<br />

71


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Under Textile Plants Sub-Measure, new capacities of about 0.300 thousand<br />

t<strong>on</strong>e/year will be set up.<br />

As regard<strong>in</strong>g cereals, through the c<strong>on</strong>tracted projects the exist<strong>in</strong>g capacities of<br />

approximately 2,669.758 thousand t<strong>on</strong>e/year will be modernized for projects not<br />

affected by natural disasters, and of approximately 18.500 thousand t<strong>on</strong>e/year for the<br />

projects affected by natural disasters.<br />

Through the c<strong>on</strong>tracted f<strong>in</strong>anced under Seed Oils Sub-Measure, the exist<strong>in</strong>g<br />

capacities of approximately 252.600 thousand t<strong>on</strong>e/years will be improved.<br />

Complete data <strong>on</strong> the capacities provided to be achieved or modernized are<br />

presented <strong>in</strong> the table II.8 and II.9.<br />

II. 4.2 Measure 1.2 „Improv<strong>in</strong>g the structures for quality, veter<strong>in</strong>ary and plant<br />

health-c<strong>on</strong>trol, for the quality of food stuffs and for c<strong>on</strong>sumer protecti<strong>on</strong>”<br />

Capacities provided to be achieved under this measure, for the approved projects are<br />

presented <strong>in</strong> the table below:<br />

Table II.10<br />

Laboratories<br />

Number of<br />

approved<br />

projects<br />

Capacity<br />

no. f analysis types<br />

sanitary-veter<strong>in</strong>ary type 17 2,232<br />

Phyto-sanitary c<strong>on</strong>trol 2 13<br />

Quality c<strong>on</strong>trol for food<br />

products<br />

1 65<br />

TOTAL 20<br />

With<strong>in</strong> this measure, the highest rate c<strong>on</strong>cerns the number of analysis types for the<br />

sanitary-veter<strong>in</strong>ary c<strong>on</strong>trol, namely 2,232 types of analyses.<br />

The complete <strong>in</strong>formati<strong>on</strong> <strong>on</strong> the capacities provided to be achieved are presented <strong>in</strong><br />

Tables II.10.<br />

II. 4.3 Measure 2.1 „ Development and improvement of rural <strong>in</strong>frastructure”<br />

Through the projects approved <strong>in</strong> the period <strong>in</strong> questi<strong>on</strong> for this measure, it is<br />

provided the achievement of 60.670 km of new communal roads, modernizati<strong>on</strong> of<br />

2,392.594 km of communal roads and reparati<strong>on</strong> of 67,898 km of the roads affected<br />

by natural disasters, the highest rate be<strong>in</strong>g represented of the modernizati<strong>on</strong> of<br />

communal roads, namely 95% out of the total works.<br />

72


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

For the projects affected by natural disasters, modernizati<strong>on</strong> of 259.450 km of<br />

communal roads and reparati<strong>on</strong> of 27.918 km for the roads affected by natural<br />

disasters are provided.<br />

In case of the Water Supply Sub-Measure, <strong>on</strong>ly 27% from the c<strong>on</strong>tracted projects<br />

represent modernizati<strong>on</strong>s of the exist<strong>in</strong>g networks, the highest rate of the<br />

<strong>in</strong>vestments aimed at execut<strong>in</strong>g of new works of dr<strong>in</strong>kable water supply, namely<br />

approximately 3,669.075 km of pipe. In view of rehabilitati<strong>on</strong> of the dr<strong>in</strong>kable water<br />

supply systems for the areas affected by natural disasters the executi<strong>on</strong> of about<br />

55.989 km of pipe is provided.<br />

For the projects affected by natural disasters, executi<strong>on</strong> of new 150.149 km of pipe,<br />

modernizati<strong>on</strong> of approximately 86.310 km of pipe and reparati<strong>on</strong> of 12.337 km of<br />

pipe are provided.<br />

As regards the Sewerage <strong>in</strong> Centralized System Sub-Measure, aimed at works<br />

execut<strong>in</strong>g <strong>on</strong> a total of approximately 862.69 km of pipes, out of which the executi<strong>on</strong><br />

of new works represents 86%, the modernizati<strong>on</strong> of the exist<strong>in</strong>g systems represents<br />

14% from the total while for the reparati<strong>on</strong> of the sewerage systems, the achievement<br />

of 0.200 km of pipe is provided.<br />

For the projects affected by natural disasters, executi<strong>on</strong> of new 5 km of pipe,<br />

modernizati<strong>on</strong> of approximately 0.910 km of pipe and reparati<strong>on</strong> of 6.100 km of pipe<br />

are provided.<br />

As regards the Works for Preventi<strong>on</strong> and Protecti<strong>on</strong> aga<strong>in</strong>st Floods Sub-Measure,<br />

the executi<strong>on</strong> of 111.425 km is provided.<br />

These percentages are correlated with the situati<strong>on</strong> <strong>on</strong> rural <strong>in</strong>frastructure <strong>in</strong> the<br />

diagnosis secti<strong>on</strong> of NPARD. The implementati<strong>on</strong> of the sub-measures for Water<br />

Supply and Sewerage has an impact up<strong>on</strong> a total number of approximately 1.33<br />

milli<strong>on</strong> of <strong>in</strong>habitants, namely 0.05 milli<strong>on</strong> of <strong>in</strong>habitants for the projects affected by<br />

natural disasters.<br />

The complete <strong>in</strong>formati<strong>on</strong> <strong>on</strong> the objectives types provided under Measure 2.1 is<br />

presented <strong>in</strong> the tables below.<br />

Acti<strong>on</strong><br />

Roads <strong>in</strong> rural areas<br />

from which:<br />

build<strong>in</strong>g of new communal<br />

roads<br />

moderniz<strong>in</strong>g of communal<br />

roads<br />

rehabilitati<strong>on</strong> of floods<br />

damaged roads<br />

Table II.11 - Projects not affected by natural disasters<br />

Reference Unit<br />

Quantity<br />

Number of<br />

approved<br />

projects<br />

Unit of<br />

measure<br />

Approved<br />

projects<br />

C<strong>on</strong>cluded<br />

projects<br />

On-go<strong>in</strong>g<br />

projects<br />

380 km 2,521.162 2,356.401 164.761<br />

10 km 60.670 61.652 -0.982<br />

352 km 2,392.594 2,241.366 151.228<br />

18 km 67.898 53.383 14.515<br />

73


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Dr<strong>in</strong>kable water supply <strong>in</strong><br />

centralized network <strong>in</strong> rural<br />

areas<br />

from which:<br />

executi<strong>on</strong> of new water supply<br />

works<br />

extensi<strong>on</strong> and/or<br />

modernizati<strong>on</strong><br />

rehabilitati<strong>on</strong> of dr<strong>in</strong>kable<br />

water supply systems <strong>in</strong> the<br />

floods damaged areas<br />

Sewerage <strong>in</strong> centralized<br />

system <strong>in</strong> rural areas<br />

from which:<br />

executi<strong>on</strong> of new sewerage<br />

works<br />

extensi<strong>on</strong> and/or<br />

modernizati<strong>on</strong><br />

rehabilitati<strong>on</strong> of sewerage<br />

systems <strong>in</strong> floods damaged<br />

areas<br />

Works for floods preventi<strong>on</strong><br />

and protecti<strong>on</strong><br />

273<br />

184<br />

78<br />

11<br />

87<br />

71<br />

15<br />

1<br />

22<br />

TOTAL 762<br />

km of<br />

pipel<strong>in</strong>e<br />

l<strong>in</strong>es<br />

no. of<br />

covered<br />

<strong>in</strong>habitants<br />

km of<br />

pipel<strong>in</strong>e l<strong>in</strong>es<br />

km of<br />

pipel<strong>in</strong>e l<strong>in</strong>es<br />

km of<br />

pipel<strong>in</strong>e l<strong>in</strong>es<br />

km of<br />

pipel<strong>in</strong>e<br />

l<strong>in</strong>es<br />

no. of<br />

covered<br />

<strong>in</strong>habitants<br />

km of<br />

pipel<strong>in</strong>e l<strong>in</strong>es<br />

km of<br />

pipel<strong>in</strong>e l<strong>in</strong>es<br />

km of<br />

pipel<strong>in</strong>e l<strong>in</strong>es<br />

5,136.063 4,624.853 511.210<br />

983,795 920,164 63.631<br />

3,669.075 3,276.805 392.270<br />

1,410.999 1,325.432 85.567<br />

55.989 22,616 33.373<br />

862.690 776.463 86.227<br />

340,788 320,831 19,957<br />

740.075 681.685 58.390<br />

122.415 94.578 27.837<br />

0.200 0.200 0<br />

km 111.425 95.660 15.765<br />

ha 6,022.180 3,333.750 2,688.430<br />

Acti<strong>on</strong><br />

Roads <strong>in</strong> rural areas<br />

from which:<br />

build<strong>in</strong>g of new communal<br />

roads<br />

moderniz<strong>in</strong>g of communal<br />

roads<br />

rehabilitati<strong>on</strong> of floods<br />

damaged roads<br />

Dr<strong>in</strong>kable water supply <strong>in</strong><br />

centralized network <strong>in</strong><br />

rural areas<br />

from which:<br />

executi<strong>on</strong> of new water<br />

supply works<br />

extensi<strong>on</strong> and/or<br />

modernizati<strong>on</strong><br />

Number of<br />

approved<br />

projects<br />

Table II.12 - Projects affected by natural disasters<br />

Unit of<br />

measure<br />

Reference Unit<br />

Approved<br />

projects<br />

Quantity<br />

C<strong>on</strong>cluded<br />

projects<br />

On-go<strong>in</strong>g<br />

projects<br />

60 km 287.368 186.592 100.776<br />

0 km 0.000 0.000 0.000<br />

50 km 259.450 159.616 99.834<br />

10 km 27.918 26.976 0.942<br />

19<br />

12<br />

5<br />

km of<br />

pipel<strong>in</strong>e<br />

l<strong>in</strong>es<br />

no. of<br />

covered<br />

<strong>in</strong>habitants<br />

km of<br />

pipel<strong>in</strong>e<br />

l<strong>in</strong>es<br />

km of<br />

pipel<strong>in</strong>e<br />

l<strong>in</strong>es<br />

248.796 153.634 95.162<br />

45,332 32,735 12.597<br />

150.149 77.217 72.932<br />

86.310 64.080 22.230<br />

rehabilitati<strong>on</strong> of dr<strong>in</strong>kable 2 km of 12.337 12.337 0.000<br />

74


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

water supply systems <strong>in</strong> the<br />

floods damaged areas<br />

Sewerage <strong>in</strong> centralized<br />

system <strong>in</strong> rural areas<br />

from which:<br />

executi<strong>on</strong> of new sewerage<br />

works<br />

extensi<strong>on</strong> and/or<br />

modernizati<strong>on</strong><br />

rehabilitati<strong>on</strong> of sewerage<br />

systems <strong>in</strong> floods damaged<br />

areas<br />

Works for floods<br />

preventi<strong>on</strong> and protecti<strong>on</strong><br />

TOTAL 83<br />

4<br />

1<br />

1<br />

2<br />

0<br />

pipel<strong>in</strong>e<br />

l<strong>in</strong>es<br />

km of<br />

pipel<strong>in</strong>e<br />

l<strong>in</strong>es<br />

12.010 0.000 12.010<br />

no. of<br />

covered 8,327 0.000 8,327<br />

<strong>in</strong>habitants<br />

km of<br />

pipel<strong>in</strong>e 5.000 0.000 5.000<br />

l<strong>in</strong>es<br />

km of<br />

pipel<strong>in</strong>e 0.910 0.000 0.910<br />

l<strong>in</strong>es<br />

km of<br />

pipel<strong>in</strong>e 6.100 0.000 6.100<br />

l<strong>in</strong>es<br />

km 0.000 0.000 0.000<br />

ha 0.000 0.000 0.000<br />

II. 4.4 Measure 3.1 “Investments <strong>in</strong> agricultural hold<strong>in</strong>gs”<br />

As a result of the approved <strong>in</strong>vestments for this measure, <strong>in</strong> the feasibility studies<br />

for the c<strong>on</strong>tracted projects the follow<strong>in</strong>g capacities are provided (Tables II.13 and<br />

II.14):<br />

• Moderniz<strong>in</strong>g or build<strong>in</strong>g 909 stables and other build<strong>in</strong>gs with<strong>in</strong> the farm,<br />

namely 5 stables and other c<strong>on</strong>structi<strong>on</strong>s with<strong>in</strong> farms for the projects<br />

affected by natural disasters;<br />

• Moderniz<strong>in</strong>g of 16 greenhouses <strong>on</strong> a surface of 1.432 ha and build<strong>in</strong>g 79<br />

new greenhouse <strong>on</strong> a surface of 20.299 ha;<br />

• Procurement of 8,414 mach<strong>in</strong>ery or equipment, from which 99% are<br />

tractors, comb<strong>in</strong>es and other equipment, namely the procurement of 244 of<br />

mach<strong>in</strong>es and equipment for the projects affected by natural disasters;<br />

• Procurement of 9,894 heads of animals with high quality genetic value;<br />

• Sett<strong>in</strong>g up or moderniz<strong>in</strong>g of 739.003 ha of orchards and 1,003.130 ha<br />

v<strong>in</strong>eyards.<br />

Table II.13 – Projects not affected by natural disasters<br />

Number Reference unit for approved<br />

Investment type<br />

of<br />

approved Measure<br />

projects<br />

Amount/Area<br />

projects unit number ha<br />

C<strong>on</strong>structi<strong>on</strong>s 356 pieces 1,004 211.834<br />

Out of<br />

which:<br />

Stables for cows/buffaloes 163 pieces 324 37.422<br />

Pig fatten<strong>in</strong>g 73 pieces 284 89.489<br />

Poultry farms 39 pieces 186 55.317<br />

Other stables 20 pieces 69 5.131<br />

Green<br />

houses and<br />

adequate<br />

equipments<br />

Newly built covered area<br />

Modernized covered area<br />

36<br />

8<br />

pieces/ha<br />

pieces/ha<br />

79<br />

16<br />

20.299<br />

1.432<br />

Other c<strong>on</strong>structi<strong>on</strong>s <strong>in</strong> farm 17 pieces 46 2.743<br />

75


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Tools and equipments- <strong>in</strong>dependent 1,404 pieces 8,414 522,408.614<br />

Out of<br />

which:<br />

Tractors, comb<strong>in</strong>e, other equipments 1,381 pieces 8,297 517,278.036<br />

Sewerage/ <strong>in</strong>stallati<strong>on</strong>s for treat<strong>in</strong>g used<br />

water<br />

0 pieces 0 0.000<br />

Irrigati<strong>on</strong> <strong>in</strong>stallati<strong>on</strong>s 20 pieces 75 5,105.372<br />

Installati<strong>on</strong>s for complex process<strong>in</strong>g of<br />

animal fodder<br />

3 pieces 42 25.205<br />

Septic tank and stable waist platforms 0 pieces 0 0.000<br />

Acquisiti<strong>on</strong> of animals with high genetic value 43 heads 9,894 967.005<br />

Milk<strong>in</strong>g cows/buffaloes 28 heads 724 526.730<br />

Out of which: Sw<strong>in</strong>e 1 heads 170 0.000<br />

Sheep/goats 14 heads 9,000 440.275<br />

Agricultural plantati<strong>on</strong>s 64 ha 85 1,742.133<br />

Out of which:<br />

Fruit grow<strong>in</strong>g 35 ha 39 739.003<br />

V<strong>in</strong>eyard 29 ha 46 1,003.130<br />

V<strong>in</strong>eyards nurseries 0 ha 0 0.000<br />

Other 54 - 234 2,188.350<br />

TOTAL 1921<br />

Table II.14 – Projects affected by natural disasters<br />

Number Reference unit for approved<br />

of<br />

projects<br />

Investment type<br />

approved Measure Amount/Area<br />

projects unit number ha<br />

C<strong>on</strong>structi<strong>on</strong>s 3 pieces 5 0.192<br />

Out of<br />

which:<br />

Stables for cows/buffaloes 1 pieces 1 0.081<br />

Pig fatten<strong>in</strong>g 0 pieces 0 0.000<br />

Poultry farms 0 pieces 0 0.000<br />

Other stables 1 pieces 1 0.071<br />

Green<br />

houses and<br />

adequate<br />

equipments<br />

Newly built covered area<br />

Modernized covered area<br />

0<br />

0<br />

pieces/ha<br />

pieces/ha<br />

0<br />

0<br />

0.000<br />

0.000<br />

Other c<strong>on</strong>structi<strong>on</strong>s <strong>in</strong> farm 1 pieces 3 0.040<br />

Tools and equipments- <strong>in</strong>dependent 28 pieces 244 7,910.210<br />

Out of<br />

which:<br />

Tractors, comb<strong>in</strong>e, other equipments 28 pieces 244 7,910.210<br />

Sewerage/ <strong>in</strong>stallati<strong>on</strong>s for treat<strong>in</strong>g used<br />

water<br />

0 pieces 0 0.000<br />

Irrigati<strong>on</strong> <strong>in</strong>stallati<strong>on</strong>s 0 pieces 0 0.000<br />

Installati<strong>on</strong>s for complex process<strong>in</strong>g of<br />

animal fodder<br />

0 pieces 0 0.000<br />

Septic tank and stable waist platforms 0 pieces 0 0.000<br />

76


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Acquisiti<strong>on</strong> of animals with high genetic value 0 heads 0 0.000<br />

Milk<strong>in</strong>g cows/buffaloes 0 heads 0 0.000<br />

Out of which: Sw<strong>in</strong>e 0 heads 0 0.000<br />

Sheep/goats 0 heads 0 0.000<br />

Agricultural plantati<strong>on</strong>s 0 ha 0 0.000<br />

Out of which:<br />

Fruit grow<strong>in</strong>g 0 ha 0 0.000<br />

V<strong>in</strong>eyard 0 ha 0 0.000<br />

V<strong>in</strong>eyards nurseries 0 ha 0 0.000<br />

Other 0 - 0 0.000<br />

TOTAL 31<br />

II. 4.5 Measure 3.4 „Development and diversificati<strong>on</strong> of ec<strong>on</strong>omic activities<br />

generat<strong>in</strong>g multiple activities and alternative <strong>in</strong>come”<br />

After the approval of the <strong>in</strong>vestments for this Measure, <strong>in</strong> feasibility studies, for<br />

c<strong>on</strong>tracted projects are menti<strong>on</strong>ed the follow<strong>in</strong>g capacities (Tables II.15 and II.16):<br />

• For the 2 approved projects <strong>on</strong> agricultural services, a number of 6<br />

organizati<strong>on</strong>s and 8 pers<strong>on</strong>s is registered;<br />

• Modernizati<strong>on</strong> or sett<strong>in</strong>g up of adaptati<strong>on</strong> places of 10,246 beds <strong>in</strong> rural<br />

tourism, as well as 50 beds for the projects affected by natural disasters<br />

and 1,284 <strong>in</strong> other type of tourist activities <strong>in</strong> rural area;<br />

• Involvement <strong>in</strong> handicraft activities of 164 artisans;<br />

• Produc<strong>in</strong>g and process<strong>in</strong>g of about 1,020.744 t<strong>on</strong>es of aquaculture products,<br />

520.154 t<strong>on</strong>es of snails and frogs, 2,169.600 kg of sericulture products,<br />

1,366.897 t<strong>on</strong>es of bee-keep<strong>in</strong>g products, 3,842.384 t<strong>on</strong>es of mushrooms,<br />

2,628.720 t<strong>on</strong>es wild berry fruits and wild berry bushes and 335.100 t<strong>on</strong>es of<br />

medic<strong>in</strong>al and aromatic plants-process<strong>in</strong>g;<br />

• Process<strong>in</strong>g at farm level of the traditi<strong>on</strong>al products certified of 38,607.000<br />

hl/year and of 196.000 t<strong>on</strong>e/year.<br />

Table II.15 – Projects not affected by natural disasters<br />

Acti<strong>on</strong>s<br />

Number of Reference unit for approved projects<br />

approved projects<br />

Measure Unit Amount<br />

Agricultural services 2<br />

no of organisati<strong>on</strong>s 6<br />

no of pers<strong>on</strong>s 8<br />

Rural tourism 643 no of beds 10,246<br />

Other types of tourist activities <strong>in</strong><br />

rural area<br />

64 no of beds 1,284<br />

Handicraft activities 18 no of artisans 164<br />

Aquaculture 17 t<strong>on</strong>es/year 1,020.744<br />

Snails and frogs 88 t<strong>on</strong>es/year 520.154<br />

Sericulture 1 t<strong>on</strong>es/year 2,169.600<br />

Bee-keep<strong>in</strong>g 214 t<strong>on</strong>es/year 1,366.897<br />

Mushrooms 24 t<strong>on</strong>es/year 3,842.384<br />

Fruit of berries and bush fruits<br />

process<strong>in</strong>g<br />

6 t<strong>on</strong>es/year 2,628.720<br />

77


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Medic<strong>in</strong>al and aromatic plantsprocess<strong>in</strong>g<br />

Process<strong>in</strong>g at farm's level of the<br />

certified traditi<strong>on</strong>al and/ or organic<br />

products<br />

Process<strong>in</strong>g of organic products 0<br />

Process<strong>in</strong>g of traditi<strong>on</strong>al products 1<br />

TOTAL 1,080<br />

2 t<strong>on</strong>nes/year 335.100<br />

1<br />

hl/ year 38,607.000<br />

t<strong>on</strong>nes/year 196.000<br />

hl/ year 0.000<br />

t<strong>on</strong>nes/year 0.000<br />

hl/ year 38,607.000<br />

t<strong>on</strong>nes/year 196.000<br />

Table II.16 – Projects affected by natural disasters<br />

Acti<strong>on</strong>s<br />

Number of Reference unit for approved projects<br />

approved projects<br />

Measure Unit Amount<br />

Agricultural services 0<br />

no of organisati<strong>on</strong>s 0<br />

no of pers<strong>on</strong>s 0<br />

Rural tourism 3 no of beds 50<br />

Other types of tourist activities <strong>in</strong><br />

rural area<br />

0 no of beds 0<br />

Handicraft activities 0 no of artisans 0<br />

Aquaculture 0 t<strong>on</strong>es/year 0.00<br />

Snails and frogs 0 t<strong>on</strong>es/year 0.00<br />

Sericulture 0 t<strong>on</strong>es/year 0.00<br />

Bee-keep<strong>in</strong>g 0 t<strong>on</strong>es/year 0.00<br />

Mushrooms 0 t<strong>on</strong>es/year 0.00<br />

Fruit of berries and bush fruits<br />

process<strong>in</strong>g<br />

0 t<strong>on</strong>es/year 0.00<br />

Medic<strong>in</strong>al and aromatic plantsprocess<strong>in</strong>g<br />

0 t<strong>on</strong>nes/year 0.00<br />

TOTAL 3<br />

II. 4.6 Measure 3.5 „Forestry”<br />

The capacities for the approved projects provided to be achieved under this measure<br />

are presented <strong>in</strong> the table below:<br />

Measures<br />

Table II.17<br />

Reference unit for the approved<br />

Number of<br />

projects 2<br />

approved<br />

projects Measurement unit Quantity<br />

Afforestati<strong>on</strong><br />

private 3<br />

public 0<br />

ha 115.000<br />

thousand piece 468<br />

ha 0.000<br />

thousand piece 0<br />

78


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Nurseries 1 ha 4.500<br />

Investments for improvement the wood primary<br />

process<strong>in</strong>g and market<strong>in</strong>g of forestry products 34<br />

Forestry roads, out of which<br />

No. of piece,<br />

equipment,<br />

mach<strong>in</strong>es<br />

207<br />

m 3 /year 736,251.000<br />

private 1 km 20.700<br />

public 75 km 594.415<br />

Equipment number 0.000<br />

Management of woods 0 C<strong>on</strong>structi<strong>on</strong>s<br />

numbers<br />

0.000<br />

0 Members number 0.000<br />

Associati<strong>on</strong>s<br />

Out of which<br />

of the forest 0 Equipment number 0.000<br />

owners<br />

C<strong>on</strong>structi<strong>on</strong>s<br />

0<br />

numbers<br />

0.000<br />

TOTAL 114<br />

II. 5 C<strong>on</strong>clusi<strong>on</strong>s <strong>on</strong> the differences between Regi<strong>on</strong>s/Measures/Sub-Measures<br />

found <strong>in</strong> the projects implementati<strong>on</strong><br />

At the end of 2008, the total amount committed is 1,400.512 milli<strong>on</strong> euro for the entire<br />

Programme, respectively a commitment rate of 92.05% <strong>in</strong> comparis<strong>on</strong> with 2000 –<br />

2006 allocati<strong>on</strong>s (Table II.18).<br />

As regards the executed payments, by 31 st of December 2008, the total amount is<br />

1,278.744 milli<strong>on</strong> euro, respectively a c<strong>on</strong>sumpti<strong>on</strong> rate of 84.05% <strong>in</strong> comparis<strong>on</strong> with<br />

2000 – 2006 allocati<strong>on</strong>s.<br />

79


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Allocated/committed/paid amounts under SAPARD Programme at 31.12.2008<br />

Table II.18<br />

EURO<br />

Measure<br />

Allocati<strong>on</strong><br />

2000-2006<br />

Committed amount<br />

(31.12.2008)<br />

Commitment<br />

rate % out of<br />

allocati<strong>on</strong><br />

2000-2006<br />

Paid amount<br />

(31.12.2008)<br />

Commitment<br />

rate % out of<br />

allocati<strong>on</strong><br />

2000-2006<br />

1.1 Process<strong>in</strong>g and market<strong>in</strong>g 379,513,279.37 351,458,474.07 92.61 340,682,877.76 89.77<br />

1.2 Improv<strong>in</strong>g new c<strong>on</strong>trol structures 37,791,593.33 36,103,520.61 95.53 17,853,207.98 47.24<br />

2.1 Infrastructure 678,160,438.67 633,128,822.81 93.36 578,747,114.10 85.34<br />

3.1 Agricultural hold<strong>in</strong>gs 259,072,564.55 238,506,378.09 92.06 229,412,305.88 88.55<br />

3.2 Producer groups 1,000,000.00 85,896.06 8.59 29,372.98 2.94<br />

3.3 Agro-envir<strong>on</strong>ment 1,849,504.00 216,864.73 11.73 186,720.87 10.10<br />

3.4 Diversificati<strong>on</strong> 84,220,533.41 70,060,061.80 83.19 64,832,277.75 76.98<br />

3.5 Forestry 74,451,006.67 66,676,683.41 89.56 42,547,654.45 57.15<br />

4.1 Vocati<strong>on</strong>al Tra<strong>in</strong><strong>in</strong>g 3,949,238.67 2,901,044.70 73.46 3,028,493.43 76.69<br />

4.2 Assistance 1,441,406.25 1,374,497.80 95.36 1,424,016.45 98.79<br />

TOTAL 1,521,449,564.92 1,400,512,244.08 92.05 1,278,744,041.65 84.05<br />

80


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

The executi<strong>on</strong> of payments to the beneficiaries of SAPARD Programme started <strong>in</strong><br />

September 2003, and the progress of the m<strong>on</strong>thly payments executed dur<strong>in</strong>g<br />

September 2003 – December 2008 is <strong>in</strong>cluded <strong>in</strong> Diagrams below.<br />

Value of payments - Measure 1.1<br />

Diagram II.28<br />

25,00<br />

Payments (milli<strong>on</strong>s EURO)<br />

20,00<br />

15,00<br />

10,00<br />

5,00<br />

0,00<br />

0,74<br />

0,56<br />

0,55<br />

1,74<br />

1,05<br />

1,37<br />

1,53<br />

1,99<br />

2,83<br />

2,16<br />

3,21<br />

4,05<br />

3,30<br />

3,45<br />

0,00<br />

4,81<br />

3,67<br />

2,04<br />

1,71<br />

1,05<br />

2,573,73<br />

1,21<br />

2,133,09<br />

1,89<br />

1,67<br />

2,76<br />

2,65<br />

3,87<br />

2,41<br />

3,00<br />

5,24<br />

4,36<br />

4,93<br />

5,17<br />

8,21<br />

9,63<br />

13,28<br />

10,10<br />

8,07<br />

12,71<br />

11,27<br />

10,08<br />

14,59<br />

8,37<br />

13,69<br />

19,17<br />

13,74<br />

15,85<br />

20,77<br />

2,61<br />

2,63<br />

7,36<br />

4,74<br />

4,24<br />

4,68<br />

3,49<br />

September 2003<br />

October 2003<br />

November 2003<br />

December 2003<br />

January 2004<br />

February 2004<br />

March 2004<br />

April 2004<br />

May 2004<br />

June 2004<br />

July 2004<br />

August 2004<br />

September 2004<br />

October 2004<br />

November 2004<br />

December 2004<br />

January 2005<br />

February 2005<br />

March 2005<br />

April 2005<br />

May 2005<br />

June 2005<br />

July 2005<br />

August 2005<br />

September 2005<br />

October 2005<br />

November 2005<br />

December 2005<br />

January 2006<br />

February 2006<br />

March 2006<br />

April 2006<br />

May 2006<br />

June 2006<br />

July 2006<br />

August 2006<br />

September 2006<br />

October 2006<br />

November 2006<br />

December 2006<br />

January 2007<br />

February 2007<br />

March 2007<br />

April 2007<br />

May 2007<br />

June 2007<br />

July 2007<br />

August 2007<br />

September 2007<br />

October 2007<br />

November 2007<br />

December 2007<br />

January 2008<br />

February 2008<br />

March 2008<br />

April 2008<br />

May 2008<br />

June 2008<br />

October 2008<br />

November 2008<br />

December 2008<br />

M<strong>on</strong>ths<br />

15,77<br />

8,32<br />

4,82<br />

Value of payments - Measure 1.2<br />

Diagram II.29<br />

9,00<br />

8,00<br />

7,89<br />

7,00<br />

Payments (milli<strong>on</strong>s EURO)<br />

6,00<br />

5,00<br />

4,00<br />

3,00<br />

3,87<br />

2,38<br />

2,00<br />

1,00<br />

0,00<br />

0,42<br />

0,00<br />

0,76<br />

0,17<br />

0,00<br />

0,01<br />

0,00<br />

0,00<br />

1,39<br />

0,96<br />

September 2007<br />

October 2007<br />

November 2007<br />

December 2007<br />

January 2008<br />

February 2008<br />

March 2008<br />

M<strong>on</strong>ths<br />

April 2008<br />

May 2008<br />

June 2008<br />

October 2008<br />

November 2008<br />

December 2008<br />

81


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Value of payments - Measure 2.1<br />

Diagram II.30<br />

60,00<br />

55,69<br />

50,00<br />

Paym ents (m illi<strong>on</strong>s EURO )<br />

40,00<br />

30,00<br />

20,00<br />

10,00<br />

0,00<br />

0,02<br />

0,73<br />

1,68<br />

1,54<br />

1,17<br />

2,15<br />

7,94<br />

4,84<br />

8,51<br />

17,43<br />

36,53<br />

35,46<br />

0,00<br />

28,05<br />

36,00<br />

17,55<br />

8,75<br />

5,69<br />

2,34<br />

4,79<br />

5,12<br />

9,98<br />

10,36<br />

15,52<br />

8,83<br />

12,89<br />

7,22<br />

9,47<br />

8,48<br />

6,76<br />

5,55<br />

4,27<br />

7,04<br />

6,81<br />

4,69<br />

3,98<br />

4,53<br />

2,42<br />

2,52<br />

2,33<br />

2,05<br />

0,78<br />

0,31<br />

0,40<br />

2,81<br />

3,96<br />

8,35<br />

16,00<br />

22,10<br />

6,92<br />

4,58<br />

3,69<br />

4,03<br />

5,849,05<br />

October 2003<br />

November 2003<br />

December 2003<br />

January 2004<br />

February 2004<br />

March 2004<br />

April 2004<br />

May 2004<br />

June 2004<br />

July 2004<br />

August 2004<br />

September 2004<br />

October 2004<br />

November 2004<br />

December 2004<br />

January 2005<br />

February 2005<br />

March 2005<br />

April 2005<br />

May 2005<br />

June 2005<br />

July 2005<br />

August 2005<br />

September 2005<br />

October 2005<br />

November 2005<br />

December 2005<br />

January 2006<br />

February 2006<br />

March 2006<br />

April 2006<br />

May 2006<br />

June 2006<br />

July 2006<br />

August 2006<br />

September 2006<br />

October 2006<br />

November 2006<br />

December 2006<br />

January 2007<br />

February 2007<br />

March 2007<br />

April 2007<br />

May 2007<br />

June 2007<br />

July 2007<br />

August 2007<br />

September 2007<br />

October 2007<br />

November 2007<br />

December 2007<br />

January 2008<br />

February 2008<br />

March 2008<br />

April 2008<br />

May 2008<br />

June 2008<br />

October 2008<br />

November 2008<br />

December 2008<br />

4,18<br />

40,67<br />

17,01<br />

10,39<br />

M<strong>on</strong>ths<br />

Diagram II.31<br />

Value of payments - Measure 3.1<br />

Payments (milli<strong>on</strong>s EURO)<br />

16,00<br />

14,00<br />

12,00<br />

10,00<br />

8,00<br />

6,00<br />

4,00<br />

2,00<br />

0,00<br />

0,41<br />

0,44<br />

0,93<br />

0,00<br />

1,38<br />

1,98<br />

0,99<br />

0,89<br />

0,58<br />

0,94<br />

1,46<br />

1,97<br />

August 2004<br />

October 2004<br />

December 2004<br />

February 2005<br />

April 2005<br />

June 2005<br />

3,13<br />

3,45<br />

3,65<br />

2,90<br />

3,73<br />

August 2005<br />

October 2005<br />

December 2005<br />

2,06<br />

3,12<br />

February 2006<br />

1,62<br />

2,17<br />

April 2006<br />

2,91<br />

5,41<br />

6,02<br />

June 2006<br />

11,09<br />

August 2006<br />

13,91<br />

M<strong>on</strong>ths<br />

11,80<br />

October 2006<br />

15,06<br />

9,70<br />

December 2006<br />

11,99<br />

7,91<br />

February 2007<br />

6,00<br />

5,83<br />

April 2007<br />

7,82<br />

5,78<br />

June 2007<br />

6,69<br />

7,58<br />

August 2007<br />

8,66<br />

5,00<br />

October 2007<br />

9,11<br />

2,59<br />

December 2007<br />

0,86<br />

2,39<br />

2,13<br />

February 2008<br />

3,53<br />

3,65<br />

April 2008<br />

1,07<br />

June 2008<br />

10,85<br />

4,19<br />

November 2008<br />

2,08<br />

82


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Value of payments - Measure 3.2<br />

Diagram II.32<br />

0,03<br />

0,02<br />

0,02<br />

0,02<br />

0,01<br />

0,01<br />

0,01<br />

0,00<br />

January 2008<br />

February 2008<br />

March 2008<br />

April 2008<br />

May 2008<br />

0,00<br />

June 2008<br />

0,00<br />

October 2008<br />

Payments (milli<strong>on</strong>s EURO)<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

November 2008<br />

December 2008<br />

M<strong>on</strong>ths<br />

Diagram II.33<br />

Value of payments - Measure 3.3<br />

0,18<br />

0,17<br />

0,16<br />

0,14<br />

Payments (milli<strong>on</strong>s EURO)<br />

0,12<br />

0,10<br />

0,08<br />

0,06<br />

0,04<br />

0,02<br />

0,00<br />

0,01<br />

0,01<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

September 2007<br />

0,00<br />

October 2007<br />

0,00<br />

November 2007<br />

0,00<br />

December 2007<br />

0,00<br />

January 2008<br />

0,00<br />

February 2008<br />

March 2008<br />

0,00<br />

April 2008<br />

May 2008<br />

June 2008<br />

October 2008<br />

November 2008<br />

December 2008<br />

M<strong>on</strong>ths<br />

83


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Value of payments - Measure 3.4<br />

Diagram II.34<br />

6,00<br />

0,04<br />

0,00<br />

0,18<br />

0,31<br />

0,27<br />

0,26<br />

0,13<br />

0,30<br />

0,49<br />

0,33<br />

0,44<br />

0,40<br />

0,55<br />

0,50<br />

0,92<br />

0,63<br />

0,98<br />

0,89<br />

0,61<br />

0,75<br />

0,61<br />

5,35<br />

5,00<br />

Paym ents (m illi<strong>on</strong>s EURO )<br />

4,00<br />

3,00<br />

2,00<br />

1,00<br />

0,00<br />

October 2004<br />

December 2004<br />

February 2005<br />

April 2005<br />

June 2005<br />

August 2005<br />

October 2005<br />

December 2005<br />

February 2006<br />

April 2006<br />

June 2006<br />

2,34<br />

1,33<br />

1,39<br />

1,53<br />

August 2006<br />

October 2006<br />

M<strong>on</strong>ths<br />

2,08<br />

1,79<br />

1,94<br />

2,30<br />

December 2006<br />

February 2007<br />

2,62<br />

1,67<br />

April 2007<br />

2,39<br />

1,83<br />

June 2007<br />

3,12<br />

2,87<br />

August 2007<br />

2,62<br />

2,64<br />

October 2007<br />

4,28<br />

2,22<br />

December 2007<br />

1,22<br />

1,40<br />

1,06<br />

0,92<br />

1,01<br />

0,83<br />

February 2008<br />

April 2008<br />

June 2008<br />

1,68<br />

November 2008<br />

0,81<br />

Value of payments - Measure 3.5<br />

Diagram II.35<br />

16,00<br />

15,16<br />

14,00<br />

12,00<br />

Payments (milli<strong>on</strong>s EURO)<br />

10,00<br />

8,00<br />

6,00<br />

4,00<br />

3,05<br />

8,75<br />

6,50<br />

2,00<br />

0,00<br />

0,01<br />

February 2007<br />

0,55<br />

0,86<br />

0,44<br />

March 2007<br />

0,42<br />

April 2007<br />

1,64<br />

May 2007<br />

0,72<br />

June 2007<br />

0,55<br />

July 2007<br />

0,24<br />

August 2007<br />

0,82<br />

September 2007<br />

0,56<br />

October 2007<br />

0,07<br />

November 2007<br />

0,55<br />

December 2007<br />

0,27<br />

0,22<br />

1,18<br />

January 2008<br />

February 2008<br />

March 2008<br />

April 2008<br />

May 2008<br />

June 2008<br />

October 2008<br />

November 2008<br />

December 2008<br />

M<strong>on</strong>ths<br />

84


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Value of payments - Measure 4.1<br />

Diagram II.36<br />

0,60<br />

0,56<br />

0,55<br />

0,50<br />

0,50<br />

0,40<br />

0,30<br />

0,20<br />

0,31<br />

0,32<br />

0,27<br />

0,29<br />

0,13<br />

0,10<br />

0,05<br />

0,05<br />

0,00<br />

January 2007<br />

February 2007<br />

March 2007<br />

April 2007<br />

May 2007<br />

June 2007<br />

July 2007<br />

August 2007<br />

September 2007<br />

October 2007<br />

November 2007<br />

December 2007<br />

January 2008<br />

February 2008<br />

March 2008<br />

0,00<br />

April 2008<br />

0,00<br />

May 2008<br />

0,00<br />

June 2008<br />

0,00<br />

October 2008<br />

0,00<br />

November 2008<br />

0,00<br />

December 2008<br />

Payments (milli<strong>on</strong>s EURO)<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

M<strong>on</strong>ths<br />

Diagram II.37<br />

Value of payments - Measure 4.2<br />

0,30<br />

0,05<br />

0,21<br />

0,26<br />

0,25<br />

Payments (milli<strong>on</strong>s EURO)<br />

0,20<br />

0,15<br />

0,10<br />

0,08<br />

0,16<br />

0,13<br />

0,15<br />

0,09<br />

0,12<br />

0,07<br />

0,05<br />

0,04<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

August 2004<br />

October 2004<br />

December 2004<br />

February 2005<br />

0,01<br />

0,01<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

April 2005<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,01<br />

0,00<br />

June 2005<br />

August 2005<br />

October 2005<br />

December 2005<br />

February 2006<br />

April 2006<br />

0,00<br />

0,00<br />

0,00<br />

0,02<br />

June 2006<br />

August 2006<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

October 2006<br />

December 2006<br />

February 2007<br />

April 2007<br />

June 2007<br />

August 2007<br />

October 2007<br />

December 2007<br />

February 2008<br />

April 2008<br />

June 2008<br />

November 2008<br />

M<strong>on</strong>ths<br />

85


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

An analysis of the implement<strong>in</strong>g stage of the c<strong>on</strong>tracted projects shows that out of<br />

