The entire project is divided in two phases: First Phase : To form the main frame of vertical control for the entire nation (~45000 Km in both direction). Second Phase : Based on the main frame of vertical control further densification of the vertical control will be done (~100000 Km in both direction). Phase – I of the Project for Redefinition of Indian Vertical Datum has been completed. Phase-II for the densification of Levelling newtwork will be undertaken on allocation of budget. Precise Vertical control is also very important ingredient for national development, so, like any other developed country, India needs to have this framework at the earliest. Proposal for allocation of Budget to the tune of Rs. 15 crores has been submitted for approval.

Interlinking of Rivers. Flood Control. MAJOR UTILITIES Development of efficient Drainage and sewer line system. Coastal Hazard Line Delineation. High value infrastructural and engineering projects.

The entire project is divided in two phases:<br />

First Phase : To form the main frame of vertical control for the<br />

entire nation (~45000 Km in both direction).<br />

Second Phase : Based on the main frame of vertical control further<br />

densification of the vertical control will be done (~100000 Km in<br />

both direction).<br />

Phase – I of the Project for Redefinition of Indian Vertical Datum<br />

has been completed.<br />

Phase-II for the densification of Levelling newtwork will be<br />

undertaken on allocation of budget.<br />

Precise Vertical control is also very important ingredient for<br />

national development, so, like any other developed country, India<br />

needs to have this framework at the earliest.<br />

Proposal for allocation of Budget to the tune of Rs. 15 crores has<br />

been submitted for approval.