Committed to Northern Development<br />

Dependable Project Development<br />

Earthworks &<br />

Site Development<br />

Photo: NUNA<br />

NUNA’s in depth knowledge of northern operations and specialized equipment enable us to<br />

mobilize, build and maintain the reliable infrastructure required for continuous and cost-efficient<br />

operations in isolated regions of Northern Canada and the world.


Earthworks & Site Development<br />

Photos: NUNA<br />

Remote Mine Site Development<br />

Proper classification of Canada’s permafrost is essential to mine<br />

planning, development and operation to ensure the location of mine<br />

infrastructure will have the least impact on permafrost. NUNA’s<br />

combined management and site personnel have worked throughout<br />

Canada’s North gaining a high level of experience with varying<br />

permafrost. Additionally, NUNA has the earthmoving fleet capacity to<br />

address the movement and placement of millions of cubic meters of<br />

earth required for mine site development.<br />

Successful Projects by NUNA & Partners<br />

AGNICO-EAGLE MINES LIMITED<br />

Meadowbank Gold, <strong>Nuna</strong>vut, Canada<br />

NUNA’s work primarily comprised the construction of an<br />

108 km all-weather road starting north of the Hamlet of Baker<br />

Lake to the Meadowbank site. <strong>Nuna</strong> planned and mobilized all<br />

equipment and supplies to Baker Lake necessary for year-round<br />

construction activities – with only 6 weeks to source and position<br />

at Churchill, Manitoba for furtherance by barge to Baker Lake. Road<br />

construction required the planning and development of 22 quarry<br />

locations, crusher operation, drill and blast activities, survey control<br />

for layout and as-built preparation as well as installation of 9 bridges<br />

to facilitate the river crossings and 119 culvert installations. NUNA<br />

also carried out the construction and maintenance of all necessary<br />

infrastructure to support the operation.<br />

NEWMONT MINING CORPORATION<br />

(Formerly Miramar Mining Corporation)<br />

Hope Bay Gold Project (Doris North), <strong>Nuna</strong>vut, Canada<br />

Since 1991 <strong>Nuna</strong> has worked closely with Miramar Mining<br />

(former owner) with respect to project planning, design and<br />

costing estimates. <strong>Nuna</strong> continues that process under Hope Bay’s<br />

new owners, Newmont Mining. In 2007, <strong>Nuna</strong> mobilized, via barge,<br />

equipment, supplies and a crew of 37 into site and provided site<br />

services, construction of the Windy Lake 2,800' airstrip, camp pad,<br />

tote road, crushing and construction and maintenance of seasonal<br />

ice access roads (Roberts Bay to the Doris North site). In 2010,<br />

<strong>Nuna</strong> became General Contractor, as well as part of the EPC<br />

Design-Build Team, to optimize design and minimize total installed<br />

costs. <strong>Nuna</strong> provides a full complement of services including safety,<br />

engineering, quality control and procurement and are involved in<br />

all planning, scheduling and execution of site civil infrastructures:<br />

roads, airstrips, jetty landings, quarry development, culvert and<br />

bridge installations, and site services support. <strong>Nuna</strong> provides heavy<br />

equipment, crushers, cranes, shops, concrete batch plants and drill<br />

and blast activities as necessary to support the work.<br />

BAFFINLAND IRON MINES CORPORATION<br />

Mary River Iron Ore Project, <strong>Nuna</strong>vut, Canada<br />

The Mary River project started in 2007 and NUNA became the<br />

General Contractor responsible for the successful delivery of a<br />

120,000 ton bulk sample from Mary River to Milne Inlet. NUNA<br />

carried out the planning and mobilization of all necessary equipment<br />

and supplies for the: construction of a 120 km all-weather road<br />

with 4 major river crossings to the Mary River site; 9 km road up<br />

a mountain to the ore body; drilling, blasting and hauling of ore to<br />

the crusher, crushing of fine and lump product and hauling crushed<br />

product to the coast at Milne Inlet for transfer onto ships. NUNA<br />

also provided services for the construction and maintenance of<br />

all necessary infrastructure to support the operation such as camp<br />

setup and operation, airstrip construction and maintenance, fuel<br />

containment construction and maintenance, shops and<br />

power generation.<br />

www.nunalogistics.com