4,549 c<strong>on</strong>tracted projects under the accredited measure, 3,965 projects have been<br />

f<strong>in</strong>alised.<br />

On 31 st of December 2008, the distributi<strong>on</strong> of the 4,549 c<strong>on</strong>tracted projects (hav<strong>in</strong>g a<br />

total public value of 5,087,091,538.668 LEI, represent<strong>in</strong>g 1,400,512,244.099 milli<strong>on</strong><br />

Euro) under measures 1.1, 1.2, 2.1, 3.1, 3.2, 3.3, 3.4, 3.5 .41 and 4.2 is as follows:<br />

- 469 projects under Measure 1.1;<br />

- 20 projects under Measure 1.2;<br />

- 845 projects under Measure 2.1;<br />

- 1,952 projects under Measure 3.1;<br />

- 4 projects under Measure 3.2;<br />

- 47 projects under Measure 3.3;<br />

- 1,083 projects under Measure 3.4;<br />

- 114 projects under Measure 3.5;<br />

- 5 projects under Measure 4.1;<br />

- 10 projects under measure 4.2.<br />

The 3,965 f<strong>in</strong>alised projects are divided <strong>on</strong> measures as follows:<br />

− 430 projects under Measure 1.1;<br />

− 6 projects under Measure 1.2;<br />

− 749 projects under Measure 2.1;<br />

− 1,807 projects under Measure 3.1;<br />

− 902 projects under Measure 3.4;<br />

− 56 projects under Measure 3.5;<br />

− 5 projects under Measure 4.1;<br />

− 10 projects under Measure 4.2.<br />

Out of the 1,521.450 milli<strong>on</strong> Euro represent<strong>in</strong>g the f<strong>in</strong>ancial allocati<strong>on</strong> under AFA<br />

2000 -2006 related to the accredited measures f<strong>in</strong>anced with<strong>in</strong> SAPARD Programme,<br />

the status of the committed amounts and executed payments is the follow<strong>in</strong>g:<br />

• Value of c<strong>on</strong>tracted projects - 1,400.512 milli<strong>on</strong> Euro;<br />

• Value of executed payments - 1,278.744 milli<strong>on</strong> Euro.<br />

The analysis of the exist<strong>in</strong>g commitments shows that 45% of the total committed<br />

amount (1,400.512 milli<strong>on</strong> Euro) is represented by commitments under measure 2.1,<br />

with a value of 633.129 milli<strong>on</strong> Euro.<br />

A comparis<strong>on</strong> of the status of the sub-measures implemented under SAPARD<br />

Programme, we may po<strong>in</strong>t out that the highest attractiveness is focused <strong>on</strong> the<br />

follow<strong>in</strong>g sub-measures:<br />

• Meat, meat products and eggs (203 c<strong>on</strong>tracted projects) – measure 1.1;<br />

• Milk and dairy products (92 c<strong>on</strong>tracted projects) – measure 1.1;<br />

• Field crops (1,217 c<strong>on</strong>tracted projects) – measure 3.1;<br />

• Milk<strong>in</strong>g animals (232 c<strong>on</strong>tracted projects) – measure 3.1;<br />

• Rural tourism (646 c<strong>on</strong>tracted projects) – measure 3.4;<br />

• Other activities (335 c<strong>on</strong>tracted projects) – measure 3.4.<br />

86


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

A synthesis of the stage of the measures under implementati<strong>on</strong> <strong>in</strong> Romania, until the<br />

end of 2008, shows that the public c<strong>on</strong>tracted amount of the c<strong>on</strong>tracts under<br />

Measure 1.1 “The Improvement of process<strong>in</strong>g and market<strong>in</strong>g of agricultural and<br />

fishery products” was 351.458 milli<strong>on</strong> Euro i.e 25% out of the total amount of<br />

PARDF’s commitments.<br />

For the 469 c<strong>on</strong>tracted projects under Measure 1.1, payments of a total amount of<br />

1,198,020.714 thousand LEI, i.e. 340.683 milli<strong>on</strong> Euro (Table II.20) – 96.93% of the<br />

c<strong>on</strong>tracted value and 89.77% of the NPARD allocati<strong>on</strong>s for 2000 – 2006 were<br />

authorized and executed.<br />

The situati<strong>on</strong> of the commitments and payments <strong>on</strong> sub-measures with<strong>in</strong> Measure<br />

1.1 is presented <strong>in</strong> tables II.19 and II.20.<br />

Table II.19<br />

Report <strong>on</strong> Executed Commitments by sub-measures under Measure 1.1 by 31.12.2008<br />

Submeasure<br />

% out of the<br />

measure<br />

Allocati<strong>on</strong><br />

2000 – 2006<br />

Value of<br />

c<strong>on</strong>tracted<br />

projects<br />

Euro<br />

Commitment<br />

rate %<br />

2000-2006<br />

Meat products and eggs 23 87,288,054.26 183,345,118.92 210.05<br />

Milk and milk products 23 87,288,054.26 49,124,045.52 56.28<br />

Cereals 10 37,951,327.94 42,532,635.45 112.07<br />

Oil seads 3 11,385,398.38 3,104,913.10 27.27<br />

W<strong>in</strong>e 9 34,156,195.14 29,860,511.78 87.42<br />

Fruits, vegetables and<br />

potatoes<br />

16 60,722,124.70 32,337,514.66 53.25<br />

Fish and fishery products 6 22,770,796.76 10,485,589.31 46.05<br />

Sugar 4 15,180,531.17 0.00 0.00<br />

Textile Plants 6 22,770,796.76 668,145.32 2.93<br />

TOTAL 100 379,513,279.37 351,458,474.07 92.61<br />

Table II.20<br />

Report <strong>on</strong> the Executed Payments by sub-measures under Measure 1.1 by 31.12.2008<br />

Submeasure<br />

% out of<br />

the<br />

measure<br />

Allocati<strong>on</strong><br />

2000 – 2006<br />

Value of executed<br />

payments<br />

Euro<br />

C<strong>on</strong>sumpti<strong>on</strong><br />

rate %<br />

2000-2006<br />

Meat products and eggs 23 87,288,054.26 176,635,540.50 202.36<br />

Milk and milk products 23 87,288,054.26 49,986,050.02 57.27<br />

Cereals 10 37,951,327.94 37,969,966.73 100.05<br />

Oil seads 3 11,385,398.38 3,470,690.76 30.48<br />

W<strong>in</strong>e 9 34,156,195.14 29,703,510.57 86.96<br />

Fruits, vegetables and<br />

potatoes<br />

16 60,722,124.70 31,692,369.84 52.19<br />

Fish and fishery products 6 22,770,796.76 10,497,995.56 46.10<br />

Sugar 4 15,180,531.17 0.00 0.00<br />

Textile Plants 6 22,770,796.76 726,753.80 3.19<br />

TOTAL 100 379,513,279.37 340,682,877.76 89.77<br />

87


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

As regards the regi<strong>on</strong>al distributi<strong>on</strong> of the projects not affected by floods under<br />

Measure 1.1, Regi<strong>on</strong> 7 Alba Iulia and Regi<strong>on</strong> 2 South East has the highest rate,<br />

namely 17.38% of all the projects approved under this measure, Regi<strong>on</strong> 1 North East<br />

has approximately 15.88% of the approved projects and Regi<strong>on</strong> 3 South Muntenia<br />

has 15.24%. In c<strong>on</strong>clusi<strong>on</strong>, these four regi<strong>on</strong>s hold 65.88% of the total approved<br />

projects which could be expla<strong>in</strong>ed by the fact that these regi<strong>on</strong>s are traditi<strong>on</strong>al areas<br />

for milk and meat producti<strong>on</strong>. The milk and meat sectors are prevalent sectors out of<br />

the total amount of approved projects under Measure 1.1. The regi<strong>on</strong>al distributi<strong>on</strong> of<br />

the projects approved under Measure 1.1 is presented <strong>in</strong> Diagram II.38.<br />

Number of c<strong>on</strong>tracted projects and committed amounts under Measure 1.1 / Regi<strong>on</strong><br />

Diagram II.38<br />

90<br />

Number of C<strong>on</strong>trected projects<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

250,00<br />

80<br />

70<br />

74<br />

81<br />

214,26<br />

71<br />

81<br />

211,86<br />

200,00<br />

Number of C<strong>on</strong>trected projects<br />

60<br />

50<br />

40<br />

30<br />

173,55<br />

187,38<br />

93,18<br />

29<br />

155,22<br />

44<br />

58<br />

113,99<br />

98,79<br />

28<br />

150,00<br />

100,00<br />

C om m itted am ounts (M illi<strong>on</strong>s R O N )<br />

20<br />

50,00<br />

10<br />

0<br />

Regi<strong>on</strong> 1 Regi<strong>on</strong> 2 Regi<strong>on</strong>3 Regi<strong>on</strong> 4 Regi<strong>on</strong> 5 Regi<strong>on</strong> 6 Regi<strong>on</strong> 7 Regi<strong>on</strong> 8<br />

Regi<strong>on</strong><br />

0,00<br />

As regards the regi<strong>on</strong>al distributi<strong>on</strong> of the projects affected by natural disasters for<br />

Measure 1.1, Diagram II.39 is presented below.<br />

88


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Diagram II.39<br />

Number of c<strong>on</strong>tracted projects and committed amounts under Measure 1.1 / Regi<strong>on</strong><br />

(Affected by natural disasters)<br />

1,2<br />

12,00<br />

Number of C<strong>on</strong>trected projects<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

10,62<br />

10,57<br />

1<br />

10,00<br />

1 1<br />

Number of C<strong>on</strong>trected projects<br />

0,8<br />

0,6<br />

0,4<br />

1<br />

8,00<br />

6,00<br />

4,00<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

0,2<br />

0<br />

0,00<br />

0,00<br />

0<br />

0<br />

0<br />

1,11<br />

0,00<br />

0,00<br />

0,00<br />

0<br />

0<br />

Regi<strong>on</strong> 1 Regi<strong>on</strong> 2 Regi<strong>on</strong>3 Regi<strong>on</strong> 4 Regi<strong>on</strong> 5 Regi<strong>on</strong> 6 Regi<strong>on</strong> 7 Regi<strong>on</strong> 8<br />

Regi<strong>on</strong><br />

2,00<br />

0,00<br />

As regards Measure 1.2 „Improv<strong>in</strong>g the structures for quality, veter<strong>in</strong>ary and<br />

plant heath-c<strong>on</strong>trol, for the quality of food stuffs and for c<strong>on</strong>sumer protecti<strong>on</strong>”<br />

the public c<strong>on</strong>tracted projects was of 36.104 milli<strong>on</strong> Euro, namely 2.58% out of the<br />

total PARDF commitments.<br />

As regards the 20 projects c<strong>on</strong>tracted under Measure 1.2, payments were authorized<br />

and executed <strong>in</strong> total amount of 65,668.548 thousand LEI, represent<strong>in</strong>g 17.853<br />

milli<strong>on</strong> Euro – 49.45% from the c<strong>on</strong>tracted value and 47.24% from the allocati<strong>on</strong>s<br />

NPARD 2000-2006.<br />

The situati<strong>on</strong> of the commitments and payments <strong>on</strong> sub-measures with<strong>in</strong> Measure<br />

1.2 is presented <strong>in</strong> tables II.21 and II.22.<br />

Table II.21<br />

Report <strong>on</strong> Executed Commitments by sub-measures under Measure 1.2 by 31.12.2008<br />

Euro<br />

Submeasure<br />

% out of<br />

the<br />

measure<br />

Allocati<strong>on</strong><br />

2002 – 2006<br />

Value of<br />

c<strong>on</strong>tracted<br />

projects<br />

Commitment<br />

rate %<br />

2002-2006<br />

Sanitary-veter<strong>in</strong>ary c<strong>on</strong>trol - - 31,957,733.47 84.56<br />

Plant-health c<strong>on</strong>trol - - 2,498,202.44 6.61<br />

Food stuffs quality c<strong>on</strong>trol - - 1,647,584.70 4.36<br />

TOTAL 100 37.791.593,33 36,103,520.61 95.53<br />

89


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Table II.22<br />

Report <strong>on</strong> the Executed Payments by sub-measures under Measure 1.2 by 31.12.2008<br />

Euro<br />

Submeasure<br />

% out of the<br />

measure<br />

Allocati<strong>on</strong><br />

2002 – 2006<br />

Value of executed<br />

payments<br />

C<strong>on</strong>sumpti<strong>on</strong><br />

rate %<br />

2002-2006<br />

Sanitary-veter<strong>in</strong>ary c<strong>on</strong>trol - - 14,921,349.10 39.48<br />

Plant-health c<strong>on</strong>trol - - 1,312,027.77 3.47<br />

Food stuffs quality c<strong>on</strong>trol - - 1,619,831.10 4.29<br />

TOTAL 100 37.791.593,33 17,853,207.98 47.24<br />

As regards the distributi<strong>on</strong> <strong>on</strong> regi<strong>on</strong>s of projects under Measure 1.2, the highest<br />

number of projects was registered <strong>in</strong> Regi<strong>on</strong> 8 Bucharest – Iflov, namely 20% of the<br />

total number of projects approved <strong>on</strong> this measure, Regi<strong>on</strong> 1 Nord – East has<br />

approximately 15% of all the projects approved under this measure and Regi<strong>on</strong> 7<br />

Alba Iulia registered 15% of the total number of projects approved <strong>on</strong> the same<br />

measure (each of them has 3 approved projects). In c<strong>on</strong>clusi<strong>on</strong>, these three regi<strong>on</strong>s<br />

hold 50% of the total approved projects under this measure.<br />

The regi<strong>on</strong>al distributi<strong>on</strong> of the approved projects under Measure 1.2 is presented<br />

<strong>in</strong> Diagram II.40.<br />

Diagram II.40<br />

90


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Number of c<strong>on</strong>tracted projects and committed amounts under Measure 1.2 / Regi<strong>on</strong><br />

4,5<br />

25,00<br />

4<br />

3,5<br />

Number of C<strong>on</strong>trected projects<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

20,61<br />

19,95<br />

23,20<br />

4<br />

20,00<br />

Number of C<strong>on</strong>trected projects<br />

3<br />

2,5<br />

2<br />

1,5<br />

3<br />

14,18<br />

2<br />

2<br />

14,14<br />

2<br />

12,65<br />

13,07<br />

2<br />

11,62<br />

2<br />

3<br />

15,00<br />

10,00<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

1<br />

5,00<br />

0,5<br />

0<br />

Regi<strong>on</strong> 1 Regi<strong>on</strong> 2 Regi<strong>on</strong>3 Regi<strong>on</strong> 4 Regi<strong>on</strong> 5 Regi<strong>on</strong> 6 Regi<strong>on</strong> 7 Regi<strong>on</strong> 8<br />

Regi<strong>on</strong><br />

0,00<br />

As regards Measure 2.1 „Development and improvement of rural <strong>in</strong>frastructure”,<br />

the public c<strong>on</strong>tracted amount of the c<strong>on</strong>tracts was of 633.129 milli<strong>on</strong> Euro i.e 45.21%<br />

out of the total amount of PARDF’s commitments.<br />

At the end of 2008, the overall value of the c<strong>on</strong>tracts under this Measure mean<strong>in</strong>g<br />

633.129 milli<strong>on</strong> Euro as compared to the amount allocated by AFA 2000 – 2006<br />

represents a commitment rate of 93.36% (Table II.23).<br />

For the 845 projects c<strong>on</strong>tracted under Measure 2.1, payments of a total amount of<br />

2,174,805.375 thousand LEI i.e. 578.747 milli<strong>on</strong> Euro (Table II.24) – 91.41% of the<br />

c<strong>on</strong>tracted value and 85.34% of the NPARD allocati<strong>on</strong>s for 2000 – 2006 were<br />

authorized and executed.<br />

Table II.23<br />

Report <strong>on</strong> Executed Commitments by sub-measures under Measure 2.1 by 31.12.2008<br />

Euro<br />

Submeasure<br />

% out of<br />

the<br />

measure<br />

Allocati<strong>on</strong><br />

2000 – 2006<br />

Value of<br />

c<strong>on</strong>tracted<br />

projects<br />

Commitment<br />

rate %<br />

2000-2006<br />

Roads <strong>in</strong> rural areas 50 339,080,219.17 339,882,909.91 100.24<br />

Dr<strong>in</strong>kable water supply<br />

through rural area district 35 237,356,153.42 187,123,263.33 78.84<br />

networks<br />

District system sewage <strong>in</strong><br />

rural areas<br />

9,6 65,103,402.08 76,347,512.60 117.27<br />

91


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Works of preventi<strong>on</strong> and<br />

protecti<strong>on</strong> aga<strong>in</strong>st floods<br />

5,4 36,620,663.67 29,775,136.97 81.31<br />

TOTAL 100 678,160,438.33 633,128,822.81 93.36<br />

Table II.24<br />

Report <strong>on</strong> the Executed Payments by sub-measures under Measure 2.1 by 31.12.2008<br />

Euro<br />

Submeasure<br />

% out of<br />

the<br />

measure<br />

Allocati<strong>on</strong><br />

2000 – 2006<br />

Value of<br />

executed<br />

payments<br />

C<strong>on</strong>sumpti<strong>on</strong><br />

rate %<br />

2000-2006<br />

Roads <strong>in</strong> rural areas 50 339,080,219.17 314,117,719.05 92.64<br />

Dr<strong>in</strong>kable water supply<br />

through rural area district 35 237,356,153.42 170,772,141.99 71.95<br />

networks<br />

District system sewage <strong>in</strong><br />

rural areas<br />

9,6 65,103,402.08 71,321,797.55 109.55<br />

Works of preventi<strong>on</strong> and<br />

protecti<strong>on</strong> aga<strong>in</strong>st floods<br />

5,4 36,620,663.67 22,535,455.52 61.54<br />

TOTAL 100 678,160,438.33 578,747,114.10 85.34<br />

In terms of the regi<strong>on</strong>al distributi<strong>on</strong> of the projects not affected by natural disasters<br />

approved for this measure, 3 regi<strong>on</strong>s, namely Regi<strong>on</strong> 1 North East Iasi (26.64%),<br />

Regi<strong>on</strong> 2 South East C<strong>on</strong>stanta (16.40%) and Regi<strong>on</strong> 3 South Muntenia Targoviste<br />

19.29%) have 62.33% of the total percentage of the approved projects under this<br />

measure.<br />

The regi<strong>on</strong>al distributi<strong>on</strong> of the approved projects under Measure 2.1 is presented<br />

<strong>in</strong> Diagram II.41.<br />

Diagram II.41<br />

92


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Number of c<strong>on</strong>tracted projects and committed amounts under Measure 2.1 / Regi<strong>on</strong><br />

250<br />

600,00<br />

570,30<br />

Number of C<strong>on</strong>trected projects<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

Number of C<strong>on</strong>trected projects<br />

200<br />

150<br />

100<br />

203<br />

318,89<br />

125<br />

420,09<br />

147<br />

104<br />

264,03<br />

151,17<br />

177,14<br />

182,33<br />

500,00<br />

400,00<br />

300,00<br />

200,00<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

50<br />

56<br />

59<br />

61<br />

100,00<br />

0<br />

22,74<br />

7<br />

Regi<strong>on</strong> 1 Regi<strong>on</strong> 2 Regi<strong>on</strong> 3 Regi<strong>on</strong> 4 Regi<strong>on</strong> 5 Regi<strong>on</strong> 6 Regi<strong>on</strong> 7 Regi<strong>on</strong> 8<br />

Regi<strong>on</strong><br />

0,00<br />

As regards the regi<strong>on</strong>al distributi<strong>on</strong> of approved projects affected by natural disasters<br />

under this measure, two regi<strong>on</strong>s, respectively, Regi<strong>on</strong> 1 North – East Iasi and Regi<strong>on</strong><br />

3 South Muntenia have approximately 20.48% of the total number of approved<br />

projects affected by natural disasters, while Regi<strong>on</strong> 4 South – West Oltenia has<br />

19.28%. In c<strong>on</strong>clusi<strong>on</strong>, these three regi<strong>on</strong>s hold 60.24% of the total approved<br />

projects affected by natural disasters.<br />

Regi<strong>on</strong>al distributi<strong>on</strong> of the approved projects under measure 2.1 is presented <strong>in</strong><br />

Diagram II.42.<br />

Diagram II.42<br />

93


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Number of c<strong>on</strong>tracted projects and committed amounts under Measure 2.1 / Regi<strong>on</strong><br />

(Affected by natural disasters)<br />

18<br />

16<br />

17<br />

44,70<br />

17<br />

47,41<br />

16<br />

Number of C<strong>on</strong>trected projects<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

50,00<br />

45,00<br />

14<br />

42,48<br />

40,00<br />

Number of C<strong>on</strong>trected projects<br />

12<br />

10<br />

8<br />

6<br />

12<br />

22,26<br />

8<br />

22,51<br />

9<br />

23,01<br />

35,00<br />

30,00<br />

25,00<br />

20,00<br />

15,00<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

4<br />

3<br />

10,00<br />

2<br />

1<br />

8,11<br />

5,00<br />

0<br />

Regi<strong>on</strong> 1 Regi<strong>on</strong> 2 Regi<strong>on</strong> 3 Regi<strong>on</strong> 4 Regi<strong>on</strong> 5 Regi<strong>on</strong> 6 Regi<strong>on</strong> 7 Regi<strong>on</strong> 8<br />

Regi<strong>on</strong><br />

3,52<br />

0,00<br />

With<strong>in</strong> Measure 3.1 „Investments <strong>in</strong> agricultural hold<strong>in</strong>gs”, the public c<strong>on</strong>tracted<br />

amount of the c<strong>on</strong>tracts was 238.506 milli<strong>on</strong> Euro i.e 17.03% out of the total<br />

amount of PARDF’s commitments.<br />

For the 1,952 projects c<strong>on</strong>tracted under Measure 3.1, payments of a total amount<br />

of 800,831.047 thousand LEI i.e. 229.412 milli<strong>on</strong> Euro (Table II.26) – 96.19% of the<br />

c<strong>on</strong>tracted value and 88.55% of the NPARD allocati<strong>on</strong>s for 2002 – 2006 were<br />

authorized and executed.<br />

The situati<strong>on</strong> of the commitments and payments executed under each sub-measure<br />

with<strong>in</strong> this measure is showed <strong>in</strong> Tables II.25 and II.26<br />

Table II.25<br />

Report <strong>on</strong> Executed Commitments by sub-measures under Measure 3.1 by 31.12.2008<br />

Euro<br />

Submeasure<br />

% out of<br />

the<br />

measure<br />

Allocati<strong>on</strong><br />

2002 – 2006<br />

Value of<br />

c<strong>on</strong>tracted<br />

projects<br />

Commitment<br />

rate %<br />

2002- 2006<br />

Field crops 19 49,223,787.26 111,454,486.78 226.42<br />

Horticulture (out of which<br />

1.5% from the flower sector)<br />

8 20,725,805.16 2,998,136.86 14.47<br />

V<strong>in</strong>eyard 8 20,725,805.16 7,953,808.01 38.38<br />

Fruit tree farm<strong>in</strong>g 8 20,725,805.16 5,216,312.30 25.17<br />

Green Houses 4 10,362,902.58 5,333,991.00 51.47<br />

Milk animal farm<strong>in</strong>g 14 36,270,159.04 32,089,824.42 88.47<br />

Cattle bread<strong>in</strong>g and fatten<strong>in</strong>g 14 36,270,159.04 4,344,455.60 11.98<br />

Goats and sheep fatten<strong>in</strong>g 3 7,772,176.94 4,300,602.36 55.33<br />

94


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Young rams fatten<strong>in</strong>g 3 7,772,176.94 2,156,111.88 27.74<br />

Sw<strong>in</strong>e 10 25,907,256.45 31,931,424.44 123.25<br />

Poultry 5 12,953,628.23 27,745,554.10 214.19<br />

Other type of vegetable,<br />

animals and poultry farm<strong>in</strong>g<br />

4 10,362,902.58 2,981,670.34 28.77<br />

TOTAL 100 259,072,564.55 238,506,378.09 92.06<br />

Table II.26<br />

Report <strong>on</strong> the Executed Payments by sub-measures under Measure 3.1 by 31.12.2008<br />

Euro<br />

% out of<br />

Value of C<strong>on</strong>sumpti<strong>on</strong><br />

Allocati<strong>on</strong><br />

Submeasure<br />

the<br />

executed<br />

rate %<br />

2002 – 2006<br />

measure<br />

payments 2002-2006<br />

Field crops 19 49,223,787.26 112,854,925.39 229.27<br />

Horticulture 8 20,725,805.16 3,138,607.69 15.14<br />

V<strong>in</strong>eyard 8 20,725,805.16 7,738,594.07 37.34<br />

Fruit tree farm<strong>in</strong>g 8 20,725,805.16 5,333,212.16 25.73<br />

Green Houses 4 10,362,902.58 5,562,994.42 53.68<br />

Milk animal farm<strong>in</strong>g 14 36,270,159.04 29,078,426.47 80.17<br />

Cattle bread<strong>in</strong>g and fatten<strong>in</strong>g 14 36,270,159.04 3,161,876.46 8.72<br />

Goats and sheep fatten<strong>in</strong>g 3 7,772,176.94 2,722,554.48 35.03<br />

Young rams fatten<strong>in</strong>g 3 7,772,176.94 1,956,771.00 25.18<br />

Sw<strong>in</strong>e 10 25,907,256.45 28,493,785.05 109.98<br />

Poultry 5 12,953,628.23 26,407,869.87 203.86<br />

Other type of vegetable,<br />

animals and poultry farm<strong>in</strong>g<br />

4 10,362,902.58 2,962,688.82 28.59<br />

TOTAL 100 259,072,564.55 229,412,305.88 88.55<br />

As regards the regi<strong>on</strong>al distributi<strong>on</strong> of projects not affected by natural disasters under<br />

measure 3.1, Regi<strong>on</strong> 2 South – East has the greatest rate, namely 24.78% out of the<br />

projects approved <strong>on</strong> this measure, Regi<strong>on</strong> 3 South – Muntenia has o rate of<br />

approximately 19.05% out of the total number of approved projects, and Regi<strong>on</strong> 1<br />

North – East Iasi has 16.09%. Thus, these three regi<strong>on</strong>s have 59.92% out of the total<br />

approved projects. This aspect can be expla<strong>in</strong>ed by the fact that these regi<strong>on</strong>s<br />

<strong>in</strong>clude areas with milk producti<strong>on</strong> traditi<strong>on</strong>s. These regi<strong>on</strong>s are also best represented<br />

as regards the total number of projects approved under measure 1.1.<br />

Diagram II.43 shows the regi<strong>on</strong>al distributi<strong>on</strong> of the projects under measure 3.1.<br />

95


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Number of c<strong>on</strong>tracted projects and committed amounts under Measure 3.1 / Regi<strong>on</strong><br />

Diagram II.43<br />

500<br />

476<br />

250,00<br />

450<br />

Number of C<strong>on</strong>trected projects<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

400<br />

191,34<br />

200,00<br />

Number of C<strong>on</strong>trected projects<br />

350<br />

300<br />

250<br />

200<br />

150<br />

309<br />

125,60<br />

164,83<br />

366<br />

61,65<br />

218<br />

95,40<br />

242<br />

107,35<br />

76,18<br />

167<br />

150,00<br />

100,00<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

100<br />

122<br />

50,00<br />

50<br />

12,01<br />

0<br />

Regi<strong>on</strong> 1 Regi<strong>on</strong> 2 Regi<strong>on</strong> 3 Regi<strong>on</strong> 4 Regi<strong>on</strong> 5 Regi<strong>on</strong> 6 Regi<strong>on</strong> 7 Regi<strong>on</strong> 8<br />

Regi<strong>on</strong><br />

21<br />

0,00<br />

As c<strong>on</strong>cerns the regi<strong>on</strong>al distributi<strong>on</strong> of projects affected by natural disasters under<br />

measure 3.1, Regi<strong>on</strong> 5 West – Romania has the highest rate, namely 74.19% out of<br />

the total number of projects approved under this measure.<br />

Diagram II.44 shows the regi<strong>on</strong>al distributi<strong>on</strong> of projects under measure 3.1.<br />

Diagram II.44<br />

96


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Number of c<strong>on</strong>tracted projects and committed amounts under Measure 3.1 / Regi<strong>on</strong><br />

(Affected by natural disasters)<br />

25<br />

18,77<br />

Number of C<strong>on</strong>trected projects<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

20,00<br />

18,00<br />

20<br />

23<br />

16,00<br />

Number of C<strong>on</strong>trected projects<br />

15<br />

10<br />

14,00<br />

12,00<br />

10,00<br />

8,00<br />

6,00<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

5<br />

2,64<br />

3,07<br />

4,00<br />

0<br />

2<br />

3<br />

0,00<br />

0,16<br />

0,00<br />

0,83<br />

0<br />

2<br />

1<br />

0<br />

0,00 0<br />

Regi<strong>on</strong> 1 Regi<strong>on</strong> 2 Regi<strong>on</strong> 3 Regi<strong>on</strong> 4 Regi<strong>on</strong> 5 Regi<strong>on</strong> 6 Regi<strong>on</strong> 7 Regi<strong>on</strong> 8<br />

Regi<strong>on</strong><br />

As regards Measure 3.2 “Sett<strong>in</strong>g up producers groups”, the public c<strong>on</strong>tracted value<br />

was of 0.086 milli<strong>on</strong> Euro, namely 0.01% from the total of PARDF’s commitments.<br />

For the 4 projects c<strong>on</strong>tracted under Measure 3.2, payments of a total amount of<br />

108.251 thousand LEI i.e. 0.029 milli<strong>on</strong> Euro (Table II.28) – 34.20% of the<br />

c<strong>on</strong>tracted value and 2.94% of the NPARD allocati<strong>on</strong>s for 2002 – 2006 were<br />

authorized and executed.<br />

The situati<strong>on</strong> of the commitments and payments executed under each sub-measure<br />

with<strong>in</strong> this measure is showed <strong>in</strong> Tables II.27 and II.28.<br />

Table II.27<br />

Report <strong>on</strong> Executed Commitments by sub-measures under Measure 3.2 by 31.12.2008<br />

Euro<br />

2,00<br />

0,00<br />

Submeasure<br />

% out of<br />

the<br />

measure<br />

Allocati<strong>on</strong><br />

2005 – 2006<br />

Value of<br />

c<strong>on</strong>tracted<br />

projects<br />

Commitment rate<br />

%<br />

2005- 2006<br />

Cereals and Technical Plants - - 0.00 0.00<br />

Medic<strong>in</strong>al and aromatic plants - - 0.00 0.00<br />

Specialized crops (tobacco,<br />

hops)<br />

- - 0.00 0.00<br />

Vegetables and Potatoes - - 0.00 0.00<br />

Fruits, <strong>in</strong>clud<strong>in</strong>g grapes - - 0.00 0.00<br />

W<strong>in</strong>e grapes - - 0.00 0.00<br />

Mushrooms - - 0.00 0.00<br />

Flowers and decorative plants - - 0.00 0.00<br />

Milk - - 75,114.60 7.51<br />

Meat - - 0.00 0.00<br />

97


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Eggs for c<strong>on</strong>sumpti<strong>on</strong> - - 0.00 0.00<br />

H<strong>on</strong>ey and beekeep<strong>in</strong>g products - - 10,781.46 1.08<br />

Fishery Products - - 0.00 0.00<br />

Forestry Products - - 0.00 0.00<br />

TOTAL 100 1,000,000.00 85,896.06 8.59<br />

Table II.28<br />

Report <strong>on</strong> the Executed Payments by sub-measures under Measure 3.2 by 31.12.2008<br />

Euro<br />

Submeasure<br />

% out of<br />

the<br />

measure<br />

Allocati<strong>on</strong><br />

2005 – 2006<br />

Value of<br />

executed<br />

payments<br />

C<strong>on</strong>sumpti<strong>on</strong> rate<br />

% 2005-2006<br />

Cereals and Technical Plants - - 0.00 0.00<br />

Medic<strong>in</strong>al and aromatic plants - - 0.00 0.00<br />

Specialized crops (tobacco,<br />

hops)<br />

- - 0.00 0.00<br />

Vegetables and Potatoes - - 0.00 0.00<br />

Fruits, <strong>in</strong>clud<strong>in</strong>g grapes - - 0.00 0.00<br />

W<strong>in</strong>e grapes - - 0.00 0.00<br />

Mushrooms - - 0.00 0.00<br />

Flowers and decorative plants - - 0.00 0.00<br />

Milk - - 29,372.98 2.94<br />

Meat - - 0.00 0,00<br />

Eggs for c<strong>on</strong>sumpti<strong>on</strong> - - 0.00 0,00<br />

H<strong>on</strong>ey and beekeep<strong>in</strong>g<br />

products<br />

- - 0.00 0.00<br />

Fishery Products - - 0.00 0.00<br />

Forestry Products - - 0.00 0.00<br />

TOTAL 100 1,000,000.00 29,372.98 2.94<br />

As regards the distributi<strong>on</strong> <strong>on</strong> regi<strong>on</strong>s of projects under Measure 3.2, the highest<br />

number of projects was registered <strong>in</strong> Regi<strong>on</strong> 7 Alba Iulia, namely 75% of the total<br />

number of projects approved <strong>on</strong> this measure.<br />

The distributi<strong>on</strong> <strong>on</strong> regi<strong>on</strong>s of projects under Measure 3.2 is given <strong>in</strong> Diagram II.45.<br />

Diagram II.45<br />

98


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Number of c<strong>on</strong>tracted projects and committed amounts under Measure 3.2 Regi<strong>on</strong><br />

3,5<br />

0,30<br />

Number of C<strong>on</strong>trected projects<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

3<br />

3<br />

0,25<br />

Number of C<strong>on</strong>trected projects<br />

2,5<br />

2<br />

1,5<br />

1<br />

1<br />

0,27<br />

0,20<br />

0,15<br />

0,10<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

0,5<br />

0<br />

0<br />

0,04<br />

0,00 0,00<br />

0,00 0,00 0,00<br />

0,00<br />

0<br />

0 0 0<br />

0<br />

Regi<strong>on</strong> 1 Regi<strong>on</strong> 2 Regi<strong>on</strong> 3 Regi<strong>on</strong> 4 Regi<strong>on</strong> 5 Regi<strong>on</strong> 6 Regi<strong>on</strong> 7 Regi<strong>on</strong> 8<br />

Regi<strong>on</strong><br />

0,05<br />

0,00<br />

As regards Measure 3.3 “Agricultural producti<strong>on</strong> methods designed to protect the<br />

envir<strong>on</strong>ment and ma<strong>in</strong>ta<strong>in</strong> the countryside” the public c<strong>on</strong>tracted value was of 0.217<br />

milli<strong>on</strong> Euro from the total of PARDF’s commitments, namely 0.02% of the total<br />

number of projects approved <strong>on</strong> this measure.<br />

For the 47 projects c<strong>on</strong>tracted under Measure 3.3 payments were authorized and<br />

executed <strong>in</strong> value of 630.189 thousand LEI, represent<strong>in</strong>g 0.187 milli<strong>on</strong> Euro – 86.10%<br />

from the c<strong>on</strong>tracted value and 10.10% from the allocati<strong>on</strong>s of NPARD 2000-2006.<br />

The situati<strong>on</strong> of the commitments and payments executed under each sub-measure<br />

with<strong>in</strong> this measure is showed <strong>in</strong> Tables II.29 and II.30.<br />

Table II.29<br />

Report <strong>on</strong> Executed Commitments by sub-measures under Measure 3.3 by 31.12.2008<br />

Euro<br />

Submeasure<br />

% out of<br />

the<br />

measure<br />

Allocati<strong>on</strong><br />

2005 – 2006<br />

Value of<br />

c<strong>on</strong>tracted<br />

projects<br />

Commitment<br />

rate % 2005-<br />

2006<br />

Preservati<strong>on</strong> of soil and<br />

protecti<strong>on</strong> aga<strong>in</strong>st erosi<strong>on</strong><br />

Preservati<strong>on</strong> of biodiversity by<br />

traditi<strong>on</strong>al agriculture methods<br />

40 739,801.60 0.00 0.00<br />

20 369,900.80 216,864.73 58.63<br />

Organic Farm<strong>in</strong>g 40 739,801.60 0.00 0.00<br />

TOTAL 100 1,849,504.00 216,864.73 11.73<br />

99


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Table II.30<br />

Report <strong>on</strong> the Executed Payments by sub-measures under Measure 3.3 by 31.12.2008<br />

Euro<br />

Submeasure<br />

% out of<br />

the<br />

measure<br />

Allocati<strong>on</strong><br />

2005 – 2006<br />

Value of<br />

executed<br />

payments<br />

C<strong>on</strong>sumpti<strong>on</strong><br />

rate %<br />

2005-2006<br />

Preservati<strong>on</strong> of soil and protecti<strong>on</strong><br />

aga<strong>in</strong>st erosi<strong>on</strong><br />

Preservati<strong>on</strong> of biodiversity by<br />

traditi<strong>on</strong>al agriculture methods<br />

40 739,801.60 0.00 0.00<br />

20 369,900.80 186,720.87 50.48<br />

Organic Farm<strong>in</strong>g 40 739,801.60 0.00 0.00<br />

TOTAL 100 1,849,504.00 186,720.87 10.10<br />

The distributi<strong>on</strong> <strong>on</strong> regi<strong>on</strong>s of projects under Measure 3.3 is given <strong>in</strong> Diagram II.46:<br />

Diagram II.46<br />

Number of c<strong>on</strong>tracted projects and committed amounts under Measure 3.3 / Regi<strong>on</strong><br />

50<br />

0,90<br />

45<br />

Number of C<strong>on</strong>trected projects<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

47<br />

0,80<br />

40<br />

0,70<br />

Number of C<strong>on</strong>trected projects<br />

35<br />

30<br />

25<br />

20<br />

15<br />

0,76<br />

0,60<br />

0,50<br />

0,40<br />

0,30<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

10<br />

0,20<br />

5<br />

0,00<br />

0,00<br />

0,00 0,00<br />

0,00 0,00<br />

0,00<br />

0,10<br />

0<br />

0<br />

0<br />

0<br />

0 0 0<br />

0<br />

0,00<br />

Regi<strong>on</strong> 1 Regi<strong>on</strong> 2 Regi<strong>on</strong> 3 Regi<strong>on</strong> 4 Regi<strong>on</strong> 5 Regi<strong>on</strong> 6 Regi<strong>on</strong> 7 Regi<strong>on</strong> 8<br />

Regi<strong>on</strong><br />

With<strong>in</strong> Measure 3.4 “Development and diversificati<strong>on</strong> of ec<strong>on</strong>omic activities<br />

generat<strong>in</strong>g multiple activities and alternative <strong>in</strong>come”, the public c<strong>on</strong>tracted amount<br />

100


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

of the c<strong>on</strong>tracts was 70.060 milli<strong>on</strong> Euro i.e. 5.00% out of the total amount of<br />

PARDF’s commitments.<br />

For the 1,083 projects c<strong>on</strong>tracted under Measure 3.4, payments of a total amount<br />

of 225,339.095 thousand LEI i.e. 64.832 milli<strong>on</strong> Euro (Table II.32) – 92.54% of the<br />

c<strong>on</strong>tracted value and 76.98% of the NPARD allocati<strong>on</strong>s for 2002 – 2006 were<br />

authorized and executed.<br />

Table II.31<br />

Report <strong>on</strong> Executed Commitments by sub-measures under Measure 3.4 by 31.12.2008<br />

Submeasure<br />

% out of<br />

the<br />

measure<br />

Allocati<strong>on</strong><br />

2002 – 2006<br />

Value of<br />

c<strong>on</strong>tracted<br />

projects<br />

Euro<br />

Commitment<br />

rate %<br />

2002-2006<br />

Agriculture Services 2 1,684,410.67 188,523.40 11.19<br />

Rural tourism 25 21,055,133.35 55,651,403.54 264.31<br />

Other types of tourism activities <strong>in</strong><br />

rural area<br />

20 16,844,106.68 5,150,303.48 30.58<br />

Handcraft activities 10 8,422,053.34 1,209,733.25 14.36<br />

Acvaculture 8 6.737,642.67 1,908,005.41 28.32<br />

Other activities 10 8,422,053.34 5,917,002.55 70.26<br />

Process<strong>in</strong>g at farm's level of the<br />

certified traditi<strong>on</strong>al and/ or organic 25 21,055,133.35 35,090.19 0.17<br />

products<br />

TOTAL 100 84,220,533.41 70,060,061.80 83.19<br />

Table II.32<br />

Report <strong>on</strong> the Executed Payments by sub-measures under Measure 3.4 by 31.12.2008<br />

