01.12.2014 Views

Download

Download

Download

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CONCLUSION<br />

Contd.<br />

Once the GCP Phase-III<br />

Project is completed, denser network of<br />

control will be available.<br />

In future the GCP points are proposed to be equipped with the<br />

facilities to transmit the differential corrections to the user community<br />

in the form of<br />

Reference Station.<br />

Continuous Operating Reference Stations / Virtual

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!