The entire project is divided in two phases: First Phase : To form the main frame of vertical control for the entire nation (~45000 Km in both direction). Second Phase : Based on the main frame of vertical control further densification of the vertical control will be done (~100000 Km in both direction). Phase – I of the Project for Redefinition of Indian Vertical Datum has been completed. Phase-II for the densification of Levelling newtwork will be undertaken on allocation of budget. Precise Vertical control is also very important ingredient for national development, so, like any other developed country, India needs to have this framework at the earliest. Proposal for allocation of Budget to the tune of Rs. 15 crores has been submitted for approval.
Interlinking of Rivers. Flood Control. MAJOR UTILITIES Development of efficient Drainage and sewer line system. Coastal Hazard Line Delineation. High value infrastructural and engineering projects.
- Page 1 and 2: REDEFINING THE HORIZONTAL & VERTICA
- Page 3 and 4: Activities of Geodetic & Research B
- Page 5 and 6: What is Datum? A datum (plural datu
- Page 7 and 8: Geoid Figure of Earth Geoid (Close
- Page 9 and 10: The Ellipsoid The Geoid is a compli
- Page 11 and 12: Horizontal Datum: An Ellipsoid is U
- Page 13 and 14: 2/15/2012 13
- Page 15 and 16: Bureau International de l’Heure (
- Page 17 and 18: International Terrestrial Reference
- Page 19 and 20: IGS Stations 2/15/2012 19
- Page 21 and 22: Status of Horizontal Control in Ind
- Page 23 and 24: Status of Horizontal Control in Ind
- Page 25 and 26: GCP Library Phase-I: Distribution i
- Page 27 and 28: Subsequent Phases Of GCP Library Ph
- Page 29 and 30: Achievements: GCP Phase-II Phase-II
- Page 31 and 32: Network Adjustment Strategy Coordin
- Page 33 and 34: GCP Phase-I Network: Adjusted with
- Page 35 and 36: Accuracy Expected Positional accura
- Page 37 and 38: National GPS Data Centre National G
- Page 39 and 40: REAL TIME GPS DATA Under the modern
- Page 41: In past, the requirement of contour
- Page 45 and 46: CONCLUSION Provision of dense contr
The entire project is divided in two phases:<br />
First Phase : To form the main frame of vertical control for the<br />
entire nation (~45000 Km in both direction).<br />
Second Phase : Based on the main frame of vertical control further<br />
densification of the vertical control will be done (~100000 Km in<br />
both direction).<br />
Phase – I of the Project for Redefinition of Indian Vertical Datum<br />
has been completed.<br />
Phase-II for the densification of Levelling newtwork will be<br />
undertaken on allocation of budget.<br />
Precise Vertical control is also very important ingredient for<br />
national development, so, like any other developed country, India<br />
needs to have this framework at the earliest.<br />
Proposal for allocation of Budget to the tune of Rs. 15 crores has<br />
been submitted for approval.