Euro<br />

Submeasure<br />

% out of<br />

the<br />

measure<br />

Allocati<strong>on</strong><br />

2002 – 2006<br />

Value of<br />

executed<br />

payments<br />

C<strong>on</strong>sumptio<br />

n rate %<br />

2002-2006<br />

Agriculture Services 2 1,684,410.67 203,213.87 12.06<br />

Rural tourism 25 21,055,133.35 51,307,470.79 243.68<br />

Other types of turist activities <strong>in</strong><br />

rural area<br />

20 16,844,106.68 4,772,591.75 28.33<br />

Handcraft activities 10 8,422,053.34 1,170,444.84 13.90<br />

Acvaculture 8 6,737,642.67 1,493,783.84 22.17<br />

Other activities 10 8,422,053.34 5,848,305.15 69.44<br />

Process<strong>in</strong>g at farm's level of the<br />

certified traditi<strong>on</strong>al and/ or organic 25 21,055,133.35 36,467.51 0.17<br />

products<br />

TOTAL 100 84,220,533.41 64,832,277.75 76.98<br />

As regards the general distributi<strong>on</strong> of projects unaffected by natural disasters under<br />

measure 3.4, Regi<strong>on</strong> 7 Central Alba Iulia is best represented hold<strong>in</strong>g 32.22% from<br />

the total of the projects approved <strong>on</strong> this measure; Regi<strong>on</strong> 1 North-East Iasi holds<br />

approximately 16.57% from the total of the approved projects, and Regi<strong>on</strong> 4 South-<br />

West Oltenia holds 13.70%. Thus, these three regi<strong>on</strong>s hold 62.49% from the total of<br />

the approved projects, aspect which can be expla<strong>in</strong>ed by the fact that many areas<br />

101


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

with a traditi<strong>on</strong> <strong>in</strong> agro-tourism are present <strong>in</strong> these regi<strong>on</strong>s.<br />

The regi<strong>on</strong>al distributi<strong>on</strong> of projects under measure 3.4 is presented <strong>in</strong> Diagram II.47<br />

Number of c<strong>on</strong>tracted projects and committed amounts under Measure 3.4 / Regi<strong>on</strong><br />

Diagram II.47<br />

400<br />

Number of C<strong>on</strong>trected projects<br />

93,09<br />

100,00<br />

350<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

90,00<br />

80,00<br />

Number of C<strong>on</strong>trected projects<br />

300<br />

250<br />

200<br />

150<br />

100<br />

179<br />

44,59<br />

87<br />

73<br />

148<br />

22,50<br />

89<br />

145<br />

34,86<br />

348<br />

70,00<br />

60,00<br />

50,00<br />

40,00<br />

30,00<br />

20,00<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

50<br />

17,70<br />

16,24<br />

20,76<br />

11<br />

10,00<br />

0<br />

1,94<br />

Regi<strong>on</strong> 1 Regi<strong>on</strong> 2 Regi<strong>on</strong> 3 Regi<strong>on</strong> 4 Regi<strong>on</strong> 5 Regi<strong>on</strong> 6 Regi<strong>on</strong> 7 Regi<strong>on</strong> 8<br />

0,00<br />

Regi<strong>on</strong><br />

The regi<strong>on</strong>al distributi<strong>on</strong> of projects affected by natural disasters with<strong>in</strong> measure 3.4<br />

is presented <strong>in</strong> Diagram II.48.<br />

Diagram II.48<br />

102


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Number of c<strong>on</strong>tracted projects and committed amounts under Measure 3.4 / Regi<strong>on</strong><br />

(Affected by natural disasters)<br />

3,5<br />

3<br />

Number of C<strong>on</strong>trected projects<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

1,64<br />

1,80<br />

1,60<br />

Number of C<strong>on</strong>trected projects<br />

2,5<br />

2<br />

1,5<br />

1<br />

3<br />

1,40<br />

1,20<br />

1,00<br />

0,80<br />

0,60<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

0,40<br />

0,5<br />

0<br />

0,00<br />

0,00 0,00<br />

0,00<br />

0,00<br />

0,00<br />

0,00<br />

0 0 0<br />

0<br />

0<br />

0<br />

0<br />

Regi<strong>on</strong> 1 Regi<strong>on</strong> 2 Regi<strong>on</strong> 3 Regi<strong>on</strong> 4 Regi<strong>on</strong> 5 Regi<strong>on</strong> 6 Regi<strong>on</strong> 7 Regi<strong>on</strong> 8<br />

Regi<strong>on</strong><br />

0,20<br />

0,00<br />

With<strong>in</strong> Measure 3.5 „Forestry”, the public c<strong>on</strong>tracted value was of 66.677 milli<strong>on</strong> Euro<br />

represent<strong>in</strong>g 4.76% from the total committed amounts of PARDF.<br />

The total value of the c<strong>on</strong>tracted projects <strong>on</strong> this measure (66.677 milli<strong>on</strong> Euro)<br />

represents 89.56% of AFA 2002-2006 (Table II.33).<br />

For the 114 projects c<strong>on</strong>tracted <strong>on</strong> Measure 3.5 payments were authorized and<br />

executed <strong>in</strong> value of 155,091.120 thousand LEI, represent<strong>in</strong>g 42.548 milli<strong>on</strong> Euro<br />

(Table II.34) – 63.81% from the c<strong>on</strong>tracted value and 57.15% from the allocati<strong>on</strong>s of<br />

NPARD 2000-2006.<br />

Table II.33<br />

Report <strong>on</strong> Executed Commitments by sub-measures under Measure 3.5 by 31.12.2008<br />

Euro<br />

Submeasure<br />

% out of<br />

the<br />

measure<br />

Allocati<strong>on</strong><br />

2003 – 2006<br />

Value of<br />

c<strong>on</strong>tracted<br />

projects<br />

Commitment<br />

rate %<br />

2003-2006<br />

Afforestati<strong>on</strong> 10 7,445,100.67 89,431.74 1.20<br />

Nurseries 5 3,722,550.33 23,892.09 0.64<br />

Investments for the<br />

improvement of primary wood<br />

process<strong>in</strong>g and market<strong>in</strong>g of<br />

15 11,167,651.00 6,072,161.69 54.37<br />

forest products<br />

Forestry roads 20 14,890,201.33 60,491,197.90 406.25<br />

Forest exploitati<strong>on</strong> 50 37,225,503.33 0.00 0.00<br />

TOTAL 100 74,451,006.67 66,676,683.41 89.56<br />

103<br />

Table II.34


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Report <strong>on</strong> the Executed Payments by sub-measures under Measure 3.5 by 31.12.2008<br />

Submeasure<br />

% out of<br />

the<br />

measure<br />

Allocati<strong>on</strong><br />

2003 – 2006<br />

Value of<br />

executed<br />

payments<br />

Euro<br />

C<strong>on</strong>sumpti<strong>on</strong><br />

rate<br />

% 2003-2006<br />

Afforestati<strong>on</strong> 10 7,445,100.67 87,185.99 1.17<br />

Nurseries 5 3,722,550.33 24,965.08 0.67<br />

Investments for the<br />

improvement of primary wood<br />

process<strong>in</strong>g and market<strong>in</strong>g of<br />

15 11,167,651.00 6,392,262.52 57.24<br />

forest products<br />

Forestry roads 20 14,890,201.33 36,043,240.85 242.06<br />

Forest exploitati<strong>on</strong> 50 37,225,503.33 0.00 0.00<br />

TOTAL 100 74,451,006.67 42,547,654.45 57.15<br />

As regards the regi<strong>on</strong>al distributi<strong>on</strong> of the projects <strong>on</strong> Measure 3.5, Regi<strong>on</strong> 7 Central<br />

Alba Iulia is best represented, hold<strong>in</strong>g 33.33% from the total number of the projects<br />

approved with<strong>in</strong> this measure. Regi<strong>on</strong> 6 Nord - West holds approximately 29.83%<br />

from the total number of the approved projects, while Regi<strong>on</strong> 5 West Romania – has<br />

15.79%. In c<strong>on</strong>clusi<strong>on</strong>, these three regi<strong>on</strong>s hold 78.95% of the total approved<br />

projects under this measure.<br />

The regi<strong>on</strong>al distributi<strong>on</strong> of the approved projects <strong>on</strong> measure 3.5 is presented <strong>in</strong><br />

Diagram II.49.<br />

Number of c<strong>on</strong>tracted projects and committed amounts under Measure 3.5 / Regi<strong>on</strong><br />

Diagram II.49<br />

40<br />

35<br />

Number of C<strong>on</strong>trected projects<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

78,20<br />

38<br />

90,00<br />

80,00<br />

Number of C<strong>on</strong>trected projects<br />

30<br />

25<br />

20<br />

15<br />

10<br />

27,04<br />

17<br />

42,05<br />

18<br />

34<br />

77,02<br />

70,00<br />

60,00<br />

50,00<br />

40,00<br />

30,00<br />

20,00<br />

Committed amounts (Milli<strong>on</strong>s RON)<br />

5<br />

0<br />

10,47<br />

0,00<br />

5<br />

2<br />

0<br />

0,00 0<br />

1,73<br />

Regi<strong>on</strong> 1 Regi<strong>on</strong> 2 Regi<strong>on</strong> 3 Regi<strong>on</strong> 4 Regi<strong>on</strong> 5 Regi<strong>on</strong> 6 Regi<strong>on</strong> 7 Regi<strong>on</strong> 8<br />

Regi<strong>on</strong><br />

10,00<br />

0,00<br />

For Measure 4.1 „Improvement of Vocati<strong>on</strong>al Tra<strong>in</strong><strong>in</strong>g”, the public c<strong>on</strong>tracted<br />

amount was of 2.901 milli<strong>on</strong> Euro i.e 0.21% out of the total amount of PARDF’s<br />

commitments.<br />

For the 5 projects c<strong>on</strong>tracted under Measure 4.1 payments were authorized and<br />

executed <strong>in</strong> value of 10,521.610 thousand LEI, represent<strong>in</strong>g 3.028 milli<strong>on</strong> Euro (Table<br />

104


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

II.35 and II.36) – 104.39% from the c<strong>on</strong>tracted value and 76.69% from the allocati<strong>on</strong>s<br />

of NPARD 2002-2006.<br />

Report <strong>on</strong> the Executed Commitments - Measure 4.1 by 31.12.2008<br />

Table II.35<br />

Euro<br />

Measure 4.1<br />

Allocati<strong>on</strong><br />

2002 – 2006<br />

Value of c<strong>on</strong>tracted<br />

projects<br />

Commitment rate %<br />

2002-2006<br />

TOTAL 3,949,238.67 2,901,044.70 73.46<br />

Table II.36<br />

Report <strong>on</strong> the Executed Payments by sub-measures under Measure 4.1 by 31.12.2008<br />

Euro<br />

Measure 4.1<br />

Allocati<strong>on</strong><br />

2002 – 2006<br />

Value of executed<br />

payments<br />

Commitment rate<br />

% 2002-2006<br />

TOTAL 3,949,238.67 3,028,493.43 76.69<br />

For Measure 4.2 „Technical Assistance”, the public c<strong>on</strong>tracted amount was of 1.374<br />

milli<strong>on</strong> Euro i.e. 0.10% out of the total amount of PARDF’s commitments.<br />

For the 10 projects c<strong>on</strong>tracted under Measure 4.2, payments of a total amount of<br />

5,214.570 thousand LEI i.e. 1.424 milli<strong>on</strong> Euro (103.60% out of the c<strong>on</strong>tracted value<br />

and 98.79% out of the NPARD allocati<strong>on</strong>s for 2000 – 2006) were authorized and<br />

executed (Table II.37).<br />

Measure 4.2<br />

Report <strong>on</strong> the Executed Commitments - Measure 4.2 by 31.12.2008<br />

Allocati<strong>on</strong><br />

2000 – 2006<br />

Value of c<strong>on</strong>tracted<br />

projects<br />

Table II.37<br />

Commitment rate<br />

% 2000-2006<br />

TOTAL 1,441,406.25 1,374,497.80 95.36<br />

Euro<br />

Report <strong>on</strong> the Executed Payments by Measure 4.2 by 31.12.2008<br />

Table II.38<br />

Euro<br />

Measure 4.2<br />

Allocati<strong>on</strong><br />

2000 – 2006<br />

Value of executed<br />

payments<br />

C<strong>on</strong>sumpti<strong>on</strong> rate<br />

% 2000-2006<br />

TOTAL 1,441,406.25 1,424,016.45 98.79<br />

105


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Chapter III<br />

Measures to improve quality and efficiency of SAPARD<br />

Programme implementati<strong>on</strong><br />

III.1 Activities of the Manag<strong>in</strong>g Authority<br />

In accordance with the provisi<strong>on</strong>s set out <strong>in</strong> Art. 5 – 11 of Secti<strong>on</strong> B <strong>on</strong> “Programme<br />

management, m<strong>on</strong>itor<strong>in</strong>g, and assessment” of the Multi-Annual F<strong>in</strong>ancial Agreement,<br />

the Manag<strong>in</strong>g Authority has tasks regard<strong>in</strong>g the m<strong>on</strong>itor<strong>in</strong>g, <str<strong>on</strong>g>annual</str<strong>on</strong>g> and f<strong>in</strong>al <str<strong>on</strong>g>report</str<strong>on</strong>g><strong>in</strong>g<br />

and mid-term and ex-post evaluati<strong>on</strong> of the SAPARD Programme, be<strong>in</strong>g the ma<strong>in</strong><br />

body resp<strong>on</strong>sible with the efficiency and reliability of the coord<strong>in</strong>ati<strong>on</strong> and <str<strong>on</strong>g>report</str<strong>on</strong>g><strong>in</strong>g<br />

carried out <strong>in</strong> relati<strong>on</strong> to the m<strong>on</strong>itor<strong>in</strong>g and evaluati<strong>on</strong> of the SAPARD Programme.<br />

The Manag<strong>in</strong>g Authority (MA) is the authorized body that can make proposals to the<br />

Commissi<strong>on</strong> <strong>on</strong> any adjustments that need to be brought to the Programme, after<br />

c<strong>on</strong>sultati<strong>on</strong>s with the Pay<strong>in</strong>g Agency for Rural Development and Fishery (PARDF)<br />

and after receiv<strong>in</strong>g the agreement of the M<strong>on</strong>itor<strong>in</strong>g Committee’s members.<br />

Accord<strong>in</strong>g to the provisi<strong>on</strong>s of Government Decisi<strong>on</strong> no. 385/2007 <strong>on</strong> the<br />

organizati<strong>on</strong> and functi<strong>on</strong><strong>in</strong>g of the M<strong>in</strong>istry of Agriculture and Rural Development,<br />

with its follow<strong>in</strong>g amendments and completi<strong>on</strong>s, the M<strong>in</strong>istry of Agriculture, Forests<br />

and Rural Development, through the Directorate General for Rural Development, is<br />

the Manag<strong>in</strong>g Authority for agriculture and rural development for the SAPARD<br />

Programme and for the Nati<strong>on</strong>al Rural Development Programme<br />

Accord<strong>in</strong>g to its specific tasks, <strong>in</strong> 2008, MA organised a number of activities to help<br />

<strong>in</strong>crease the efficiency of the Programme implementati<strong>on</strong>, by ensur<strong>in</strong>g the<br />

coord<strong>in</strong>ati<strong>on</strong> of the m<strong>on</strong>itor<strong>in</strong>g and <str<strong>on</strong>g>report</str<strong>on</strong>g><strong>in</strong>g activities.<br />

In 2008, the Manag<strong>in</strong>g Authority organised the 16 th reuni<strong>on</strong> of the M<strong>on</strong>itor<strong>in</strong>g<br />

Committee for the SAPARD Programme (MC), <strong>on</strong> the 25 th of November. The<br />

approval, <strong>in</strong> written procedure, by the M<strong>on</strong>itor<strong>in</strong>g Committee members of the 2007<br />

SAPARD Annual Report has been c<strong>on</strong>sidered the 15 th reuni<strong>on</strong>.<br />

The Manag<strong>in</strong>g Authority has ensured the secretariat of the Committee’s reuni<strong>on</strong>s and<br />

has ma<strong>in</strong>ta<strong>in</strong>ed a permanent c<strong>on</strong>tact with the bodies represented <strong>in</strong> the Committee <strong>in</strong><br />

order to identify the problems they are fac<strong>in</strong>g.<br />

Whenever necessary, the Manag<strong>in</strong>g Authority notified the <strong>in</strong>stituti<strong>on</strong>s <strong>in</strong>volved <strong>in</strong> the<br />

SAPARD Programme implementati<strong>on</strong> c<strong>on</strong>cern<strong>in</strong>g the occurr<strong>in</strong>g problems <strong>in</strong> order to<br />

identify appropriate measures for address<strong>in</strong>g them.<br />

106


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

In order to avoid the decommitment of the funds, the Manag<strong>in</strong>g Authority for<br />

SAPARD Programme solicited to the European Commissi<strong>on</strong> to prol<strong>on</strong>g the validity<br />

term of the amount allocated through AFA 2006 from n+2 to n+3.<br />

In this regard, the Manag<strong>in</strong>g Authority submitted to the European Commissi<strong>on</strong>,<br />

through address no. 77787/18 th of April 2008, an official request for the prol<strong>on</strong>gati<strong>on</strong><br />

of the AFA 2006 validity.<br />

The European Commissi<strong>on</strong> transmitted to the Romanian authorities a po<strong>in</strong>t of view<br />

regard<strong>in</strong>g AFA’s 2006 prol<strong>on</strong>gati<strong>on</strong> through address no. D(2008)1081 from<br />

05.11.2008 menti<strong>on</strong><strong>in</strong>g, at the same time, that the decisi<strong>on</strong> regard<strong>in</strong>g the<br />

prol<strong>on</strong>gati<strong>on</strong> of the deadl<strong>in</strong>e for the decommitment does not co<strong>in</strong>cide with the<br />

recommencement of the funds by the Commissi<strong>on</strong>; the Commissi<strong>on</strong> will start the<br />

reimbursement of the Community c<strong>on</strong>tributi<strong>on</strong> <strong>on</strong>ly when the EC services will receive<br />

the f<strong>in</strong>al <strong>in</strong>dependent audit <str<strong>on</strong>g>report</str<strong>on</strong>g> from NAO, follow<strong>in</strong>g the revise of the <str<strong>on</strong>g>report</str<strong>on</strong>g> and of<br />

the additi<strong>on</strong>al comments made by NAO, which have to highlight that the acti<strong>on</strong> plan<br />

can be implemented.<br />

Hav<strong>in</strong>g <strong>in</strong> regard that, <strong>in</strong> accordance with art. 2 from MAFA, the EC f<strong>in</strong>ancial<br />

c<strong>on</strong>tributi<strong>on</strong> is established through <str<strong>on</strong>g>annual</str<strong>on</strong>g> f<strong>in</strong>anc<strong>in</strong>g agreements, MA made all the<br />

necessary acti<strong>on</strong>s <strong>in</strong> order to close, ratify and notify the ratificati<strong>on</strong> of the Agreement<br />

modify<strong>in</strong>g the Annual F<strong>in</strong>anc<strong>in</strong>g Agreement for 2006, agreement signed <strong>on</strong> the 4 th of<br />

December 2008.<br />

Hav<strong>in</strong>g <strong>in</strong> regard that the Multi-Annual F<strong>in</strong>ancial Agreement (Art. 2) stipulates that the<br />

EC c<strong>on</strong>tributi<strong>on</strong> is determ<strong>in</strong>ed through the Annual F<strong>in</strong>ancial Agreements, the MA has<br />

taken the necessary steps to c<strong>on</strong>clude, ratify, and notify the ratificati<strong>on</strong> of the 2006<br />

Agreement, agreement signed <strong>on</strong> 4 th of December 2008.<br />

Also dur<strong>in</strong>g 2008, the Manag<strong>in</strong>g Authority carried out activities of analys<strong>in</strong>g and<br />

process<strong>in</strong>g the statistical <strong>in</strong>formati<strong>on</strong> received from the PARDF c<strong>on</strong>cern<strong>in</strong>g the<br />

SAPARD Programme. These activities comprise:<br />

• Verify<strong>in</strong>g, process<strong>in</strong>g and archiv<strong>in</strong>g the daily and weekly <str<strong>on</strong>g>report</str<strong>on</strong>g>s sent by<br />

PARDF by measure and sub-measure c<strong>on</strong>cern<strong>in</strong>g the degree of<br />

commitment and c<strong>on</strong>sumpti<strong>on</strong> of the amounts allocated, the projects’<br />

physical stage of implementati<strong>on</strong>.<br />

• Verify<strong>in</strong>g, m<strong>on</strong>itor<strong>in</strong>g and archiv<strong>in</strong>g the Registers of Payment Dossiers<br />

(RPD);<br />

• Verify<strong>in</strong>g the implementati<strong>on</strong> stage of projects by measures and submeasures<br />

at county and regi<strong>on</strong>al level;<br />

• Verify<strong>in</strong>g the <strong>in</strong>formati<strong>on</strong> exist<strong>in</strong>g <strong>in</strong> the m<strong>on</strong>thly/trimester <strong>in</strong>form<strong>in</strong>g notes<br />

regard<strong>in</strong>g the progress of the technical and f<strong>in</strong>ancial implementati<strong>on</strong> of the<br />

measures and sub-measures, compared to the commitments envisaged<br />

accord<strong>in</strong>g to the Annual F<strong>in</strong>anc<strong>in</strong>g Agreements;<br />

• Weekly elaborati<strong>on</strong> of the m<strong>on</strong>itor<strong>in</strong>g tables by measures and submeasures<br />

<strong>in</strong> order to <strong>in</strong>form the management of the m<strong>in</strong>istry regard<strong>in</strong>g the<br />

absorpti<strong>on</strong> stage of the funds allocated through the <strong>programme</strong>.<br />

• Justify<strong>in</strong>g the proposals regard<strong>in</strong>g the amounts necessary amounts <strong>in</strong> order<br />

to ensure the co-f<strong>in</strong>anc<strong>in</strong>g of projects through the <strong>programme</strong>.<br />

107


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Dur<strong>in</strong>g the 16 th reuni<strong>on</strong> of the SAPARD Programme the Manag<strong>in</strong>g Authority proposed<br />

for approval of the MC members the NPARD’s f<strong>in</strong>ancial table for measure 2.1<br />

“Development and improvement of rural <strong>in</strong>frastructure”, for 2006, a reallocati<strong>on</strong> of<br />

45.00 milli<strong>on</strong> Euro from the Community c<strong>on</strong>tributi<strong>on</strong> from the affected areas to the not<br />

affected areas, without modify<strong>in</strong>g the <strong>in</strong>itially allocated amount for this measure,<br />

respectively the value of 524.81 milli<strong>on</strong> Euro.<br />

Also, MA proposed the <strong>in</strong>creas<strong>in</strong>g with 0.1 milli<strong>on</strong> Euro, the Community c<strong>on</strong>tributi<strong>on</strong><br />

for measure 4.2 “Technical Assistance” for 2005, through redistributi<strong>on</strong> from measure<br />

1.2 “Improv<strong>in</strong>g the structures for quality, veter<strong>in</strong>ary, and plant-health c<strong>on</strong>trol, for the<br />

quality of foodstuffs and for c<strong>on</strong>sumer protecti<strong>on</strong>” <strong>in</strong> order for the f<strong>in</strong>ancial allocati<strong>on</strong><br />

level to corresp<strong>on</strong>d to the value foreseen <strong>in</strong> the acquisiti<strong>on</strong> <strong>programme</strong> elaborated for<br />

this measure.<br />

Dur<strong>in</strong>g 2008, the General Directorate for Rural Development approved the f<strong>in</strong>al<br />

activity <str<strong>on</strong>g>report</str<strong>on</strong>g>s for the follow<strong>in</strong>g projects with<strong>in</strong> 4.1 “Improv<strong>in</strong>g vocati<strong>on</strong>al tra<strong>in</strong><strong>in</strong>g”:<br />

• Vocati<strong>on</strong>al tra<strong>in</strong><strong>in</strong>g for the development of the competencies regard<strong>in</strong>g the<br />

agricultural methods assigned to protect the envir<strong>on</strong>ment and ma<strong>in</strong>ta<strong>in</strong> the<br />

rural landscape;<br />

• Vocati<strong>on</strong>al tra<strong>in</strong><strong>in</strong>g <strong>in</strong> the development of competencies regard<strong>in</strong>g the<br />

vegetable and breed<strong>in</strong>g animals’ producti<strong>on</strong>;<br />

• Vocati<strong>on</strong>al tra<strong>in</strong><strong>in</strong>g for the development of competencies <strong>in</strong> forestry.<br />

Moreover, the f<strong>in</strong>al activity <str<strong>on</strong>g>report</str<strong>on</strong>g> for the project “Set up and preparati<strong>on</strong> of the<br />

M<strong>on</strong>itor<strong>in</strong>g Committee meet<strong>in</strong>gs <strong>in</strong> 2005, 2006 and 2007” with<strong>in</strong> measure 4.2<br />

“Technical Assistance” was approved.<br />

Hav<strong>in</strong>g <strong>in</strong> regard the European Commissi<strong>on</strong>’s request c<strong>on</strong>cern<strong>in</strong>g the elaborati<strong>on</strong> and<br />

implementati<strong>on</strong> of the Acti<strong>on</strong> Plan, the Manag<strong>in</strong>g Authority has collaborated with the<br />

Nati<strong>on</strong>al Fund and PARDF, thus m<strong>on</strong>itor<strong>in</strong>g the implementati<strong>on</strong> of the Acti<strong>on</strong> Plan.<br />

Also, MA has c<strong>on</strong>stantly <strong>in</strong>formed <strong>on</strong> the <strong>programme</strong>’s implementati<strong>on</strong> stage by bim<strong>on</strong>thly<br />

<str<strong>on</strong>g>report</str<strong>on</strong>g>s regard<strong>in</strong>g the value of the c<strong>on</strong>tracts/ performed payments from the<br />

European Commissi<strong>on</strong>’s c<strong>on</strong>tributi<strong>on</strong>.<br />

III. 2 Competent Authority – Nati<strong>on</strong>al Fund Activities<br />

III. 2.1 F<strong>in</strong>ancial aspects regard<strong>in</strong>g the implement<strong>in</strong>g status of SAPARD<br />

Programme<br />

III. 2.1.1 Declarati<strong>on</strong>s of expenditure and requests of funds to the European<br />

Commissi<strong>on</strong><br />

Accord<strong>in</strong>g to the supplementary Declarati<strong>on</strong> of expenditure and the Request of Funds<br />

no. 36, with cut off date November, 30th 2008, the total amount of expenditures from<br />

European Uni<strong>on</strong>’s SAPARD funds from the beg<strong>in</strong>n<strong>in</strong>g of the <strong>programme</strong> up to<br />

November, 31 st 2008 is 909,963,876.79 Euro. This sum also <strong>in</strong>cludes the amount of<br />

685.167,89 Euro represent<strong>in</strong>g payments effectuated from the <strong>in</strong>terest gathered <strong>in</strong> the<br />

Euro SAPARD account and which, accord<strong>in</strong>g to EC’s recommendati<strong>on</strong>s, have been<br />

<strong>in</strong>cluded <strong>in</strong> Table A1 of the Declarati<strong>on</strong>s of expenditures and Request of funds no.<br />

36. The Declarati<strong>on</strong> of expenditure with cut off date, the 4 th quarter of 2008, was<br />

submitted to EC <strong>on</strong> 19 th of May 2009.<br />

108


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

In 2008, the Nati<strong>on</strong>al Fund submitted to EC-DG AGRI, the Declarati<strong>on</strong>s of<br />

expenditure and Requests of funds <strong>in</strong> amount of 152,050,058. 27 Euro, as it follows:<br />

• Declarati<strong>on</strong> of Expenditure and Request of Funds no. 33 with respect to<br />

quarter IV 2007, <strong>in</strong> amount of 11,696,348.08 Euro, submitted to the European<br />

Commissi<strong>on</strong> <strong>on</strong> 05.02.2008 by letter no. 310280;<br />

• Declarati<strong>on</strong> of Expenditure and Request of Funds no. 34 with respect to<br />

quarter I 2008, <strong>in</strong> amount of 28,332,290.40 Euro, submitted to the European<br />

Commissi<strong>on</strong> <strong>on</strong> 12.06.2008 by letter no. 313689;<br />

• Declarati<strong>on</strong> of Expenditure and Request of Funds no. 35, with respect to 2 nd<br />

and 3 rd quarter of 2008, submitted to the European Commissi<strong>on</strong> <strong>on</strong><br />

03.11.2008 by letter no. 316992, did not <strong>in</strong>clude the payments fulfilled dur<strong>in</strong>g<br />

the <str<strong>on</strong>g>report</str<strong>on</strong>g><strong>in</strong>g period due to the fact that the payments fulfilled dur<strong>in</strong>g the 2 nd<br />

quarter of 2008 should have been re-verified accord<strong>in</strong>g to the improved<br />

manuals of procedures and dur<strong>in</strong>g the 3 rd quarter payments had not been<br />

performed;<br />

• Declarati<strong>on</strong> of expenditure and Request of funds no. 36 with respect to<br />

October and November 2008, <strong>in</strong> amount of 112,021,419.79 Euro submitted to<br />

the European Commissi<strong>on</strong> <strong>on</strong> 18.12.2008 by letter no. 318700.<br />

Dur<strong>in</strong>g 2008, no payments were performed from the <strong>in</strong>terest accumulated <strong>in</strong> Euro<br />

SAPARD account. The <strong>in</strong>terest accrued <strong>on</strong> 31.12.2008 is <strong>in</strong> amount of 2,087,624.27<br />

Euro (the amount accumulated dur<strong>in</strong>g 2008 is 649,575.25 Euro).<br />

III. 2.1.2 Reimbursements from European Commissi<strong>on</strong><br />

Dur<strong>in</strong>g 2008 the European Commissi<strong>on</strong> reimbursed to the Nati<strong>on</strong>al Fund a total<br />

amount of 10.549.598, 00 Euro from the total eligible amount requested <strong>in</strong> 2008, as it<br />

is presented <strong>in</strong> the table below:<br />

Table III.1<br />

No.<br />

declar<br />

ati<strong>on</strong><br />

33<br />

34<br />

35<br />

36<br />

Declarati<strong>on</strong> of<br />

expenditure and Request<br />

of funds<br />

Declarati<strong>on</strong> of expenditure<br />

and Request of funds trim.<br />

IV 2007<br />

Declarati<strong>on</strong> of expenditure<br />

and Request of funds trim.<br />

I 2008<br />

Declarati<strong>on</strong> of expenditure<br />

and Request of funds trim.<br />

I and III 2008<br />

Declarati<strong>on</strong> of expenditure<br />

and Request of funds with<br />

cut off date 30.11.2008<br />

Requested<br />

amount<br />

11,696,348.08<br />

Date of<br />

submissi<strong>on</strong><br />

to EC<br />

28,332,290.40 12-iun-08<br />

0 03-nov-08<br />

112,021,419.79 18-dec-08<br />

Amount<br />

transferred<br />

from EC<br />

Date of<br />

transfer<br />

05-feb-08 10,549,598.00 10-apr-2008<br />

TOTAL 152,050,058.27 10,549,598.00<br />

The difference from the requested amount and the transferred <strong>on</strong>e <strong>in</strong> amount of<br />

141,500,460.27 Euro, will be subjected to the transfers from the European<br />

Commissi<strong>on</strong> from the budget of 2009, after the implementati<strong>on</strong> of the ”Acti<strong>on</strong> plan for<br />

the implementati<strong>on</strong> of DG AGRI’s recommendati<strong>on</strong>s follow<strong>in</strong>g the m<strong>on</strong>itor<strong>in</strong>g missi<strong>on</strong><br />

from 3rd-13 th of June 2008”.<br />

109


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Moreover, <strong>in</strong> 2008, EC reimbursed to Romania the expenditures fulfilled and declared<br />

to EC <strong>in</strong> the 3 rd and 4 th quarter 2007, <strong>in</strong> amount of 77,933,537.00 Euro.<br />

The c<strong>on</strong>clusi<strong>on</strong> is that dur<strong>in</strong>g 2008, <strong>in</strong> the Euro SAPARD account were reimbursed<br />

amounts from EC totalis<strong>in</strong>g 88,483,135.00 Euro.<br />

III. 2.1.3 Written-off debts accord<strong>in</strong>g to art. 14 (2.8) from Secti<strong>on</strong> A of the MAFA<br />

annex<br />

The written-off debts accord<strong>in</strong>g to art. 14 (2.8) from Secti<strong>on</strong> A of the MAFA annex<br />

have been menti<strong>on</strong>ed <strong>in</strong> Tabel A4 –„Cancelled debts accord<strong>in</strong>g to art. 14 (2.8) from<br />

Secti<strong>on</strong> A of the MAFA annex and deducted from the present Declarati<strong>on</strong>” (attached<br />

to each Declarati<strong>on</strong> of expenditure and Request of Funds).<br />

In the table below, we present the written- off debts accord<strong>in</strong>g to art.14 (2.8) from<br />

Secti<strong>on</strong> A of the MAFA annex stat<strong>in</strong>g that, <strong>on</strong>ly the value of the debt bel<strong>on</strong>g<strong>in</strong>g to EC<br />

c<strong>on</strong>tributi<strong>on</strong> was cancelled and deducted from the Declarati<strong>on</strong>s of expenditure<br />

submitted to EC. Accord<strong>in</strong>g to NF’s procedures, the Euro SAPARD account was<br />

replenished with amounts from the state budget represent<strong>in</strong>g the amount of the<br />

cancelled debt bel<strong>on</strong>g<strong>in</strong>g to EC c<strong>on</strong>tributi<strong>on</strong>.<br />

As about the debt no. 114, although it was written off, <strong>in</strong> short time it was recovered<br />

from the beneficiary and c<strong>on</strong>sequently, it was deducted from Declarati<strong>on</strong> of<br />

Expenditure no. 34 (recorded at po<strong>in</strong>t 23 of Table A2 – “Debts recovered” attached to<br />

the Declarati<strong>on</strong>).<br />

Table III.2<br />

No.<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

No/Debt<br />

date<br />

108/18.02.2<br />

006<br />

110/24.02.2<br />

006<br />

115/28.02.2<br />

006<br />

114/28.02.2<br />

006<br />

117/13.03.2<br />

006<br />

118/22.03.2<br />

006<br />

121/10.04.2<br />

006<br />

123/14.04.2<br />

006<br />

129/15.05.2<br />

006<br />

144/19.07.2<br />

006<br />

153/12.09.2<br />

006<br />

159/17.10.2<br />

006<br />

161/25.10.2<br />

006<br />

Irregularity<br />

code<br />

192<br />

194<br />

199<br />

198<br />

201<br />

202<br />

RO/06/019/S<br />

RO/06/021/S<br />

RO/06/027/S<br />

RO/06/042/S<br />

RO/06/053/S<br />

RO/06/059/S<br />

RO/06/061/S<br />

Beneficiary<br />

CL Tuzla, jud.<br />

C<strong>on</strong>stanţa<br />

CL Bălăneşti, jud.<br />

Gorj<br />

CL Mahmudia, jud.<br />

Tulcea<br />

CL Golăeşti, jud.<br />

Iaşi<br />

CL Tartasesti, jud.<br />

Dambovita<br />

CL Sanmart<strong>in</strong>, jud.<br />

Bihor<br />

CL Brebu, jud.<br />

Prahova<br />

CL Susani, jud.<br />

Vâlcea<br />

PFA Maftei Tiberiu<br />

CL Pângăraţi, jud.<br />

Neamţ<br />

CL Săcelu, jud. Gorj<br />

CL Săcelu, jud. Gorj<br />

PFA Tamaş Iulian,<br />

jud. Bacău<br />

Approval<br />

date by<br />

NAO<br />

311248/<br />

28.02.2008<br />

311776/<br />

24.03.2008<br />

311777/<br />

24.03.2008<br />

311778/<br />

24.03.2008<br />

312036/<br />

11.04.2008<br />

312110/<br />

11.04.2008<br />

312510/<br />

06.05.2008<br />

312517/<br />

07.05.2008<br />

313495/<br />

30.05.2008<br />

314916/<br />

08.08.2008<br />

317196/<br />

24.10.2009<br />

317196/<br />

24.10.2008<br />

317868/<br />

27.11.2008<br />

Cancelled<br />

amount<br />

bel<strong>on</strong>g<strong>in</strong>g to<br />

EC<br />

c<strong>on</strong>tributi<strong>on</strong><br />

(lei)<br />

Cancelled<br />

amount<br />

bel<strong>on</strong>g<strong>in</strong>g to<br />

EC<br />

c<strong>on</strong>tributi<strong>on</strong><br />

(Euro)<br />

9,918.67 2,747.48<br />

10,075.50 2,790.92<br />

64,031.82 17,736.85<br />

1,458.96 404.13<br />

4,295.18 1,227.37<br />

329,119.87 94,047.68<br />

57,762.75 16.409,41<br />

2,047,732.03 581,725.53<br />

11,250.00 3,237.41<br />

14,358.91 4,003.82<br />

440,916.73 124,806.59<br />

1,212.75 342.58<br />

5,225.51 1,476.09<br />

2,997,358.68 850,955.87<br />

Declarati<strong>on</strong> of<br />

expenditure and<br />

Request of funds<br />

from which it<br />

was deducted<br />

Decl. no 34/2008,<br />

Table A4<br />

Decl. no 34/2008,<br />

Table A4<br />

Decl. no 34/2008,<br />

Table A4<br />

Decl. no 34/2008,<br />

Table A2<br />

Decl. no 36/2008<br />

Table A4<br />

Decl. no 36/2008<br />

Table A4<br />

Decl. no 36/2008<br />

Table A4<br />

Decl. no 36/2008<br />

Table A4<br />

Decl. no 36/2008<br />

Table A4<br />

Decl. no 36/2008<br />

Table A4<br />

Decl. no 36/2008<br />

Table A4<br />

Decl. no 36/2008<br />

Table A4<br />

Decl. no 36/2008<br />

Table A4<br />

110


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

The PARDF is also <strong>in</strong> charge with the recovery of these debts accord<strong>in</strong>g to<br />

Government’s Ord<strong>in</strong>ance no. 79/2003 regard<strong>in</strong>g the c<strong>on</strong>trol and the recovery of the<br />

Community’s funds, as well as of the co-f<strong>in</strong>anc<strong>in</strong>g <strong>on</strong>es, irregularly used, with the<br />

subsequent modificati<strong>on</strong>s and completi<strong>on</strong>s, the prescripti<strong>on</strong> of the recovery of the<br />

debt occurr<strong>in</strong>g <strong>in</strong> the terms of the nati<strong>on</strong>al legislati<strong>on</strong>.<br />

Accord<strong>in</strong>g to the procedure, the Nati<strong>on</strong>al Fund replenished the Euro SAPARD<br />

account with the total amount of 850,551.73 Euro (it was not <strong>in</strong>cluded the debt 114<br />

for the reas<strong>on</strong>s menti<strong>on</strong>ed above) with amounts from the state budget.<br />

III. 2.1.4 Payments from the Nati<strong>on</strong>al Fund to PARDF<br />

The PARDF prepared and submitted to the Nati<strong>on</strong>al Fund requests for funds twice<br />

per m<strong>on</strong>th. Dur<strong>in</strong>g 2008, the Nati<strong>on</strong>al Fund transferred to PARDF a total amount of<br />

193,744,487.56 Euro as represent<strong>in</strong>g EC c<strong>on</strong>tributi<strong>on</strong> for SAPARD Programme.<br />

III. 2.1.5 The use of the Buffer Fund<br />

Due to the exhaust<strong>in</strong>g of the available amount <strong>in</strong> Euro SAPARD account, determ<strong>in</strong>ed<br />

by the time difference between its use and their reimbursement by the European<br />

Commissi<strong>on</strong> (EC), and of the suspensi<strong>on</strong> of the payments by EC, the Nati<strong>on</strong>al Fund<br />

transferred to PARDF an amount of 141,629,043.84 Euro. On 31.12.2008 it should<br />

have been replenished the buffer fund account with the amount of 117,663,669.13<br />

Euro. This amount is to be returned to the state budget as so<strong>on</strong> as it will be restarted<br />

the EC payments to Romania.<br />

III. 2.2 Accreditati<strong>on</strong> m<strong>on</strong>itor<strong>in</strong>g dur<strong>in</strong>g 2008<br />

III. 2.2.1 European Commissi<strong>on</strong>'s <strong>in</strong>form<strong>in</strong>g regard<strong>in</strong>g the changes of procedures of<br />

