<strong>Direct</strong> <strong>Material</strong> <strong>Supplies</strong> <strong>Quality</strong> <strong>Agreement</strong><br />

Records relating to the implementation of control plans shall be maintained. Control plans shall be<br />

revised in line with information, i.e. Arçelik feedback, process controls, etc.<br />

3.4. Product identification and traceability<br />

The Supplier shall identify the material by proper means at the product realization stage. The<br />

Supplier shall identify material status according to monitoring and measurement specifications. In<br />

manifest situations, product location identification will be adequate in the automated production<br />

transfer process. Changes in material and production specifications shall be recorded.<br />

3.5. Arçelik property<br />

The Supplier shall pay due care to Arçelik property as long as such property is under the control of,<br />

or used by the Supplier. The Supplier shall identify, verify, protect and secure the safety of<br />

customer property provided for use, or for incorporation in the manufacture of a product. Unless<br />

otherwise approved in writing by Arçelik, all dies, benches, raw materials, substances, products,<br />

semi-finished products, etc. which are the property of Arçelik may only be used for the production<br />

of products or services for Arçelik. Arçelik shall be notified of any Arçelik property lost, damaged or<br />

found in unusable condition; and records thereof shall be maintained.<br />

Unless otherwise notified in writing by Arçelik, insurance policies for the materials and equipment<br />

which are the property of Arçelik and kept at the Supplier’s premises shall be taken out by Arçelik.<br />

Returnable packages which are the property of Arçelik are subject to this article.<br />

3.6. Procurement process<br />

The Supplier shall ensure that the product purchased by the Supplier complies with the identified<br />

purchasing specifications. Type and content of the control applicable to the Supplier and the<br />

purchased product shall depend on the impact of the purchased product on the subsequent<br />

product realization, or on the end product.<br />

Employment of the sources identified by Arçelik shall not release the Supplier from its responsibility<br />

to ensure the quality of purchased products.<br />

3.7. Change control<br />

The Supplier shall notify Arçelik of all product realization changes with an impact on Arçelik<br />

specifications and obtain Arçelik’s approval.<br />

The following changes shall be verified for validity before implementation:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Production method and parameter change (production and control cycle change),<br />

Design change,<br />

<strong>Material</strong> change,<br />

Supplier change,<br />

Change in test equipment and methods,<br />

Change in the location of production equipment at the same premise,<br />

Re-commissioning of equipment and line which have not been operational for more than<br />

one year,<br />

Technical specification change.<br />