Sustainable Water Management Plan - Nillumbik Shire Council

Sustainable Water Management Plan - Nillumbik Shire Council Sustainable Water Management Plan - Nillumbik Shire Council

nillumbik.vic.gov.au
from nillumbik.vic.gov.au More from this publisher
28.11.2014 Views

3. Strategic objective: Incorporate Water Sensitive Urban Design principles and water treatment options in all upgrades and developments in the Shire. Sediment and Erosion Control A* * Action identified in another plan Council action Priority Responsibility Partners 3.1 Incorporate the implementation of Water Sensitive 2008 ID Urban Design principles as a desired level of service in Asset Management Plans for all Council buildings and developments – e.g. permeable paving, bioretention bays, swales and street tree pits. 3.2 Investigate, and implement where possible, the 2007 ID harvesting of rainwater from Council buildings for reuse. 3.3 SMP Investigate undertaking a trial of a number of different 2010 ID unmade road alternatives (in conjunction with Interface Councils) using a range of materials and drainage layouts to determine which surface is most effective. Nutrient management A* * Action identified in another plan Council action Priority Responsibility Partners 3.4 Investigate options to collect and/or treat stormwater 2009 ID and EW from urban developments where high levels of pollutants may impact on water quality. 3.5 Develop a program or strategy to reduce the high 2007 PH and ID levels of nutrients in stormwater entering Yarrambat Lake. Wastewater management A* * Action identified in another plan Council-led community action Priority Responsibility Partners A* * Action identified in another plan Council-led community action Priority Responsibility Partners 3a ES Improve planning permit conditions which would 2008 SP, EP and ID MW require the collection and/or treatment of stormwater run-off in all new subdivisions and developments. 3b Develop or source and distribute educational material 2008 EP, ID and PB which promotes the principles of Water Sensitive Urban Design for residential and commercial developments. 3c Facilitate Council officers receiving appropriate ongoing EP, ID and SP training in WSUD modelling, for assessment of planning applications. 3e Develop an appropriate maintenance regime 2008 ID associated with WSUD treatments. 3f Ensure Council staff are trained in the maintenance ongoing ID of the WSUD features after handover from the developer. 3.6 Investigate options for reusing greywater or Ongoing EP and IM wastewater in Council operations as opportunities arise. 3.7 SMP Install line triple separators and oil and grit separators 2008 ID MW and to treat stormwater from the Susan Street, Peel Street EPA and Bridge Street industrial areas in Eltham. A* * Action identified in another plan Council-led community action Priority Responsibility Partners 3g SMP Continue to liaise with Yarra Valley Water regarding ongoing PH YVW DWMP installation of sewer or centralised treatment systems in areas identified in the DWMP as being high risk for wastewater contamination. 3h DWMP Advocate to the Victorian government to accelerate ongoing PH YVW funding to clear the sewerage backlog program 44 Sustainable Water Management Plan Sustainable Water Management Plan

3. Strategic objective: Incorporate <strong>Water</strong> Sensitive Urban Design principles and<br />

water treatment options in all upgrades and developments in the <strong>Shire</strong>.<br />

Sediment and Erosion Control<br />

A* * Action identified in another plan<br />

<strong>Council</strong> action Priority Responsibility Partners<br />

3.1 Incorporate the implementation of <strong>Water</strong> Sensitive 2008 ID<br />

Urban Design principles as a desired level of service<br />

in Asset <strong>Management</strong> <strong>Plan</strong>s for all <strong>Council</strong> buildings<br />

and developments – e.g. permeable paving,<br />

bioretention bays, swales and street tree pits.<br />

3.2 Investigate, and implement where possible, the 2007 ID<br />

harvesting of rainwater from <strong>Council</strong> buildings<br />

for reuse.<br />

3.3 SMP Investigate undertaking a trial of a number of different 2010 ID<br />

unmade road alternatives (in conjunction with Interface<br />

<strong>Council</strong>s) using a range of materials and drainage<br />

layouts to determine which surface is most effective.<br />

Nutrient management<br />

A* * Action identified in another plan<br />

<strong>Council</strong> action Priority Responsibility Partners<br />

3.4 Investigate options to collect and/or treat stormwater 2009 ID and EW<br />

from urban developments where high levels of<br />

pollutants may impact on water quality.<br />

3.5 Develop a program or strategy to reduce the high 2007 PH and ID<br />

levels of nutrients in stormwater entering<br />

Yarrambat Lake.<br />

Wastewater management<br />

A* * Action identified in another plan<br />

<strong>Council</strong>-led community action Priority Responsibility Partners<br />

A* * Action identified in another plan<br />

<strong>Council</strong>-led community action Priority Responsibility Partners<br />

3a ES Improve planning permit conditions which would 2008 SP, EP and ID MW<br />

require the collection and/or treatment of stormwater<br />

run-off in all new subdivisions and developments.<br />

3b Develop or source and distribute educational material 2008 EP, ID and PB<br />

which promotes the principles of <strong>Water</strong> Sensitive<br />

Urban Design for residential and commercial<br />

developments.<br />

3c Facilitate <strong>Council</strong> officers receiving appropriate ongoing EP, ID and SP<br />

training in WSUD modelling, for assessment of<br />

planning applications.<br />

3e Develop an appropriate maintenance regime 2008 ID<br />

associated with WSUD treatments.<br />

3f Ensure <strong>Council</strong> staff are trained in the maintenance ongoing ID<br />

of the WSUD features after handover from the<br />

developer.<br />

3.6 Investigate options for reusing greywater or Ongoing EP and IM<br />

wastewater in <strong>Council</strong> operations as opportunities<br />

arise.<br />

3.7 SMP Install line triple separators and oil and grit separators 2008 ID MW and<br />

to treat stormwater from the Susan Street, Peel Street<br />

EPA<br />

and Bridge Street industrial areas in Eltham.<br />

A* * Action identified in another plan<br />

<strong>Council</strong>-led community action Priority Responsibility Partners<br />

3g SMP Continue to liaise with Yarra Valley <strong>Water</strong> regarding ongoing PH YVW<br />

DWMP installation of sewer or centralised treatment systems<br />

in areas identified in the DWMP as being high risk for<br />

wastewater contamination.<br />

3h DWMP Advocate to the Victorian government to accelerate ongoing PH YVW<br />

funding to clear the sewerage backlog program<br />

44 <strong>Sustainable</strong> <strong>Water</strong> <strong>Management</strong> <strong>Plan</strong> <strong>Sustainable</strong> <strong>Water</strong> <strong>Management</strong> <strong>Plan</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!