PARDF and Nati<strong>on</strong>al Fund<br />

Accord<strong>in</strong>g to the stipulati<strong>on</strong>s of art. 6 of the EC Regulati<strong>on</strong> no. 248/2007 regard<strong>in</strong>g<br />

the measures c<strong>on</strong>cern<strong>in</strong>g the multi-<str<strong>on</strong>g>annual</str<strong>on</strong>g> f<strong>in</strong>anc<strong>in</strong>g agreements and the <str<strong>on</strong>g>annual</str<strong>on</strong>g><br />

f<strong>in</strong>anc<strong>in</strong>g agreements signed <strong>on</strong> the basis of SAPARD Programme, as well as to the<br />

transiti<strong>on</strong> from the SAPARD Programme to the <strong>programme</strong>s for rural development,<br />

the Nati<strong>on</strong>al Authoris<strong>in</strong>g Officer (NAO) <strong>in</strong>formed the European Commissi<strong>on</strong> as so<strong>on</strong><br />

as it was proposed any modificati<strong>on</strong> <strong>in</strong> the implement<strong>in</strong>g of SAPARD Programme<br />

dur<strong>in</strong>g 2008.<br />

Follow<strong>in</strong>g the m<strong>on</strong>itor<strong>in</strong>g missi<strong>on</strong> performed by DG AGRI <strong>in</strong> June 2008 and as a<br />

c<strong>on</strong>sequence of the recommendati<strong>on</strong>s regard<strong>in</strong>g „the strengthen<strong>in</strong>g of the m<strong>on</strong>itor<strong>in</strong>g<br />

role of the competent Authority towards PARDF ”, the Nati<strong>on</strong>al Fund took measures<br />

by modify<strong>in</strong>g its procedures, as it follows:<br />

a) Instructi<strong>on</strong> 21 – for the modificati<strong>on</strong> of the NF manuals of procedures, approved<br />

by NAO and sent for <strong>in</strong>formati<strong>on</strong> to EC <strong>on</strong> 24.09.2008 by the letter no. 319183. This<br />

<strong>in</strong>structi<strong>on</strong> referred to a completi<strong>on</strong> of the exist<strong>in</strong>g procedure with a checklist for the<br />

proposals of PARDF to modify the procedures and the organisati<strong>on</strong>al structure and<br />

approval procedure by NAO of the modificati<strong>on</strong>s proposed by PARDF. Also, with<br />

111


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

respect to the m<strong>on</strong>itor<strong>in</strong>g of the accreditati<strong>on</strong> criteria, <strong>on</strong> a m<strong>on</strong>thly basis PARDF<br />

submits to NF supervis<strong>in</strong>g <str<strong>on</strong>g>report</str<strong>on</strong>g>s of the Regi<strong>on</strong>al Centres, Counties' Offices and <strong>on</strong><br />

a quarterly basis, the stage of implement<strong>in</strong>g the recommendati<strong>on</strong>s from the audit<br />

<str<strong>on</strong>g>report</str<strong>on</strong>g>s.<br />

Moreover, it stipulates that PIAD with<strong>in</strong> MPF will perform <str<strong>on</strong>g>annual</str<strong>on</strong>g>ly <strong>in</strong> this purpose, two<br />

audit missi<strong>on</strong>s <strong>on</strong> the ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g the accreditati<strong>on</strong> criteria by PARDF. Also, it was<br />

settled a system of m<strong>on</strong>thly meet<strong>in</strong>gs with the management and/or experts of PARDF<br />

so that to identify possible deficiencies and to take the measures <strong>in</strong> order to solve<br />

them. As a c<strong>on</strong>sequence of these modificati<strong>on</strong>s, it was amended the Agreement<br />

between the Nati<strong>on</strong>al Authoris<strong>in</strong>g Officer, official lead<strong>in</strong>g the Nati<strong>on</strong>al Fund with<strong>in</strong><br />

M<strong>in</strong>istry of Public F<strong>in</strong>ance <strong>in</strong> Romania and SAPARD Agency, signed <strong>in</strong> Bucharest <strong>on</strong><br />

19.06.2002.<br />

b) Instructi<strong>on</strong> 22 – for the modificati<strong>on</strong> of the <str<strong>on</strong>g>annual</str<strong>on</strong>g> procedures of NF, approved by<br />

NAO and communicated to EC <strong>on</strong> 04.11.2008 by the letter no. 317370. By this<br />

<strong>in</strong>structi<strong>on</strong> it was updated the NF procedure regard<strong>in</strong>g the human resources with the<br />

legal stipulati<strong>on</strong>s <strong>in</strong> force regard<strong>in</strong>g the appo<strong>in</strong>tment and the promot<strong>in</strong>g of the public<br />

servants.<br />

c) Instructi<strong>on</strong> 23 - for the modificati<strong>on</strong> of the <str<strong>on</strong>g>annual</str<strong>on</strong>g> procedures of NF, approved by<br />

NAO and communicated to EC <strong>on</strong> 07.10.2008 by the letter no. 316613. By this<br />

<strong>in</strong>structi<strong>on</strong> it was described the procedure for the payment from the state budget of<br />

the f<strong>in</strong>ancial allocati<strong>on</strong>s overrun aga<strong>in</strong>st the technical fiches of the measure (<strong>in</strong><br />

NPRD).<br />

Dur<strong>in</strong>g 2008, it was submitted to EC <strong>on</strong>e <strong>in</strong>structi<strong>on</strong> for the modificati<strong>on</strong> of the<br />

manuals of procedures of PARDF namely Instructi<strong>on</strong> 118, modify<strong>in</strong>g all the manuals<br />

of procedures of PARDF. This was issued <strong>in</strong> order to implement the<br />

recommendati<strong>on</strong>s of DG AGRI, follow<strong>in</strong>g the m<strong>on</strong>itor<strong>in</strong>g missi<strong>on</strong> from 3-13.06.2009.<br />

We must state that this was evaluated both by the Internal Audit Directorate (IAD)<br />

with<strong>in</strong> PARDF, by NF and by the Public Internal Directorate (PIAD), accord<strong>in</strong>g to the<br />

new procedures of NF (namely, Instructi<strong>on</strong> 21). On the basis of the favourable<br />

notificati<strong>on</strong> of IAD, PIAD, NF, NAO approved this <strong>in</strong>structi<strong>on</strong>. Also, it was approved<br />

the c<strong>on</strong>solidated manuals of procedures with the previous <strong>in</strong>structi<strong>on</strong>s, <strong>in</strong>clud<strong>in</strong>g<br />

Instructi<strong>on</strong> 118, issued by PARDF. Instructi<strong>on</strong> 118, together with the c<strong>on</strong>solidated<br />

manuals of procedures, was sent to EC <strong>on</strong> 25.09.2008 by the letter no. 316295.<br />

Also, follow<strong>in</strong>g the recommendati<strong>on</strong>s of DG AGRI, NAO approved the account<strong>in</strong>g<br />

software PROSYS of PARDF, based <strong>on</strong> the <str<strong>on</strong>g>report</str<strong>on</strong>g> of the <strong>in</strong>dependent expert<br />

(Delloitte) regard<strong>in</strong>g „The audit of the account<strong>in</strong>g software PROSYS of APDRP” by<br />

which it was offered the ensurance that it is issued and works accord<strong>in</strong>g to the<br />

<strong>in</strong>ternati<strong>on</strong>ally accepted standards and accord<strong>in</strong>g to the m<strong>in</strong>imum standards of<br />

security of the <strong>in</strong>formati<strong>on</strong>. EC was <strong>in</strong>formed about this approval and it was submitted<br />

the Audit Report of Deloitte <strong>on</strong> 28.11.2008 by the letter no. 317385.<br />

Follow<strong>in</strong>g the recommendati<strong>on</strong>s submitted by the auditors EC-DG AGRI, as a result<br />

of the m<strong>on</strong>itor<strong>in</strong>g missi<strong>on</strong> of SAPARD Programme <strong>in</strong> Romania, dur<strong>in</strong>g June, 3-13<br />

2008, the nati<strong>on</strong>al payments to the beneficiaries were suspended. NAO imposed to<br />

PARDF some c<strong>on</strong>diti<strong>on</strong>s accord<strong>in</strong>g to which these payments will be realised from the<br />

state budget.<br />

112


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

These c<strong>on</strong>diti<strong>on</strong>s were ma<strong>in</strong>ly po<strong>in</strong>t<strong>in</strong>g out the improvement of PARDF procedures<br />

and also to ensure a sufficient number of tra<strong>in</strong>ed staff so that it is ensured that the<br />

large number of requests of funds, registered by PARDF dur<strong>in</strong>g the period when the<br />

payments were suspended, will be processed <strong>in</strong> time and accord<strong>in</strong>gly. Only after the<br />

fulfilment of the c<strong>on</strong>diti<strong>on</strong>s and the communicati<strong>on</strong> to EC of the Instructi<strong>on</strong> no. 118,<br />

<strong>on</strong> 25.09.2008, it has been restarted the nati<strong>on</strong>al payments from funds bel<strong>on</strong>g<strong>in</strong>g to<br />

the state budget for the beneficiaries of SAPARD Programme.<br />

III. 2.2.2 Audit missi<strong>on</strong> requested by NAO<br />

Internal audit missi<strong>on</strong><br />

Dur<strong>in</strong>g 15.01.2008-15.03.2008, the Internal Public Audit Directorate (PIAD) with<strong>in</strong> the<br />

M<strong>in</strong>istry of Public F<strong>in</strong>ance performed an audit missi<strong>on</strong> regard<strong>in</strong>g the Instructi<strong>on</strong> no.<br />

104 issued by PARDF, evaluat<strong>in</strong>g the c<strong>on</strong>formity of this Instructi<strong>on</strong> accord<strong>in</strong>g to<br />

MAFA. The op<strong>in</strong>i<strong>on</strong> of the auditors was that Instructi<strong>on</strong> no. 104 is not trespass<strong>in</strong>g art.<br />

5(1), Secti<strong>on</strong> A from MAFA annex and by its applicati<strong>on</strong> there were not affected the<br />

f<strong>in</strong>ancial <strong>in</strong>terests of EC.<br />

Requested by NAO, PIAD performed dur<strong>in</strong>g 01-10.09.2008 an audit missi<strong>on</strong><br />

regard<strong>in</strong>g ”The audit<strong>in</strong>g of the applicati<strong>on</strong> of the <strong>in</strong>structi<strong>on</strong>s and circulars issued by<br />

PARDF” by which it was c<strong>on</strong>firmed to NAO that it cannot be obta<strong>in</strong>ed the ensurance<br />

that PARDF applied them after hav<strong>in</strong>g them communicated to EC and moreover,<br />

there were issued circulars that might be c<strong>on</strong>sidered as modificati<strong>on</strong> of procedures.<br />

There have been made recommendati<strong>on</strong>s for PARDF that, together with the <strong>on</strong>es<br />

received from EC, leaded to the improvement of PARDF methodology manual of<br />

procedures.<br />

Also, <strong>in</strong> order to implement the EC recommendati<strong>on</strong>s regard<strong>in</strong>g the ensurance by NF<br />

that all the projects have been approved or rejected accord<strong>in</strong>g to the approved<br />

procedures, NAO requested to PIAD an audit missi<strong>on</strong> c<strong>on</strong>cern<strong>in</strong>g the applicati<strong>on</strong> of<br />

the <strong>in</strong>structi<strong>on</strong>s and circulars issued by PARDF, missi<strong>on</strong> that took place dur<strong>in</strong>g 01.09-<br />

10.10.2008. The specific objective of the <strong>in</strong>ternal audit missi<strong>on</strong> was to evaluate the<br />

possible impact of the <strong>in</strong>structi<strong>on</strong>s and the circulars issued by PARDF c<strong>on</strong>cern<strong>in</strong>g the<br />

implementati<strong>on</strong> of SAPARD Programme. As a c<strong>on</strong>sequence of this to this missi<strong>on</strong> it<br />

was settled the <strong>in</strong>structi<strong>on</strong>s and the missi<strong>on</strong>s hav<strong>in</strong>g specific c<strong>on</strong>tent as the<br />

<strong>in</strong>structi<strong>on</strong>s with possible f<strong>in</strong>ancial impact up<strong>on</strong> the projects.<br />

External audit missi<strong>on</strong>s<br />

Also, follow<strong>in</strong>g the request of EC, NAO requested to the Audit Authority with<strong>in</strong> the<br />

Romanian Court of Accounts, to effectuate an audit missi<strong>on</strong> <strong>in</strong> order to c<strong>on</strong>firm to<br />

NAO that the Acti<strong>on</strong> plan for implement<strong>in</strong>g the recommendati<strong>on</strong>s of DG AGRI<br />

follow<strong>in</strong>g the m<strong>on</strong>itor<strong>in</strong>g missi<strong>on</strong> from 3-13.06.2009, was implemented.<br />

The Audit Authority accepted and fulfilled the audit missi<strong>on</strong> dur<strong>in</strong>g 01.09-04.11.2008<br />

f<strong>in</strong>alized by the Audit Report by which it was issued the op<strong>in</strong>i<strong>on</strong> accord<strong>in</strong>g to which<br />

EC recommendati<strong>on</strong>s have been implemented accord<strong>in</strong>g to the acti<strong>on</strong> plan but it<br />

must be improved the strengthen<strong>in</strong>g of the c<strong>on</strong>trol up<strong>on</strong> the correctness and the<br />

completi<strong>on</strong> of the <strong>in</strong>formati<strong>on</strong> enclosed <strong>in</strong> the data base with SAPARD<br />

rejected/c<strong>on</strong>tracted/paid/cancelled projects and up<strong>on</strong> the accuracy and veridicity of<br />

113


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

the record<strong>in</strong>gs from the Debtors' Ledger and the Register of the written-off debts and<br />

CPA must m<strong>on</strong>itor the activities c<strong>on</strong>cern<strong>in</strong>g the accreditati<strong>on</strong> criteria.<br />

Based <strong>on</strong> this <str<strong>on</strong>g>report</str<strong>on</strong>g>, NAO c<strong>on</strong>sidered the Acti<strong>on</strong> Plan implemented but, hav<strong>in</strong>g <strong>in</strong><br />

view that there are certa<strong>in</strong> aspects not-implemented she requested to the Audit<br />

Authority a follow-up missi<strong>on</strong>. The <str<strong>on</strong>g>report</str<strong>on</strong>g> was submitted to EC <strong>on</strong> 07.11.2008 by the<br />

letter no. 317471.<br />

III. 2.3 Clearance of accounts<br />

III.2.3.1 The decisi<strong>on</strong> of clearance of accounts for 2007<br />

Accord<strong>in</strong>g to the Multi<str<strong>on</strong>g>annual</str<strong>on</strong>g> F<strong>in</strong>anc<strong>in</strong>g Agreement, the Nati<strong>on</strong>al Authoris<strong>in</strong>g Officer<br />

submitted to EC the ”Annual Declarati<strong>on</strong> of Accounts for the Year 2007”,<br />

accompanied by the Certificate and the Audit Report for 2007 of the Certify<strong>in</strong>g Body,<br />

<strong>on</strong> 12 th of May 2008, by the letter no. 311807.<br />

Follow<strong>in</strong>g the EC clarificati<strong>on</strong> requests <strong>in</strong> the letter no. 17426/15.07.2008, the Audit<br />

Authority issued a new Audit<strong>in</strong>g Certificate for the f<strong>in</strong>ancial year 2007, submitted by<br />

EC <strong>on</strong> 17 th of November 2008 by the letter no. 317787.<br />

III. 2.3.2 The c<strong>on</strong>formity decisi<strong>on</strong><br />

Dur<strong>in</strong>g 2008 it c<strong>on</strong>t<strong>in</strong>ued the procedures stipulated <strong>in</strong> MAFA c<strong>on</strong>cern<strong>in</strong>g the<br />

C<strong>on</strong>formity Decisi<strong>on</strong> for the f<strong>in</strong>ancial years 2006 and 2007, for which the Romanian<br />

authorities prepared and submitted to EC additi<strong>on</strong>al <strong>in</strong>formati<strong>on</strong> and explanati<strong>on</strong>s<br />

regard<strong>in</strong>g the EC recommendati<strong>on</strong>s follow<strong>in</strong>g the audit missi<strong>on</strong>.<br />

1. On 31.01.2008, NAO together NF and PARDF representatives participated <strong>in</strong><br />

Bruxelles to a bilateral meet<strong>in</strong>g <strong>in</strong> order to analyse the outstand<strong>in</strong>g aspects<br />

c<strong>on</strong>cern<strong>in</strong>g the DG AGRI f<strong>in</strong>d<strong>in</strong>gs follow<strong>in</strong>g the audit missi<strong>on</strong> dur<strong>in</strong>g 18-22.09.2006.<br />

Later <strong>on</strong> there were communicated to EC supplementary <strong>in</strong>formati<strong>on</strong> <strong>on</strong> 12 th of May,<br />

2008 by the letter no. 312050<br />

2. On 01.04.2008, representatives of NF and PARDF participated <strong>in</strong> Bruxelles to a<br />

bilateral meet<strong>in</strong>g <strong>in</strong> order to analyse the outstand<strong>in</strong>g aspects c<strong>on</strong>cern<strong>in</strong>g the f<strong>in</strong>d<strong>in</strong>gs<br />

and the recommendati<strong>on</strong>s from the Audit Certificate issued by the Audit Authority for<br />

the f<strong>in</strong>ancial year 2006. Later <strong>on</strong> there were communicated to EC the supplementary<br />

<strong>in</strong>formati<strong>on</strong> <strong>on</strong> 26 th of May 2008 by the letter no. 312788.<br />

3. On 16.10.2008, representatives of NF and PARDF participated <strong>in</strong> Bruxelles to a<br />

bilateral meet<strong>in</strong>g <strong>in</strong> order to analyse the outstand<strong>in</strong>g aspects c<strong>on</strong>cern<strong>in</strong>g the DG<br />

AGRI f<strong>in</strong>d<strong>in</strong>gs follow<strong>in</strong>g the c<strong>on</strong>trol DG AGRI RDG/2007/022 for the measures 1.1,<br />

2.1, 3.1<br />

III. 2.4 Irregularities <str<strong>on</strong>g>report</str<strong>on</strong>g><br />

NAO submitted the quarterly <str<strong>on</strong>g>report</str<strong>on</strong>g>s of irregularities to the Fight aga<strong>in</strong>st Fraud<br />

Department (DLAF), accord<strong>in</strong>g to the Multi-<str<strong>on</strong>g>annual</str<strong>on</strong>g> F<strong>in</strong>anc<strong>in</strong>g Agreement and the<br />

protocol signed with this structure, as it follows:<br />

114


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

• The irregularity <str<strong>on</strong>g>report</str<strong>on</strong>g> for the quarter I 2008, issued by NAO to DLAF <strong>on</strong><br />

16.05.2008 and by DLAF to OLAF <strong>on</strong> 29.05.2008;<br />

• The irregularity <str<strong>on</strong>g>report</str<strong>on</strong>g> for the quarter II 2008, issued by NAO to DLAF <strong>on</strong><br />

19.08.2008 and by DLAF to OLAF <strong>on</strong> 28.08.2008;<br />

• The irregularity <str<strong>on</strong>g>report</str<strong>on</strong>g> for the quarter III 2008, issued by NAO to DLAF <strong>on</strong><br />

17.11.2008 and by DLAF to OLAF <strong>on</strong> 28.11.2008;<br />

• The irregularity <str<strong>on</strong>g>report</str<strong>on</strong>g> for the quarter IV 2008, issued by NAO to DLAF <strong>on</strong><br />

27.02.2009 and by DLAF to OLAF <strong>on</strong> 27.02.2009.<br />

Also, when there were received notificati<strong>on</strong>s from the Fight aga<strong>in</strong>st Fraud Department<br />

(DLAF), from the <strong>in</strong>ternal audit of the Nati<strong>on</strong>al Fund or from any other entity,<br />

c<strong>on</strong>cern<strong>in</strong>g the possibility of an irregularity with respect to obta<strong>in</strong>, manage or use the<br />

funds of SAPARD Programme, both the <strong>on</strong>es from the budget of the European Uni<strong>on</strong><br />

as well as from the corresp<strong>on</strong>dent co-f<strong>in</strong>anc<strong>in</strong>g, it was requested to PARDF to take all<br />

the necessary measures <strong>in</strong> order to verify the <strong>in</strong>formati<strong>on</strong> and, if case, to recover the<br />

amounts settled as debts accord<strong>in</strong>g to the Government Ord<strong>in</strong>ance no. 79/2003<br />

regard<strong>in</strong>g the c<strong>on</strong>trol and the recovery of the Community's funds, as well as of the<br />

corresp<strong>on</strong>d<strong>in</strong>g co-f<strong>in</strong>anc<strong>in</strong>g funds irregularly used, with the modificati<strong>on</strong>s and the<br />

c<strong>on</strong>sequent completi<strong>on</strong>s.<br />

III. 3 Pay<strong>in</strong>g Agency for Rural Development and Fishery activities<br />

Dur<strong>in</strong>g 2008, the activity of the Pay<strong>in</strong>g Agency for Rural Development and Fishery<br />

(PARDF) was focussed <strong>on</strong> achiev<strong>in</strong>g two ma<strong>in</strong> objectives, namely, the c<strong>on</strong>t<strong>in</strong>uati<strong>on</strong> of<br />

the <strong>in</strong>stituti<strong>on</strong>al build<strong>in</strong>g process, necessary to perform the functi<strong>on</strong> of pay<strong>in</strong>g agency<br />

for the rural development projects f<strong>in</strong>anced under EAFRD, as well as the c<strong>on</strong>t<strong>in</strong>uati<strong>on</strong><br />

of SAPARD Programme implementati<strong>on</strong>.<br />

In order to achieve both objectives, PARDF took <strong>in</strong>to c<strong>on</strong>siderati<strong>on</strong> the development<br />

of the allocated human resources, the <strong>in</strong>crease of the tra<strong>in</strong><strong>in</strong>g level, the elaborati<strong>on</strong><br />

and adjustment of the specific work procedures, as well as, the improvement of both<br />

the endowment and branches’ premises.<br />

III. 3.1. Audit missi<strong>on</strong>s performed by the Internal Audit Directorate (IAD)<br />

In 2008 the Internal Audit Directorate has performed the follow<strong>in</strong>g types of activities /<br />

audit missi<strong>on</strong>s:<br />

‣ Audit missi<strong>on</strong>s carried out accord<strong>in</strong>g to the Annual Audit Plan for 2008;<br />

‣ Ad – hoc audit – missi<strong>on</strong>s requested by the General Director of the Agency;<br />

‣ Ad – hoc audit missi<strong>on</strong>s to follow up the external auditors’ recommendati<strong>on</strong>s;<br />

‣ Other follow up, evaluati<strong>on</strong> and m<strong>on</strong>itor<strong>in</strong>g activities.<br />

The audit missi<strong>on</strong>s performed by the Internal Audit Directorate dur<strong>in</strong>g 2008 <strong>in</strong>cluded<br />

checks as regards:<br />

• The manner of observ<strong>in</strong>g the procedures for the implementati<strong>on</strong> of the<br />

Measures 1.2, 3.2, 3.3 („100% Re-performance”) and the follow up of the<br />

recommendati<strong>on</strong>s related to these verificati<strong>on</strong>s;<br />

• The completeness, the accuracy and the veracity of the Agency’s accounts for<br />

the years 2006 and 2007;<br />

115


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

• The manner of observ<strong>in</strong>g the public procurement procedure for the projects<br />

related to the Measure 2.1 of the regi<strong>on</strong>s affected by natural disasters;<br />

• Assess<strong>in</strong>g the PROSYS software applicati<strong>on</strong>;<br />

• Assess<strong>in</strong>g the manner of establish<strong>in</strong>g the public procurement procedure (G3<br />

ACP) applicable to the procurements performed by the beneficiaries of the<br />

Measures 1.2 and 2.1 dur<strong>in</strong>g 2007;<br />

• Identify<strong>in</strong>g the causes which led to the emergence of the differences between<br />

the Agency’s directorates records for the projects f<strong>in</strong>anced by SAPARD<br />

Programme;<br />

• Assess<strong>in</strong>g the audit trail for the <strong>in</strong>structi<strong>on</strong>s and circulars letters issued <strong>in</strong> order<br />

to amend the procedures for the SAPARD Programme’s implementati<strong>on</strong>;<br />

• Assess<strong>in</strong>g the Procedure Manual for record<strong>in</strong>g and recover<strong>in</strong>g the debts G8<br />

IRD;<br />

• Assess<strong>in</strong>g the proposals to amend the payments’ executi<strong>on</strong> procedure, G6 –<br />

EP;<br />

• Assess<strong>in</strong>g the proposals to amend the procedures drawn up for the<br />

implementati<strong>on</strong> of the SAPARD Programme <strong>in</strong> compliance with the provisi<strong>on</strong>s<br />

of the MARD’s Order no. 63/2008;<br />

• Assess<strong>in</strong>g the proposals for the modificati<strong>on</strong>s and completi<strong>on</strong>s of the<br />

procedures drawn up for the implementati<strong>on</strong> of the SAPARD Programme <strong>in</strong><br />

compliance with the European Commissi<strong>on</strong>’s recommendati<strong>on</strong>s by letter no.<br />

16.859/09.07.2008;<br />

• Follow<strong>in</strong>g up the recommendati<strong>on</strong>s and observati<strong>on</strong>s made by authorized<br />

external entities, namely: European Court of Auditors, European Commissi<strong>on</strong>’s<br />

auditors, Audit Authority from the Romanian Court of Accounts, M<strong>in</strong>istry of<br />

Public F<strong>in</strong>ances – Internal Public Audit Directorate, C<strong>on</strong>trol Department of the<br />

Government, MAFRD’s General Directorate for Technical Inspecti<strong>on</strong>s and<br />

C<strong>on</strong>trol.<br />

The activities carried out by the Internal Audit Directorate dur<strong>in</strong>g 2008, were planned<br />

and executed accord<strong>in</strong>g to the Annual Plan for 2008 and to the Internal Audit<br />

Strategic Plan for the period 2008 – 2010 for the SAPARD Programme, <strong>in</strong> order to<br />

provide to the management a reas<strong>on</strong>able assurance <strong>on</strong> the follow<strong>in</strong>g aspects:<br />

• The structure and the process of verify<strong>in</strong>g the c<strong>on</strong>formity and the eligibility of<br />

the projects for Measures 1.1, 1.2, 2.1, 3.1, 3.2, 3.3, 3.4, 3.5, 4.1 and 4.2 are<br />

functi<strong>on</strong>al, as provided <strong>in</strong> the procedures;<br />

• Agency’s aims are performed at the required standards and are <strong>in</strong> compliance<br />

with the accreditati<strong>on</strong> criteria foreseen <strong>in</strong> the Multi – Annual F<strong>in</strong>anc<strong>in</strong>g<br />

Agreement between the European Community and Romania for SAPARD;<br />

• The Agency’s procedures are observed by the Agency’s staff;<br />

• The European Commissi<strong>on</strong>’s f<strong>in</strong>ancial <strong>in</strong>terests are protected;<br />

• The <strong>in</strong>ternal c<strong>on</strong>trols relat<strong>in</strong>g to the pre-authorizati<strong>on</strong> of the project, prepayment<br />

verificati<strong>on</strong>s, the account<strong>in</strong>g and the payment procedures of the<br />

Agency are functi<strong>on</strong>al and provide a reas<strong>on</strong>able assurance <strong>on</strong> the process;<br />

• The projects are assessed <strong>in</strong> compliance with the accredited procedures both<br />

dur<strong>in</strong>g the technical implementati<strong>on</strong> stage, as well as dur<strong>in</strong>g the f<strong>in</strong>ancial<br />

implementati<strong>on</strong> stage;<br />

• The c<strong>on</strong>clusi<strong>on</strong>s regard<strong>in</strong>g the eligibility of the f<strong>in</strong>anc<strong>in</strong>g applicati<strong>on</strong>s and the<br />

authorizati<strong>on</strong> of the payment claims are correct.<br />

116


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Follow<strong>in</strong>g these audit missi<strong>on</strong>s, Internal Audit Directorate issued audit <str<strong>on</strong>g>report</str<strong>on</strong>g>s that<br />

were submitted to the management of Pay<strong>in</strong>g Agency for Rural Development and<br />

Fishery, to the Nati<strong>on</strong>al Authoriz<strong>in</strong>g Officer, to the Audit Directorate with<strong>in</strong> MAFRD, to<br />

the external auditors with<strong>in</strong> Audit Authority - Romanian Court of Accounts, the<br />

M<strong>in</strong>istry of Public F<strong>in</strong>ance – Internal Public Audit Directorate and European<br />

Commissi<strong>on</strong>.<br />

The ma<strong>in</strong> f<strong>in</strong>d<strong>in</strong>gs and recommendati<strong>on</strong>s with the high level of importance drawn up<br />

as a result of the audit missi<strong>on</strong>s and presented <strong>in</strong> the audit <str<strong>on</strong>g>report</str<strong>on</strong>g>s for year 2008<br />

address to the follow<strong>in</strong>g deficiencies:<br />

Executi<strong>on</strong> of an overpayment<br />

We found that <strong>in</strong> case of a payment claim for Measure 1.2 submitted to PRCRDF<br />

Timis an amount larger than the due <strong>on</strong>e was approved to be paid.<br />

IAD recommended to take <strong>in</strong>to account the amount unduly paid by deduct<strong>in</strong>g it from<br />

the next payment <strong>in</strong>stalment or by mak<strong>in</strong>g a debt to recover the amount.<br />

The recommendati<strong>on</strong> of high importance level has been implemented by mak<strong>in</strong>g a<br />

debt for the overpayment and its recovery.<br />

The pr<strong>in</strong>ciple of sound f<strong>in</strong>ancial management was not observed accord<strong>in</strong>g to MAFA’s<br />

provisi<strong>on</strong>s, Secti<strong>on</strong> B, article. 4<br />

For 3 projects from regi<strong>on</strong> 3 Târgovişte and for all the projects from Regi<strong>on</strong> 4 Craiova<br />

we identified that the <strong>on</strong>-the-spot verificati<strong>on</strong>s were not completely performed or the<br />

verificati<strong>on</strong>s regard<strong>in</strong>g the reas<strong>on</strong>ability of the prices of the materials and works were<br />

not performed.<br />

The recommendati<strong>on</strong>s comprise the follow<strong>in</strong>gs:<br />

• to c<strong>on</strong>sult the database by the experts from the Regi<strong>on</strong>al Centers 3 Târgovişte<br />

and 4 Craiova and if the prices for certa<strong>in</strong> services/materials/works are not<br />

found, the verify<strong>in</strong>g experts get the <strong>in</strong>formati<strong>on</strong> from other sources, attach<strong>in</strong>g<br />

them as justify<strong>in</strong>g documents and menti<strong>on</strong><strong>in</strong>g <strong>in</strong> the sheet for the c<strong>on</strong>tract’s<br />

verificati<strong>on</strong> the manner for compar<strong>in</strong>g the reas<strong>on</strong>ability of the prices for the<br />

projects verified;<br />

• SCD – AS and PRCRDF make regular proposals for fill<strong>in</strong>g <strong>in</strong> / change / update<br />

the database with reference prices of materials / works / services which are<br />

not found or which are found by the verify<strong>in</strong>g experts as not reas<strong>on</strong>able;<br />

• the SCD – AS’s experts must re-verify the reas<strong>on</strong>ability from the awarded<br />

tender for the projects from Regi<strong>on</strong> 4. If it is found that these prices are not<br />

reas<strong>on</strong>able, the work/services’ c<strong>on</strong>tracts are not to be approved or their value<br />

must be reduced.<br />

Based <strong>on</strong> the received resp<strong>on</strong>ses, the audit’s op<strong>in</strong>i<strong>on</strong> <strong>on</strong> the recommendati<strong>on</strong>s is as<br />

follows:<br />

• the recommendati<strong>on</strong> regard<strong>in</strong>g the c<strong>on</strong>sultati<strong>on</strong> of the database with reference<br />

prices has not been implemented;<br />

• the follow<strong>in</strong>g recommendati<strong>on</strong> will be under m<strong>on</strong>itor<strong>in</strong>g as regards the projects<br />

submitted under EAFRD. It refers to the regular proposals made by SCD – AS<br />

and PRCRDF’s staff for fill<strong>in</strong>g <strong>in</strong>/change/update the database with reference<br />

117


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

prices of the materials/works/services which are not currently found there or<br />

for which the verify<strong>in</strong>g experts c<strong>on</strong>sider that are not reas<strong>on</strong>able;<br />

• the recommendati<strong>on</strong> regard<strong>in</strong>g the re-verificati<strong>on</strong> of the projects from Regi<strong>on</strong> 4<br />

by experts SCD – AS was not agreed with.<br />

Fill<strong>in</strong>g <strong>in</strong> and/ or clarify<strong>in</strong>g the procurements procedures<br />

In the Circular Letter no. 164/ 30.08.2006 by which the public procurement procedure<br />

G3 – ACP, versi<strong>on</strong> 010 with “Alternative 3 – package tender for the design services<br />

and works’ executi<strong>on</strong>” was amended, it is stipulated that “the documentati<strong>on</strong> for the<br />

f<strong>in</strong>ancial tender for works will be drawn up <strong>in</strong> unit prices divided by material, labour,<br />

equipment and transport without any technical project.”<br />

The observati<strong>on</strong>s of IAD menti<strong>on</strong> that the circular letter does not provide the<br />

follow<strong>in</strong>gs:<br />

• the deadl<strong>in</strong>e for draw<strong>in</strong>g up and submitt<strong>in</strong>g the technical project to the<br />

Regi<strong>on</strong>al Centres;<br />

• the pers<strong>on</strong>s <strong>in</strong> charge and the deadl<strong>in</strong>es for perform<strong>in</strong>g the verificati<strong>on</strong><br />

regard<strong>in</strong>g the compliance between the awarded tender and the technical<br />

project.<br />

IAD recommended that for the projects for which the provisi<strong>on</strong>s of the circular letter<br />

no. 164/30.08.2006 are applicable, SCD’s management shall establish and <strong>in</strong>form the<br />

Regi<strong>on</strong>al Centres and beneficiaries with regard to:<br />

• the deadl<strong>in</strong>e for perform<strong>in</strong>g and submitt<strong>in</strong>g the technical project to the<br />

Regi<strong>on</strong>al Centre <strong>in</strong> order to meet the deadl<strong>in</strong>es for implement<strong>in</strong>g the<br />

<strong>in</strong>vestments from the f<strong>in</strong>anc<strong>in</strong>g applicati<strong>on</strong>;<br />

• the pers<strong>on</strong>s <strong>in</strong> charge and the deadl<strong>in</strong>es that the verificati<strong>on</strong> of the compliance<br />

between the awarded tender and the technical project must be carried out.<br />

The audit’s op<strong>in</strong>i<strong>on</strong>:<br />

The recommendati<strong>on</strong> was c<strong>on</strong>sidered closed tak<strong>in</strong>g <strong>in</strong>to account that <strong>on</strong> the date that<br />

the audit <str<strong>on</strong>g>report</str<strong>on</strong>g> was issued, the public procurements procedures for measure 2.1<br />

were completed <strong>in</strong> percentage of 94%, despite the fact that measures for its<br />

implementati<strong>on</strong> had not been taken.<br />

The discrepancies between the procedures’ manual G8 - IRD and other PARDF<br />

procedures elaborated for the SAPARD Program or other documents from the<br />

nati<strong>on</strong>al legislati<strong>on</strong><br />

There are discrepancies between the procedures’ manual G8 – IRD and the c<strong>on</strong>trol<br />

and anti-fraud procedures’ manual G9 – CA regard<strong>in</strong>g the follow<strong>in</strong>g aspects:<br />

• the suspensi<strong>on</strong> of the payments;<br />

• the prelim<strong>in</strong>ary c<strong>on</strong>trol and verificati<strong>on</strong>s regard<strong>in</strong>g the <strong>in</strong>timati<strong>on</strong>s from the<br />

bodies <strong>in</strong> charge with c<strong>on</strong>trol/<strong>in</strong>vestigati<strong>on</strong>s tasks, performed by CAD;<br />

• CAD exclusive expertise to analyze the irregularities received both from <strong>in</strong>side<br />

and outside PARDF, to update the procedure with nati<strong>on</strong>al legislati<strong>on</strong><br />

c<strong>on</strong>cern<strong>in</strong>g the recovery of the debts and with the provisi<strong>on</strong>s of the circular<br />

letter no. 152/2006, to draw up documents no l<strong>on</strong>ger necessary <strong>in</strong> the flow;<br />

118


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

IAD recommended the correlati<strong>on</strong> of the provisi<strong>on</strong>s from the two manuals <strong>in</strong> order to<br />

unitary apply the procedures, namely <strong>in</strong> order to prevent the double verificati<strong>on</strong>s.<br />

The recommendati<strong>on</strong> was implemented.<br />

The provisi<strong>on</strong>s of the nati<strong>on</strong>al legislati<strong>on</strong> <strong>in</strong> force regard<strong>in</strong>g the public procurements<br />

have not been observed.<br />

IAD found that <strong>in</strong> the case of 5 projects under measure 2.1 and 8 projects under<br />

measures 1.2, for which certa<strong>in</strong> procurement procedures were launched after<br />

January 1 st , 2007 (call for tender 2007), the provisi<strong>on</strong>s of the nati<strong>on</strong>al legislati<strong>on</strong><br />

regard<strong>in</strong>g the public procurements were not observed. Thus, the provisi<strong>on</strong>s of MAFA<br />

and the European Commissi<strong>on</strong>’s notificati<strong>on</strong>s, regard<strong>in</strong>g the rules applicable after the<br />

date of the Romania’s accessi<strong>on</strong> to the European Uni<strong>on</strong>, have not been observed.<br />

IAD recommended to exclude from the statement of expenditures the amounts<br />

already paid for the procurements related to the projects c<strong>on</strong>cerned and not to<br />

<strong>in</strong>clude <strong>in</strong> the statement the next amounts for the procurements to be paid.<br />

Recommendati<strong>on</strong> not implemented.<br />

Lack of assurance measures<br />

IAD found that PARDF decided the cancellati<strong>on</strong> of the tenders <strong>in</strong> process accord<strong>in</strong>g<br />

to the manual drawn up based <strong>on</strong> the Commissi<strong>on</strong>’s manual <strong>in</strong> the case of 5 public<br />

beneficiaries and re-launched the tenders accord<strong>in</strong>g to the provisi<strong>on</strong>s of the nati<strong>on</strong>al<br />

legislati<strong>on</strong>, without elaborat<strong>in</strong>g a m<strong>on</strong>itor<strong>in</strong>g plan for the implementati<strong>on</strong> of the<br />

projects <strong>in</strong> order to meet the established c<strong>on</strong>tractual deadl<strong>in</strong>es.<br />

We recommended to closely m<strong>on</strong>itor the implementati<strong>on</strong> of these projects <strong>in</strong> order to<br />

assure their f<strong>in</strong>alizati<strong>on</strong> with<strong>in</strong> the deadl<strong>in</strong>es <strong>in</strong>itially established by the F<strong>in</strong>anc<strong>in</strong>g<br />

C<strong>on</strong>tract<br />

The recommendati<strong>on</strong> was implemented.<br />

Use of a procedure manual that does not observe the requirements of the European<br />

Commissi<strong>on</strong><br />

It has been found that by the end of February 2007, the procedures manual <strong>on</strong> the<br />

public procurements was not drawn up accord<strong>in</strong>g to GEO no. 34/2006, although the<br />

Agency was <strong>in</strong>formed by the European Commissi<strong>on</strong> by letter no. 35029/ 22.12.2006<br />

that the provisi<strong>on</strong>s of the Regulati<strong>on</strong> for the transiti<strong>on</strong> from SAPARD Programme to<br />

the post-accesssi<strong>on</strong> rural development <strong>programme</strong>s related to the public<br />

procurement procedures shall be retroactive applicable start<strong>in</strong>g with the accessi<strong>on</strong><br />

date. At the same time, the Agency was also <strong>in</strong>formed that the draft versi<strong>on</strong> of the<br />

Regulati<strong>on</strong> <strong>in</strong>clud<strong>in</strong>g the retroactive applicati<strong>on</strong> clause was positively endorsed with<strong>in</strong><br />

the STAR Committee <strong>on</strong> November 2006.<br />

IAD recommended to further analyze the legislati<strong>on</strong> modificati<strong>on</strong>s as so<strong>on</strong> as the first<br />

<strong>in</strong>formati<strong>on</strong> regard<strong>in</strong>g these modificati<strong>on</strong>s and their impact <strong>on</strong> the procedures are<br />

received, <strong>in</strong> order to prevent similar situati<strong>on</strong>s.<br />

The recommendati<strong>on</strong> was not agreed.<br />

119


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Incomplete procedural provisi<strong>on</strong>s<br />

IAD found that the procedural provisi<strong>on</strong>s related to the <strong>in</strong>serti<strong>on</strong>, identificati<strong>on</strong> and<br />

correcti<strong>on</strong> of the wr<strong>on</strong>g or <strong>in</strong>complete <strong>in</strong>formati<strong>on</strong> <strong>in</strong> the system are <strong>in</strong>c<strong>on</strong>sistent.<br />

