Executive Summary - Winrock International India
Executive Summary - Winrock International India
Executive Summary - Winrock International India
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Draft Report on:<br />
IMPROVING RURAL ENERGY SERVICES<br />
THROUGH METHEX BIO ENGINES<br />
SITE SELECTION ASSIGNMENT FOR<br />
RURAL ELECTRIFICATION PILOT IN INDIA Phase I<br />
Prepared by<br />
Somnath Bhattacharjee<br />
Ritu Bharadwaj<br />
Md. Aatish Khan<br />
Sunpreet Kaur
Background<br />
M/s Orenda Aerospace Corporation., (Orenda) based in Canada, have developed the OGT<br />
1200 turbine engine (refurbished helicopter turbine engines) capable of generating 1.2 MW /<br />
2.4 MW power that can run on a variety of feed stocks ranging from bio oils derived from<br />
biomass or non-edible seeds to conventional fossil fuels. It is proposed to offer a complete<br />
power generation package, based on the OGT 1200 starting from fuel<br />
preparation/processing to distribution of the generated power. The plant will not only cater to<br />
the in-house requirement of a private power consumer (an industrial establishment), but also<br />
supply surplus power to nearby rural cluster(s). For the supply of surplus power, emphasis<br />
will be on interventions that stimulate rural economic growth and contribute to a variety of<br />
cross-sectoral development objectives. The program is also intended to create demand<br />
through productive end-uses such as agricultural processing, lighting for business purposes,<br />
communications, irrigation, and income generation activities. In the above context, Orenda<br />
along with its partners CFM, VDMI and EMAI has sought co-operation with M/s Uhde <strong>India</strong><br />
Private Ltd. (UIPL) and M/s <strong>Winrock</strong> <strong>International</strong> <strong>India</strong> to implement this concept, and help<br />
undertake the necessary accompanying measures to create a market for such models. The<br />
Phase of I of the support involves the following:<br />
Develop criteria for site selection;<br />
Provide assistance with the selection of three pilot sites to participate in the Program;<br />
Work plan development for Phase-II<br />
The following chapters of the report detail the approach and activities under each of these<br />
tasks, entailed in Phase-I of the project.