Committed to Northern Development<br />
Dependable Project Development<br />
Earthworks &<br />
Site Development<br />
Photo: NUNA<br />
NUNA’s in depth knowledge of northern operations and specialized equipment enable us to<br />
mobilize, build and maintain the reliable infrastructure required for continuous and cost-efficient<br />
operations in isolated regions of Northern Canada and the world.
Earthworks & Site Development<br />
Photos: NUNA<br />
Remote Mine Site Development<br />
Proper classification of Canada’s permafrost is essential to mine<br />
planning, development and operation to ensure the location of mine<br />
infrastructure will have the least impact on permafrost. NUNA’s<br />
combined management and site personnel have worked throughout<br />
Canada’s North gaining a high level of experience with varying<br />
permafrost. Additionally, NUNA has the earthmoving fleet capacity to<br />
address the movement and placement of millions of cubic meters of<br />
earth required for mine site development.<br />
Successful Projects by NUNA & Partners<br />
AGNICO-EAGLE MINES LIMITED<br />
Meadowbank Gold, <strong>Nuna</strong>vut, Canada<br />
NUNA’s work primarily comprised the construction of an<br />
108 km all-weather road starting north of the Hamlet of Baker<br />
Lake to the Meadowbank site. <strong>Nuna</strong> planned and mobilized all<br />
equipment and supplies to Baker Lake necessary for year-round<br />
construction activities – with only 6 weeks to source and position<br />
at Churchill, Manitoba for furtherance by barge to Baker Lake. Road<br />
construction required the planning and development of 22 quarry<br />
locations, crusher operation, drill and blast activities, survey control<br />
for layout and as-built preparation as well as installation of 9 bridges<br />
to facilitate the river crossings and 119 culvert installations. NUNA<br />
also carried out the construction and maintenance of all necessary<br />
infrastructure to support the operation.<br />
NEWMONT MINING CORPORATION<br />
(Formerly Miramar Mining Corporation)<br />
Hope Bay Gold Project (Doris North), <strong>Nuna</strong>vut, Canada<br />
Since 1991 <strong>Nuna</strong> has worked closely with Miramar Mining<br />
(former owner) with respect to project planning, design and<br />
costing estimates. <strong>Nuna</strong> continues that process under Hope Bay’s<br />
new owners, Newmont Mining. In 2007, <strong>Nuna</strong> mobilized, via barge,<br />
equipment, supplies and a crew of 37 into site and provided site<br />
services, construction of the Windy Lake 2,800' airstrip, camp pad,<br />
tote road, crushing and construction and maintenance of seasonal<br />
ice access roads (Roberts Bay to the Doris North site). In 2010,<br />
<strong>Nuna</strong> became General Contractor, as well as part of the EPC<br />
Design-Build Team, to optimize design and minimize total installed<br />
costs. <strong>Nuna</strong> provides a full complement of services including safety,<br />
engineering, quality control and procurement and are involved in<br />
all planning, scheduling and execution of site civil infrastructures:<br />
roads, airstrips, jetty landings, quarry development, culvert and<br />
bridge installations, and site services support. <strong>Nuna</strong> provides heavy<br />
equipment, crushers, cranes, shops, concrete batch plants and drill<br />
and blast activities as necessary to support the work.<br />
BAFFINLAND IRON MINES CORPORATION<br />
Mary River Iron Ore Project, <strong>Nuna</strong>vut, Canada<br />
The Mary River project started in 2007 and NUNA became the<br />
General Contractor responsible for the successful delivery of a<br />
120,000 ton bulk sample from Mary River to Milne Inlet. NUNA<br />
carried out the planning and mobilization of all necessary equipment<br />
and supplies for the: construction of a 120 km all-weather road<br />
with 4 major river crossings to the Mary River site; 9 km road up<br />
a mountain to the ore body; drilling, blasting and hauling of ore to<br />
the crusher, crushing of fine and lump product and hauling crushed<br />
product to the coast at Milne Inlet for transfer onto ships. NUNA<br />
also provided services for the construction and maintenance of<br />
all necessary infrastructure to support the operation such as camp<br />
setup and operation, airstrip construction and maintenance, fuel<br />
containment construction and maintenance, shops and<br />
power generation.<br />