IAD also found that the procedural provisi<strong>on</strong>s are aim<strong>in</strong>g <strong>on</strong>ly at the elim<strong>in</strong>ati<strong>on</strong> of the<br />

possibility to electr<strong>on</strong>ically process the wr<strong>on</strong>g <strong>in</strong>formati<strong>on</strong>, but there is no proper<br />

framework for dim<strong>in</strong>ish<strong>in</strong>g the rate of the errors caused by the <strong>in</strong>serti<strong>on</strong> of wr<strong>on</strong>g or<br />

<strong>in</strong>complete <strong>in</strong>formati<strong>on</strong>.<br />

The quality of the <strong>in</strong>formati<strong>on</strong> <strong>in</strong> electr<strong>on</strong>ic format was <strong>in</strong>fluenced by the degree to<br />

cover certa<strong>in</strong> specific necessities:<br />

- the management process of the <strong>in</strong>formati<strong>on</strong> with<strong>in</strong> the system, namely their<br />

proper organizati<strong>on</strong>, exploitati<strong>on</strong> and protecti<strong>on</strong>;<br />

- the supervisi<strong>on</strong> of the activity for <strong>in</strong>sert<strong>in</strong>g, extracti<strong>on</strong> and <str<strong>on</strong>g>report</str<strong>on</strong>g><strong>in</strong>g the<br />

<strong>in</strong>formati<strong>on</strong>, namely there is no supervisi<strong>on</strong> related to the compliance of the<br />

data <strong>in</strong>serted <strong>in</strong> the system with the <strong>in</strong>itial documents.<br />

It has been recommended to establish procedural norms specific to assure the quality<br />

of the <strong>in</strong>formati<strong>on</strong> <strong>in</strong>serted <strong>in</strong> the system. These norms must assure the accuracy,<br />

<strong>in</strong>tegrity, completeness, c<strong>on</strong>sistency and reliability <strong>on</strong> the <strong>in</strong>formati<strong>on</strong> from the<br />

collecti<strong>on</strong> areas.<br />

Not implemented recommendati<strong>on</strong><br />

Incomplete procedural provisi<strong>on</strong>s<br />

We found that CD – MERU collects, processes, centralizes and transmits different<br />

<strong>in</strong>formati<strong>on</strong> to entities with<strong>in</strong> PARDF and to MA, although there are no procedural<br />

provisi<strong>on</strong>s <strong>in</strong> this respect. The <strong>in</strong>formati<strong>on</strong> collected from the regi<strong>on</strong>al level and<br />

processed by CD – MERU are received <strong>on</strong>ly <strong>in</strong> electr<strong>on</strong>ic format, thus there is no<br />

certa<strong>in</strong>ty that the <strong>in</strong>formati<strong>on</strong> are correctly collected and supervised.<br />

We recommended tak<strong>in</strong>g the measures for <strong>in</strong>clud<strong>in</strong>g <strong>in</strong> CD – MERU procedure of<br />

certa<strong>in</strong> provisi<strong>on</strong>s <strong>in</strong> order to cover the activities carried out at present outside the<br />

procedural provisi<strong>on</strong>s.<br />

The recommendati<strong>on</strong> was implemented<br />

Incomplete procedural provisi<strong>on</strong>s<br />

IAD identified the follow<strong>in</strong>g deficiencies <strong>in</strong> the manner the m<strong>on</strong>thly rec<strong>on</strong>ciliati<strong>on</strong>s<br />

related to c<strong>on</strong>tracts and addenda c<strong>on</strong>cluded by the Agency are processed:<br />

• the units <strong>in</strong>volved <strong>in</strong> process<strong>in</strong>g the rec<strong>on</strong>ciliati<strong>on</strong>s (SCD-CU, PPD-PAcU, CD-<br />

MERU, TAD) do not fill <strong>in</strong> a sole rec<strong>on</strong>ciliati<strong>on</strong> form;<br />

• the rec<strong>on</strong>ciliati<strong>on</strong> between CD-MERU and SCD-CU is performed by CD-MERU<br />

tak<strong>in</strong>g over the database transmitted by SCD-CU and compar<strong>in</strong>g it with the<br />

amounts from CD-MERU – amounts taken over as well from SCD-CU; there is<br />

no other <strong>in</strong>dependent source for compar<strong>in</strong>g the amounts related to c<strong>on</strong>tracts;<br />

• the differences are expla<strong>in</strong>ed by CD-MERU and aim at round<strong>in</strong>g up the values<br />

of the c<strong>on</strong>tracts generated by denom<strong>in</strong>ati<strong>on</strong>, but these differences turn <strong>in</strong> tens<br />

of lei, with the risk of grow<strong>in</strong>g; this fact is not noticed <strong>in</strong> the rec<strong>on</strong>ciliati<strong>on</strong>s<br />

between SCD-CU and PPD-PAcU;<br />

• another explanati<strong>on</strong> of the differences between the rec<strong>on</strong>ciliati<strong>on</strong>s CD-MERU<br />

and SCD-CU is the cancelled c<strong>on</strong>tracts which are taken over <strong>in</strong> the database<br />

120


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

by CD-MERU <strong>on</strong> the m<strong>on</strong>th the cancellati<strong>on</strong> has been performed and by SCD-<br />

CU and PPD-PAcU <strong>on</strong> the moment PPD receives the notice <strong>on</strong> the<br />

cancellati<strong>on</strong>;<br />

• the differences with<strong>in</strong> the rec<strong>on</strong>ciliati<strong>on</strong>s for the cancelled c<strong>on</strong>tracts occur also<br />

due to the transmissi<strong>on</strong> with delay of the notices regard<strong>in</strong>g the cancellati<strong>on</strong>s<br />

due to the large period of time necessary to process the de-commitment of the<br />

amounts follow<strong>in</strong>g the cancellati<strong>on</strong> (signature by OPFCU, credit ord<strong>in</strong>ator,<br />

etc.);<br />

• the registrati<strong>on</strong>s <strong>in</strong> SCD-CU database of the c<strong>on</strong>tracts, addenda, cancelled<br />

c<strong>on</strong>tracts or process<strong>in</strong>g the de-commitments of amounts, are not performed<br />

when the related documents are received, but at the end of the rec<strong>on</strong>ciliati<strong>on</strong><br />

m<strong>on</strong>th or at a certa<strong>in</strong> period of time, by a s<strong>in</strong>gle pers<strong>on</strong> with<strong>in</strong> the unit, fact that<br />

affects the operativity of this activity and may generate errors <strong>in</strong>dependent<br />

from the resp<strong>on</strong>sible expert’s will;<br />

• the rec<strong>on</strong>ciliati<strong>on</strong> between SCD-CU and CD-MERU is performed dur<strong>in</strong>g the<br />

m<strong>on</strong>th related to the rec<strong>on</strong>ciliati<strong>on</strong> (current entries) without perform<strong>in</strong>g a<br />

rec<strong>on</strong>ciliati<strong>on</strong> of the global values of the c<strong>on</strong>tracts under SAPARD Programme,<br />

thus there is a risk not to f<strong>in</strong>d a possible error <strong>in</strong> a prior m<strong>on</strong>th;<br />

• the rec<strong>on</strong>ciliati<strong>on</strong> of the c<strong>on</strong>tracts and addenda (CP 18.J.1.) between PAcU,<br />

SCD and TAD exceeds the procedural framework because <strong>in</strong> the case of the<br />

lists with the c<strong>on</strong>tracts and addenda which are the object of the rec<strong>on</strong>ciliati<strong>on</strong>s,<br />

their acknowledgment by signature, by the pers<strong>on</strong>s resp<strong>on</strong>sible with<strong>in</strong> the<br />

<strong>in</strong>volved parties is not proved, or the names of the pers<strong>on</strong>s who sign them are<br />

not specified.<br />

IAD recommended the follow<strong>in</strong>gs:<br />

1. To perform rec<strong>on</strong>ciliati<strong>on</strong>s between the three units <strong>in</strong>volved <strong>in</strong> the process of<br />

<str<strong>on</strong>g>report</str<strong>on</strong>g><strong>in</strong>g the amounts c<strong>on</strong>tracted under SAPARD Programme (SCD-CU, PPD-PAcU,<br />

CD-MERU), <strong>on</strong> a s<strong>in</strong>gle form. The form should <strong>in</strong>clude the explanati<strong>on</strong>s of the<br />

differences occurred, acknowledged by the three units. Thus, all the units shall know<br />

what differences related to the amounts c<strong>on</strong>tracted under SAPARD Programme may<br />

occur, not <strong>on</strong>ly the units perform<strong>in</strong>g the rec<strong>on</strong>ciliati<strong>on</strong>s, as it happens at present (CD-<br />

MERU and SCD-CU or SCD-CU and CD-MERU). At the same time, we<br />

recommended to perform the rec<strong>on</strong>ciliati<strong>on</strong>s m<strong>on</strong>thly <strong>on</strong> current entries and also <strong>on</strong><br />

the global amounts registered from the start of the <strong>programme</strong> up to present.<br />

2. In case the differences from the rec<strong>on</strong>ciliati<strong>on</strong>s, which are the result of round<strong>in</strong>g up<br />

the values of the c<strong>on</strong>tracts follow<strong>in</strong>g the denom<strong>in</strong>ati<strong>on</strong>, tend to be significant, we<br />

recommend to take the measures for identify<strong>in</strong>g the c<strong>on</strong>tracts generat<strong>in</strong>g these<br />

differences and to correct the amounts <strong>in</strong> all databases at PARDF’s level.<br />

3. To establish the moment the registrati<strong>on</strong> related to the cancelled c<strong>on</strong>tracts has to<br />

be operated <strong>in</strong> the database, <strong>in</strong> order to avoid such differences with<strong>in</strong> the<br />

rec<strong>on</strong>ciliati<strong>on</strong>s, c<strong>on</strong>sider<strong>in</strong>g the gaps generated by the c<strong>on</strong>clusi<strong>on</strong> and approval of the<br />

“Proposal for committ<strong>in</strong>g expenditure”.<br />

4. In order to register <strong>in</strong> the database of SCD-CU and to perform the rec<strong>on</strong>ciliati<strong>on</strong>s<br />

regard<strong>in</strong>g the c<strong>on</strong>tracted amounts, it is necessary to allocate more experts for this<br />

activity.<br />

121


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

5. It has been recommended that all the <str<strong>on</strong>g>report</str<strong>on</strong>g>s drawn up at units/ directorates level<br />

to <strong>in</strong>clude the positi<strong>on</strong>, name and signature of all the pers<strong>on</strong>s <strong>in</strong>volved.<br />

Based <strong>on</strong> the answers received, the audit’s op<strong>in</strong>i<strong>on</strong> regard<strong>in</strong>g the recommendati<strong>on</strong>s<br />

is the follow<strong>in</strong>g:<br />

1. Not implemented recommendati<strong>on</strong>;<br />

2. Implemented recommendati<strong>on</strong>;<br />

3. Not implemented recommendati<strong>on</strong>;<br />

4. Not implemented recommendati<strong>on</strong>;<br />

5. Implemented recommendati<strong>on</strong>.<br />

Incomplete procedural provisi<strong>on</strong>s<br />

It has been found that after the payment of the last <strong>in</strong>stalment to the beneficiary, <strong>in</strong><br />

case there is a difference between the c<strong>on</strong>tracted value and the total paid value, <strong>in</strong><br />

lack of a document to perform the de-commitment of the rema<strong>in</strong><strong>in</strong>g amount, there is a<br />

large period of time the amount is unavailable to be re-committed for other c<strong>on</strong>tracts.<br />

IAD recommended tak<strong>in</strong>g <strong>in</strong>to account the measures for shorten<strong>in</strong>g the deadl<strong>in</strong>e for<br />

the de-commitment of the unused amount by m<strong>on</strong>itor<strong>in</strong>g the beneficiaries’ appeal<br />

deadl<strong>in</strong>e and by launch<strong>in</strong>g the procedure for de-committ<strong>in</strong>g these amounts.<br />

IAD c<strong>on</strong>sidered the recommendati<strong>on</strong> closed for SAPARD implementati<strong>on</strong> as the<br />

funds absorpti<strong>on</strong> degree can no l<strong>on</strong>ger be affected.<br />

Incomplete procedural provisi<strong>on</strong>s<br />

As regards the elaborati<strong>on</strong> of the “Statement of expenditure”, we found the follow<strong>in</strong>g<br />

deficiencies:<br />

The statement is drawn up manually by collect<strong>in</strong>g the <strong>in</strong>formati<strong>on</strong> directly from the<br />

justify<strong>in</strong>g documents, thus be<strong>in</strong>g a risk to omit certa<strong>in</strong> registrati<strong>on</strong> or writ<strong>in</strong>gs of<br />

numbers no l<strong>on</strong>ger available;<br />

The statement is drawn up by a s<strong>in</strong>gle pers<strong>on</strong> (head of PAcU), without any proof of<br />

his/hers supervisi<strong>on</strong>.<br />

This f<strong>in</strong>d<strong>in</strong>g has been also menti<strong>on</strong>ed before other audit missi<strong>on</strong>s, when a series of<br />

errors related to the Statement of Expenditure were found.<br />

IAD recommended the follow<strong>in</strong>gs:<br />

1. Involv<strong>in</strong>g more pers<strong>on</strong>s <strong>in</strong> draw<strong>in</strong>g up of the Statement of Expenditures <strong>in</strong> order to<br />

assure a proper c<strong>on</strong>trol and expertise level.<br />

2. Insert<strong>in</strong>g a <str<strong>on</strong>g>report</str<strong>on</strong>g> to be the base of the State of expenditure. The <str<strong>on</strong>g>report</str<strong>on</strong>g> should be<br />

given by the account<strong>in</strong>g software, based <strong>on</strong> the account<strong>in</strong>g <strong>in</strong>formati<strong>on</strong>.<br />

Based <strong>on</strong> the answers received, the audit’s op<strong>in</strong>i<strong>on</strong> regard<strong>in</strong>g the recommendati<strong>on</strong>s<br />

is the follow<strong>in</strong>g:<br />

1. Implemented recommendati<strong>on</strong> ;<br />

2. Partially implemented recommendati<strong>on</strong>, as the software does not generate the<br />

Statement of Expenditures.<br />

122


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Deficiencies <strong>in</strong> communicati<strong>on</strong><br />

As regards the use of the payment authorizati<strong>on</strong> procedures IAD found that there are<br />

different versi<strong>on</strong>s of these procedures at PCORDF and PRCRDF levels (PRCRDF –<br />

June 11 th 2007, PCORDF – September 17 th 2007, the official <strong>on</strong>e), due to the<br />

<strong>in</strong>efficient communicati<strong>on</strong> of the procedural modificati<strong>on</strong>s operated <strong>in</strong> time at<br />

PARDF’s level, of the modificati<strong>on</strong>s operated <strong>in</strong> track-changes and of the <strong>in</strong>formati<strong>on</strong><br />

regard<strong>in</strong>g the usage of the procedures posted <strong>on</strong> the comm<strong>on</strong> field fileserver<br />

allocated to the Methodology Unit. At the same time, there is no acknowledgment<br />

table for the experts with<strong>in</strong> PRCRDF and PCORDF regard<strong>in</strong>g the procedural<br />

modificati<strong>on</strong>s.<br />

IAD recommended the improvement of both the communicati<strong>on</strong> process and of the<br />

transmissi<strong>on</strong> of documents between the entities at PARDF’s level, as well as the<br />

strengthen<strong>in</strong>g the <strong>in</strong>ternal c<strong>on</strong>trol.<br />

Recommendati<strong>on</strong> partially implemented.<br />

III. 3.2 C<strong>on</strong>trol missi<strong>on</strong>s performed by C<strong>on</strong>trol and Antifraud Directorate<br />

Accord<strong>in</strong>g to the accredited procedure, the C<strong>on</strong>trol and Antifraud Directorate (CAD),<br />

under the direct subord<strong>in</strong>ati<strong>on</strong> of the general director of PARDF, carries out technical<br />

and f<strong>in</strong>ancial verificati<strong>on</strong>s of the projects <strong>in</strong> terms of their certificati<strong>on</strong>, c<strong>on</strong>formity,<br />

eligibility, selecti<strong>on</strong> and payments, ma<strong>in</strong>tenance of the eligibility <strong>on</strong> a 5-year period of<br />

time and also <strong>in</strong> terms of <strong>in</strong>ternal c<strong>on</strong>trol <strong>in</strong> order to prevent fraud and also to assure<br />

the proper use of funds, observ<strong>in</strong>g the quality requirements def<strong>in</strong>ed <strong>in</strong> the project.<br />

The ma<strong>in</strong> c<strong>on</strong>trol activities c<strong>on</strong>sisted <strong>in</strong>:<br />

I. The verificati<strong>on</strong> of the projects dur<strong>in</strong>g the implementati<strong>on</strong> and executi<strong>on</strong> stage;<br />

II. The verificati<strong>on</strong> of the projects after the last payment (the ex-post verificati<strong>on</strong>).<br />

A. The verificati<strong>on</strong> of the projects dur<strong>in</strong>g the implementati<strong>on</strong> and executi<strong>on</strong><br />

stage<br />

1. Random sample c<strong>on</strong>trol of the projects both before and after the last payment;<br />

2. Solv<strong>in</strong>g, <strong>in</strong> the limit of its competences, of the petiti<strong>on</strong>s, <strong>in</strong>timati<strong>on</strong>s, appeals<br />

and notificati<strong>on</strong>s received from PARDF, from beneficiaries, natural or legal<br />

pers<strong>on</strong>s, the <strong>in</strong>volved <strong>in</strong>stituti<strong>on</strong>s, mass-media or self-<strong>in</strong>timati<strong>on</strong>s, <strong>in</strong>clud<strong>in</strong>g the<br />

<strong>on</strong>es <strong>on</strong> quality works with<strong>in</strong> Measure 2.1 and the other measures;<br />

3. Analysis and m<strong>on</strong>itor<strong>in</strong>g of irregularities received from the other<br />

directorates/units <strong>in</strong>volved <strong>in</strong> the verificati<strong>on</strong> and c<strong>on</strong>trol activities and <str<strong>on</strong>g>report</str<strong>on</strong>g><strong>in</strong>g<br />

them to the European Commissi<strong>on</strong> through the Nati<strong>on</strong>al Fund with<strong>in</strong> the<br />

M<strong>in</strong>istry of Public F<strong>in</strong>ances;<br />

4. Analysis, documentary verificati<strong>on</strong> and, by case, <strong>on</strong>-the-spot verificati<strong>on</strong> of<br />

<strong>in</strong>timati<strong>on</strong>s/requests received from other c<strong>on</strong>trol bodies, OLAF, DLAF, NAD<br />

(Nati<strong>on</strong>al Anticorrupti<strong>on</strong> Directorate).<br />

123


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

At the same time, dur<strong>in</strong>g 2008, through its councillors, the C<strong>on</strong>trol and Antifraud<br />

Directorate took part <strong>in</strong>:<br />

• Commissi<strong>on</strong>s for the verificati<strong>on</strong> of certa<strong>in</strong> projects’ implementati<strong>on</strong>, to<br />

establish the damage and elaborate the F<strong>in</strong>d<strong>in</strong>g M<strong>in</strong>utes with the<br />

acknowledgment of a debt and the enforcement value, based <strong>on</strong> Government<br />

Ord<strong>in</strong>ance No. 79/2003 (approximately 35 c<strong>on</strong>trol activities);<br />

• Committees for solv<strong>in</strong>g the appeals to the m<strong>in</strong>utes (approximately 40 appeals)<br />

and issu<strong>in</strong>g the f<strong>in</strong>al Decisi<strong>on</strong>s accord<strong>in</strong>g to the Government Ord<strong>in</strong>ance’s<br />

provisi<strong>on</strong>s no. 79/2003.<br />

1. The random sample<br />

The random sample was established based <strong>on</strong> the “risk analysis method” of the<br />

c<strong>on</strong>trol and anti-fraud procedure, <strong>on</strong> a percentage of 5% of the total eligible amount<br />

c<strong>on</strong>tracted <strong>on</strong> measure 3.1 and <strong>on</strong> a percentage of 10% of the total eligible amount<br />

c<strong>on</strong>tracted <strong>on</strong> measures 2.1 and 3.5.<br />

The random sample was determ<strong>in</strong>ed for each PRCRDF, based <strong>on</strong> the total number of<br />

c<strong>on</strong>tracted projects and the values of these projects, tak<strong>in</strong>g <strong>in</strong>to account the provisi<strong>on</strong><br />

of the c<strong>on</strong>trol procedure as:<br />

• 30% of the projects <strong>in</strong>cluded <strong>in</strong> the random sample to be verified before the<br />

first payment;<br />

• 70% to be verified after the first payment was made.<br />

1.1. The random sample <strong>on</strong> measure 3.1<br />

Initially, all the 1,508 projects c<strong>on</strong>tracted between October 2005 and June 2007 were<br />

taken <strong>in</strong>to c<strong>on</strong>siderati<strong>on</strong>. Follow<strong>in</strong>g the analysis, 76 projects to be verified were<br />

resulted, distributed <strong>in</strong> two stages:<br />

• 27 projects <strong>in</strong> the first stage, between September 10 th , 2007 – December 15 th ,<br />

2007;<br />

• 49 projects <strong>in</strong> the sec<strong>on</strong>d stage between March 15 th , 2008 and July 15 th , 2008.<br />

Dur<strong>in</strong>g the sec<strong>on</strong>d stage, the 1,020 f<strong>in</strong>alized projects were identified and it was found<br />

that 368 projects were not f<strong>in</strong>alized. Follow<strong>in</strong>g the verificati<strong>on</strong> of the projects <strong>in</strong>cluded<br />

<strong>in</strong> the random established <strong>in</strong> August 2007, it was found that of the 49 projects, 19<br />

projects were f<strong>in</strong>alized, thus, 30 projects rema<strong>in</strong><strong>in</strong>g to be verified.<br />

The c<strong>on</strong>trol missi<strong>on</strong>s established for the projects <strong>in</strong>cluded <strong>in</strong> the random sample<br />

exam<strong>in</strong>ed dur<strong>in</strong>g the sec<strong>on</strong>d stage, Measure 3.1, were carried out <strong>in</strong> compliance with<br />

the C<strong>on</strong>trol Plan approved and registered at PARDF Bucharest with no.<br />

3556/01.03.2007.<br />

It must be menti<strong>on</strong>ed that <strong>on</strong>e of these projects was cancelled after the approval of<br />

the C<strong>on</strong>trol Plan, so the c<strong>on</strong>trol had not been necessary.<br />

Follow<strong>in</strong>g the verificati<strong>on</strong> of the 29 projects of the approved C<strong>on</strong>trol Plan, the situati<strong>on</strong><br />

is as follows:<br />

a) The projects to which the irregularities were not found or the found<br />

irregularities have no f<strong>in</strong>ancial implicati<strong>on</strong>s – 27 projects, namely 93.10%;<br />

b) The projects where the irregularities with f<strong>in</strong>ancial implicati<strong>on</strong>s were found – 2<br />

projects, namely 6.90%;<br />

124


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Observati<strong>on</strong>: There were c<strong>on</strong>sidered irregularities with f<strong>in</strong>ancial implicati<strong>on</strong>s <strong>on</strong>ly the<br />

irregularities which supposed to make a debt follow<strong>in</strong>g the c<strong>on</strong>trol.<br />

1.2. The random sample <strong>on</strong> measure 2.1<br />

In order to establish the sample <strong>on</strong> measure 2.1, all the 252 projects c<strong>on</strong>tracted<br />

between January 1 st , 2006 and May 31 st , 2008 were taken <strong>in</strong>to c<strong>on</strong>siderati<strong>on</strong>,<br />

result<strong>in</strong>g 26 projects, namely 10.32%. The <strong>on</strong>-the-spot c<strong>on</strong>trol of these projects was<br />

carried out between September – November 2008, accord<strong>in</strong>g to the C<strong>on</strong>trol Plan<br />

approved and registered at PARDF Bucharest with no. 15963/28.08.2008.<br />

Follow<strong>in</strong>g the c<strong>on</strong>trol performed <strong>on</strong> the 26 projects, the c<strong>on</strong>trol <str<strong>on</strong>g>report</str<strong>on</strong>g>s have been<br />

drawn up and approved by the general director, for all projects, the situati<strong>on</strong> be<strong>in</strong>g as<br />

follows:<br />

a) Projects where irregularities were not found or the irregularities found have no<br />

f<strong>in</strong>ancial implicati<strong>on</strong>s - 23 projects, namely 88.5%.<br />

b) Projects where irregularities with f<strong>in</strong>ancial implicati<strong>on</strong>s were found – 2 projects,<br />

namely 11.5%. Report<strong>in</strong>g the amount of the debt made of 259,262.17 Lei to<br />

the total eligible amount of 26 projects from the sample of Lei 145,068,889.0,<br />

the debts made represent a percentage of 0.17%.<br />

Observati<strong>on</strong>: Only the irregularities <strong>in</strong>volv<strong>in</strong>g debt mak<strong>in</strong>g follow<strong>in</strong>g the c<strong>on</strong>trol were<br />

c<strong>on</strong>sidered irregularities with f<strong>in</strong>ancial implicati<strong>on</strong>s.<br />

The cases <strong>in</strong> which at the payment <strong>in</strong>stalments made until the c<strong>on</strong>trol (3 of 5 payment<br />

<strong>in</strong>stalments), values represent<strong>in</strong>g quota that were not <strong>in</strong>cluded <strong>in</strong> the awarded tender<br />

were discounted, the recalculati<strong>on</strong> for all the payment <strong>in</strong>stalments will be made by the<br />

<strong>in</strong>volved PRCRDF and from the last payment <strong>in</strong>stalment the amount of the quota<br />

from the estimate c<strong>on</strong>clusi<strong>on</strong> will be reta<strong>in</strong>ed, <strong>in</strong>clud<strong>in</strong>g the expenditures aris<strong>in</strong>g from<br />

this recalculati<strong>on</strong> (<strong>in</strong>direct costs, profit, VAT) which were c<strong>on</strong>sidered at this time<br />

without f<strong>in</strong>ancial implicati<strong>on</strong>s. In these cases, the maximum amount overpaid is about<br />

179,800 Lei (about 2.5% of the total eligible amount cumulative of 2 projects of<br />

7,191,928 Lei) represent<strong>in</strong>g a rate of 0.12% of the total eligible amount of 26 projects<br />

from the sample.<br />

Thus, the formed debts represent a rate of 0.17%, which is smaller than the <strong>on</strong>e<br />

resulted from the number of projects with f<strong>in</strong>ancial irregularities from the total sample,<br />

respectively 11.5%.<br />

1.3. The random sample <strong>on</strong> measure 3.5.<br />

In order to establish the sample <strong>on</strong> measure 3.5, all the 116 projects c<strong>on</strong>tracted<br />

between January 1 st 2006 and May 31 st , 2008 were taken <strong>in</strong>to c<strong>on</strong>siderati<strong>on</strong>.<br />

Follow<strong>in</strong>g these analysis, 13 projects resulted, namely 11, 21%. The <strong>on</strong>-the-spot<br />

c<strong>on</strong>trol of these projects was carried out between September – November 2008,<br />

accord<strong>in</strong>g to the C<strong>on</strong>trol Plan approved and registered at PARDF Bucharest with no.<br />

15962/28.08.2008.<br />

For the 13 projects documentary and <strong>on</strong>-the-spot verified, the C<strong>on</strong>trol Reports have<br />

been drawn up and approved by the General Director and the situati<strong>on</strong> be<strong>in</strong>g as<br />

follows:<br />

125


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

a) Projects where irregularities were not found or the irregularities found have no<br />

f<strong>in</strong>ancial implicati<strong>on</strong>s – 13 projects, namely 100%;<br />

b) Projects where irregularities with f<strong>in</strong>ancial implicati<strong>on</strong>s were found – 0 projects,<br />

namely 0%;<br />

Only the irregularities <strong>in</strong>volv<strong>in</strong>g debt mak<strong>in</strong>g follow<strong>in</strong>g the c<strong>on</strong>trol were c<strong>on</strong>sidered<br />

irregularities with f<strong>in</strong>ancial implicati<strong>on</strong>s.<br />

In a specific case, follow<strong>in</strong>g the verificati<strong>on</strong> of the works’ situati<strong>on</strong>, it was found that<br />

the c<strong>on</strong>structor <strong>in</strong>cluded <strong>in</strong> the estimate, for the sec<strong>on</strong>d and third <strong>in</strong>stalments (three<br />

out of five payment <strong>in</strong>stalments had been paid when the c<strong>on</strong>trol took place) another<br />

quota (represent<strong>in</strong>g the c<strong>on</strong>tributi<strong>on</strong> to the state budget) which had not been <strong>in</strong>itially<br />

<strong>in</strong>cluded <strong>in</strong> the awarded offer. The case was c<strong>on</strong>sidered an irregularity without<br />

f<strong>in</strong>ancial implicati<strong>on</strong>s. Thus, PRCRDF shall recalculate the works situati<strong>on</strong>s accord<strong>in</strong>g<br />

to the estimate <strong>in</strong>cluded <strong>in</strong> the offer and shall hold the related amounts from the next<br />

payment <strong>in</strong>stalment tak<strong>in</strong>g <strong>in</strong>to account the <strong>in</strong>fluence the above-menti<strong>on</strong>ed quota<br />

might have <strong>on</strong> the <strong>in</strong>direct expenditures, profit and VAT.<br />

In case of irregularities as a result of the discovery of certa<strong>in</strong> discrepancy or errors,<br />

the regi<strong>on</strong>al directorates and offices <strong>in</strong>volved were notified to remedy these problems.<br />

2. Appeals, claims and <strong>in</strong>timati<strong>on</strong>s<br />

CAD has resolved 34 <strong>in</strong>timati<strong>on</strong>s, claims and appeals relat<strong>in</strong>g to: the manner that the<br />

tenders for goods was performed and awarded, irregularities <strong>in</strong> works’ executi<strong>on</strong>,<br />

quality’s works, the differences between PRCRDF - PAU related to a c<strong>on</strong>flict of<br />

<strong>in</strong>terest <strong>in</strong> the procurement of the design services, the approval of the Addendum,<br />

cash payment of the <strong>in</strong>voices related to the works’ executi<strong>on</strong>, n<strong>on</strong> observance of the<br />

technical project <strong>in</strong> the works’ executi<strong>on</strong>, suspected fraud, over-f<strong>in</strong>anc<strong>in</strong>g, lack of the<br />

title deed for the land where the <strong>in</strong>vestment was executed, n<strong>on</strong> observance of the<br />

m<strong>in</strong>imum distances admitted between neighbourhoods. For the above-menti<strong>on</strong>ed<br />

aspects, the follow<strong>in</strong>gs have been drawn up:<br />

• 20 c<strong>on</strong>trol <str<strong>on</strong>g>report</str<strong>on</strong>g>s related to the <strong>in</strong>timati<strong>on</strong>s and appeals;<br />

• 14 reply letters without draw<strong>in</strong>g c<strong>on</strong>trol <str<strong>on</strong>g>report</str<strong>on</strong>g>s.<br />

Follow<strong>in</strong>g the c<strong>on</strong>trol <str<strong>on</strong>g>report</str<strong>on</strong>g>s, follow<strong>in</strong>gs have been drawn up and transmitted:<br />

• Reply letters to petiti<strong>on</strong>ers;<br />

• Inform<strong>in</strong>g letters to the local councils of the authorities that made the<br />

<strong>in</strong>timati<strong>on</strong>;<br />

• Transmissi<strong>on</strong> of CAD’s <strong>in</strong>vestigati<strong>on</strong>s f<strong>in</strong>d<strong>in</strong>gs to PRCRDF <strong>in</strong>volved;<br />

• Transmissi<strong>on</strong> to PRCRDF of certa<strong>in</strong> notes regard<strong>in</strong>g the obligati<strong>on</strong> to verify if<br />

the beneficiaries carried out the measures proposed by the C<strong>on</strong>trol and Anti-<br />

Fraud Directorate and to <strong>in</strong>form CAD <strong>on</strong> these verificati<strong>on</strong>s.<br />

All these <strong>in</strong>timati<strong>on</strong>s were drawn up and submitted to CAD by:<br />

• Directorates of PARDF;<br />

• Central and local public adm<strong>in</strong>istrati<strong>on</strong> <strong>in</strong>stituti<strong>on</strong>s (M<strong>in</strong>istry of Agriculture and<br />

Rural Development, Nati<strong>on</strong>al Anticorrupti<strong>on</strong> Directorate, F<strong>in</strong>ancial Guard, The<br />

Court of Account, etc)<br />

• Companies participat<strong>in</strong>g as a tenderer at the public procurement procedure;<br />

126


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

• Natural pers<strong>on</strong>s (residents of the villages benefit<strong>in</strong>g of the SAPARD<br />

Programme)<br />

• Press articles.<br />

In order to resolve these <strong>in</strong>timati<strong>on</strong>s were carried out:<br />

• Documentary c<strong>on</strong>trol;<br />

• On-the-spot c<strong>on</strong>trol that c<strong>on</strong>sisted <strong>in</strong>: physical exam<strong>in</strong>ati<strong>on</strong> and<br />

measurements, excavati<strong>on</strong>s and sampl<strong>in</strong>g (exist<strong>in</strong>g sand), visual <strong>in</strong>specti<strong>on</strong> of<br />

them, verificati<strong>on</strong> of the purchased equipment, etc.<br />

The measures proposed by the C<strong>on</strong>trol and Anti-fraud Directorate and submitted to<br />

the entities <strong>in</strong>volved c<strong>on</strong>sisted <strong>in</strong>:<br />

• the cancellati<strong>on</strong> of the tender and the re-launch<strong>in</strong>g of the procurement<br />

procedure accord<strong>in</strong>g to Government Ord<strong>in</strong>ance no. 34;<br />

• restorati<strong>on</strong> of the damaged works;<br />

• debt mak<strong>in</strong>g (over-f<strong>in</strong>anc<strong>in</strong>g, payment <strong>in</strong> cash of certa<strong>in</strong> <strong>in</strong>voices, build<strong>in</strong>g site<br />

<strong>in</strong>spector works);<br />

• c<strong>on</strong>tract’s cancellati<strong>on</strong> (n<strong>on</strong>-observance of the eligibility criteria);<br />

• submissi<strong>on</strong> to DLAF for <strong>in</strong>vestigati<strong>on</strong> (suspici<strong>on</strong> of forged documents).<br />

Depend<strong>in</strong>g <strong>on</strong> the results of DLAF’s <strong>in</strong>vestigati<strong>on</strong>, the necessary measures<br />

shall be taken;<br />

• analysis of the account<strong>in</strong>g documents related to the works executi<strong>on</strong> c<strong>on</strong>tract<br />

by the F<strong>in</strong>ancial Guard;<br />

If follow<strong>in</strong>g CAD’s c<strong>on</strong>trols, no irregularities were found for the projects, it was<br />

proposed to c<strong>on</strong>t<strong>in</strong>ue the implementati<strong>on</strong> of the projects.<br />

3. Analyz<strong>in</strong>g and m<strong>on</strong>itor<strong>in</strong>g the irregularities<br />

In 2008, 94 irregularities with f<strong>in</strong>ancial implicati<strong>on</strong>s have been found and registered<br />

follow<strong>in</strong>g the analysis of the Notes <strong>on</strong> f<strong>in</strong>d<strong>in</strong>g irregularities, transmitted by the<br />

directorates with<strong>in</strong> PARDF and / or PRCRDF and follow<strong>in</strong>g the elaborati<strong>on</strong> of the<br />

F<strong>in</strong>d<strong>in</strong>g M<strong>in</strong>utes. Out of these irregularities, 40 were made debts as a result of the<br />

c<strong>on</strong>trols carried out by CAD.<br />

4. Analysis and verificati<strong>on</strong> of the <strong>in</strong>timati<strong>on</strong>s/ requests received from other<br />

c<strong>on</strong>trol bodies<br />

• the documentati<strong>on</strong> related to 72 SAPARD projects was transmitted at the<br />

request of DLAF, NAD and GIP;<br />

• 124 answers were drawn up at the request of OLAF, NAD, DLAF, GIP, FG,<br />

M<strong>in</strong>istry of Internal Affairs and Adm<strong>in</strong>istrative reform. In order to draw up these<br />

answers, 14 projects were verified <strong>on</strong> the spot follow<strong>in</strong>g the request of NAD,<br />

OLAF and respectively EC;<br />

• 11 Informati<strong>on</strong> Notes received from DLAF were processed;<br />

• 42 projects under measure 1.1 were verified documentary follow<strong>in</strong>g EC’s<br />

recommendati<strong>on</strong>s (DG AGRI and OLAF).<br />

B. Verificati<strong>on</strong> of projects after the f<strong>in</strong>al payment (Ex-post c<strong>on</strong>trol)<br />

Dur<strong>in</strong>g 2008 the ex-post c<strong>on</strong>trol was carried out based <strong>on</strong> two c<strong>on</strong>trol plans:<br />

• Ex-post c<strong>on</strong>trol plan no. 1.350/ 25.01.2008;<br />

• Ex-post c<strong>on</strong>trol plan no. 13.904/ 05.08.2008.<br />

127


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

The centraliz<strong>in</strong>g situati<strong>on</strong> of the projects verified ex-post <strong>on</strong>-the-spot by CAD dur<strong>in</strong>g<br />

2008, <strong>in</strong> compliance with the two c<strong>on</strong>trol plans, can be found below:<br />

Measure<br />

1.1 Improv<strong>in</strong>g process<strong>in</strong>g and<br />

market<strong>in</strong>g of agricultural and<br />

fishery products<br />

2.1 Development and<br />

improvement of the rural<br />

<strong>in</strong>frastructure<br />

3.1 Investments <strong>in</strong> agricultural<br />

hold<strong>in</strong>gs<br />

3.4 Development and<br />

diversificati<strong>on</strong> of ec<strong>on</strong>omic<br />

activities<br />

Number of projects<br />

verified accord<strong>in</strong>g to<br />

Ex-post c<strong>on</strong>trol plan<br />

no. 1.350/ 25.01.2008<br />

Number of projects<br />

verified accord<strong>in</strong>g to<br />

Ex-post c<strong>on</strong>trol plan,<br />

semester II- 2008 no.<br />

13.904/ 05.08.2008<br />

Total<br />

5 projects 5 projects 10 projects<br />

7 projects 12 projects 19 projects<br />

15 projects 7 projects 22 projects<br />

2 projects 8 projects 10 projects<br />

Total 29 projects 32 projects 61 projects<br />

In c<strong>on</strong>clusi<strong>on</strong>, we would like to specify that dur<strong>in</strong>g 2008, <strong>in</strong> compliance with the two<br />

c<strong>on</strong>trol plans, CAD – Ex-post C<strong>on</strong>trol Unit verified <strong>on</strong>-the-spot 61 f<strong>in</strong>alized projects,<br />

distributed <strong>on</strong> measures as follows:<br />

• Measure 1.1 – 10 projects;<br />

• Measure 2.1 – 19 projects;<br />

• Measure 3.1 – 22 projects;<br />

• Measure 3.4 – 10 projects.<br />

As regards the 61 projects verified ex-post <strong>on</strong>-the-spot dur<strong>in</strong>g 2008, the follow<strong>in</strong>gs<br />

were found:<br />

• <strong>on</strong> 10 projects (16,39%) no deficiencies were found;<br />

• <strong>on</strong> 29 (47,54%) projects, <strong>on</strong> the date of the <strong>on</strong>-the-spot c<strong>on</strong>trol, deficiencies<br />

were found. Follow<strong>in</strong>g the c<strong>on</strong>trol, the beneficiaries proved the remedy of<br />

the found deficiencies;<br />

• <strong>on</strong> 20 (32,79%) projects, <strong>on</strong> the date of the <strong>on</strong>-the-spot c<strong>on</strong>trol, deficiencies<br />

were found (e.g. n<strong>on</strong>-compliant advertis<strong>in</strong>g banners, not-endorsed<br />

envir<strong>on</strong>ment and sanitary authorizati<strong>on</strong>s, chang<strong>in</strong>g the legal/technical<br />

resp<strong>on</strong>sible without <strong>in</strong>form<strong>in</strong>g PARDF, SAPARD <strong>in</strong>vestment was not<br />

highlighted <strong>in</strong> the f<strong>in</strong>ancial – account<strong>in</strong>g documents, etc.) which were not<br />

remedied. Thus, these projects are still m<strong>on</strong>itored by PARDF;<br />

• <strong>in</strong> case of 2 verified projects (3,28%) the procedure for the recovery of the<br />

n<strong>on</strong>-reimbursable f<strong>in</strong>ancial support was launched.<br />

