Building CanadaFund - Comnunities Component -<br />

Application Rep<strong>of</strong>i<br />

Page 5 <strong>of</strong> ll<br />

SECTION V,TIMELINES AND RATIONALE<br />

Timelines or nilestones represent key da;ies in the project when progress is achieved (such as fhe<br />

completion <strong>of</strong> a phase er a component <strong>of</strong> the project) and should be provided for proiects whose<br />

construction time is expected to last heyond one year. A descríption <strong>of</strong> each mílestone and its<br />

anticioated completion should be provided.<br />

Pioiect Start Date: 2011-02-'11 lProiect End Date: 2012-03-30<br />

fender Date: 201 1-05-09<br />

Construction Start Date: 2011-0ô-30 lGonstruction End Date: 201 2-03-30<br />

Proiect Rationale<br />

L Whst âre the spêc¡fíc Droblems or obiect¡ves that lhis proiect will address?<br />

This section shoutd províde a synopsis <strong>of</strong> what is happening curently within the municipality or<br />

region and what rhight happen if no action is taken at this time. Make sure that you deline the<br />

öøsrness opp<strong>of</strong>tunityiproblem in clear terms. lf statistical information is available to support thìs<br />

br,rsrness case then state what and where it can he found. lt should describe the history and the<br />

çunent state <strong>of</strong> affairs giving rise to the general bus¡ness problem and thus the need foithe project.<br />

Ihe primary objective <strong>of</strong> the proposed proJect is to provide flood protection in the lower reaches <strong>of</strong><br />

y'emon Crqek drainage basin and limit the impact <strong>of</strong> flooding on land and structures. A secondary<br />

rbjective/benefit <strong>of</strong> the proje.ct will be a higher level <strong>of</strong> treatment <strong>of</strong> water in the basin (metals and<br />

roilutants) and habitat protection and enhancement for blue and red listed species.<br />

Ihe <strong>City</strong> <strong>of</strong> <strong>Vernon</strong> Master Drainage Plan identifies that significant flooding will occur in the area with<br />

:he Water surface <strong>of</strong> flooding for the 10 year storm being 4.08 meters above the normal water level<br />

i4 meters deep) which would result in a breach <strong>of</strong> the creek banks and be 325 meters wide (normal<br />

:¡.eek width is between 5 and 25 meters). This depth and width <strong>of</strong> flooding would impact<br />

approx¡mately 74 Hectares up to a depth <strong>of</strong> 4 meters (approximate maximum depth <strong>of</strong> flooding on<br />

mprovements/ developed property <strong>of</strong> 2 meters). Flooding to this extent damages residential houses,<br />

:ommercial properties, airport industríal lands and buildings and the airport runway thereby<br />

rotentially limiting emergency services access to the airport as it is designated.<br />

l'he proposed project is the fist <strong>of</strong> several phases that will provide the following:<br />

, Flood mitigation and protection for existing lands to the 200 yeâr return period storm event.<br />

'Conveyance <strong>of</strong> 100 year return period storm event.<br />

, Sediment removal<br />

' Metals and pollutant removal where possible.<br />

, Habitat protection for red and blue listed species and enhancement for blue listed species,<br />

' Flood protection <strong>of</strong> existing airport site.<br />

, Flood protection <strong>of</strong> approximately 74 Hectares <strong>of</strong> residential, airport industrial and commercial<br />

ands inoluding lR#6 First Natìons Lands.<br />

l. How would vour proiect address these speciflc probfems or objectlves?<br />

Th¡s section should îndicate how the project would improve orfix the problem stated in the "Proiect<br />

Rationale" sectisn. lt should explain why Federal - Provincial fundlng is required to enable the<br />

projectto proceed, ¡ncrease íús scope (size) or atlow it to proceed earlier than originally planned.<br />

lnctude a brief explanation <strong>of</strong> a) how the project suppotts the local development plan for the<br />

communW and b) how the project wilt affect the socíal, economic and/or natural environmenf <strong>of</strong> the<br />

municina:litv.<br />

The project would address the problem (flooding) through the construction <strong>of</strong> flood ptotectlon<br />

infrastructure to mitigate the impact <strong>of</strong> the 200 year return period storrn event, conveyance <strong>of</strong> the<br />

100 year storm, sediment removal, metals and pollutant removal (secondary benefit) and habitat<br />

protection for red and blue listed species and enhancement for blue listed species (secondary<br />

beneflt).<br />

https:/lbcfcc-fccvc.infrastructure.gc.calReportView/ProgramAppFormHeader.asp?db:O<br />

Il/0ll20ll<br />

254