USER MANUAL FOR F.I.O. INSTALLATION - Pietro Fiorentini
USER MANUAL FOR F.I.O. INSTALLATION - Pietro Fiorentini
USER MANUAL FOR F.I.O. INSTALLATION - Pietro Fiorentini
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
F.I.O.<br />
User’s Manual<br />
2.2.2 Installation on the pipeline or vertical circular support:<br />
If there is no Q-kit because the indirect measurement of the flow rate is not requested,<br />
is necessary to fix the ECU in another position. The position of the ECU can be<br />
selected according to the distance from the solenoid valves and the flow rate meter.<br />
Pict 1- Fix the two brackets with the nuts<br />
Pict 2- Cut a piece of stainless steel band. The length has to be measured as the<br />
circumference of the pipeline + 150 mm (6 inch)<br />
Pict 3- Pass one side of the stainless steel band in the endless-head as shown in pict<br />
3<br />
Pict 4- Pass the opposite side of the band on the slits of the bracket as shown in<br />
picture 4.<br />
Pict 5- Pass the band around the pipe and then insert it inside the endless-head,<br />
screwing the endless screw<br />
Pict 6- Adjust the bracket in the proper position and then fix it definitively<br />
Pict 7- Prepare the screws with the nut on the bracket.<br />
Pict 8- Install the ECU and fix the screws<br />
1<br />
4<br />
7<br />
ENGLISH<br />
F.I.O. User Manual – Ed.2. Rev.5 Page 8/ 53<br />
The information contained in this document is confidential and the property of <strong>Pietro</strong> <strong>Fiorentini</strong> S.p.A.<br />
Technical data may undergo changes without notice<br />
2 3<br />
5 6<br />
8