The C<strong>on</strong>trol and Anti-fraud Directorate c<strong>on</strong>siders that the <str<strong>on</strong>g>report</str<strong>on</strong>g>ed above irregularities<br />

do not affect the eligibility of the projects, with the excepti<strong>on</strong> of two projects for which<br />

the procedure for the recovery of the n<strong>on</strong> reimbursable f<strong>in</strong>anc<strong>in</strong>g assistance was<br />

launched.<br />

As regards the m<strong>on</strong>itor<strong>in</strong>g projects, <strong>in</strong> case the beneficiaries do not comply with<br />

PARDF’s requests accord<strong>in</strong>g to the c<strong>on</strong>tractual terms, the procedure for the recovery<br />

of the n<strong>on</strong>-reimbursable f<strong>in</strong>anc<strong>in</strong>g assistance will be launched.<br />

128


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

III. 4 The activities of the SAPARD Programme M<strong>on</strong>itor<strong>in</strong>g Committee<br />

The M<strong>on</strong>itor<strong>in</strong>g Committee for the SAPARD Programme was set up accord<strong>in</strong>g to the<br />

provisi<strong>on</strong>s of art. 7, secti<strong>on</strong> B of MAFA, hav<strong>in</strong>g as ma<strong>in</strong> objective to ensure the<br />

efficiency and quality of the SAPARD Programme implementati<strong>on</strong>.<br />

The SAPARD M<strong>on</strong>itor<strong>in</strong>g Committee was set up through the Prime M<strong>in</strong>ister’s<br />

Decisi<strong>on</strong> no. 271/04.04.2001 and has the role of exam<strong>in</strong><strong>in</strong>g the results of the<br />

Programme, the achievement of the objectives set out for different measures, the<br />

progress of us<strong>in</strong>g the measures’ f<strong>in</strong>ancial allocati<strong>on</strong>s as well as to approve the <str<strong>on</strong>g>annual</str<strong>on</strong>g><br />

and f<strong>in</strong>al implementati<strong>on</strong> <str<strong>on</strong>g>report</str<strong>on</strong>g>s before submitt<strong>in</strong>g them to the European Commissi<strong>on</strong><br />

and to exam<strong>in</strong>e the SPARAD Programme mid-term evaluati<strong>on</strong>. Also, the M<strong>on</strong>itor<strong>in</strong>g<br />

Commissi<strong>on</strong> may propose to the Commissi<strong>on</strong>, via the Manag<strong>in</strong>g Authority, any<br />

amendment or rec<strong>on</strong>siderati<strong>on</strong> of the Programme <strong>in</strong> order to facilitate the<br />

achievement of the Programme’s objectives.<br />

As a structure, the M<strong>on</strong>itor<strong>in</strong>g Committee is a collective body made up of<br />

representatives of m<strong>in</strong>istries and public authorities as well as of several professi<strong>on</strong>al<br />

associati<strong>on</strong>s and n<strong>on</strong>-governmental organizati<strong>on</strong>s. The Committee is also attended<br />

by European Commissi<strong>on</strong> officials, as observers. The president of the M<strong>on</strong>itor<strong>in</strong>g<br />

Committee is the m<strong>in</strong>ister of agriculture and rural development, and the secretariat of<br />

the M<strong>on</strong>itor<strong>in</strong>g Committee is ensured by the Evaluati<strong>on</strong>, Report<strong>in</strong>g Unit from the<br />

Directorate General for Rural Development – MAFRD.<br />

The M<strong>on</strong>itor<strong>in</strong>g Committee carries out its activity based <strong>on</strong> an organizati<strong>on</strong> and<br />

functi<strong>on</strong><strong>in</strong>g regulati<strong>on</strong> which was adopted with<strong>in</strong> the first reuni<strong>on</strong> of the Committee <strong>on</strong><br />

28.11.2001.<br />

Dur<strong>in</strong>g 2001-2008, sixteen reuni<strong>on</strong>s of the M<strong>on</strong>itor<strong>in</strong>g Committee have been carried<br />

out, out of which two dur<strong>in</strong>g 2008. Dur<strong>in</strong>g 2008 <strong>on</strong>e reuni<strong>on</strong> of the MC has been<br />

organized and a written procedure for approval of the SAPARD Annual Report for<br />

2007.<br />

Follow<strong>in</strong>g the c<strong>on</strong>sultati<strong>on</strong>s with the European Commissi<strong>on</strong>’s officials it was decided<br />

that the approval of the 2007 SAPARD Annual Report by the M<strong>on</strong>itor<strong>in</strong>g Committee<br />

members, <strong>in</strong> written procedure, to be c<strong>on</strong>sidered a reuni<strong>on</strong> of the M<strong>on</strong>itor<strong>in</strong>g<br />

Committee, namely the 15 th .<br />

The Annual <str<strong>on</strong>g>report</str<strong>on</strong>g> <strong>on</strong> the SAPARD Programme implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2007<br />

has been submitted for the approval of the MC members <strong>on</strong> the 5 th of June 2008 and<br />

has been approved by the M<strong>on</strong>itor<strong>in</strong>g Committee members <strong>on</strong> the 16 th of June 2008<br />

and submitted to the European Commissi<strong>on</strong> <strong>on</strong> the 20 th of June 2008.<br />

With<strong>in</strong> the sixteen reuni<strong>on</strong> of the M<strong>on</strong>itor<strong>in</strong>g Committee <strong>on</strong> the 25 th of November<br />

2008, several aspects were presented:<br />

• The progress of the <strong>programme</strong>’s implementati<strong>on</strong>;<br />

• The c<strong>on</strong>trols carried out and the manner of solv<strong>in</strong>g the compla<strong>in</strong>ts received<br />

by the Pay<strong>in</strong>g Agency for Rural Development and Fishery;<br />

129


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

• Modificati<strong>on</strong> proposals of the f<strong>in</strong>anc<strong>in</strong>g table from NPARD – reallocati<strong>on</strong><br />

with<strong>in</strong> measure 21 “Development and improvement of rural <strong>in</strong>frastructure”;<br />

• Implementati<strong>on</strong> of the measures foreseen <strong>in</strong> the Acti<strong>on</strong> Plan set up for the<br />

implementati<strong>on</strong> of the European Commissi<strong>on</strong> observati<strong>on</strong>s and<br />

recommendati<strong>on</strong>s received after the audit missi<strong>on</strong> held dur<strong>in</strong>g 3 rd – 13 th of<br />

June 2008;<br />

• The Audit <str<strong>on</strong>g>report</str<strong>on</strong>g> issued by the Audit Authority for the proper implementati<strong>on</strong><br />

of the Acti<strong>on</strong> plan;<br />

• European Commissi<strong>on</strong>’s positi<strong>on</strong> c<strong>on</strong>cern<strong>in</strong>g the Romania’s request<br />

regard<strong>in</strong>g the prol<strong>on</strong>gati<strong>on</strong> of the term of validity of AFA 2006.<br />

With<strong>in</strong> the reuni<strong>on</strong> from the 25 th of November 2008, the Manag<strong>in</strong>g Authority for<br />

SAPARD Programme proposed, follow<strong>in</strong>g the PARDF request, the modificati<strong>on</strong> of the<br />

f<strong>in</strong>ancial table NPARD, respectively the reallocati<strong>on</strong> with<strong>in</strong> measure 21 “Development<br />

and improvement of rural <strong>in</strong>frastructure” of 45 milli<strong>on</strong> Euro community c<strong>on</strong>tributi<strong>on</strong><br />

from the affected areas to the not-affected <strong>on</strong>es, without modify<strong>in</strong>g the <strong>in</strong>itial amount<br />

allocated for this measure, respectively 524.81 milli<strong>on</strong> Euro.<br />

For the motivati<strong>on</strong> of this proposal, the Manag<strong>in</strong>g Authority specified that dur<strong>in</strong>g<br />

2000-2006, for measure 2.1 “Development and improvement of rural <strong>in</strong>frastructure” –<br />

not-affected areas, the c<strong>on</strong>tracted amount was of 575.56 milli<strong>on</strong> Euro, out of which<br />

431.67 milli<strong>on</strong> Euro Community c<strong>on</strong>tributi<strong>on</strong>, aga<strong>in</strong>st 516.27 milli<strong>on</strong> Euro <strong>in</strong>itially<br />

allocated, while for the affected areas the c<strong>on</strong>tracted amount was of 60.76 milli<strong>on</strong><br />

Euro, out of which 51.64 milli<strong>on</strong> Euro Community c<strong>on</strong>tributi<strong>on</strong>, aga<strong>in</strong>st 161.89 milli<strong>on</strong><br />

Euro <strong>in</strong>itially allocated. Thus, a surpass of the c<strong>on</strong>tracted public value resulted for the<br />

not affected areas totall<strong>in</strong>g 59.29 milli<strong>on</strong> Euro and also an ec<strong>on</strong>omy for the affected<br />

areas of 101.13 milli<strong>on</strong> Euro.<br />

Also, the Community c<strong>on</strong>tributi<strong>on</strong> for measure 4.2 “Technical Assistance” has been<br />

<strong>in</strong>creased with 0.1 milli<strong>on</strong> Euro, for 2005, through redistributi<strong>on</strong> from measure 1.2<br />

“Improv<strong>in</strong>g the structures for quality, veter<strong>in</strong>ary, and plant-health c<strong>on</strong>trol, for the<br />

quality of foodstuffs and for c<strong>on</strong>sumer protecti<strong>on</strong>” <strong>in</strong> order for the f<strong>in</strong>ancial allocati<strong>on</strong><br />

level to corresp<strong>on</strong>d to the value foreseen <strong>in</strong> the acquisiti<strong>on</strong> <strong>programme</strong> elaborated for<br />

this measure.<br />

Dur<strong>in</strong>g the MC reuni<strong>on</strong> from November 2008, it has been discussed the manner of<br />

reimburs<strong>in</strong>g to the Commissi<strong>on</strong> all the amount earned with<strong>in</strong> the SAPARD euro<br />

account, <strong>in</strong> accordance with the provisi<strong>on</strong>s of article 10 (3), Secti<strong>on</strong> A of the Annex to<br />

the Multi-Annual F<strong>in</strong>anc<strong>in</strong>g Agreement, underl<strong>in</strong>g, at the same time, the necessity of<br />

a meet<strong>in</strong>g with the EC representatives <strong>in</strong> order to clarify these aspects and to<br />

establish the procedure for reimburs<strong>in</strong>g the <strong>in</strong>terest.<br />

III. 5 M<strong>on</strong>itor<strong>in</strong>g and evaluati<strong>on</strong> system<br />

The m<strong>on</strong>itor<strong>in</strong>g of SAPARD Programme is performed us<strong>in</strong>g the <strong>in</strong>dicators<br />

corresp<strong>on</strong>d<strong>in</strong>g to the specific character of the assistance and socio-ec<strong>on</strong>omic<br />

structural and envir<strong>on</strong>mental situati<strong>on</strong> <strong>in</strong> Romania.<br />

At PARDF’s level the m<strong>on</strong>itor<strong>in</strong>g <strong>in</strong>dicators are grouped as follows: regi<strong>on</strong>al<br />

<strong>in</strong>dicators, f<strong>in</strong>ancial m<strong>on</strong>itor<strong>in</strong>g <strong>in</strong>dicators and achievement <strong>in</strong>dicators.<br />

130


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

The regi<strong>on</strong>al <strong>in</strong>dicators give <strong>in</strong>formati<strong>on</strong> <strong>on</strong> the positi<strong>on</strong> of SAPARD aid tak<strong>in</strong>g <strong>in</strong>to<br />

account the development regi<strong>on</strong>s <strong>in</strong> Romania. They are very useful to po<strong>in</strong>t out the<br />

correlati<strong>on</strong> of SAPARD Programme and regi<strong>on</strong>al development strategies.<br />

F<strong>in</strong>ancial m<strong>on</strong>itor<strong>in</strong>g <strong>in</strong>dicators deal with the degree of the f<strong>in</strong>ancial allocati<strong>on</strong>s<br />

executi<strong>on</strong> po<strong>in</strong>t<strong>in</strong>g out, for the entire Programme and each measure, the total eligible<br />

costs <strong>programme</strong>d, committed and executed. These <strong>in</strong>dicators can be used as an<br />

<strong>in</strong>strument to <strong>programme</strong> the allocati<strong>on</strong>s at nati<strong>on</strong>al and regi<strong>on</strong>al level. At the same<br />

time the <strong>in</strong>dicators signal deficiencies that can occur dur<strong>in</strong>g the implementati<strong>on</strong> of the<br />

Programme regard<strong>in</strong>g allocati<strong>on</strong>s – commitments – payments flow.<br />

Achievement <strong>in</strong>dicators measure the direct effects appeared as a result of the<br />

activities performed with<strong>in</strong> each measure under the Programme, quantify<strong>in</strong>g the<br />

operati<strong>on</strong>al objectives of the measures. For <strong>in</strong>stance, the number of the approved<br />

projects, the <strong>in</strong>volved capacities, the eligible costs, the public c<strong>on</strong>tributi<strong>on</strong> paid to the<br />

beneficiaries <strong>in</strong> order to <strong>in</strong>vest <strong>in</strong> mach<strong>in</strong>e work capacities, stor<strong>in</strong>g and market<strong>in</strong>g<br />

capacities (measure 1.1), or for the modernizati<strong>on</strong> of communal roads (measure 2.1)<br />

are achievement <strong>in</strong>dicators.<br />

The m<strong>on</strong>itor<strong>in</strong>g activity supposes the cooperati<strong>on</strong> of the parties <strong>in</strong>volved <strong>in</strong> this<br />

process at nati<strong>on</strong>al and regi<strong>on</strong>al levels. At local level, the experts resp<strong>on</strong>sible with the<br />

m<strong>on</strong>itor<strong>in</strong>g with<strong>in</strong> the Pay<strong>in</strong>g Regi<strong>on</strong>al Centres for Rural Development and Fishery of<br />

SAPARD Programme m<strong>on</strong>thly collect primary data and fill the regi<strong>on</strong>al <strong>in</strong>dicators <strong>in</strong><br />

the m<strong>on</strong>itor<strong>in</strong>g tables.<br />

The m<strong>on</strong>itor<strong>in</strong>g tables c<strong>on</strong>ta<strong>in</strong><strong>in</strong>g regi<strong>on</strong>al <strong>in</strong>dicators are to be transmitted to the<br />

headquarters, where they are centralized and based <strong>on</strong> these the m<strong>on</strong>itor<strong>in</strong>g<br />

<strong>in</strong>dicators at nati<strong>on</strong>al level are obta<strong>in</strong>ed.<br />

The m<strong>on</strong>itor<strong>in</strong>g tables approved by the top management of PARDF are then<br />

transmitted to the Manag<strong>in</strong>g Authority which forwards them to the European<br />

Commissi<strong>on</strong> to prepare the meet<strong>in</strong>gs of the M<strong>on</strong>itor<strong>in</strong>g Committees.<br />

Detailed <strong>in</strong>formati<strong>on</strong> is presented <strong>in</strong> ”M<strong>on</strong>itor<strong>in</strong>g Indicators” Annexes (F<strong>in</strong>ancial<br />

Tables – Annex 1, M<strong>on</strong>itor<strong>in</strong>g tables – Annex 2, Approved Projects – Annex 3).<br />

To ensure an efficient system to trace and po<strong>in</strong>t out the SAPARD Programme’s<br />

implementati<strong>on</strong> stage, a series of acti<strong>on</strong>s related to m<strong>on</strong>itor<strong>in</strong>g reflected <strong>in</strong> various<br />

daily, weekly or m<strong>on</strong>thly situati<strong>on</strong>s regard<strong>in</strong>g the collecti<strong>on</strong> of <strong>in</strong>formati<strong>on</strong> and<br />

<strong>in</strong>dicators <strong>in</strong> different stages a project goes through: applicati<strong>on</strong>, selecti<strong>on</strong>,<br />

notificati<strong>on</strong>, c<strong>on</strong>tract<strong>in</strong>g, payment claim applicati<strong>on</strong>, payment authorizati<strong>on</strong> and the<br />

actual payment of the <strong>in</strong>stalment.<br />

III. 6 Measures taken to correct problems identified <strong>in</strong> Programme’s<br />

implementati<strong>on</strong><br />

Acti<strong>on</strong>s regard<strong>in</strong>g procedures’ improvement:<br />

Follow<strong>in</strong>g the letter of observati<strong>on</strong>s AGRI J 5/ GK/ DG/ D (2008) 20525, <strong>in</strong> July 2008,<br />

the Agency launched the process for the c<strong>on</strong>solidati<strong>on</strong> of the procedure manuals<br />

used under SAPARD Programme, <strong>in</strong> order to <strong>in</strong>clude the observati<strong>on</strong>s issued by<br />

131


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

EC’s auditors. Thus, <strong>on</strong> September 26 th , 2008, Instructi<strong>on</strong> no. 118 was issued and<br />

submitted to the M<strong>in</strong>istry of Public F<strong>in</strong>ances – Pay<strong>in</strong>g and Certify<strong>in</strong>g Authority.<br />

All the recommendati<strong>on</strong>s of the EC’s experts were discussed, and the amend<strong>in</strong>g<br />

proposals were <strong>in</strong>serted <strong>in</strong> the c<strong>on</strong>solidated versi<strong>on</strong> of SAPARD’s procedures<br />

<strong>in</strong>clud<strong>in</strong>g all the <strong>in</strong>structi<strong>on</strong>s issued up to that moment.<br />

Methodology Unit<br />

With<strong>in</strong> the methodology’s procedure manual, the <strong>in</strong>ternal c<strong>on</strong>trol system regard<strong>in</strong>g<br />

the management of the <strong>in</strong>structi<strong>on</strong>s has been improved. The chapter “Amend<strong>in</strong>g the<br />

accredited procedures by <strong>in</strong>structi<strong>on</strong>s” <strong>in</strong>cluded a sub-chapter related to the<br />

methodology for submitt<strong>in</strong>g, implement<strong>in</strong>g and m<strong>on</strong>itor<strong>in</strong>g the <strong>in</strong>structi<strong>on</strong>s by<br />

PRCRDF and PCORDF.<br />

As regards the standard model of the <strong>in</strong>structi<strong>on</strong>s and the flow of their submissi<strong>on</strong>, at<br />

PARDF’s level, the provisi<strong>on</strong>s of the methodology’s procedure are implemented, with<br />

specific menti<strong>on</strong>s related to:<br />

• Sett<strong>in</strong>g up at the PRCRDF and PCORDF’s level certa<strong>in</strong> specific registers for<br />

record<strong>in</strong>g the <strong>in</strong>structi<strong>on</strong>s, <strong>in</strong>dicat<strong>in</strong>g the standard format of the registers with<strong>in</strong><br />

the procedure;<br />

• Submitt<strong>in</strong>g the <strong>in</strong>structi<strong>on</strong>s to PRCRDF and PCORDF, <strong>in</strong> order to be<br />

implemented, accompanied by an official letter signed by the PARDF’s<br />

General Director for fill<strong>in</strong>g <strong>in</strong> the audit trail.<br />

• Fill<strong>in</strong>g <strong>in</strong> two new forms at the PRCRDF/PCORDF/PARDF’s level:<br />

- Instructi<strong>on</strong> <str<strong>on</strong>g>report</str<strong>on</strong>g> regard<strong>in</strong>g the manual/the <strong>in</strong>structi<strong>on</strong> no....../date;<br />

- Note for acknowledgement of the manual’s receipt / of the <strong>in</strong>structi<strong>on</strong>.<br />

Also, there is an electr<strong>on</strong>ic register to record the <strong>in</strong>structi<strong>on</strong>s with <strong>in</strong>formati<strong>on</strong><br />

regard<strong>in</strong>g the <strong>in</strong>stituti<strong>on</strong>s where the <strong>in</strong>structi<strong>on</strong> was submitted, the submissi<strong>on</strong>’s date,<br />

the date when the EC’s resp<strong>on</strong>se was received, the accredited procedure manual,<br />

etc., as well as a register <strong>on</strong> paper with <strong>in</strong>structi<strong>on</strong>s, with the identificati<strong>on</strong> data of<br />

each <strong>in</strong>structi<strong>on</strong>.<br />

The electr<strong>on</strong>ic register was improved by add<strong>in</strong>g two new secti<strong>on</strong>s relat<strong>in</strong>g to the<br />

number and the address’ date of the submissi<strong>on</strong> of the <strong>in</strong>structi<strong>on</strong> to the regi<strong>on</strong>al<br />

centres and county offices, as well as the date to implement the <strong>in</strong>structi<strong>on</strong>.<br />

With<strong>in</strong> the Procurements Unit, Instructi<strong>on</strong> no. 118/26.09.2008 for the modificati<strong>on</strong> of<br />

the procurements procedure for public beneficiaries of SAPARD Programme was<br />

issued. By this Instructi<strong>on</strong> all the <strong>in</strong>structi<strong>on</strong>s and circular letters previously issued<br />

were <strong>in</strong>cluded <strong>in</strong> the accredited Manual.<br />

In parallel with the c<strong>on</strong>trol activity, CAD worked at:<br />

• improv<strong>in</strong>g the c<strong>on</strong>trol procedure <strong>on</strong> SAPARD follow<strong>in</strong>g the DG-AGRI’s<br />

recommendati<strong>on</strong>s made <strong>in</strong> the Observati<strong>on</strong>s Letter <strong>on</strong> July 2008 issued as a<br />

result of the DG-AGRI’s missi<strong>on</strong> dur<strong>in</strong>g June 2008;<br />

• draw<strong>in</strong>g up the Acti<strong>on</strong> Plan requested by the European Commissi<strong>on</strong> (EC). This<br />

acti<strong>on</strong> c<strong>on</strong>sisted <strong>in</strong>:<br />

- Modify<strong>in</strong>g the c<strong>on</strong>trol procedure as the European Commissi<strong>on</strong> did not<br />

accept the provisi<strong>on</strong>s of the Instructi<strong>on</strong> 105;<br />

- Draw<strong>in</strong>g up a random sample <strong>in</strong>creased to 15% for the not completed<br />

projects, until 30.11.2008;<br />

132


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

- Participat<strong>in</strong>g <strong>in</strong> numerous meet<strong>in</strong>gs with the Certify<strong>in</strong>g and Pay<strong>in</strong>g<br />

Authority (CPA) and the Manag<strong>in</strong>g Authority (MA);<br />

IT Unit<br />

Dur<strong>in</strong>g 2008, the IT Unit has launched the sett<strong>in</strong>g up of a database which c<strong>on</strong>ta<strong>in</strong>s all<br />

the projects that were submitted with<strong>in</strong> the SAPARD Programme. On August 31 st ,<br />

2008, the procedure for load<strong>in</strong>g the database with all <strong>in</strong>formati<strong>on</strong> was launched so at<br />

the moment the database c<strong>on</strong>ta<strong>in</strong>s all SAPARD projects submitted with<strong>in</strong> SAPARD<br />

Programme, all addenda related to each project and also c<strong>on</strong>ta<strong>in</strong>s all the payment<br />

<strong>in</strong>stalments (<strong>in</strong>clud<strong>in</strong>g all the <strong>in</strong>formati<strong>on</strong> related to the payment order that the<br />

respective transacti<strong>on</strong> has been made).<br />

The objectives of the IT System are:<br />

• development of a database <strong>in</strong> compliance with the requirements received from<br />

the European Commissi<strong>on</strong>;<br />

• design<strong>in</strong>g and draw<strong>in</strong>g up the models for collect<strong>in</strong>g the necessary <strong>in</strong>formati<strong>on</strong><br />

from the f<strong>in</strong>anc<strong>in</strong>g applicati<strong>on</strong>’s files and from the submitted projects’ files;<br />

• develop<strong>in</strong>g the procedures for sav<strong>in</strong>g and restor<strong>in</strong>g the data;<br />

• develop<strong>in</strong>g the policies to ensure the data’s security and the access to the<br />

database, develop<strong>in</strong>g and provid<strong>in</strong>g a mechanism for grant<strong>in</strong>g the access’<br />

rights at user level;<br />

• provid<strong>in</strong>g export format of the database to the European Commissi<strong>on</strong>;<br />

• develop<strong>in</strong>g a daily record of a data <strong>in</strong>serted <strong>in</strong> the database;<br />

• design<strong>in</strong>g, draw<strong>in</strong>g up and develop<strong>in</strong>g certa<strong>in</strong> <str<strong>on</strong>g>report</str<strong>on</strong>g>s for m<strong>on</strong>itor<strong>in</strong>g the<br />

process of load<strong>in</strong>g data.<br />

The <strong>in</strong>serti<strong>on</strong> of the <strong>in</strong>formati<strong>on</strong> <strong>in</strong> the database is drawn up by the experts of<br />

C<strong>on</strong>tract<strong>in</strong>g Directorate and Projects Payments Directorate (at Central level) and by<br />

the experts of F<strong>in</strong>anc<strong>in</strong>g Applicati<strong>on</strong> Verificati<strong>on</strong> Unit and Payment Claim Verificati<strong>on</strong><br />

Unit (at regi<strong>on</strong>al level). The experts have rights either to <strong>in</strong>sert data or to view data <strong>in</strong><br />

accordance with certa<strong>in</strong> decisi<strong>on</strong>s of the PARDF’s Director General, depend<strong>in</strong>g <strong>on</strong><br />

the needs of each office separately.<br />

In order to <strong>in</strong>sert data <strong>in</strong> the SAPARD database, all the experts have been tra<strong>in</strong>ed<br />

through tra<strong>in</strong><strong>in</strong>g sessi<strong>on</strong>s by IT experts <strong>in</strong> charge with the management of the<br />

database. In order to understand all the procedures for the automatic process<strong>in</strong>g<br />

data, an operat<strong>in</strong>g manual has also been created. This manual is necessary to<br />

ensure that the product is <strong>in</strong> compliance with the standards <strong>in</strong> the field and/or the<br />

technical specificati<strong>on</strong>s of the database. It is the resp<strong>on</strong>sibility of all employees to<br />

apply the provisi<strong>on</strong>s of the manual.<br />

This manual is distributed to all the experts who operate <strong>in</strong> the database. Depend<strong>in</strong>g<br />

<strong>on</strong> the modificati<strong>on</strong>s of the database, the manual is periodically updated by the<br />

Directorates whose <strong>in</strong>terface is changed.<br />

The manual presents the applicati<strong>on</strong> field, the categories of the users and the people<br />

resp<strong>on</strong>sible for the process, def<strong>in</strong>es the <strong>in</strong>serti<strong>on</strong> <strong>in</strong>to the system, the procedures for<br />

load<strong>in</strong>g and updat<strong>in</strong>g the database, output <str<strong>on</strong>g>report</str<strong>on</strong>g>s, ma<strong>in</strong>tenance of the database. The<br />

tra<strong>in</strong><strong>in</strong>g support, the sheets <strong>in</strong>clud<strong>in</strong>g the names of the participants to the tra<strong>in</strong><strong>in</strong>g and<br />

the assessments of tra<strong>in</strong>ed experts are <strong>in</strong> possessi<strong>on</strong> of the Human Resources<br />

Directorate.<br />

133


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Measures related to endowment<br />

In order to ensure the endowments necessary for the optimum progress of the<br />

activities, dur<strong>in</strong>g 2008, beside the current functi<strong>on</strong><strong>in</strong>g expenditures, procurements<br />

from the Agency’s own budget <strong>in</strong> total value of 3,543.600 lei, were performed. The<br />

procurements completed the exist<strong>in</strong>g endowments and their ma<strong>in</strong>tenance. At the<br />

same time, other requests occurred, as follows:<br />

1. Servers - 3 pieces;<br />

2. Computers for new employees – 127 pieces;<br />

3. GPS receivers for <strong>on</strong>-the-spot measurement -11 pieces;<br />

4. Computer peripherals ( switch, hard-disk);<br />

5. Soft for SAPARD projects data base, as well as assistance services;<br />

6. C<strong>on</strong>solidati<strong>on</strong>, arrangement and rehabilitati<strong>on</strong> works for PRCRDF Satu Mare<br />

headquarters;<br />

7. Reparati<strong>on</strong> works, space redistributi<strong>on</strong>, hygiene of headquarters, as well as<br />

arrang<strong>in</strong>g archiv<strong>in</strong>g spaces for all applicants;<br />

8. Office furniture for the new employees and completi<strong>on</strong> of the existent<br />

endowments;<br />

9. Spare parts and comp<strong>on</strong>ents for pr<strong>in</strong>ters, copy mach<strong>in</strong>es, fax mach<strong>in</strong>es and<br />

other IT peripherals;<br />

10. Ma<strong>in</strong>tenance services for the IT peripherals, teleph<strong>on</strong>e central, <strong>in</strong>formatics<br />

applicati<strong>on</strong>s;<br />

11. Stati<strong>on</strong>ary and other office supplies;<br />

12. Metallic shelves for archiv<strong>in</strong>g spaces to complete the existent endowment;<br />

13. Bookb<strong>in</strong>dery and archiv<strong>in</strong>g documents services;<br />

14. C<strong>on</strong>sultancy services for PARDF accreditati<strong>on</strong> accord<strong>in</strong>g to ISO 27 001<br />

standard;<br />

15. Ensur<strong>in</strong>g vehicles for employees, as well as the materials requested for<br />

perform<strong>in</strong>g the <strong>on</strong>-the-spot check<strong>in</strong>g, <strong>in</strong> all the areas of the country where<br />

these acti<strong>on</strong>s were carried out.<br />

Measures regard<strong>in</strong>g the ensur<strong>in</strong>g of the necessary staff<br />

Start<strong>in</strong>g with July 2008, based <strong>on</strong> G.E.O. no. 65/2008 <strong>on</strong> the amendment and<br />

completi<strong>on</strong> of G.E.O. 13/2006 regard<strong>in</strong>g the establishment, organizati<strong>on</strong> and<br />

functi<strong>on</strong><strong>in</strong>g of the Pay<strong>in</strong>g Agency for Rural Development and Fishery, by reorganiz<strong>in</strong>g<br />

SAPARD Agency, as well as for sett<strong>in</strong>g up of some measures regard<strong>in</strong>g<br />

the effectiveness of the Pay<strong>in</strong>g and Interventi<strong>on</strong> Agency for Agriculture, the number<br />

of the job positi<strong>on</strong>s of the Pay<strong>in</strong>g Agency for Rural Development and Fishery was<br />

supplemented by 350 positi<strong>on</strong>s.<br />

Also, the m<strong>in</strong>ister’s for agriculture and rural development order no. 152/4 th of July<br />

2008 regard<strong>in</strong>g the approval of the organizati<strong>on</strong>al structure, the organiz<strong>in</strong>g and<br />

functi<strong>on</strong><strong>in</strong>g regulati<strong>on</strong> and the number of positi<strong>on</strong>s for PARDF, was issued.<br />

The approved number of positi<strong>on</strong>s was of 1,613 and the distributi<strong>on</strong> <strong>on</strong> the three<br />

organizati<strong>on</strong> levels of the Agency was the follow<strong>in</strong>g:<br />

• At central level : 323 positi<strong>on</strong>s;<br />

• At regi<strong>on</strong>al level: 451 positi<strong>on</strong>s;<br />

• At county level: 839 positi<strong>on</strong>s.<br />

134


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

On December 31 st , 2008 the degree of fill<strong>in</strong>g <strong>in</strong> the job positi<strong>on</strong>s was of 90%.<br />

Out of the total approved number of 1,613 of positi<strong>on</strong>s, 1,461 positi<strong>on</strong>s have been<br />

filled <strong>in</strong> and 152 are vacant and distributed as follows:<br />

• At central level: out of 323 of approved positi<strong>on</strong>s, 277 have been filled <strong>in</strong> and<br />

46 are vacant.<br />

• At regi<strong>on</strong>al level: out of 451 of approved positi<strong>on</strong>s, 405 have been filled <strong>in</strong> and<br />

46 are vacant.<br />

• At county level: out of 839 of approved positi<strong>on</strong>s, 779 have been filled <strong>in</strong> and<br />

60 are vacant.<br />

At central level with<strong>in</strong> the C<strong>on</strong>trol and Antifraud Directorate the positi<strong>on</strong> number was<br />

supplemented with 15 positi<strong>on</strong>s <strong>in</strong> order to ensure the efficiency of the ex-post c<strong>on</strong>trol<br />

activity.<br />

At the regi<strong>on</strong>al level, the number of positi<strong>on</strong>s for the experts with ex-post c<strong>on</strong>trol<br />

attributi<strong>on</strong>s was supplemented by 17 positi<strong>on</strong>s.<br />

The distributi<strong>on</strong> of the staff <strong>on</strong> levels accord<strong>in</strong>g to the attributi<strong>on</strong>s is the follow<strong>in</strong>g:<br />

Level of<br />

Attributi<strong>on</strong>s<br />

Staff no.<br />

organizati<strong>on</strong><br />

SAPARD<br />

EAFRD<br />

CENTRAL 323 53 270<br />

REGIONAL 451 155 296<br />

COUNTY 839 239 600<br />

TOTAL 1,613 447 1,166<br />

Measures of staff tra<strong>in</strong><strong>in</strong>g<br />

The professi<strong>on</strong>al tra<strong>in</strong><strong>in</strong>g of PARDF staff aimed at strengthen<strong>in</strong>g the professi<strong>on</strong>al<br />

competences accord<strong>in</strong>g to the job positi<strong>on</strong> requirements and the strategy of<br />

Agency’s development c<strong>on</strong>cern<strong>in</strong>g the follow<strong>in</strong>g fields: security of <strong>in</strong>formati<strong>on</strong>,<br />

measures of rural development c<strong>on</strong>cern<strong>in</strong>g the evaluati<strong>on</strong>, c<strong>on</strong>tract<strong>in</strong>g, authoriz<strong>in</strong>g<br />

and payment account<strong>in</strong>g, debts recover<strong>in</strong>g, legislati<strong>on</strong>, management,<br />

communicati<strong>on</strong> processes and unitary applicati<strong>on</strong> of the work<strong>in</strong>g procedures<br />

regard<strong>in</strong>g the SAPARD and EAFRD Programmes. The number of employees<br />

<strong>in</strong>cluded <strong>in</strong> the tra<strong>in</strong><strong>in</strong>g sessi<strong>on</strong>s was of 1400. The SAPARD attributi<strong>on</strong> staff<br />

benefited of <strong>in</strong>ternal tra<strong>in</strong><strong>in</strong>g sessi<strong>on</strong>s, EFARD attributi<strong>on</strong>s staff benefited both<br />

<strong>in</strong>ternal tra<strong>in</strong><strong>in</strong>g regard<strong>in</strong>g the way of applicati<strong>on</strong> the work<strong>in</strong>g procedures, as well<br />

as tra<strong>in</strong><strong>in</strong>g sessi<strong>on</strong>s with<strong>in</strong>:<br />

• RO2006/IB/AG/02 Tw<strong>in</strong>n<strong>in</strong>g Project "Organizati<strong>on</strong> of the appropriate structures<br />

to ensure the absorpti<strong>on</strong> of the European funds after accessi<strong>on</strong>”<br />

• Phare Programme 2005 "Tra<strong>in</strong><strong>in</strong>g of the staff with<strong>in</strong> the <strong>in</strong>stituti<strong>on</strong>s <strong>in</strong>volved <strong>in</strong><br />

the implementati<strong>on</strong> of the Nati<strong>on</strong>al Program of Rural development and<br />

Operati<strong>on</strong>al Programme for Fishery and the potential beneficiaries”<br />

• RO2004/016-772.03.02.01.02 Phare Program "Tra<strong>in</strong><strong>in</strong>g for the staff of<br />

Management Authority <strong>in</strong>volved <strong>in</strong> the programm<strong>in</strong>g process and<br />

implementati<strong>on</strong> of the system c<strong>on</strong>cern<strong>in</strong>g EAFRD and EFF".<br />

135


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

III. 7 Assur<strong>in</strong>g the promoti<strong>on</strong> of SAPARD Programme <strong>in</strong> Romania<br />

The promoti<strong>on</strong> activity of SAPARD Programme dur<strong>in</strong>g 2008 was achieved ma<strong>in</strong>ly<br />

through the presentati<strong>on</strong> of the Programme’s implementati<strong>on</strong> stage, by press<br />

releases and public <strong>in</strong>formati<strong>on</strong>, successful projects implemented us<strong>in</strong>g SAPARD<br />

funds and also achieved with<strong>in</strong> the specific public events.<br />

C<strong>on</strong>sider<strong>in</strong>g that s<strong>in</strong>ce 2007 <strong>in</strong>vestment projects for f<strong>in</strong>ancial support under SAPARD<br />

Programme can no l<strong>on</strong>ger be submitted, dur<strong>in</strong>g 2008 the Pay<strong>in</strong>g Agency for Rural<br />

Development and Fishery (PARDF) did not <strong>in</strong>itiated any advertis<strong>in</strong>g campaigns of the<br />

Programme, the specific activity be<strong>in</strong>g based <strong>on</strong> <strong>in</strong>formati<strong>on</strong> activities regard<strong>in</strong>g the<br />

progress of the SAPARD Programme.<br />

In this respect, PARDF carried out a series of <strong>in</strong>formati<strong>on</strong> activities, namely:<br />

• Presentati<strong>on</strong> of models of projects implemented under SAPARD;<br />

• Draw<strong>in</strong>g up and distribut<strong>in</strong>g <strong>in</strong>formative materials;<br />

• Participati<strong>on</strong> <strong>in</strong> promoti<strong>on</strong> events;<br />

• Fil<strong>in</strong>g <strong>in</strong> and updat<strong>in</strong>g PARDF’s website.<br />

Inform<strong>in</strong>g the potential beneficiaries<br />

In 2008 the experts of PARDF from the central, regi<strong>on</strong>al and county levels <strong>in</strong>formed<br />

9,400 potential beneficiaries through direct or teleph<strong>on</strong>e discussi<strong>on</strong>s, e-mail and<br />

letters.<br />

In additi<strong>on</strong> to the accessi<strong>on</strong> and implementati<strong>on</strong> of the Nati<strong>on</strong>al Programme of Rural<br />

Development 2007 – 2013, the <strong>in</strong>formati<strong>on</strong> provided by the specialized department<br />

(Promoti<strong>on</strong>, Communicati<strong>on</strong> and Mass-Media Relati<strong>on</strong>s Directorate - PCMMRD) and<br />

by the resp<strong>on</strong>sible for the advertis<strong>in</strong>g campaigns at regi<strong>on</strong>al and county levels was<br />

focused <strong>on</strong> the progress of SAPARD Programme, especially as regards the<br />

payments executi<strong>on</strong> process.<br />

The m<strong>on</strong>thly rate of people who requested <strong>in</strong>formati<strong>on</strong> <strong>on</strong> the n<strong>on</strong>-reimbursable funds<br />

is more than 40 people daily. Dur<strong>in</strong>g 2008 <strong>in</strong>formati<strong>on</strong> was provided to potential<br />

beneficiaries, as follows: the largest rate - teleph<strong>on</strong>e communicati<strong>on</strong> (6,000 requests)<br />

followed by <strong>in</strong>formati<strong>on</strong> <strong>on</strong> paper support (2,000 applicati<strong>on</strong>s) and the direct<br />

<strong>in</strong>formati<strong>on</strong> at the head office (1,400 meet<strong>in</strong>gs).<br />

At the same time, <strong>in</strong>formati<strong>on</strong> <strong>on</strong> the payments status under SAPARD Programme,<br />

<strong>on</strong> successful SAPARD projects and implementati<strong>on</strong> of SAPARD <strong>in</strong> Romania, were<br />

given dur<strong>in</strong>g the specific public events. Thus, PARDF participated to 999 acti<strong>on</strong>s<br />

<strong>in</strong>volv<strong>in</strong>g 25,202 people.<br />

136


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Follow<strong>in</strong>g the discussi<strong>on</strong>s dur<strong>in</strong>g the <strong>in</strong>formati<strong>on</strong> activities, it was observed that a<br />

large part of the potential beneficiaries of the EAFRD are already prepared to access<br />

the European funds also due to the fact that examples <strong>on</strong> successful <strong>in</strong>vestments<br />

implemented under SAPARD Programme were promoted.<br />

Draw<strong>in</strong>g up and distribut<strong>in</strong>g the <strong>in</strong>formati<strong>on</strong>al materials<br />

The SAPARD Programme’s advertis<strong>in</strong>g was assured dur<strong>in</strong>g 2008 by <strong>in</strong>formative<br />

materials present<strong>in</strong>g successful projects implemented with European SAPARD funds.<br />

For this purpose a Newsletter of PARDF was drawn up and sent to media and<br />

PARDF’s target public - beneficiaries of the SAPARD Programme, potential<br />

beneficiaries of EAFRD and EFF, local op<strong>in</strong>i<strong>on</strong> leaders, public <strong>in</strong>stituti<strong>on</strong>s that<br />

PARDF collaborates with, educati<strong>on</strong>al <strong>in</strong>stituti<strong>on</strong>s (Academy of Ec<strong>on</strong>omic Sciences,<br />

Academy of Agricultural and Forestry Sciences, Nati<strong>on</strong>al Institute for Research<br />

Development for Land C<strong>on</strong>solidati<strong>on</strong>) associati<strong>on</strong>s, employers, organizati<strong>on</strong>s <strong>in</strong> the<br />

agricultural-<strong>in</strong>dustrial field, natural and legal entities operat<strong>in</strong>g <strong>in</strong> the field of<br />

agriculture or rural development, public county and communal <strong>in</strong>stituti<strong>on</strong>s (town<br />

halls, county councils, prefectures).<br />

Aspects and technical difficulties related to access<strong>in</strong>g the <strong>programme</strong>, the soluti<strong>on</strong>s<br />

for their settlement and presentati<strong>on</strong>s of the successful projects implemented by the<br />

beneficiaries of the n<strong>on</strong>-reimbursable funds provided by the SAPARD Programme<br />

were <strong>in</strong>cluded <strong>in</strong> PARDF’s Newsletter.<br />

3 Newsletters of PARDF were drawn up <strong>in</strong> March, May and June 2008.<br />

Participati<strong>on</strong> at advertis<strong>in</strong>g events<br />

PARDF took part and represented the SAPARD and NPRD <strong>programme</strong>s through<br />

PCMMRD at the most important events specialized <strong>in</strong> promoti<strong>on</strong>, organized by the<br />

Presidency of Romania, MAFRD, Chamber of Commerce and Industry of Romania,<br />

Romexpo.<br />

Dur<strong>in</strong>g these events, PARDF’s representatives presented the opportunities offered<br />

under SAPARD and EAFRD, distributed <strong>in</strong>formati<strong>on</strong>al materials and provided to the<br />

target audience detailed <strong>in</strong>formati<strong>on</strong> <strong>on</strong> the manner to obta<strong>in</strong> n<strong>on</strong>-reimbursable funds.<br />

137


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Major events where PARDF participated:<br />

• Thematic sem<strong>in</strong>ars <strong>on</strong> European fund<strong>in</strong>g, organized by the Chamber of<br />

Commerce and Industry of Romania (CCIRB); Nati<strong>on</strong>al C<strong>on</strong>ferences <strong>on</strong> the<br />

possibilities of EFARD f<strong>in</strong>anc<strong>in</strong>g - organized by Prefectures and County<br />

Councils;<br />

• Internati<strong>on</strong>al Fair for Agriculture INDAGRA Farm and INDAGRA Food -<br />

Romexpo;<br />

• Fair for Agriculture FINAGRA 2008;<br />

• Internati<strong>on</strong>al Agriculture Fair "Green Week 2008 - Berl<strong>in</strong>;<br />

• "Rustica Romania” Fair and "Europlant Protecti<strong>on</strong>" Fair;<br />

• Tra<strong>in</strong><strong>in</strong>g sessi<strong>on</strong>s for <strong>in</strong>formati<strong>on</strong> and professi<strong>on</strong>al perfecti<strong>on</strong> of the<br />

representatives of local authorities - organized by Eurocom;<br />

• Nati<strong>on</strong>al fair for tourist fund<strong>in</strong>g - organized by MTCT;<br />

• Fair f<strong>in</strong>anc<strong>in</strong>g for SMEs - TIMM 2008;<br />

• PROFINN f<strong>in</strong>anc<strong>in</strong>g fair;<br />

• Events organized by foreign embassies - the Netherlands, Turkey, Austria.<br />

Promoti<strong>on</strong> of the SAPARD Programme<br />

Inform<strong>in</strong>g the potential beneficiaries through mass-media was particularly effective<br />

due to the credibility of the media am<strong>on</strong>g the public and due to the large number of<br />

people who receive <strong>in</strong>formati<strong>on</strong> <strong>in</strong> very short period of time.<br />

Therefore, even if the Pay<strong>in</strong>g Agency for Rural Development and Fishery began the<br />

implementati<strong>on</strong> of EFARD <strong>in</strong> 2008, it c<strong>on</strong>t<strong>in</strong>ued to pay special attenti<strong>on</strong> to the<br />

promoti<strong>on</strong> of SAPARD Programme through:<br />

Press releases:<br />

• 4 press releases were sent to the mass-media. The releases referred to the<br />

acti<strong>on</strong> plan undertaken to resume the payments to the beneficiaries of the<br />

SAPARD Programme, as well as to the manner these payments were<br />

resumed. All of these press releases were entirely published by the press,<br />

with positive references.<br />

Effective communicati<strong>on</strong> with mass-media:<br />

• One of the most important objectives of the communicati<strong>on</strong> with the massmedia<br />

is ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g a permanent communicati<strong>on</strong> with the media by<br />

ensur<strong>in</strong>g the c<strong>on</strong>tact with the management of PARDF through fast and<br />

complete <strong>in</strong>formati<strong>on</strong> of journalists;<br />

• Over 20 answers to journalists' requests were sent to the mass-media (the<br />

Press Agencies and TV). Most of these resp<strong>on</strong>ses referred to the<br />

successful implementati<strong>on</strong> of SAPARD projects, the clarificati<strong>on</strong> of some<br />

technical implementati<strong>on</strong> aspects and to the number and value of all<br />

SAPARD projects that were f<strong>in</strong>alized, sometimes emphasis<strong>in</strong>g <strong>on</strong> the<br />

hierarchy of development regi<strong>on</strong>s of the country;<br />

• Follow<strong>in</strong>g the answers given to the journalists, there were requested and<br />

elaborated materials which were broadcasted with<strong>in</strong> the news bullet<strong>in</strong>s of<br />

nati<strong>on</strong>al televisi<strong>on</strong> stati<strong>on</strong>s (ProTV, Antena1, RealitateaTV), televisi<strong>on</strong><br />

<strong>in</strong>terviews (TVR, M<strong>on</strong>ey Channel) and radio <strong>in</strong>terviews (Radio Antena<br />

Satelor, Radio Romania Actualitati), most of them with positive references.<br />

138


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

III. 8 Us<strong>in</strong>g the Technical Assistance<br />

Measure 4.1 “Improvement of vocati<strong>on</strong>al tra<strong>in</strong><strong>in</strong>g”<br />

As regards Measure 4.1 “Improvement of vocati<strong>on</strong>al tra<strong>in</strong><strong>in</strong>g”, 5 projects have been<br />

approved by the end of 2008, <strong>in</strong> value of 13,287.55 thousand lei, represent<strong>in</strong>g 3.65<br />

milli<strong>on</strong> Euro. All these projects have been c<strong>on</strong>tracted <strong>in</strong> 2005.<br />

The approved projects ensure the improvement of the vocati<strong>on</strong>al tra<strong>in</strong><strong>in</strong>g for<br />

producti<strong>on</strong> practices, the tra<strong>in</strong><strong>in</strong>g of the heads of agricultural and forestry hold<strong>in</strong>gs <strong>in</strong><br />

the ec<strong>on</strong>omical, technical and legal fields, the diversificati<strong>on</strong> or the re-orientati<strong>on</strong> of<br />

different activities <strong>in</strong> rural area, the process<strong>in</strong>g and market<strong>in</strong>g of agricultural and<br />

fishery products accord<strong>in</strong>g to specific technologies, the protecti<strong>on</strong> of the envir<strong>on</strong>ment,<br />

sett<strong>in</strong>g up of producers’ groups and the promoti<strong>on</strong> of their objectives, pr<strong>in</strong>ciples and<br />

functi<strong>on</strong><strong>in</strong>g, as well as the tra<strong>in</strong><strong>in</strong>g of the members of the certified producers’ groups,<br />

<strong>in</strong> order to improve their activity.<br />

All the projects f<strong>in</strong>anced under this measure were f<strong>in</strong>alized by December 31 st 2008<br />

and payments <strong>in</strong> value of 10,521.61 thousands Lei, represent<strong>in</strong>g 3.03 milli<strong>on</strong> Euro,<br />

have been authorized and executed.<br />

Measure 4.2 “Technical Assistance”<br />

10 projects <strong>in</strong> value of 5,839.98 thousand Lei, represent<strong>in</strong>g 1.54 milli<strong>on</strong> Euro, have<br />

been approved by the end of 2008 under the technical assistance measure.<br />

The approved projects ensure technical assistance for the M<strong>on</strong>itor<strong>in</strong>g Committee (1<br />

project), nati<strong>on</strong>al workshops (2 projects), <strong>in</strong>formati<strong>on</strong> and advertis<strong>in</strong>g campaigns (2<br />

projects), tra<strong>in</strong><strong>in</strong>g studies for other measures (2 projects), development of a data<br />

base c<strong>on</strong>ta<strong>in</strong><strong>in</strong>g reference prices (1 project) and the accomplishment of the<br />

<strong>in</strong>termediary assessment of the Programme (2 projects).<br />

All the projects f<strong>in</strong>anced under this measure were f<strong>in</strong>alized by December 31 st 2008<br />

and payments <strong>in</strong> value of 5,214.57 thousands Lei, represent<strong>in</strong>g 1.42 milli<strong>on</strong> Euro,<br />

have been authorized and executed.<br />

139


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

III. 9 Compliance of the complementarity pr<strong>in</strong>ciple between community funds<br />

and nati<strong>on</strong>al funds<br />

Accord<strong>in</strong>g to the provisi<strong>on</strong>s of the art. 3 ”Complementarity and technical assistance“<br />

from the Council Regulati<strong>on</strong> (EC). 1268/1999 <strong>on</strong> the f<strong>in</strong>ancial aid of the pre-accessi<strong>on</strong><br />

measures for agriculture and rural development <strong>in</strong> the candidate countries of Central<br />

and Eastern Europe <strong>in</strong> the pre-accessi<strong>on</strong> period, "Community acti<strong>on</strong> complements<br />

nati<strong>on</strong>al acti<strong>on</strong>s appropriate or c<strong>on</strong>tribute to them." To these provisi<strong>on</strong>s, the<br />

Romanian Government promotes a policy to support the agricultural producers.<br />

In 2008, under the f<strong>in</strong>ancial support programs promoted by the M<strong>in</strong>istry of Agriculture,<br />

Forests and Rural Development, the budget approved by our <strong>in</strong>stituti<strong>on</strong> <strong>in</strong> 2008, was<br />

allocated the sum of 3,127,090,019 Lei, for the payments to farmers from the state<br />

budget.<br />

The dest<strong>in</strong>ati<strong>on</strong> of these funds was as follows:<br />

• 461,295,430 lei, represent<strong>in</strong>g support for farmers <strong>in</strong> the form of value bills for<br />

purchase of diesel, seeds, chemical fertilizers and pesticides for crop<br />

establishment <strong>in</strong> autumn 2007 under Government Emergency Ord<strong>in</strong>ance no.<br />

123/2006 and Government Decisi<strong>on</strong> no. 871/2007 amended by Government<br />

Decisi<strong>on</strong> no. 492/2008;<br />

• 143,970,395 lei, represent<strong>in</strong>g f<strong>in</strong>ancial support to farmers <strong>in</strong> the livestock<br />

sector <strong>in</strong> 2007, based <strong>on</strong> Government Emergency Ord<strong>in</strong>ance no. 123/2006<br />

and Government Decisi<strong>on</strong> no. 141/2007, of which:<br />

- pigs classified Class E 35,909,760 lei<br />

- pigs classified Class U 12,750,400 lei<br />

- bov<strong>in</strong>es 1,196,300 lei<br />

- sows 1,966,200 lei<br />

- chicken 40,282,862 lei<br />

- milk 45,755,791 lei<br />

- bee families 5,001,980 lei<br />

- combat of varroasis 901,152 lei<br />

- restock<strong>in</strong>g <strong>in</strong> hives 15,900 lei<br />

- test dissecti<strong>on</strong> 88,790 lei<br />

• 318,510,595 lei, represent<strong>in</strong>g complementary nati<strong>on</strong>al direct payments <strong>in</strong><br />

livestock sector, <strong>in</strong> 2007, accord<strong>in</strong>g to M<strong>in</strong>ister’s Order no. 295/2007 and<br />

Government Decisi<strong>on</strong> no. 985/2007, out of which:<br />

- bov<strong>in</strong>es 259,834,170 lei (out of which part I 252,868,500 lei);<br />

- sheep and goats 58,545,105 lei (out of which part II 43,122,980 lei).<br />

• 570,964,572 lei, represent<strong>in</strong>g f<strong>in</strong>ancial support for agricultural producers <strong>in</strong> the<br />

livestock sector <strong>in</strong> 2008, based <strong>on</strong> Government Emergency Ord<strong>in</strong>ance no.<br />

123/2006 and Government Decisi<strong>on</strong> no. 3/2008, of which:<br />

- pigs classified Class E 125,330,700 lei<br />

- pigs classified Class U 30,396,150 lei<br />

- bov<strong>in</strong>es 2,664,550 lei<br />

140


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

- sows 4,894,425 lei<br />

- chicken 190,286,083 lei<br />

- eggs 39,999,523 lei<br />

- milk cow 165,405,386 lei<br />

- bee families 11,000,000 lei<br />

• 476,170,825 lei, represent<strong>in</strong>g complementary nati<strong>on</strong>al direct payments <strong>in</strong><br />

livestock sector <strong>in</strong> 2008, respectively bov<strong>in</strong>es, accord<strong>in</strong>g to M<strong>in</strong>ister’s Order<br />

no. 295/2007 and Government Decisi<strong>on</strong> no. 1230/2008, out of which<br />

443,343,600 lei for bov<strong>in</strong>es and 32,827,225 lei for sheep;<br />

• 10,096,338 lei, represent<strong>in</strong>g f<strong>in</strong>ancial support to agricultural producers <strong>in</strong><br />

vegetal sector, <strong>in</strong> 2007, based <strong>on</strong> Government Emergency Ord<strong>in</strong>ance no.<br />

123/2006 and Government Decisi<strong>on</strong> no. 463/2007 modified through<br />

Government Decisi<strong>on</strong> no. 570/2008, out of which:<br />

- operat<strong>in</strong>g groups producers 240,000 lei<br />

- system implementati<strong>on</strong> EUREPGAG 92,051 lei<br />

- vegetable greenhouse 1,533,590 lei<br />

- mushrooms 329,729 lei<br />

- vegetables and fruit for process<strong>in</strong>g 6,063,769 lei<br />

- v<strong>in</strong>eyard sector 375,192 lei<br />

- potatoes for process<strong>in</strong>g 1,420,075 lei<br />

- medic<strong>in</strong>al and aromatic herbs 41,932 lei<br />

- flowers, ornamental and dendrological plants 84,650 lei<br />

• 16,595,263 lei, represent<strong>in</strong>g the state <strong>in</strong>surance for <strong>in</strong>frastructure operat<strong>in</strong>g of<br />

land improvements <strong>in</strong> 2007, based <strong>on</strong> Government Emergency Ord<strong>in</strong>ance no.<br />

123/2006 and Government Decisi<strong>on</strong> no. 463/2007;<br />

• 56,164,502 lei, represent<strong>in</strong>g f<strong>in</strong>ancial support to agricultural producers <strong>in</strong> the<br />

vegetal sector <strong>in</strong> 2008, based <strong>on</strong> Government Emergency Ord<strong>in</strong>ance no.<br />

123/2006 and Government Decisi<strong>on</strong> no. 570/2008, out of which:<br />

- system implementati<strong>on</strong> EUREPGAG 42,496 lei<br />

- greenhouse vegetables 19,972,266 lei<br />

- mushrooms 3,527,799 lei<br />

- vegetables and fruits for process<strong>in</strong>g 5,728,234 lei<br />

- purchas<strong>in</strong>g of packag<strong>in</strong>g for vegetables 985,470 lei<br />

- purchas<strong>in</strong>g of packag<strong>in</strong>g for fruits 283,787 lei<br />

- v<strong>in</strong>eyard sector 21,286,398 lei<br />

- potatoes for process<strong>in</strong>g 1,449,181 lei<br />

- medic<strong>in</strong>al and aromatic herbs 3,539,816 lei<br />

- flowers, ornamental and dendrological plants 60,975 lei<br />

• 106,393,190 lei, represent<strong>in</strong>g f<strong>in</strong>ancial support for diesel purchase <strong>in</strong> order to<br />

make the mechanized works for sett<strong>in</strong>g up crops <strong>in</strong> spr<strong>in</strong>g and autumn 2008 <strong>in</strong><br />

compliance with the Government Decisi<strong>on</strong> no. 277/2008, modified by<br />

Government Decisi<strong>on</strong> no. 829/2008 and Government Decisi<strong>on</strong> no. 1154/2008<br />

and M<strong>in</strong>ister’s Order no. 174/2008, M<strong>in</strong>ister’s Order no. 485/2008, M<strong>in</strong>ister’s<br />

Order no. 568/2008 and M<strong>in</strong>ister’s Order no. 174/2008;<br />

141


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

• 15,794,545 lei represent<strong>in</strong>g f<strong>in</strong>ancial support for seed for sow<strong>in</strong>g plants <strong>in</strong> the<br />

f<strong>in</strong>ancial year 2007/2008, accord<strong>in</strong>g to Government Decisi<strong>on</strong> no. 1611/2006;<br />

• 91,604,529 lei, represent<strong>in</strong>g the public funds granted to agricultural producers,<br />

under the Agricultural Credit Law no. 150/2003;<br />

• 31,409,891 lei, represent<strong>in</strong>g f<strong>in</strong>ancial support granted to the agricultural<br />

producers for the producti<strong>on</strong> of sugar beet and rice made <strong>in</strong> 2007, accord<strong>in</strong>g to<br />

Government Decisi<strong>on</strong> no. 1577/2007, out of which:<br />

- 19,692,279 lei for sugar beet (656,409 to)<br />

- 11.717.612 for rice (23,435 to)<br />

• 31,512,000 lei, represent<strong>in</strong>g f<strong>in</strong>ancial support, granted to the agricultural<br />

producers for a quantity of 105,040 t<strong>on</strong>es soybean producti<strong>on</strong> performed <strong>in</strong><br />

2007, accord<strong>in</strong>g to Government Decisi<strong>on</strong> no. 1576/2007;<br />

• 233,468,263 lei, represent<strong>in</strong>g f<strong>in</strong>ancial support, granted to the agricultural<br />

producers <strong>in</strong> accordance with “the m<strong>in</strong>imis aid” scheme for sett<strong>in</strong>g up<br />

agricultural crops <strong>in</strong> autumn 2008, accord<strong>in</strong>g to Government Decisi<strong>on</strong> no.<br />

1153/2008;<br />

- wheat - 181,467,201 lei,<br />

- rape - 29,469,380 lei,<br />

- barley/raw barley - 18,320,795 lei,<br />

- other crops - 4,210,886 lei;<br />

• 45,184,921 lei, represent<strong>in</strong>g the functi<strong>on</strong><strong>in</strong>g of the land improvement<br />

<strong>in</strong>frastructure <strong>in</strong> 2008, based <strong>on</strong> the Government Emergency Ord<strong>in</strong>ance no.<br />

123/2006 and Government Decisi<strong>on</strong> no. 420/2008;<br />

• 12,407 lei, represent<strong>in</strong>g support for the agricultural associati<strong>on</strong> <strong>in</strong> view to<br />

participate to organizati<strong>on</strong>s established at the EU level, accord<strong>in</strong>g to<br />

Government Decisi<strong>on</strong> no. 545/2007;<br />

• 600,000 lei, represent<strong>in</strong>g support for the agricultural associati<strong>on</strong>s <strong>in</strong> view to<br />

participate to organizati<strong>on</strong>s established at the EU level, accord<strong>in</strong>g to<br />

Government Decisi<strong>on</strong> no. 401/2008;<br />

• 1,893,272 lei, represent<strong>in</strong>g f<strong>in</strong>ancial support granted for the acquisiti<strong>on</strong> <strong>in</strong> 2007<br />

of frozen sem<strong>in</strong>al material from bulls certified and officially authorized, used <strong>in</strong><br />

the artificial <strong>in</strong>sem<strong>in</strong>ati<strong>on</strong>, accord<strong>in</strong>g to M<strong>in</strong>ister’s Order no. 641/200;<br />

• 2,082,835 lei, represent<strong>in</strong>g f<strong>in</strong>ancial support granted for the acquisiti<strong>on</strong> <strong>in</strong> 2008<br />

of frozen sem<strong>in</strong>al material from bulls certified and official authorized, used <strong>in</strong><br />

the artificial <strong>in</strong>sem<strong>in</strong>ati<strong>on</strong>, accord<strong>in</strong>g to M<strong>in</strong>ister’s Order no. 66/2008;<br />

• 100.000.000 lei, represent<strong>in</strong>g <strong>in</strong>vestment <strong>in</strong> agriculture, accord<strong>in</strong>g to Law no.<br />

231/2005, for this measure be<strong>in</strong>g allocated 78.04% from the MAFRD budget <strong>in</strong><br />

2008 (128,131,515 lei);<br />

142


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

• 298,222,526 lei, represent<strong>in</strong>g n<strong>on</strong>-reimbursable co-f<strong>in</strong>anc<strong>in</strong>g from the state<br />

budget for <strong>in</strong>vestments projects with<strong>in</strong> the SAPARD Programme, accord<strong>in</strong>g to<br />

Government Emergency Ord<strong>in</strong>ance no. 59/2006;<br />

• 2,389,912 lei, represent<strong>in</strong>g SAPARD 4.1 and 4.2 measures (technical<br />

assistance and professi<strong>on</strong>al tra<strong>in</strong><strong>in</strong>g);<br />

• 38,095,506 lei, represent<strong>in</strong>g direct support, granted for the neutralizati<strong>on</strong> of<br />

animal waste, accord<strong>in</strong>g to Government Decisi<strong>on</strong> no. 1211/2005;<br />

• 17,438,046 lei, represent<strong>in</strong>g compensati<strong>on</strong>s for animals slaughtered to<br />

prevent and combat Epizooties, accord<strong>in</strong>g to Government Decisi<strong>on</strong> no.<br />

1415/2004, established at the replacement value and market price of the<br />

animal slaughtered;<br />

• 20,731,203 lei, compensati<strong>on</strong> granted as a result of the weather c<strong>on</strong>diti<strong>on</strong>s<br />

from the autumn of 2006 and the spr<strong>in</strong>g of 2007 (excessive dryness) under<br />

Government Decisi<strong>on</strong> no. 636/2007 with subsequent amendments and<br />

additi<strong>on</strong>s;<br />

• 31,804,802 lei, represent<strong>in</strong>g agricultural life annuity for 2007, granted <strong>in</strong><br />

accordance with the previsi<strong>on</strong>s of title XI from Law no. 247/2005.<br />

• 4,160,144 lei, represent<strong>in</strong>g f<strong>in</strong>ance from the state budget of some measures<br />

for c<strong>on</strong>servati<strong>on</strong> and use of animal genetic resources <strong>in</strong> critical c<strong>on</strong>diti<strong>on</strong>, <strong>in</strong><br />

danger and vulnerable under Government Emergency Ord<strong>in</strong>ance no.<br />

194/2005, of which:<br />

- 199,309 lei, for 2007 year, accord<strong>in</strong>g to Government Emergency<br />

Ord<strong>in</strong>ance no. 194/2005, Government Decisi<strong>on</strong> no. 853/2007 and<br />

M<strong>in</strong>ister’s Order no. 767/2007;<br />

- 3,960,835 lei, for 2008 year, accord<strong>in</strong>g to Government Decisi<strong>on</strong> no.<br />

822/2008 and M<strong>in</strong>ister’s Order no. 582/2008;<br />

• 267,737 lei, for subsidiz<strong>in</strong>g of a percentage of 50% from the <strong>in</strong>surance<br />

premiums related to the <strong>in</strong>surance c<strong>on</strong>tracts of the agricultural producers<br />

c<strong>on</strong>cluded with the <strong>in</strong>surance companies, under Government Decisi<strong>on</strong> no.<br />

74/2003.<br />

143


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Chapter IV<br />

Coord<strong>in</strong>ati<strong>on</strong> of SAPARD Programme with Other F<strong>in</strong>ancial Instruments<br />

for Internati<strong>on</strong>al Support<br />

IV. 1 General framework<br />

Accord<strong>in</strong>g to the provisi<strong>on</strong>s set out <strong>in</strong> Art. 1 – Secti<strong>on</strong> C, of MAFA, the European<br />

Commissi<strong>on</strong> and Romania must ensure the co-ord<strong>in</strong>ati<strong>on</strong> of support between the<br />

SAPARD Programme and the pre-accessi<strong>on</strong> <strong>in</strong>struments such as ISPA, PHARE, and<br />

the assistance of EIB (the European Investment Bank), as well as other <strong>in</strong>ternati<strong>on</strong>al<br />

f<strong>in</strong>ancial <strong>in</strong>struments.<br />

Under the MAFA provisi<strong>on</strong>s, <strong>in</strong> case any SAPARD project, due to its nature, might be<br />

entirely or partly eligible for assistance under <strong>on</strong>e of the other <strong>in</strong>struments menti<strong>on</strong>ed<br />

above, Romania must avoid any risk of the respective cost be<strong>in</strong>g <strong>in</strong>curred more than<br />

<strong>on</strong>ce.<br />

In order to avoid overlaps and ensure a transparent use of <strong>in</strong>ternati<strong>on</strong>al fund<strong>in</strong>g<br />

<strong>in</strong>struments, Romania has created the structures needed to ensure the coord<strong>in</strong>ati<strong>on</strong>,<br />

<strong>in</strong>formati<strong>on</strong> and m<strong>on</strong>itor<strong>in</strong>g of the <strong>in</strong>ternati<strong>on</strong>al f<strong>in</strong>ancial assistance.<br />

The European Commissi<strong>on</strong> regularly analyses the progress Romania has made <strong>in</strong><br />

us<strong>in</strong>g the funds that were allocated through the three f<strong>in</strong>ancial pre-accessi<strong>on</strong><br />

<strong>in</strong>struments PHARE, ISPA and SAPARD.<br />

For this purpose, the Jo<strong>in</strong>t M<strong>on</strong>itor<strong>in</strong>g Committee (JMC) holds <str<strong>on</strong>g>annual</str<strong>on</strong>g> meet<strong>in</strong>gs and<br />

comprises representatives of the European Commissi<strong>on</strong> and of the Romanian<br />

authorities <strong>in</strong>volved <strong>in</strong> the management of the pre-accessi<strong>on</strong> funds. JMC is<br />

resp<strong>on</strong>sible for supervis<strong>in</strong>g the progress of EU-funded assistance <strong>programme</strong>s<br />

(PHARE, ISPA and SAPARD). Dur<strong>in</strong>g 2008, the JMC met <strong>on</strong>ly <strong>on</strong>ce <strong>on</strong> the 10 th of<br />

June.<br />

In order to avoid double f<strong>in</strong>anc<strong>in</strong>g, PARDF has been work<strong>in</strong>g with the fund<strong>in</strong>g<br />

<strong>in</strong>stituti<strong>on</strong>s for projects that are similar to those f<strong>in</strong>anced under the SAPARD<br />

Programme, <strong>in</strong> order to identify and remove any <strong>in</strong>stance of possible double<br />

f<strong>in</strong>anc<strong>in</strong>g.<br />

144


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

IV. 2 Assistance under PHARE Programme<br />

As regards the technical assistance provided by the PHARE Programmes, the<br />

follow<strong>in</strong>g projects were put <strong>in</strong>to practice for the Pay<strong>in</strong>g Agency for Rural Development<br />

and Fishery <strong>in</strong> 2008:<br />

IV.2.1 RO 2004/016-772.03. 02.01.02 EuropeAid/122610/D/SER/RO-Tra<strong>in</strong><strong>in</strong>g for<br />

the staff of the Manag<strong>in</strong>g Authority and for the bodies <strong>in</strong>volved <strong>in</strong> the<br />

programm<strong>in</strong>g process and the sett<strong>in</strong>g up of the implementati<strong>on</strong> system<br />

Budget: EUR 500,000<br />

Value of the Services Supply C<strong>on</strong>tract: EUR 499,400<br />

Implementati<strong>on</strong> period: 13 m<strong>on</strong>ths<br />

Project objectives: - To improve the professi<strong>on</strong>al skills and knowledge of the staff<br />

with<strong>in</strong> the <strong>in</strong>stituti<strong>on</strong>s <strong>in</strong>volved <strong>in</strong> the implementati<strong>on</strong> of the Rural Development and<br />

Fishery <strong>programme</strong>s 2007 – 2013, through technical assistance and tra<strong>in</strong><strong>in</strong>g, <strong>in</strong> order<br />

to meet the requirements of the European Uni<strong>on</strong>.<br />

The follow<strong>in</strong>g results have been achieved:<br />

• A detailed 3-years tra<strong>in</strong><strong>in</strong>g plan was elaborated, <strong>in</strong> collaborati<strong>on</strong> with the<br />

Romanian authorities, cover<strong>in</strong>g all pers<strong>on</strong>nel to be <strong>in</strong>volved <strong>in</strong> the<br />

implementati<strong>on</strong> of NRDP and FOP;<br />

• 134 pers<strong>on</strong>s with<strong>in</strong> The Manag<strong>in</strong>g Authority for NPRD, the Manag<strong>in</strong>g Authority<br />

for FOP and with<strong>in</strong> the <strong>in</strong>stituti<strong>on</strong>s with horiz<strong>on</strong>tal resp<strong>on</strong>sibilities for EAFRD<br />

and EFF, were tra<strong>in</strong>ed at nati<strong>on</strong>al level;<br />

• 575 pers<strong>on</strong>s with<strong>in</strong> The Manag<strong>in</strong>g Authority for NRDP, Manag<strong>in</strong>g Authority for<br />

FOP and with<strong>in</strong> PARDF, were tra<strong>in</strong>ed at regi<strong>on</strong>al/county level.<br />

The C<strong>on</strong>tract was signed <strong>on</strong> November 30 th , 2006. The project was f<strong>in</strong>alized <strong>on</strong><br />

February 9 th , 2008.<br />

IV.2.2 RO 2005/017-553.03.02.01 –Tra<strong>in</strong><strong>in</strong>g the staff of the <strong>in</strong>stituti<strong>on</strong>s <strong>in</strong>volved<br />

<strong>in</strong> design<strong>in</strong>g and implementati<strong>on</strong> of the Rural Development Programme and the<br />

Fishery Operati<strong>on</strong>al Programme 2007 – 2013 and communicati<strong>on</strong> activities of<br />

the bodies resp<strong>on</strong>sible for the implementati<strong>on</strong> of the <strong>programme</strong>s<br />

Budget: 800,000 Euro<br />

Services C<strong>on</strong>tract value: 797,920 Euro<br />

Implementati<strong>on</strong> period: 10 m<strong>on</strong>ths<br />

Specific objectives:<br />

• To tra<strong>in</strong> all the employees of PIAA, PARDF and of the two Manag<strong>in</strong>g<br />

Authorities resp<strong>on</strong>sible for the implementati<strong>on</strong> and payment functi<strong>on</strong>s related<br />

to the Rural Development and Fishery Programmes;<br />

• To tra<strong>in</strong> the future members of the M<strong>on</strong>itor<strong>in</strong>g Committee <strong>on</strong> the Rural<br />

Development and Fishery Programmes;<br />

• To provide detailed <strong>in</strong>formati<strong>on</strong> for the ma<strong>in</strong> <strong>in</strong>volved entities and for the<br />

potential beneficiaries of the Rural Development Programmes (RDP) and<br />

Fishery Programmes (FOP) regard<strong>in</strong>g the available f<strong>in</strong>anc<strong>in</strong>g opportunities<br />

and adm<strong>in</strong>istrative procedures to be implemented.<br />

145


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Results to be achieved:<br />

• Provisi<strong>on</strong> of <strong>in</strong>troductory and <strong>in</strong>termediate level tra<strong>in</strong><strong>in</strong>g, for the different<br />

<strong>in</strong>stituti<strong>on</strong>s <strong>in</strong>volved, <strong>in</strong> various aspects of RDP and FOP implementati<strong>on</strong>;<br />

• Delivery of two <strong>in</strong>formati<strong>on</strong> sem<strong>in</strong>ars <strong>in</strong> Romania for the bodies and ma<strong>in</strong><br />

entities <strong>in</strong>volved <strong>in</strong> RDP and FOP;<br />

• Producti<strong>on</strong> of high-quality <strong>in</strong>formati<strong>on</strong> and communicati<strong>on</strong> materials –<br />

brochures, detailed guidel<strong>in</strong>es for applicants, websites, posters etc. – to<br />

support the implementati<strong>on</strong> of the RDP and FOP <strong>in</strong> Romania.<br />

The c<strong>on</strong>tract was signed <strong>on</strong> November 30 th , 2007, and the activities started <strong>on</strong><br />

January 24 th , 2008. The project is f<strong>in</strong>alized.<br />

IV.2.3 RO 2005/017-553.03.02.03 – Technical Assistance for the elaborati<strong>on</strong> of<br />

the software necessary for the implementati<strong>on</strong> of the Rural Development and<br />

Fishery Funds<br />

Budget: 4,000,000 Euro<br />

Services C<strong>on</strong>tract value: 2,499,998 Euro<br />

Implementati<strong>on</strong> period: November 31 st , 2007 – September 31 st , 2008<br />

The Technical Specificati<strong>on</strong>s have been elaborated with<strong>in</strong> Framework C<strong>on</strong>tract<br />

ROSU 41, the f<strong>in</strong>al form <strong>in</strong>clud<strong>in</strong>g all the observati<strong>on</strong>s specified by the beneficiaries.<br />

Objective:<br />

• The <strong>in</strong>stituti<strong>on</strong>s <strong>in</strong>volved <strong>in</strong> the implementati<strong>on</strong> of the rural development and<br />

fishery <strong>programme</strong>s (Manag<strong>in</strong>g Authority, PARDF and the delegated bodies) shall be<br />

equipped with the SOFTWARE necessary for the Management of the Informatics<br />

System for the efficient operati<strong>on</strong> at all the management levels and dur<strong>in</strong>g all the<br />

stages (programm<strong>in</strong>g, tender, c<strong>on</strong>tract<strong>in</strong>g, m<strong>on</strong>itor<strong>in</strong>g, evaluati<strong>on</strong>, audit, c<strong>on</strong>trol and<br />

horiz<strong>on</strong>tal procedures).<br />

Results to be achieved:<br />

• Analysis of the user’s requirements (functi<strong>on</strong>s and data);<br />

• Def<strong>in</strong><strong>in</strong>g the user’s requirements. The requirements must be captured<br />

/<strong>in</strong>terpreted / filled <strong>in</strong> by the c<strong>on</strong>tractor <strong>in</strong> a document which will be filed <strong>in</strong><br />

<strong>in</strong>teractively dur<strong>in</strong>g the entire period of implementati<strong>on</strong> of the project;<br />

• The document regard<strong>in</strong>g the elaborati<strong>on</strong> of the software applicati<strong>on</strong> – detailed<br />

architecture of the system and functi<strong>on</strong><strong>in</strong>g specificati<strong>on</strong>s;<br />

• Sett<strong>in</strong>g up a data base <strong>in</strong>clud<strong>in</strong>g detailed and accurate relati<strong>on</strong>ship diagrams;<br />

• A set of tested hardware, tested system and applicati<strong>on</strong> modules already<br />

implemented;<br />

• A set of tested hardware, tested system and <strong>in</strong>terface modules already<br />

implemented;<br />

• A set of tested hardware, tested system and modules for the c<strong>on</strong>versi<strong>on</strong> of<br />

data already implemented. The implemented modules for the c<strong>on</strong>versi<strong>on</strong> of<br />

data will be accomplished for the purpose of <strong>in</strong>tegrat<strong>in</strong>g the data written <strong>in</strong><br />

different formats (e.g. MS Office, PDF, etc);<br />

• The reference technical documentati<strong>on</strong> for the software applicati<strong>on</strong> and the<br />

modules for the c<strong>on</strong>versi<strong>on</strong> of data;<br />

146


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

• Envir<strong>on</strong>ment for the c<strong>on</strong>figurati<strong>on</strong> of the software for the development, test<strong>in</strong>g,<br />

test<strong>in</strong>g the acceptance of the user and of the producti<strong>on</strong> versi<strong>on</strong>s of the<br />

applicati<strong>on</strong>;<br />

• Plans and results regard<strong>in</strong>g the test<strong>in</strong>g of hardware and systems;<br />

• Tra<strong>in</strong><strong>in</strong>g the user, <strong>in</strong>clud<strong>in</strong>g the tra<strong>in</strong><strong>in</strong>g materials and practical works;<br />

• Inform<strong>in</strong>g the user, <strong>in</strong>clud<strong>in</strong>g the user’s guide and the user’s manual.<br />

The services supply c<strong>on</strong>tract was signed <strong>on</strong> November 31 st , 2007. The project was<br />

f<strong>in</strong>alized <strong>on</strong> February 27 th , 2009 and the F<strong>in</strong>al Report was submitted for endorsement<br />

at PARDF.<br />

IV.2.4 Phare Tw<strong>in</strong>n<strong>in</strong>g Project RO 2006/IB/AG/02 – Tw<strong>in</strong>n<strong>in</strong>g to set-up adequate<br />

structures assur<strong>in</strong>g the absorpti<strong>on</strong> of EU Rural Development and Fishery<br />

funds after Accesi<strong>on</strong><br />

Budget: 750,000 Euro<br />

Value of the Services Supply C<strong>on</strong>tract: 750,000 Euro<br />

Implementati<strong>on</strong> period: October 10 th , 2007 – January 10 th , 2009<br />

The objective of the project was to improve Romania’s capacity to absorb the<br />

necessary post-accessi<strong>on</strong> funds.<br />

Project’s purpose - To set-up adequate structures assur<strong>in</strong>g the absorpti<strong>on</strong> of EU<br />

funds for Rural Development and Fishery after accessi<strong>on</strong>.<br />

The follow<strong>in</strong>g results were achieved:<br />

• The strengthen<strong>in</strong>g of the <strong>in</strong>stituti<strong>on</strong>al capacity of the Pay<strong>in</strong>g Agency for Rural<br />

Development and Fisheries and the improvement of its operati<strong>on</strong>al framework<br />

<strong>in</strong> terms of legislati<strong>on</strong> and staff capabilities;<br />

• Tra<strong>in</strong><strong>in</strong>g of staff at central, regi<strong>on</strong>al and county levels as regards the<br />

operati<strong>on</strong>al manuals;<br />

• Tra<strong>in</strong><strong>in</strong>g of staff with<strong>in</strong> the Pay<strong>in</strong>g Agency for Rural Development and<br />

Fisheries <strong>in</strong> l<strong>in</strong>e with the Comm<strong>on</strong> Agricultural Policy and rural development<br />

strategy;<br />

• The system will be developed and fully operati<strong>on</strong>al.<br />

The c<strong>on</strong>tract was signed <strong>on</strong> October 10 th , 2007 and the activities were launched <strong>on</strong><br />

December 3 rd , 2007. The project is f<strong>in</strong>alized.<br />

IV. 3 Other f<strong>in</strong>ancial <strong>in</strong>struments<br />

IV. 3.1 The Rural Development Project for the Apuseni Mounta<strong>in</strong>s funded by<br />

IFAD<br />

On May 10 th , 1999, <strong>in</strong> Rome, through its M<strong>in</strong>istry of Public F<strong>in</strong>ance, Romania and the<br />

Internati<strong>on</strong>al Fund for Agricultural Development (IFAD) signed the Loan Agreement<br />

regard<strong>in</strong>g the Rural Development Project for the Apuseni Mounta<strong>in</strong>s, ratified through<br />

Government Ord<strong>in</strong>ance No. 115/1999, approved by Law No. 25/2000.<br />

147


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

The ma<strong>in</strong> objective of the Agreement is to raise household <strong>in</strong>come and improve liv<strong>in</strong>g<br />

standards am<strong>on</strong>g poorer communities <strong>in</strong> the rural mounta<strong>in</strong> area, as well as creat<strong>in</strong>g<br />

new jobs <strong>in</strong> the rural area.<br />

The fund<strong>in</strong>g provided under the project totals 12.4 milli<strong>on</strong> SDR (Special Draft Right),<br />

the equivalent of 16.4 milli<strong>on</strong> USD; the loan is to be refunded between 1 st of June<br />

2004 and 1 st of December 2018.<br />

The <strong>programme</strong> was f<strong>in</strong>alised <strong>on</strong> the 31 st of December 2006, the last fund draft date<br />

be<strong>in</strong>g 30 th of June 2007. The IFAD Programme shall c<strong>on</strong>t<strong>in</strong>ue <strong>in</strong> a revolv<strong>in</strong>g form until<br />

2018.<br />

For 2008 a number of 117 c<strong>on</strong>cluded c<strong>on</strong>tracts have been registered, the total value<br />

of the credits be<strong>in</strong>g of 4,771,408 USD, also be<strong>in</strong>g created 243 new jobs.<br />

In 2008 were registered 29 c<strong>on</strong>cluded c<strong>on</strong>tracts, the total value of the credits be<strong>in</strong>g of<br />

883,856 USD, also be<strong>in</strong>g created 55 new jobs.<br />

The <strong>programme</strong> covers 15 th counties: Alba, Arad, Bihor, Cluj, Hunedoara,Sălaj, Sibiu,<br />

Covasna, Harghita, Bacău, Buzău, Vâlcea, Vrancea, Neamţ and Suceava.<br />

The applicant must meet the follow<strong>in</strong>g criteria <strong>in</strong> order to submit a project:<br />

• to be a resident <strong>in</strong> the area covered by the project;<br />

• to provide proof of his/her solvency;<br />

• to make proof of technical competence regard<strong>in</strong>g the purpose of the loan.<br />

The acti<strong>on</strong>s funded by the Programme <strong>in</strong>clude:<br />

• Investments <strong>in</strong> the development, modernisati<strong>on</strong> and upgrad<strong>in</strong>g of small and<br />

medium dairy and meat process<strong>in</strong>g facilities, by provid<strong>in</strong>g them with specific<br />

equipment;<br />

• Procurement of animals to build parent breed<strong>in</strong>g stocks, build modern shelters<br />

that provide appropriate c<strong>on</strong>diti<strong>on</strong>s for livestock rais<strong>in</strong>g;<br />

• Equipp<strong>in</strong>g households with specific agricultural mach<strong>in</strong>ery and equipment;<br />

• Agro tourism – modernis<strong>in</strong>g exist<strong>in</strong>g build<strong>in</strong>gs while preserv<strong>in</strong>g the traditi<strong>on</strong>al<br />

architecture of the area and design an appropriate <strong>in</strong>ner layout of houses;<br />

• Traditi<strong>on</strong>al trades and crafts;<br />

• Agricultural producti<strong>on</strong>, namely:<br />

- plant crop establishment – mechanical operati<strong>on</strong>s; procurement of seed,<br />

fertiliser, fuel etc;<br />

- livestock farms – procurement of feed c<strong>on</strong>centrates, vitam<strong>in</strong>s, premixes<br />

etc.<br />

The <strong>programme</strong> implementati<strong>on</strong> is carried out by the PCU (Project Coord<strong>in</strong>ati<strong>on</strong><br />

Unit) with<strong>in</strong> the M<strong>in</strong>istry of Public F<strong>in</strong>ances, the M<strong>in</strong>istry of Agriculture /DGRD - MA<br />

for NRDP, which m<strong>on</strong>itors the project implementati<strong>on</strong> and the Directorates for<br />

Agriculture and Rural Development <strong>in</strong> the 15 th counties that provide c<strong>on</strong>sultancy to<br />

potential IFAD beneficiaries.<br />

148


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

IV. 3.2 Projects f<strong>in</strong>anced by the World Bank<br />

The project <strong>on</strong> “The Rehabilitati<strong>on</strong> and Reform of the Irrigati<strong>on</strong> Sector” – The<br />

objectives of the project are: decreas<strong>in</strong>g the drought risk, <strong>in</strong>creas<strong>in</strong>g of the<br />

ec<strong>on</strong>omical efficiency of irrigati<strong>on</strong>, <strong>in</strong>creas<strong>in</strong>g of the irrigati<strong>on</strong> management,<br />

<strong>in</strong>creas<strong>in</strong>g of the hydraulic and energetic efficiency of the irrigati<strong>on</strong> scheme,<br />

<strong>in</strong>volvement of beneficiaries (WUOs) <strong>in</strong> irrigati<strong>on</strong> rehabilitati<strong>on</strong> and management.<br />

The Loan Agreement, for f<strong>in</strong>anc<strong>in</strong>g the Project, was signed <strong>on</strong> August 26 th , 2003 by<br />

the Government of Romania and BIRD and the Parliament of Romania ratified the<br />

Loan Agreement <strong>in</strong> February 2004 through Law no. 4/2004. The implementati<strong>on</strong><br />

period is 2004 – 2011.<br />

The project will be implemented by the M<strong>in</strong>istry of Agriculture, Forests and Rural<br />

Development through the Project Management Unit.<br />

The total cost of the project is of 102.947 milli<strong>on</strong>s USD and will be covered as follows:<br />

• IBRD - 80.0 mil. USD;<br />

• Romanian Government - 20.622 mil. USD;<br />

• Water Users Organizati<strong>on</strong>s (WUOs) - 2.325 mil. USD.<br />

The comp<strong>on</strong>ents of the project are the follow<strong>in</strong>g:<br />

Comp<strong>on</strong>ent 1. Rehabilitati<strong>on</strong> of the irrigati<strong>on</strong> systems<br />

(a) Rehabilitati<strong>on</strong> of the ma<strong>in</strong> <strong>in</strong>frastructure<br />

Through the ma<strong>in</strong> irrigati<strong>on</strong> <strong>in</strong>frastructure the water is taken over from the source and<br />

transported till the pressure pump<strong>in</strong>g stati<strong>on</strong>s and it is composed by the <strong>in</strong>take, lift<strong>in</strong>g<br />

pump<strong>in</strong>g stati<strong>on</strong>s, the transport and delivery canals network and the afferent c<strong>on</strong>trol<br />

structures.<br />

Through the Project, the ma<strong>in</strong> <strong>in</strong>frastructure should be rehabilitated <strong>in</strong> 2 phases:<br />

(a1). Sadova Corabia irrigati<strong>on</strong> scheme (Olt and Dolj counties), area of 40.310<br />

ha and Terasa Nicoresti Tecuci (Galati county), area 11.030 ha;<br />

(a2). The irrigati<strong>on</strong> schemes: Terasa Viziru, Terasa Brailei (Braila county),<br />

Campia Covurlui (Galati county), Fantanele Sagu si Semlac Pereg (Arad<br />

county). The area is of 100.000 ha)<br />

(b) Water meters<br />

Installati<strong>on</strong> of about 300 water meters <strong>in</strong> the pressure pump<strong>in</strong>g stati<strong>on</strong>s of WUOs<br />

which had c<strong>on</strong>cluded c<strong>on</strong>tracts for water deliver<strong>in</strong>g with the Nati<strong>on</strong>al Land<br />

Reclamati<strong>on</strong> Adm<strong>in</strong>istrati<strong>on</strong> (NLRA).<br />

(c) Rehabilitati<strong>on</strong> of the <strong>on</strong> farm <strong>in</strong>frastructure owned by WUOs<br />

(c1) Rehabilitati<strong>on</strong> based <strong>on</strong> technical design – 100% c<strong>on</strong>tributi<strong>on</strong> of WUOs<br />

and works – 5% WUOs c<strong>on</strong>tributi<strong>on</strong><br />

(c2) Repairs of the <strong>on</strong> farm <strong>in</strong>frastructure through replac<strong>in</strong>g of the worn spare<br />

parts, based <strong>on</strong> technical expertise – 100% WUOs c<strong>on</strong>tributi<strong>on</strong> and spare<br />

parts – 10% WUOs c<strong>on</strong>tributi<strong>on</strong>.<br />

149


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Comp<strong>on</strong>ent 2. Support for the <strong>in</strong>stituti<strong>on</strong>al reform of the irrigati<strong>on</strong> sector<br />

(a) Support for NLRA<br />

(a1) IT equipment endowment<br />

(a2) Design and implementati<strong>on</strong> of the Management Informati<strong>on</strong> System<br />

(MIS).<br />

(b) Support for the M<strong>in</strong>istry of Agriculture, Forests and Rural Development<br />

(MAFRD)<br />

Endowment of the Regulatory Office of WUOs and Land Reclamati<strong>on</strong> Directorate<br />

with IT equipment and technical assistance.<br />

(c) Ec<strong>on</strong>omic analysis of the irrigati<strong>on</strong> sector<br />

A study for establish<strong>in</strong>g the ec<strong>on</strong>omical viable schemes/part of irrigati<strong>on</strong> schemes will<br />

be carried out <strong>in</strong> order to establish the priorities to <strong>in</strong>vest <strong>in</strong> the ec<strong>on</strong>omical z<strong>on</strong>es.<br />

(d) Support for WUOs.<br />

Tra<strong>in</strong><strong>in</strong>g and WUOs endowment with IT equipment, irrigati<strong>on</strong> equipment and means<br />

of transport (motorcycles) for field water<strong>in</strong>g survey.<br />

Comp<strong>on</strong>ent 3. Technologies for Energetic C<strong>on</strong>sumpti<strong>on</strong> Reducti<strong>on</strong> <strong>in</strong>to the <strong>on</strong><br />

farm <strong>in</strong>frastructure<br />

This comp<strong>on</strong>ent will focus <strong>on</strong> the possibilities to decrease the energetic c<strong>on</strong>sumpti<strong>on</strong><br />

us<strong>in</strong>g pump<strong>in</strong>g units and irrigati<strong>on</strong> equipment with low pressure and establishment of<br />

a dem<strong>on</strong>strati<strong>on</strong> field with such equipment.<br />

Comp<strong>on</strong>ent 4. Support for Project implementati<strong>on</strong><br />

F<strong>in</strong>ancial support to the Project Management Unit: staff, IT and office equipment,<br />

means of transport and technical assistance for the Project implementati<strong>on</strong>.<br />

Accord<strong>in</strong>g to the acti<strong>on</strong> plan for 2008, the activity had been focused <strong>on</strong> the irrigati<strong>on</strong><br />

<strong>in</strong>frastructure rehabilitati<strong>on</strong> and the support for WUOs <strong>in</strong> order to improve the<br />

irrigati<strong>on</strong> <strong>in</strong>frastructure for the <strong>on</strong>-farm irrigati<strong>on</strong> systems that are <strong>in</strong> the property of<br />

the WUOs.<br />

A. Ma<strong>in</strong> <strong>in</strong>frastructure rehabilitati<strong>on</strong><br />

1. Ma<strong>in</strong> <strong>in</strong>frastructure rehabilitati<strong>on</strong> <strong>in</strong> Sadova Corabia and Terasa Nicoresti<br />

Tecuci irrigati<strong>on</strong> systems (40.000 ha and 10.000 ha respective)<br />

1.1. Ma<strong>in</strong> irrigati<strong>on</strong> stati<strong>on</strong> rehabilitati<strong>on</strong> L1, PN, PS and gate R0 at the Danube<br />

(works were completed <strong>in</strong> time – July 30 th , 2008)<br />

1.2. Rehabilitati<strong>on</strong> of the channel and dra<strong>in</strong>age network <strong>in</strong> the Sadova Corabia<br />

irrigati<strong>on</strong> system (the completi<strong>on</strong> – March 2010)<br />

a) The irrigati<strong>on</strong> channel network – waterproof<strong>in</strong>g and related hydro technical<br />

c<strong>on</strong>structi<strong>on</strong>s (22 cannels - 190 km )<br />

• F<strong>in</strong>alized works – 5 cannels (60 km); value: 13,7 mil lei;<br />

• Works <strong>in</strong> progress for completi<strong>on</strong> (17 channels – 130 km) - 70% f<strong>in</strong>alized; Value<br />

= 29,1 milli<strong>on</strong>s lei out of which paid = 20,4 milli<strong>on</strong>s lei;<br />

• Hydro technical c<strong>on</strong>structi<strong>on</strong>s works – 100% realized; Value = 5,1 milli<strong>on</strong>s lei<br />

150


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

b) Dra<strong>in</strong>age channels – desalt<strong>in</strong>g and clean<strong>in</strong>g the wood and grassy vegetati<strong>on</strong> (40<br />

channels – 180 km);<br />

• 18 channels (81 km) – f<strong>in</strong>alized works; value: 2, 7 milli<strong>on</strong>s lei<br />

c) Restor<strong>in</strong>g the tree shelter-belts – replant<strong>in</strong>g of trees to restore the adequate tree<br />

density – 113 ha;<br />

• F<strong>in</strong>alized works 100%; Value: 0,87 milli<strong>on</strong>s lei.<br />

1.3. Rehabilitati<strong>on</strong> of the irrigati<strong>on</strong> <strong>in</strong>frastructure and dra<strong>in</strong>age <strong>in</strong> the Terasa<br />

Nicoresti Tecuci irrigati<strong>on</strong> system<br />

On April 30 th , 2008 took place the recepti<strong>on</strong> of the f<strong>in</strong>alized works with 3 m<strong>on</strong>ths <strong>in</strong><br />

advance from the c<strong>on</strong>tract term.<br />

1.4. The feasibility study and the technical project for the rehabilitati<strong>on</strong><br />

<strong>in</strong>cluded <strong>in</strong> the Phase II – about 100,000 ha Terasa Viziru and Terasa Brailei –<br />

Braila County, Campia Covurlui –Galati County, Fantanele Sagu and Semlac<br />

Pereg – Arad County)<br />

The technical – ec<strong>on</strong>omical <strong>in</strong>dicators accord<strong>in</strong>g to the feasibility studies were<br />

approved by the Government <strong>in</strong> December 2008.<br />

• The technical project for Terasa Viziru irrigati<strong>on</strong> system – f<strong>in</strong>alized; The<br />

estimated value of works – 50 mil. lei<br />

• The technical project for Terasa Braila irrigati<strong>on</strong> system –SPA km 166<br />

subsystems– f<strong>in</strong>alized. The estimated value of works – 13.2 mil. Lei.<br />

1.5. Rehabilitati<strong>on</strong> of 2 ma<strong>in</strong> pump<strong>in</strong>g stati<strong>on</strong>s (SPA km 221 and SRP01 <strong>in</strong><br />

Terasa Viziru irrigati<strong>on</strong> system)<br />

- The c<strong>on</strong>tract is submitted to the special directorates from MAFRD for approval<br />

and signature. Works value = 9.6 mil lei.<br />

B. Support for Water Users Organizati<strong>on</strong>s (WUOs)<br />

b.1. Water meters for the pump<strong>in</strong>g stati<strong>on</strong>s (SPP) owned by WUOs<br />

a. Planned 300 water meters;<br />

b. 151 water meters for 48 WUOs – 126 SPPs – <strong>in</strong> value of 2.0 mil lei;<br />

c. <strong>in</strong> preparati<strong>on</strong> – 150 water meters for 75 WUOs. Estimated value 4.0 mil. lei.<br />

b.2 Rehabilitati<strong>on</strong> of the <strong>on</strong>-farm <strong>in</strong>frastructure owned by WUOs<br />

b.2.a Rehabilitati<strong>on</strong> based <strong>on</strong> technical project (100% WUO c<strong>on</strong>tributi<strong>on</strong> for the<br />

project and 5% c<strong>on</strong>tributi<strong>on</strong> for works)<br />

a. Planned: rehabilitati<strong>on</strong> of 11 WUOs - Value: 8.4 mil lei;<br />

b. 5 WUOs from the Sadova Corabia irrigati<strong>on</strong> system; Value: 4.44 mil lei; f<strong>in</strong>alized<br />

works.<br />

c. 6 WUOs from Terasa Nicoresti Tecuci irrigati<strong>on</strong> system; Value 3.98 mil lei;<br />

Deadl<strong>in</strong>e for completi<strong>on</strong> – May 2009<br />

b.2.b Reparati<strong>on</strong>s (spare parts) based <strong>on</strong> technical expertise (100% WUO<br />

c<strong>on</strong>tributi<strong>on</strong> for technical expertise and 10% c<strong>on</strong>tributi<strong>on</strong> for spare parts)<br />

a. Planned: 50 WUOs; value: 51 milli<strong>on</strong>s lei;<br />

b. 4 WUOs – delivery f<strong>in</strong>alized: 3.05 mil lei;<br />

c. 46 WUOs; Estimated value: 47 mil lei (under bidd<strong>in</strong>g process).<br />

151


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

b.3. Procurement of the irrigati<strong>on</strong> equipment (10% WUO c<strong>on</strong>tributi<strong>on</strong>)<br />

a. Planned: 1500 <strong>in</strong>stallati<strong>on</strong>s for 100 WUOs;<br />

b. 595 irrigati<strong>on</strong> equipment for 62 WUOs – delivery f<strong>in</strong>alized dur<strong>in</strong>g 2006-2007.<br />

Value: 6.3 mil. Lei;<br />

c. under preparati<strong>on</strong> a package of 350 <strong>in</strong>stallati<strong>on</strong>s – 11.3 milli<strong>on</strong>s lei.<br />

b.4. IT equipments (10% WUO c<strong>on</strong>tributi<strong>on</strong>)<br />

a. Planned: 100 sets /WUO ( 1 set: 1 computer +1 pr<strong>in</strong>ter + 1 copy mach<strong>in</strong>e +1 fax);<br />

b. Realized: 53 Sets; Total value of goods = 0,5 milli<strong>on</strong>s lei;<br />

c. Under preparati<strong>on</strong> 47 sets for 47 WUOs; Estimated value = 0.45 milli<strong>on</strong>s lei.<br />

b.5. Motorcycles for field irrigati<strong>on</strong>s survey and for <strong>in</strong>terventi<strong>on</strong>s<br />

a. Planned: 140 motorcycles for 70 WUOs<br />

b. Realised: 78 motorcycles for 54 WUOs; Value = 0.25 mil lei<br />

c. Under preparati<strong>on</strong> bid for 62 motorcycles; Estimated value = 0.3 mil lei<br />

The project „Moderniz<strong>in</strong>g Agricultural Knowledge and Informati<strong>on</strong> Systems”<br />

(MAKIS) is implemented by the M<strong>in</strong>istry of Agriculture, Forests and Rural<br />

Development (MAFRD) and by the Nati<strong>on</strong>al Sanitary, Veter<strong>in</strong>ary and Food Safety<br />

Authority (NSVFSA) through theirs PMU’s. The Loan Agreement between Romania<br />

and the Internati<strong>on</strong>al Bank for Rec<strong>on</strong>structi<strong>on</strong> and Development (IBRD) for f<strong>in</strong>anc<strong>in</strong>g<br />

the project was signed <strong>in</strong> Bucharest <strong>on</strong> January 28 th , 2005. The Loan Agreement was<br />

ratified through Law no. 170/2005 published <strong>in</strong> the Official Gazette no. 526/21 st of<br />

June 2005 and the effectiveness was announced <strong>on</strong> June 24 th , 2005. The total value<br />

of the project is of 59.88 milli<strong>on</strong> Euros, out of which 41.4 milli<strong>on</strong> Euro is the World<br />

Bank loan no. 4758-Ro and 18.48 milli<strong>on</strong> Euro is the c<strong>on</strong>tributi<strong>on</strong> of the Romanian<br />

Government. The official launch of the project took place <strong>on</strong> September 22, 2005.<br />

The „Moderniz<strong>in</strong>g Agricultural Knowledge and Informati<strong>on</strong> Systems” Project is<br />

focused <strong>on</strong> three comp<strong>on</strong>ents that are priorities for EU <strong>in</strong>tegrati<strong>on</strong>, respectively food<br />

safety, agricultural research and <strong>in</strong>formati<strong>on</strong> and extensi<strong>on</strong> system.<br />

The ma<strong>in</strong> objective of the project is to assist the Romanian Government to improve<br />

the competitiveness of farmers and agro-processors <strong>in</strong> the EU <strong>in</strong>tegrati<strong>on</strong><br />

envir<strong>on</strong>ment. This will be achieved through strengthen<strong>in</strong>g the Nati<strong>on</strong>al Sanitary<br />

Veter<strong>in</strong>ary and Food Safety Authority and the phyto-sanitary units, modernizati<strong>on</strong> of<br />

the nati<strong>on</strong>al agricultural research system and improvement of the c<strong>on</strong>sultancy and<br />

tra<strong>in</strong><strong>in</strong>g services, thus ensur<strong>in</strong>g the access to relevant technologies and <strong>in</strong>formati<strong>on</strong><br />

by the farm<strong>in</strong>g community <strong>in</strong> order to meet EU requirements. The primary<br />

beneficiaries would be middle-sized and small farmers with the potential to become<br />

commercial.<br />

The project is implemented over five years and c<strong>on</strong>sists of three comp<strong>on</strong>ents:<br />

A. Strengthen<strong>in</strong>g the Nati<strong>on</strong>al Sanitary, Veter<strong>in</strong>ary and Food Safety Authority<br />

(NSVFSA) and the Phyto-sanitary Units;<br />

B. Support for Agricultural Research;<br />

C. Support for Advisory and Informati<strong>on</strong> System.<br />

152


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

A. Strengthen<strong>in</strong>g the Nati<strong>on</strong>al Sanitary, Veter<strong>in</strong>ary and Food Safety Authority<br />

(NSVFSA) and the Phyto-sanitary Units<br />

A.1. Instituti<strong>on</strong>al Capacity Build<strong>in</strong>g<br />

This subcomp<strong>on</strong>ent aims at improv<strong>in</strong>g the communicati<strong>on</strong> system, develop<strong>in</strong>g the<br />

awareness system and at support<strong>in</strong>g the press office from NSVFSA.<br />

‣ Strengthen the communicati<strong>on</strong> system with support for IT<br />

The ToRs regard<strong>in</strong>g the c<strong>on</strong>sultance services corresp<strong>on</strong>d<strong>in</strong>g to the preparati<strong>on</strong> of the<br />

ToRs for the IT platform were approved by NSVFSA (25 th of March 2008) and<br />

forwarded to the World Bank for “no objecti<strong>on</strong>”. The World Bank made some<br />

comments based <strong>on</strong> which the Food Safety General Directorate from NSVFSA<br />

revised the ToRs.<br />

‣ Public Awareness System<br />

A.2 Improv<strong>in</strong>g the Nati<strong>on</strong>al and Regi<strong>on</strong>al Network of veter<strong>in</strong>ary laboratories<br />

With<strong>in</strong> this comp<strong>on</strong>ent, the project supports the c<strong>on</strong>structi<strong>on</strong> of a new build<strong>in</strong>g<br />

accord<strong>in</strong>g to EU norms for the Institute for Hygiene and Veter<strong>in</strong>ary Public Health<br />

(IHVPH) and equipp<strong>in</strong>g the Sanitary Veter<strong>in</strong>ary and Food Safety Directorates<br />

(SVFSD) Bucharest, Braşov and Prahova. Through the MAKIS project there are<br />

provisi<strong>on</strong>ed 2 milli<strong>on</strong> Euro for the c<strong>on</strong>structi<strong>on</strong> of the new build<strong>in</strong>g, while the most<br />

recent estimated cost is c<strong>on</strong>siderably higher. Dur<strong>in</strong>g the May 26 – June 6, 2008<br />

World Bank Supervisi<strong>on</strong> Missi<strong>on</strong> it was discussed the possibility that a significant<br />

fracti<strong>on</strong> of the fund from the NSVFSA comp<strong>on</strong>ent to be reallocated to the c<strong>on</strong>structi<strong>on</strong><br />

of the build<strong>in</strong>g. NSVFSA -PMU is to forward the reallocati<strong>on</strong> request to the M<strong>in</strong>istry of<br />

Public F<strong>in</strong>ances, after obta<strong>in</strong><strong>in</strong>g the approval of the technical departments and of the<br />

project coord<strong>in</strong>ator.<br />

The equipments for SVFSD Bucharest and Braşov were procured and delivered to<br />

the beneficiaries. The bidd<strong>in</strong>g for SVFSD Prahova was postp<strong>on</strong>ed until the laboratory<br />

build<strong>in</strong>g rehabilitati<strong>on</strong> with SAPARD fund<strong>in</strong>g is completed.<br />

A.3 Support for the strengthen<strong>in</strong>g the Border Inspecti<strong>on</strong> Posts: Otopeni,<br />

C<strong>on</strong>stanţa North and South – subcomp<strong>on</strong>ent f<strong>in</strong>alized<br />

A.4 Animal Welfare<br />

This subcomp<strong>on</strong>ent was <strong>in</strong>itially designed to have NSVFSA c<strong>on</strong>tract the Pasteur<br />

Institute to carry out a program for Animal Welfare <strong>in</strong> livestock producti<strong>on</strong> to<br />

dem<strong>on</strong>strate the EU requirements.<br />

Accord<strong>in</strong>g to the tra<strong>in</strong><strong>in</strong>g plan the project organized for 45 specialists a tra<strong>in</strong><strong>in</strong>g<br />

sessi<strong>on</strong> <strong>on</strong> animal welfare <strong>in</strong> Alba county. All the arrangements were made (February<br />

2008), but the sessi<strong>on</strong> was postp<strong>on</strong>ed due to a visit from the European Commissi<strong>on</strong><br />

and so far was not rescheduled.<br />

A.5 Phyto-Sanitary Units<br />

The project provides support to the Phyto-sanitary Department <strong>in</strong> MAFRD, <strong>in</strong>clud<strong>in</strong>g<br />

the two Nati<strong>on</strong>al Reference Laboratories and the county laboratories, through IT and<br />

laboratory equipment, tra<strong>in</strong><strong>in</strong>g and technical assistance. All the equipments required<br />

153


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

by the Central Laboratory for Pesticides Residues C<strong>on</strong>trol for Plant and Plant<br />

Products and by the Central Laboratory for Phyto-sanitary Quarant<strong>in</strong>e were<br />

purchased and are currently <strong>in</strong> use. The c<strong>on</strong>structi<strong>on</strong> of the water dec<strong>on</strong>tam<strong>in</strong>ati<strong>on</strong><br />

facility at the Central Laboratory for Phyto-sanitary Quarant<strong>in</strong>e is underway and it is<br />

expected to be f<strong>in</strong>alized dur<strong>in</strong>g the first decade of 2009.<br />

A.6 Tra<strong>in</strong><strong>in</strong>g Program<br />

The objective of this subcomp<strong>on</strong>ent is to tra<strong>in</strong> the NSVFSA staff and the phytosanitary<br />

pers<strong>on</strong>nel of MAFRD <strong>in</strong> EU <strong>in</strong>stituti<strong>on</strong>s.<br />

B. Support for Agricultural Research<br />

B.1 Establish<strong>in</strong>g the Nati<strong>on</strong>al Reference Laboratories<br />

‣ Nati<strong>on</strong>al Reference Laboratory for GMO Detecti<strong>on</strong> at INCDBH Ştefăneşti<br />

The aim of this subcomp<strong>on</strong>ent is to provide support for found<strong>in</strong>g a Nati<strong>on</strong>al<br />

Reference Laboratory for GMO detecti<strong>on</strong> at INCDBH Ştefăneşti that is to be<br />

accredited by RENAR.<br />

June 24-27, 2008, three researchers participated to the First Global C<strong>on</strong>ference <strong>on</strong><br />

GMO organized by the Jo<strong>in</strong>t Research Center of the European Commissi<strong>on</strong> at Como,<br />

Italy.<br />

The RENAR audit, <strong>on</strong>e of the compulsory stages of the accreditati<strong>on</strong> process, was<br />

performed <strong>in</strong> November 16-18, 2008. There was analyzed the documentati<strong>on</strong>, the<br />

laboratory records, the procedures for sample analysis and the two trials for which<br />

the accreditati<strong>on</strong> was requested: qualitative and quantitative determ<strong>in</strong>ati<strong>on</strong> for soy<br />

bean and corn samples. Accord<strong>in</strong>g to the audit<strong>in</strong>g <str<strong>on</strong>g>report</str<strong>on</strong>g> several problems were<br />

identified. INCDBH Ştefăneşti elaborated, <strong>in</strong> December 2008, an acti<strong>on</strong> plan to solve<br />

them, to be implemented start<strong>in</strong>g January 2009.<br />

‣ Nati<strong>on</strong>al Reference Laboratory for the Implementati<strong>on</strong> of the EU Nitrates<br />

(91/676/EEC) and Sludge Directives (86/278/EEC) at RISSA<br />

The aim of this subcomp<strong>on</strong>ent is to provide support for found<strong>in</strong>g a Nati<strong>on</strong>al<br />

Reference Laboratory for the implementati<strong>on</strong> of the EU Nitrates and Sludge<br />

Directives at RISSA.<br />

The researchers from RISSA attended several tra<strong>in</strong><strong>in</strong>g programs, study tours and<br />

scientific c<strong>on</strong>ferences, as follows:<br />

‣ 1 st -4 th of July 2008, 3 researchers attended the c<strong>on</strong>ference “Green5,<br />

C<strong>on</strong>ference for a Susta<strong>in</strong>able Development”, Vilnius, Lithuania;<br />

‣ 6 th -10 th of July 2008, 2 researchers participated to a documentati<strong>on</strong> visit at the<br />

Federal M<strong>in</strong>istry of Agriculture, Forestry, Envir<strong>on</strong>ment and Waters, Viena,<br />

Austria;<br />

‣ 16 th -20 th of September 2008, 3 researchers participated to the tra<strong>in</strong><strong>in</strong>g course<br />

“Envir<strong>on</strong>mental Soil and Groundwater Research”, organized by Van Welt Ltd,<br />

UK;<br />

154


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

‣ 20 th -24 th of October 2008, 3 researchers participated to the “Soil and<br />

groundwater c<strong>on</strong>ference” <strong>in</strong> Netherlands;<br />

‣ 26 th October – 1 st November 2008, 2 researchers participated to the tra<strong>in</strong><strong>in</strong>g<br />

course “GIS basics” organized by the Cranfield University, Bedford UK;<br />

‣ 23 rd -27 th of November 2008, 3 researchers participated to the 17 th<br />

Internati<strong>on</strong>al Symposium of CIEC, Egypt.<br />

B.2 Reform program<br />

Five Research Institutes have been identified at time of MAKIS project appraisal, to<br />

be reformed <strong>in</strong> order to have the capacity to address priority research programs:<br />

Agricultural Research and Development Institute, Fundulea ; Potato and Sugar Beet<br />

Research and Design Institute, Braşov; Nati<strong>on</strong>al Research and Development Institute<br />

for Biotechnology <strong>in</strong> Horticulture, Ştefăneşti, Nati<strong>on</strong>al Research and Development<br />

Institute for Soil Science, Agro-chemistry and Envir<strong>on</strong>ment Protecti<strong>on</strong>, Bucharest<br />

and Animal Biology and Nutriti<strong>on</strong> Institute, Baloteşti.<br />

Regard<strong>in</strong>g the rehabilitati<strong>on</strong> works and the implementati<strong>on</strong> stage of the tra<strong>in</strong><strong>in</strong>g plan,<br />

the follow<strong>in</strong>g results were recorded:<br />

‣ IBNA Baloteşti<br />

Rehabilitati<strong>on</strong> works<br />

The land registrati<strong>on</strong> is f<strong>in</strong>alized for the facilities that are to be rehabilitated: the ma<strong>in</strong><br />

build<strong>in</strong>g of the <strong>in</strong>stitute, the nutriti<strong>on</strong> physiology laboratory and the gas <strong>in</strong>frastructure<br />

of the <strong>in</strong>stitute. In December 2008, MAKIS-PMU sent to the World Bank for “no<br />

objecti<strong>on</strong>” the terms of reference for a c<strong>on</strong>sultancy company to elaborate the<br />

technical project and the feasibility study for the rehabilitati<strong>on</strong> of the ma<strong>in</strong> build<strong>in</strong>g of<br />

the <strong>in</strong>stitute and the gas <strong>in</strong>frastructure of the <strong>in</strong>stitute.<br />

Tra<strong>in</strong><strong>in</strong>g<br />

The <strong>in</strong>stitute organized between 25-26 September 2008, with support form MAKIS<br />

project, the “7 th Internati<strong>on</strong>al Symposium of Biology and Animal Nutriti<strong>on</strong>”.<br />

‣ NARDI Fundulea<br />

Rehabilitati<strong>on</strong> works<br />

The <strong>in</strong>stitute obta<strong>in</strong>ed the urbanism certificate for the facilities that are to be<br />

rehabilitated through MAKIS project. C<strong>on</strong>sequently, a c<strong>on</strong>sultant company was<br />

selected to prepare the feasibility study, the technical project and help the <strong>in</strong>stitute<br />

obta<strong>in</strong> the c<strong>on</strong>structi<strong>on</strong> authorizati<strong>on</strong>s. Follow<strong>in</strong>g its negotiati<strong>on</strong>, the c<strong>on</strong>tract was<br />

signed <strong>in</strong> May 2008. The TORs for the build<strong>in</strong>g rehabilitati<strong>on</strong>, prepared based <strong>on</strong> the<br />

technical project and the feasibility study, were transmitted to the World Bank for “no<br />

objecti<strong>on</strong>” <strong>in</strong> December 2008.<br />

155


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

Tra<strong>in</strong><strong>in</strong>g<br />

Between May 26 - June 27, 2008, 5 young researchers were tra<strong>in</strong>ed at CIMMYT<br />

(Internati<strong>on</strong>al Maize and Wheat Improvement Center) from Mexico at the tra<strong>in</strong><strong>in</strong>g<br />

“Basis of the susta<strong>in</strong>able producti<strong>on</strong> systems”.<br />

‣ PSRDI Braşov<br />

Tra<strong>in</strong><strong>in</strong>g<br />

‣ October 15-December 13, 2008, 1 researchers was tra<strong>in</strong>ed at NEIKER,<br />

Instituto Vasco de Investigación y Desarrollo Agrario, Bilbao, Spa<strong>in</strong>;<br />

‣ November 28-December 10, 2008, 2 researchers participated to the Fourth<br />

Lat<strong>in</strong>-American Sem<strong>in</strong>ar <strong>on</strong> Potato Use and Commercializati<strong>on</strong>.<br />

‣ ICPA Bucharest (RISSA)<br />

Rehabilitati<strong>on</strong> works<br />

The reform plan <strong>in</strong>cludes the c<strong>on</strong>structi<strong>on</strong> of a new build<strong>in</strong>g of the <strong>in</strong>stitute which will<br />

host the Nati<strong>on</strong>al Reference Laboratory for the Implementati<strong>on</strong> of the EU Nitrates<br />

(91/676/EEC) and Sludge Directives (86/278/EEC).<br />

The urbanism certificate was obta<strong>in</strong>ed (May 2008). A company was selected to<br />

undertake the feasibility study, design the technical project and to obta<strong>in</strong> the<br />

authorizati<strong>on</strong>s for c<strong>on</strong>structi<strong>on</strong> (July 2008).<br />

B.3 Ma<strong>in</strong>stream<strong>in</strong>g the Competitive Grant Scheme<br />

The subcomp<strong>on</strong>ent’s aim is to ma<strong>in</strong>stream <strong>in</strong>to MAFRD’s regular activity a<br />

Competitive Grant Scheme, follow<strong>in</strong>g the model implemented successfully by the<br />

Agricultural Support Services Project (ASSP).<br />

The Competitive Grant Scheme is managed by the Technical Unit with<strong>in</strong> MAFRD with<br />

support from PMU-MAKIS.<br />

By the end of 2008, there were launched 5 competitive bidd<strong>in</strong>gs (March 2007, August<br />

2007, January 2008, February 2008 and August 2008). The Grant Agreements were<br />

signed for the projects approved <strong>in</strong> the first four bidd<strong>in</strong>gs, and the project proposals<br />

approved <strong>in</strong> the fifth bidd<strong>in</strong>g are <strong>in</strong> the negotiati<strong>on</strong>s phase. The c<strong>on</strong>cept notes and the<br />

project proposals were analyzed by peer reviewers and the <strong>on</strong>es that obta<strong>in</strong>ed the<br />

m<strong>in</strong>imum required score were discussed by the CGS Board and c<strong>on</strong>sequently<br />

approved. On aggregate, there were signed 34 Grant Agreements (1 st bidd<strong>in</strong>g – 10<br />

projects, 2 nd bidd<strong>in</strong>g – 10 projects, 3 rd bidd<strong>in</strong>g 10 projects, 4 th bidd<strong>in</strong>g – 4 projects;<br />

Annex 1 – list of signed grant agreements) and <strong>on</strong>e was later cancelled by the CGS<br />

Board. At the beg<strong>in</strong>n<strong>in</strong>g of 2009 there will be launched the 6 th bidd<strong>in</strong>g to commit the<br />

rema<strong>in</strong><strong>in</strong>g CGS funds.<br />

MAKIS-PMU assisted CGSTU <strong>in</strong> all aspects of CGS implementati<strong>on</strong> and especially<br />

regard<strong>in</strong>g f<strong>in</strong>ancial management, procurement, m<strong>on</strong>itor<strong>in</strong>g and evaluati<strong>on</strong> (<strong>in</strong>clud<strong>in</strong>g<br />

the computerized Management Informati<strong>on</strong> System).<br />

156


Annual Report <strong>on</strong> SAPARD Programme Implementati<strong>on</strong> <strong>in</strong> Romania <strong>in</strong> 2008<br />

C. Support for Advisory and Informati<strong>on</strong> Systems<br />

The objective of this comp<strong>on</strong>ent is to improve the capacity of the agricultural<br />

c<strong>on</strong>sultants, food safety specialists and of the agricultural researchers to better serve<br />

the needs and improve competitiveness of farmers, producers and processors and to<br />

<strong>in</strong>crease access of farmers and processors to knowledge <strong>on</strong> technologies related to<br />

producti<strong>on</strong>, quality c<strong>on</strong>trol, food safety, process<strong>in</strong>g and market<strong>in</strong>g <strong>in</strong> order to meet the<br />

EU requirements.<br />

C.1. Sett<strong>in</strong>g-up the Tra<strong>in</strong><strong>in</strong>g and Informati<strong>on</strong> Center<br />

This comp<strong>on</strong>ent supports the sett<strong>in</strong>g-up of four Tra<strong>in</strong><strong>in</strong>g and Informati<strong>on</strong> Centers<br />

(TICs) for tra<strong>in</strong><strong>in</strong>g agricultural c<strong>on</strong>sultants, food safety <strong>in</strong>spectors and researchers. To<br />

coord<strong>in</strong>ate TICs activities a C<strong>on</strong>sultative Council was founded with representatives<br />

from: MAFRD, MAKIS-PMU, NAAC, AAFS, NSVFSA, agricultural universities (4<br />

seats), Romanian Farmer’s Associati<strong>on</strong>, private sector.<br />

The C<strong>on</strong>tract Amendment with TIC Bucharest was signed (May 16, 2008) for tra<strong>in</strong><strong>in</strong>g<br />

660 agricultural c<strong>on</strong>sultants and 100 food safety <strong>in</strong>spectors. By the end of 2008, there<br />

were tra<strong>in</strong>ed 240 agricultural c<strong>on</strong>sultants and 100 food safety <strong>in</strong>spectors.<br />

By the end of 2008, there were tra<strong>in</strong>ed 40 agricultural c<strong>on</strong>sultants, 40 researchers<br />

and 20 food safety <strong>in</strong>spectors at TIC Cluj, and 20 agricultural c<strong>on</strong>sultants at TIC<br />

Timişoara.<br />

C.2. Improv<strong>in</strong>g Effectiveness of the Advisory Services<br />

C<strong>on</strong>tract Extensi<strong>on</strong> Activities<br />

This subcomp<strong>on</strong>ent provides support for <strong>in</strong>formati<strong>on</strong> campaigns for farmers and agroproducers.<br />

To support the “Farmer” program there were edited and distributed the<br />

brochure “Guidel<strong>in</strong>es for the Farmer Program” 10,000 copies and the leaflet “Farmer<br />

Program for any understand<strong>in</strong>g: 5 important steps to be taken”, 10,000 copies each.<br />

MAFRD requested support from MAKIS project for the implementati<strong>on</strong> of <strong>in</strong>formati<strong>on</strong><br />

campaign regard<strong>in</strong>g CAP’s sec<strong>on</strong>d pillar measures, producer groups and agroenvir<strong>on</strong>mental<br />

schemes, and for PIAA’s <strong>in</strong>formati<strong>on</strong> campaigns <strong>on</strong> S<strong>in</strong>gle Area<br />

Payment Scheme and <strong>on</strong> the Nati<strong>on</strong>al Complementary Direct Payments applicable to<br />

CAP’s first pillar. The <strong>in</strong>formati<strong>on</strong> campaign <strong>on</strong> the CAP’s Sec<strong>on</strong>d Pillar measures<br />

was implemented by flyers dissem<strong>in</strong>ati<strong>on</strong> and by produc<strong>in</strong>g and broadcast<strong>in</strong>g audiovideo<br />

spots. For the PIAA campaign there were pr<strong>in</strong>ted 150,000 <strong>in</strong>formati<strong>on</strong> flyers<br />

regard<strong>in</strong>g the SAPS funds requests and 250,000 copies of the “S<strong>in</strong>gle Area Payment<br />

Scheme – The Farmer’s Guide”.<br />

V. Annexes:<br />

Annex 1 – F<strong>in</strong>ancial tables;<br />

Annex 2 - M<strong>on</strong>itor<strong>in</strong>g tables;<br />

Annex 3 - Approved projects.<br />